综合教程V期末考试试卷B

  • 格式:doc
  • 大小:63.78 KB
  • 文档页数:3

下载文档原格式

  / 3
  1. 1、下载文档前请自行甄别文档内容的完整性,平台不提供额外的编辑、内容补充、找答案等附加服务。
  2. 2、"仅部分预览"的文档,不可在线预览部分如存在完整性等问题,可反馈申请退款(可完整预览的文档不适用该条件!)。
  3. 3、如文档侵犯您的权益,请联系客服反馈,我们会尽快为您处理(人工客服工作时间:9:00-18:30)。

B 卷《商务英语综合教程V 》第 1 页,共 6 页

B 卷《商务英语综合教程V 》第 2 页,共 6 页

XXX 学院期末考试试卷

2009-2010第 一学期 07 级 高 职 商务英语 专业 《 商务英语综合教程V 》课程(B )卷 闭卷 考试

I choose the best (20’)

1. Which one of the following is NOT the means of remittance? __________. a. L/G b. M/T c. T/T d. D/D

2. T/T means __________.

a. mail transfer

b. telegraphic transfer

c. demand draft

d. letter of credit

3. Which means of international payment is a kind of bank credit? __________. a. Remittance b. Collection c. L/C d. D/D

4. Which L/C means double guarantee for the beneficiary ﹖ __________. a. Revocable L/C b. Documentary L/C c. Confirmed L/C d. Transferable L/C

5. As to confirmed L/C, the payment responsibility of confirming bank is _______. a. primary b. secondary c. third d. fourth

6. There is a draft whose drawer and drawee are both bankers. Which one is it in the followings? __________. a. Commercial Draft b. Banker’s Draft c. Clean Draft d. Documentary Draft

7. A Check is a kind of __________ drawn on a banker.

a. sight draft

b. time draft

c. sight promissory note

d. time promissory note 8. D/P at sight means __________.

a. document against payment after sight

b. document against payment at sight

c. documentary collection

d. document against acceptance 9. As to the seller, the risk of D/P, D/A and L/C can be arranged (from great to small) as followings __________.

a. D/A D/P and L/C

b. L/C D/P and D/A

c. D/P D/A and L/C

d. D/A L/C and D/P 10. In the following terms of settlement, which is the most risky one for the seller? __________.

a. T/T in advance

b. D/A

c. D/P at sight

d. D/P after sight

11. “Shipping Weight and Landed Quality ” means __________. a. to make inspection at the port/place of destination b. to make inspection at the port/place of destination

c. to make inspection in the exporting country and make reinspection in the importing country

d. to make inspection at the port/place of shipment to take shipped weight as final and make reinspection at the port/place of destination to take landed quality as final 12. Among those inspection methods, the most commonly used one is ________. a. to make inspection at the port of shipment b. to make inspection at the port of destination

c. to make inspection in the exporting country and make reinspection in the importing country

d. to make inspection at the port of shipment to take shipped weight as final and make reinspection at the port of destination to make take landed quality as final 13. An exporter delivered the goods according to the stipulation of contract, and submitted clean B/L to the importer. After receiving the goods, the importer found that the goods are damaged because of the damage to the outside packing. There is also a sea protest showing that the damage is due to heavy weather. Whom should the importer claim to? __________. a. Shipping company b . Insurance company c. Seller d. Buyer

14. When __________ happens the party that fails to perform the contract is allowed to relieve liabilities of the non-performance. a. war b. world market price goes up c. manufacture fault d. currency devaluation

15. In international commodity sales, the commonly used way to stipulate force majeure clause is __________. a. in a general way b. without stipulation c. in a way to list the scope d. in a comprehensive way

16. The necessary condition of settling disputes through arbitration is that ______. a. the seller and buyer have an arbitration agreement or an arbitration clause in the contract

b. the seller and buyer have contract

c. the case can ’t be settled through conciliation

d. one party comes to nothing through litigation

17. Which description of arbitration award is not correct? __________. a. The award is usually final

b. The seller or buyer can sue in a law court about the award

c. If the award is not executed by one party, the other may ask the competent court to enforce it

d. The award is binding upon both parties