Unit 2Performance Criteria and Manage ment工作准则和管理Civil engineering is that field of engineering concerned with planning, design, and construction for environmental control, natural resource development, transportation facilities, tunnels, buildings, bridges, and other structures for the needs of people. Persons who are qualified by education and experience and who meet state requirements for practicing the profession of civil engineering are called civil engineers.土木工程包括计划、设计、建造环境监控、自然资源、运输、隧道、建筑、桥梁及其他结构以满足人类的需求。
土木工程师指那些那些受过专业教育、具有一定经验,具备从事土木行业要求的人。
Performance Criteria for Civil Engineers土木工程师的工作准则As professionals, civil engineers should conform to the following canons as they perform their duties:作为一名土木工程师,应将以下几方面作为工作准则:(1)Hold paramount the safety, health, and welfare of the public. (This also implies a commitment to conservation of energy and improvement of the environment, to enhance the quality of life.)(1)将公共安全、健康及财产作为首要考虑因素。
2.翻译句子:Lesson 1.土木工程Civil engineers in this field oversee the construction of a project from beginning to end.这一领域的工程师要监督一个项目从开始到结束的整个施工过程。
Those engaged in this area of civil engineering may plan and develop communities within a city, or entire cities.该领域的工程师从事规划小区或者一个完整的城市。
These civil engineers coordinate planning of public works along with private development. They evaluate the kinds of facilities needed, including streets and highways, public transportation systems, airports, port facilities, water-supply and wastewater-disposal systems, public buildings, parks, and recreational and other facilities to ensure social and economic as well as environmental well-being.规划工程师协调公共工程和私有设施的发展。
他们评估各种设施的需求,包括街道和公路、公共运输系统,机场、港口、供水排水系统,公共建筑,公园、娱乐设施等,以保证社会、经济和环境的协调发展。
The civil engineer-manager combines technical knowledge with an ability to organize and coordinate worker power, materials, machinery, and money.管理工程师将技术和组织协调劳动力、材料、机械设备、资金的能力结合起来。
辽宁工程技术大学20 级专升本(土木工程专业)第二学期《专业英语》试卷(A)题号一二三总分得分I .单项选择:(2*20)1. I used to ____at 6:30, but now I get used to_____at 7:00.a. got up, getting upb. gets up, getting upc. getting up get upd. get up, getting up2. _____many difficulties, they still went on with their experiment.a. Face b Faced c. Facing with d. Faced with3. It was in 1492 _____ Columbus discovered America.a. thatb. whenc. the timed. whom4. Vickie had most probably ____ her for her twin sister.a. regardedb. mistakenc. looked ond. considered5.It is the boy’s laziness that ______his failure in the exams.a. resulted inb. resulted fromc. brought ind. led into6. Rain does not ___ bring down the temperature.a. necessarilyb. certainlyc. undoubtedlyd. completely7. One of his many faults is that he never___.anything very long.a. decides onb. sticks toc. goes overd. make sure8. It was not a serious accident: the car needs only some______ repairs.a. majorb. minorc. primaryd. secondary9. The train arrived one hour behind______ .a. planb. timetablec. scheduled. date10. Be sure to______your work at the end of the exam.a. set asideb. hang upc. look overd. catch sight of11. How we_____ a chance to visit your country!.a. longed forb. looked forc. waited ford.went for12. Scientists didn’t know much about lung cancer_____ .a. before longb. long beforec. until recentlyd.very soon13. _____you keep trying, you will certainly succeeded. a. As b. Because c. As long as d. No matter how14. To my ______, this guy is a good-for-nothing.a. heartb. mindc. thoughtd. thinking15. The boys would rather the basketball match _____ next match.a. took placeb. has taken placec. take placed. should take place16. It is____ to run into danger for nothing.a. childlikeb. childhoodc. childishd. childishly17. They do not allow_____ in this classroom.a. smoking b . to smoke c. smoked d. being smoked18. The winner vacation_____ over, he got down to his work again.a. wasb. had beenc. wered. being19. They can’t help ______of their daughter.a. thinkb. thinkingc. to thinkd. thought20. It is necessary that he_______ for Beijing right now.c. will leave.d. leftII. 选词填空:(2*15)absolutely entire service reveal luxury share introduceget rid of prefer catch up client ban profound go in forconcerning1. They make _____ use of their computers.2. He is ______ wrong.3. She doesn’t have very high standards of_____.4. Young people should never simply _____ material comforts.5. He ______his close friend to me.6. He was jailed for _____ secrets to the Japanese.7. I am very _____about her examination.8. We had a______ lesson in children education yesterday.9. You will have to work harder to _____ with the top students in your class.10. You are supposed to _____ carelessness.11. For him, it would be a _____ to be able to have a day off work.12. I should ______ you not to stay there too long.13. Swimming is_____in this lake.14. We always aim to give our____ personal attention.15. Bill and John ______the work equally between them.III. 翻译: (3*10)汉译英:1.依我看,你完全错了。
