供应商年度审核计划表
- 格式:xlsx
- 大小:17.94 KB
- 文档页数:1
节拍生产标准1960-B 节拍生产标准1927-16供应商质量过程控制计划审核汇总表Date:Supplier Name:供应商名称Mfg.DUNS:Plant Location &Country:公司地址/国家Auditor:(SQE,SQI)Auditor Phone:评审员评审员电话Auditor:E-Mail:评审员邮箱通用分部Part Number (s):Part Name:零件编号Drawing Date:图面日期设计变更单号PPAP/In terim/Be nestare Status:Progra m 生产件批准车型年份项目Creativit y Team:开发项目,样商品Reason For 评审依据保安件Type of Audit:WWP Supplier QualityGM 1960-B Process Control Plan Audit Summary SheetGM 1927-16Supplier Phone:供应商电话GM Division:EWO #: / ODM #Eng. Change Level:Model Year:Commodity:Safety Related Part ?Product Validation/Qualification Complete:FutureLaunchCurrentPartialOtherInitial Follow Up Run at Rate (GP9 Attachement B)Yes NoYes No N/AN/A评审类型产品有效期质量完成情况Driver of Audit:评审范围Focus of Audit:评审要点Approve d 批准批准,同时需要文档没批准复评日期YesNoN/A1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.Approved, but need Documentation Not Approved Follow-Up Audit Date:TECHNICAL INFORMATION AVAILABILITYCommentsAre actual drawings availabe at production facility with the latest最后一次设变的生产设备的实际图纸是否为有效版本?Does the supplier have the final customer approved drawing?供应商是否有最终顾客批准的图纸?Is the print complete (Tolerances, GD&T, Correct Datums, KPCs,图纸内容是否完整?Are all technical regulations/CTS/SSTS available?所有的技术标准是否有效?If supplier is design responsible, has DFMEA been used todevelop the PFMEA?如果供方有设计责任,是否参照DFMEA作PFMEA?QUALITY SYSTEM DOCUMENTATION Is a Process Flow Diagram available?过程流程图是否有效?Does the Process Flow Diagram include receiving?过程流程是否包括让步接收?Does the Process Flow Diagram include rework?过程流程是否包括返工返修?Does the Process Flow Diagram include scrap?过程流程是否包括报废?Does the Process Flow Diagram include gauging/inspection?过程流程是否包括计量器具?Does the Process Flow Diagram include shipping?过程流程是否包括交付?Does the Process Flow Diagram include labeling and Part ID atreceiving, WHIP, finished good and shipping areas?过程流程是否包括产品标识和接受零件代码,whip,成品,发货区域?Is there a PFMEA available?是否有有效的PFMEA?Is the PFMEA acceptable (RPNs, numbers match Process flowand include KPCs/PQCs/KCCs)?PFMEA 是否可接收?Is there any evidence that it is kept up to date?是否有改进的证据?APQP Confirmation Mgmt. Request Plant Request Run @ RateTop FocusCSL-1CSL-2Major Disruption DD&WComponent Check Plan Critical Fastner (D02)D/PFMEAShutdown/Start Up Audit CPIP/WarrantyOtherPart / Assembly Line /Cell Operation / MachineComplete Mfg. SystemQuality System -Ongoing Documentation16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.34.35.36.Is there a Process Control Plan (PCP) available?是否有有效的过程控制计划?Is the Process Control Plan (PCP) acceptable (numbers match PFMEA and Process Flow, including KPCs/PQCs/KCCs, GP-12 if applicable and latest EWO/ODM included)?过程控制计划是否可接收(与PFMEA匹配的参数和流程,包括过程特性/产品特性,如早期生产限制合适,是否包括最新的EWO/ODM)?Are all "Current Controls" listed on the PFMEA detailed on the所有PFMEA 中标注的当前的控制方法是否具体体现在控Are process controls in place in the PCP to address the high PFMEA Risk Priority Numbers?PFMEA中涉及的高风险控制要求是否体现在控制计划中?Is there a procedure/process for Continuous Improvement for是否建立了优先减少风险的持续改进过程?Are KPCs/PQCs/KCCs called out on the PCP?在控制计划中是否标注了关键控制特性和关键产品特Are sample sizes and check frequency for each operation是否合理的规定了每个过程的样品尺寸和检验频次?Do your supplier's provide evidance of approved material for all components needed for the assembled part?供应商是否获得协力厂商提供的零组件材质证明和试验报告等证据?Are controls in place to ensure only approved incoming material released for production?是否依据协力厂商提供的检验证明实施进料检验?When parts require traceability, do controls link component traceability to the final part?当零部件有可追溯性要求时,是否作了标识并能追溯到产品形成的过程?Is the workplace properly configured and matches Process Flow 是否配置了合理的工作场所并与过程流程图相符合?Are all tools and gauges properly identified?