FMEA标准模板

  • 格式:xls
  • 大小:99.00 KB
  • 文档页数:4

FMEA编号(FMEA No.):FMEA-001

项目名称

Item Name:过程责任部门

Responsible

Department:Pro

duct

ion,

QA

产品型号

Product Type:关键日期

Key date:

核心小组

Core Team:

采取的措施

Actions Taken严

度S频

度O探

度DR

O

N

Influence optical

function/影响光学

功能8ΔShipment wrong/装货

出错1Material

ICY/原料运

输Check

labeling/确认

标签216ICY instruction/运输指

导书81216

Influence optical

function/影响光学

功7ΔMaterial quality not

good/原材料品质不好1Material

ICY/原料运

输Check COCA214ICY instruction/运输指

导书71214

Influence optical

function/影响光学

功4ΔPackage damaged

during shipment/装货

时包装损坏1Material

ICY/原料运

输Check

packing/确认

包装28ICY instruction/运输指

导书4128

Packing tray: not

END material/包

装不是最终包装Contaminate the

products/产品脏污3oStore for long time, or

made of wrong

material/入库时间太

久,用错物料3Material

ICY/原料运

输Check

surface

resistance/确

认表面的抵抗

力218ICY instruction/运输指

导书33218

2. Store/仓库Raw material

handling not

properly/原料仓库

管理不当Influence optical

function/影响光学

功5ΔMaterial mixed/混料3Material

labeling/原

料标签Check

labeling/确认

标签230Review

personnel

instructions/人员

回顾作业指导Production

supervisor,

WW26/生产主

管Review personnel

instructions/人员回顾作

业指导53230

3.1 PerryNot dry enough/湿

度控制不够Bubble inside,

Yellow product,/产

生气泡,产品变色6oTime or temp not right

/时间和温度不对4time/temp

control/时间

稳定控制supervisor

double check

+ QC audit/主

管确认+品质

稽核496Review

personnel

instructions/人员

回顾作业指导Production

supervisor,

WW26/生产主

管Review Personnel

instructions/人员回顾作

业指导63472责任和目标完

成日期Responsibility

& Target Date

Amelia Lu,

WW26R

O

N建议措施Recommended

Actions

Review and

confirm ICY

instruction/回顾

并确认作业指导现行探测过程

控制探

度D频

度O现行预防过

程控制严

度S级别Class潜在失效模式Potential Failure

Modes

Raw plastic

material incorrect/

塑胶原料错误潜在失效后果Potential Effect of

Failure

1. ICY/交通运输工程编制者/日期

Preparation/Date

确认者/日期

Approved/Date

措施执行结果

Executive Results of Actions

潜在失效起因/机理

Origin/Mechanism of

Potential FailureXXX High Tech Plastic (Suzhou) Co.,Ltd

XXX注塑(苏州)有限公司

潜在过程失效模式及后果分析(过程FMEA)

Potential Process Failure Modes and Effects Analysis (PFMEA)

页码

Page:Page 1 of 3 Pages

过程功能

Process function

要求

Requirements

3.2 Molding/成型Imaging lens Dia.,

Dim 1: 5.78± 0.03

out of spec./镜头

直径尺寸超规Influence

assembly/影响装配3oWrong insert/嵌入错误1Order start

release

plan/订单开

始出计划Dim check/尺

寸确认26PM mould /点检

磨具Production

supervisor,

WW26/生产主

管Review PM mould

personnel instruction,

incoming inspection

optical inserts/人员回顾

作业指导,来料检验光学

尺寸3126

采取的措施

Actions Taken严

度S频

度O探

度DR

O

N

Imaging lens

thickness, Dim 2:

1.93± 0.03 mm

out of spec.Poor image quality,

Influence TOP7★Incorrect stack height

after PM mould1Order start

release

plan+IPQCDim check321PM mouldXu ZhenglinReview PM mould

personnel instruction71321

Total height

Dim.4: 5.05±

0.05, out of spec.Influence imaging

function6★Molding process or

mold dim. Or mould

temp.5IPQCDim check260PM mould, check

molding

parameter

regularlyXu Zhenglin

/AmeliaReview PM mould

personnel instruction,

check molding

parameter regularly65260

Distance, Dim 5:

14.54± 0.03 out of

spec.Impact illumination,

spot position6ΔMolding process or

mold dim. Or mould

temp.5Order start

release planDim check260PM mould, check

molding

parameter

regularlyXu Zhenglin

/AmeliaReview PM mould

personnel instruction,

check molding

parameter regularly65260

Distance, Dim.6:

7.86± 0.03 out of

spec.Impact illumination,

spot position6ΔMolding process or

mold dim. Or mould

temp.5Order start

release planDim check260PM mould, QC

check molding

parameter

regularlyXu Zhenglin

/AmeliaReview PM mould

personnel instruction,

check molding

parameter regularly65260

Distance, Dim.9:

1.60± 0.05 out of

spec.Impact TOP7★Molding process or

mold dim. Or mould

temp.1IPQCDim 2, 3, 4

are controlled

during

process321PM mould, check

molding

parameter

regularlyXu Zhenglin

/AmeliaReview PM mould

personnel instruction,

check molding

parameter regularly71321

Overall width,

Dim 12: 39.5± 0.1

out of spec.Influence product

assembly6★Mould dimension

wrong1Order start

release planDim check212PM mouldXu ZhenglinReview PM mould

personnel instruction61212

Diameter, Dim13:

42± 0.1mm out of

specInfluence product

assembly6★Mould dimension

wrong1Order start

release planDim check212PM mouldXu ZhenglinReview PM mould

personnel instruction61212

Thickness, Dim

16: 6± 0.1mm out

of spec.Influence product

assembly6★Mould dimension

wrong1Order start

release planDim check212PM mouldXu ZhenglinReview PM mould

personnel instruction61212

Thickness, Dim

17: 10.36± 0.1 out

of spec.Conflict with clip on

product6★Mould dimension

wrong1Order start

release planDim check212PM mouldXu ZhenglinReview PM mould

personnel instruction61212

Distance, Dim 18:

3.51±0.03mm out

of spec.Impact illumination,

spot position6ΔMould dimension

wrong5Order start

release planDim check260PM mouldXu ZhenglinReview PM mould

personnel instruction65260

Thickness, Dim

19: 1.3±0.1 out of

spec.6★Mould dimension

wrong1Order start

release planDim check212PM mouldFang Gosh /

Xu Zhenglin61212责任和目标完

成日期Responsibility

& Target DateR

O

N建议措施Recommended

Actions现行探测过程

控制探

度D频