英译汉Lesson One Sandcrete is a yellow-white building material made from Portland cement and sand in a ratio of circa 1:8.It is the main building material for walls of single-storey buildings (such as houses and schools)in countries such as Ghana and Nigeria. Measured strengths fo commercially available Sandcrete blocks in Nigeria were found to be between 0.5 and 1 N/mm2,which is well below the 3.5 N/mm2that is legally required there. This may be due to the need of the manufacturers to keep the price low,and since the main cost-factor is the Portland cement, they reduce that, which results in a block that starts behaving more like loose sand.翻译:sandcrete是黄白色建筑材料制成的波特兰水泥和沙子的比例大约1:8.it是主要的建筑墙体材料的单层建筑(如房屋和学校)在加纳和尼日利亚等国家。
测量优势的商用sandcrete块在尼日利亚被发现之间的0.5和1牛顿/毫米,这是远远低于3.5牛顿/毫米,是法律所要求的有。
这可能是由于需要的厂家保持价格低,因为主要cost-factor是波特兰水泥,他们减少,从而在一块,开始表现得更像松砂。
土木工程专业英语课后答案Unite 22、Translate the following phrases into Chinese /English .(1)cross section 截面(2)bending moment 弯矩(3)live load 活载(4)force due to gravity 重力(5)building code 建筑规范(6)functional design 功能设计(7)nonstructural components 非结构构件(8)Nonprofit organization非赢利组织(9)the Uniform Building Code统一建筑规范(10)the Standard Building Code标准建筑规范3、Translate the following sentence into Chinese.(1)The structural design of buildings ,whether of structural steel(结构钢) or reinforced concrete(钢筋混凝土),requires the determination of the overall proportions(整体比例) and dimensions of the supporting framework(支撑结构) and the selection of the cross sections of individual members.建筑的结构设计,不论是用结构钢还是用钢筋混凝土材料,都要决定其整体比例和支撑结构的大小,以及选择单个构件的截面尺寸。
(2)The architect decides how the building should look; the engineer must make sure that it doesn’t fall down.建筑师决定建筑物的外观,结构工程师必须保证它不会倒塌。
土木工程专业英语题库一、单选题(题数:45,共90.0 分)1The material costs make up only about()of the cost of the completed steel structure in a building(2.0分)0.0 分A、one-thirdsB、one-thirdC、one-thirdlyD、one-three正确答案:C C2Steel and composite construction is often adopted in()owing to high structural efficiency with large strength-to-self-weight ratios as well as large flexural rigidities against instability and serviceability problems.(2.0分)2.0 分A、super high-rise buildingsB、long span bridgesC、roof structuresD、All of the above are right正确答案:D D3Both elastic theory and plastic theory are used for composite members, the differences being as follows: concrete in tension is ()neglected in elastic theory, and()neglected in plastic theory.(2.0分)2.0 分A、usually, usuallyB、always, alwaysC、usually, alwaysD、always, usually正确答案:C C4Failure modes include()and less rigidity of bending(2.0分)2.0 分A、Strength failureB、Lateral-torsional-bucklingC、Local buckling of platesD、All of the above are right正确答案:D D5(), where the column’s failure is due to the crushing of concrete or due to the yielding of the steel bars under the full load capacity of the column.(2.0分)2.0 分A、Short columnsB、Long columnsC、Slender columnsD、None正确答案:A A6()loaded columns, where the loads are applied at any point on the column section, causing moments about both the x axis and y axis simultaneously(2.0分)2.0 分A、AxiallyB、EccentricallyC、BiaxiallyD、None正确答案:C C7Strictly speaking, all()nonlinearities of the different materials should be observed in calculating the strength of steel-concrete composite column.(2.0分)2.0 分A、geometrical and physicalB、mechanical and geometricalC、mechanical and physicalD、none正确答案:A A8The main structural forms of steel structure are()(2.0分)2.0 分A、Truss structuresB、Frame structuresC、Grids structuresD、All of the above are right正确答案:D D9A tendon with a duct that contains multiple pieces of prestressing steel strand is commonly called a()tendon.(2.0分)2.0 分A、multistrandB、monostrandC、singleD、strand正确答案:A A10The()system makes use of either column capitals, drop panels or both to increase the shear and moment resistance of the system at the columns where the shears and moments are greatest.