所有配置的工具和量检具其准确度和精度是否满足要Are all gauges calibrated?所有量检具是否定期校验?Are all tools and gauges certified?所有配置的工具和量检具能否提供表明校验状态的合格证明?Is gauge Repeatability and Reproducabilty less than 10%?所有量检具的重复性和再现性是否小于10%?Do all gauges have proper operator instructions?所有量检具是否有合适的操作规程或作业指导书?Are proper operator instructions available for each operation?操作规程或作业指导书是否对每个操作过程都有效?Are Standardized Work instructions detailed to run the job properly, including handling of non-conforming parts?作业指导书是否详细标注了正常操作所需的内容(包括手工制品)Is there Standardized Work?是否将作业指导书配挂在现场?Is the Standradized Work being followed?是否按作业指导书操作?Do the operators understand the instructions?37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.54.55.56.57.58.59.60.61.操作员是否了解作业指导书内容?Have operators been properly trained?操作者是否经过适当的培训Are boundary samples (BS) available to operators?操作者是否有合适的限度样件?Are boundary samples (BS) in use?限度样件是否在现场使用?Are Master Parts or samples available to confirm inspection?是否依据标准样件进行确认检验?Are Master Parts available for error proofing devices?标准样件对防呆装置是否有效?Is there a Preventive Maintenance (PM) plan on tools and is it是否建立了工具的预防性维护计划并付诸实施?Is there a Preventive Maintenance (PM) plan on equipment and 是否建立了设备的预防性维护计划并付诸实施?Are listed tests and inspections per control plan, actually每个控制计划是否规定了检验和实验项目并按规定执行?Where the Process Control Plan calls for SPC are the data控制计划规定的SPC能否提供合适数据记录?Are the Upper Control Limits (ULC) current?控制图的上控制限是否为现行的?Are the Lower Control Limits (LCL) current?控制图的下控制限是否为现行的?Does the data make sense and are reasonable control limits数据是否合理,数据限(线)是否依据数据计算?Are out of control points noted with the corrective action taken?对超出控制限的点是否采取适当的对策?Are product audits showing acceptable results for Final Product?产品最终审核的结果是否满足接受准则?Does the manufacturing process demonstrate the required capability or performance?制造过程是否显示了所要求的能力和性能?Does packaging and material handling protect parts from包装和包装材料是否起到有效的防护作用?Are instructions for handling Work In Process (WIP) and final product followed throughout the process to shipping area; including repair/rework areas?在制品和最终产品是否按规定存放在指定的区域,包括返工返修Are all parts and components labeled properly?所有零部件是否正确标识?QUALITY SYSTEM IMPLEMENTATION BY MANAGEMENT Is there a process for documenting and tracking Downtime?是否建立了偶发事故应急处理过程文件(计划和记Is there a process for documenting and tracking Scrap?是否建立了废品控制过程的文件?Is there a process for documenting and tracking Premium是否建立了超额费用的文件?Is there a process for documenting and tracking Plant Problem 是否建立了设备停机故障的文件?Does leadership ensure that Out of Control Conditions are领导层能否确保超出控制范围的项目得到管理?Are Action Plans (AP) followed?是否实施了反应计划?Is responsibility for implementation assigned and do peopleunderstand their responsibility?是否明确了所有人员的职责权限,他们是否理解?62.63.64.65.66.67.Auditors Comme nts:Supplier Represe ntative Signatur e GMReprese ntative Signatur eAre problems quickly communicated to people who can help?是否建立了有效的内部沟通系统?Does the support system respond to the operator?操作者是否熟悉操作系统?If more than one shift, does information part passes across是否所有的结果都有记录?Are suitable actions taken in case of deviations?当结果偏离基准或规定时,是否采取合适的措当多班轮换时,能否将当班的产品信息传递给Are all checks to be done under the PCP requirements所有在 PCP要求下的检查记录是否得到执行?Are results properly documented?。
过程No.项目文件发现问题点改善措施责任人完成日期备注
组则1质量部门是否被授予一定的权限去开展他们的工作?
2质量部门如果发现质量问题,是否有权停止生产或者停止发货?
质量程序1质量政策, 目标与承诺是否被定义与文件化?
2操作手册或其他文件是否包含有质量管理程序?
3是否有计划并在计划内实施检讨质量管理系统连贯性, 适宜性和有效性的管理审查会议?
4是否有一个有计划和文件化的全面内部质量稽核系统, 以确认质量管理系统是有效的依照预定计划执行?
各单位负责人是否针对在稽核中发现的缺点进行适时的改善措施?
5质量管理程序是否包含统计过程管理?
教育训练1管理系统是否定义了会影响到产品质量的执行人员所必要完成的训练项目及考核指标?
2训练是否足够,以保证岗位职能需
求?
