编制说明
本工程施工组织设计方案是根据建设单位的招标书、招标书说明文件、设计构思、关于体育场地建设的国家相关施工及验收规范、质量验评标准、有关安全技术操作规程、结合现场条件和工程特点,以及我公司多年的施工经验和目前我公司实际的施工技术力量、施工机具及其生产能力进行编制。
设计编制内容将作为中标后现场指导施工的主要依据,设计方案有未尽事项,将在工程中依据实际情况进行调整和补充。
现我公司将以项目部为核心的基础上以项目经理负责制为原则,组织高效精干的项目部,根据工程现状及工期的需要,充分调动全公司力量及时、优质地为本项目服务。
具体机构安排详见施工组织机构。
编制依据
1、根据《四川省锦江大学xx小组采购项目(综合楼施工工程项目)
招标文件》;(招标编号:ZXZB2004066)
2、根据招标人提供的“锦江大学xx事务所”设计的《综合楼》项目
设计图纸;
3、依据对招标文件所确认建设地点的实地勘察、记要;
4、依据现行国家及省、市颁布的相关规范、规程、政策法令和法规;
5、依据我公司已通过的国际质量管理体系(IS09001:2000)、国际环境管理体系(IS014001:1996)、职业健康安全管理体系(GB/T28001—2001)标准所发布的有关工程管理文件及补充文件;
6、其他相关国家及地方规范及标准;
7、依据我公司的技术力量、管理水平现状和经济、技术实力。
Preparation instructions
The construction organization design is compiled according to the construction unit of the tender, tender book description file, design concept, a sports venue construction of national related construction and acceptance specification, quality checking and evaluation standard and related safety regulations for technical operations, combined with site conditions and engineering characteristics, and construction experience of our company for many years and current my company
actual construction technical force, construction equipment and production capacity.
Design content as after winning the scene to guide the construction of main basis, the design scheme is unmentioned matters, will in the project according to the actual situation of adjustment and supplement.
Now my company will the project department for core based on to the project manager responsibility system as the principle, organization of a lean and efficient project department,
according to the needs of the current status of project and the time limit for a project, fully mobilize the strength across the company timely, quality more services for the project. Details of specific institutions are detailed in the construction organization.
Compilation basis
1, according to the "Jinjiang University of Sichuan Province XX Group procurement project (building construction project) (construction project) tender documents"; (tender number: ZXZB2004066)
2, according to the "Jinjiang University XX office" design of the "comprehensive building" project design drawings;
3, according to the tender documents for the confirmation of the construction site investigation, summary;
4, according to the current national and provincial and municipal regulations, rules, regulations, policies, laws and regulations;
5. On the basis of our company has passed the international quality management system (ISO9001: 2000), international environmental management system (the is014001:1996), occupational health and safety
management system (GB / T28001 - 2001) standard issued by the relevant project management documentation and supplementary documents;
6. Other relevant national and local codes and standards;
7, according to our company's technical strength, management level and economic, technical strength.。