供应商审核计划表
Supplier Quality Audit Plan
维蒙特工业(中国)有限公司。
供应商二方审核评定表
2018年度供应商二方审核计划
文件编号:YL-GC-15-2 版本/修改:B/0 审核目的:审核供应商的质量管理体系的符合性、有效性,并持续改进。
审核范围:质量体系涉及的各部门、人员及过程。
审核方式: A 集中式 B分散式
审核的依据:供应商的体系文件、体系标准、产品标准、顾客要求、法律法规
审核员:石佳、杨明龙
审核对象、频次、日期
二方审核供应商名录供应商类型供应材料审核频次计划审核日期
杭州电化集团有限公司
主要原材
料供应商树脂1年1次每年9月
杭州华通化工有限公司树脂1年1次每年9月安徽华阳非金属材料有限公司碳酸钙1年1次每年10月爱敬(宁波)化工有限公司二辛酯1年1次每年11月浙江硕亚油脂化工有限公司大豆油1年1次每年11月
临安华立塑胶有限公司关键原材
料供应商
稳定剂1年1次每年6月
东莞市从墨塑胶材料有限公司其他原材
料供应商
黑浆2年1次隔年7月。
供应商审核计划编制:
审核:
批准:
年月
供应商审核计划
1、通过此次审核,证实供应商在质量管理体系的运行是否符合我公司的要求;
2、针对此次审核中暴露出来的供应商在体系、过程和产品存在的缺陷和问题,要求其制定有效的纠正预防措施并予以执行,提高供应商的质量管理体系运行有效性和效率,为产品质量的稳定和提升提供有力的质量管理体系保证。
江苏双菊汽车配件有限公司供方现场审核标准及其评分法则。
(见附件1)
审核组长:
审核组成员:
审核时间: 年月日
首次会议,审核开始
末次会议,审核结束
六、审核记录和报告
审核组成员在审核过程中应做好记录,审核完毕作出审核结论并形成报告.
七、附加说明
1,本计划由江苏双菊汽车配件有限公司质量部负责编制.
2,本计划如有变动,将通过适当方式通知受审核方和审核组成员.
附件1,
供应商现场审核评价评分表
评审人员签字:
签名:。
供应商质量控制计划审核表供应商质量控制计划审核表1供应商质量控制计划审核表1. 供⽅处是否为最新更改⽔平的图纸?2. 供⽅处图纸是否经最终⽤户正式批准?3. 供⽅处图纸是否完整(耐久性、⼏何尺⼨、外观、测量数据记录、产品关键特性,正确的定位基准等)4. 所有相关技术⽂件、资料、标准及政府法规是否齐全?是否应⽤了所有技术标准/零件技术标准/下级零件技术标准5. 如果由供应商负责设计, 使⽤设计故障模式和后果分析来产⽣⽣产流程故障模式和后果分析么? ( 解释: 该项⽬是要求项⽬, 如果是供⽅负责设计, 要求供⽅做DFMEA)质量体系⽂件6. 过程流程图是否能够接受(包括接收, 返⼯, 返修, 贴标签, 废品区,检验/检测/测量和运输)?27. PFMEA是否能够接受(风险顺序数值, 编号与流程图⼀致, 包括关键产品特性KPC) 、和参数( 关键过程参数KCC) , 产品质量特性( PQC) , 过程监控点( PMP) 等);是否有证据有表明此⽂件动态更新?是否有FMEA,令⼈满意么? ( 从潜在风险系数、与⽣产流程相符的数量, 及是否包括⽣产和程序要求的规定等⽅⾯考虑) 有证据表明这⼀⽂件正在使⽤么? 是否有证据表明该⽂件是⼀个变动的⽂件? ( FMEA, ⽆论DFMEA还是PFMEA,都应该仔细的进⾏分析, 查看每⼀个步骤, 看是否合理, 包括潜在失效模式、失效的起因机理、现⾏控制⽅法、严重度等。
其中失效机理以及现⾏控制⽅法是关键, 直接能够让⼈了解是否能够真正的解决出现的问题。
FMEA是⼀个变动的⽂件,当接到顾客的抱怨或⾃⼰发现问题之后,应该进⾏分析原因,同时更新PFMEA,调整控制计划。
)8. 有⽆过程控制计划 (PCP),3是否合格并及时更新(编号与PFMEA和流程图⼀致, 包括KPC/PQC/KCC, GP-12 -适⽤时,最新的ODM)? 现⾏版本如涉及⼯艺、过程、材料等的更改, 是否经富佳的书⾯确认?过程控制计划是否有效并能够接受么? ( 数值与PFMEA和⼯艺流程相匹配、包括产品关键特性KPC/PQC/KCC、如果适⽤的话, 以及是否包括最新的⼯程修改单等⽅⾯的考虑。