(2.0分)2.0 分A、flat plateB、waffle slabC、flat slabD、two-way slab with. beams正确答案:C C11The height of Khalifa tower is 828m, and the total number of floors is()(2.0分)2.0 分A、100B、130C、162D、188正确答案:C C12It includes(),keyways, threads, or abrupt changes in plate width or thickness.(2.0分)2.0 分A、holesB、groovesC、notchesD、All of the above are right正确答案:D D13Prestressing by()involves installing and stressing prestressing strand of bar tendons only after the concrete has been placed, hardened and attained a minimum compressive strength for that transfer.(2.0分)2.0 分A、pretensioningB、post-tensioningC、pretensionedD、post-tensioned正确答案:B B14When grease is used, the prestressing steel is permanently free to move relative to the sheathing and the tendon is referred to as an]()tendon.(2.0分)2.0 分A、bondedB、unbondedC、barD、strand正确答案:B B15In()members the prestressing strands are tensioned against restraining bulkheads before the concrete is cast.(2.0分)2.0 分A、pretensioningB、post-tensioningC、pretensionedD、post-tensioned正确答案:C C16Yan Fu, a translator at the end of the Qing Dynasty, thinks that the standard of translation is()(2.0分)2.0 分A、faithfulnessB、expressivenessC、eleganceD、All of the above are right正确答案:D D17This section mainly introduces the professional English vocabulary and expression related to()of steel structure technology(2.0分)2.0 分A、the development levelB、market prospectC、design principleD、All of the above are right正确答案:D D18For walls, a()is a slab wider than the wall and extending the length of the wall(2.0分)2.0 分A、combined footingB、spread foundationC、grid foundationD、mat foundation正确答案:B B19(), because there is only one point at the intersection of the center line of the long and narrow section, which is their shear center(2.0分)2.0 分A、Cross sectionB、Angle sectionC、T-sectionD、All of the above are right正确答案:D D20Reinforced concrete beams not included()(2.0分)2.0 分A、Singly reinforced rectangular beamsB、Doubly reinforced rectangular beamsC、Plain concreteD、Singly or doubly reinforced T -beams正确答案:C C21Standard parts can be measured()(2.0分)2.0 分A、yield strengthB、ultimate strengthC、elastic modulusD、All of the above are right正确答案:D D22The maximum strain in the tension reinforcement in the section at failure is()(2.0分)2.0 分A、0.01B、0.1C、0.001D、正确答案:A A23The classification and grade of steel are()(2.0分)2.0 分A、carbon structural steelB、low alloy structural steelC、quality carbon structural steelD、All of the above are right正确答案:D D24The assumed complete interaction enables definition of()for the whole inhomogeneous cross-section.(2.0分)2.0 分A、section propertiesB、stiffnessC、slender ratiosD、All of the above are right正确答案:D D25()are most economical for spans from 4.5 to 6m(2.0分)2.0 分A、Flat platesB、Waffle slabC、Flat slabTwo-way slab with beams正确答案:A A26The "Structural Welding" provides welding processes for()and SAW.(2.0分)2.0 分A、SMAWB、GMAWC、FCAWD、All of the above are right正确答案:D D27Concrete is assumed to fail when the compressive strain reaches()(2.0分)2.0 分A、0.3B、0.03C、0.0033D、0.003正确答案:C C28In the(), the steel mesh reinforcements of 3-4mm in diameter are embedded into the horizontal mortar joints every 2-5 courses.(2.0分)2.0 分A、steel mesh reinforced brick masonryB、reinforced hollow unit masonryC、reinforced grouted cavity masonryD、composite brick masonry正确答案:A A29In steel mesh reinforced brick masonry,the steel mesh reinforcements of 3-4mm in diameter are embedded into the horizontal mortar joints every 2-5()(2.0分)2.0 分A、layersB、coursesC、piecesD、blocks正确答案:B B30Bending in a main plane is called()(2.0分)2.0 分A、biaxial flexural memberB、unidirectional bending memberC、platform beamD、castellated beam正确答案:B B31Civil Engineering English is set as a required course to cultivate high-quality civil engineering talents, which is beneficial to()(2.0分)2.0 分A、improve the students' attention to professional English learningB、promote the construction progress and height of professional English online coursesC、training senior civil engineering talents with international vision and professional English literacy D、All of the above are right正确答案:D D32It is believed that automobile is blamed for such problems as()and slum conditions in the central areas, and air and noise pollition.(2.0分)2.0 分A、urban expansionB、wasteful land useC、congestionD、All of the above are right正确答案:D D33()has excellent deep drawing and deep drawing properties(2.0分)2.0 分A、Fire resistant steelB、ultra-low yield point steelC、high friction factor steel plateD、structural casting steel正确答案:B B34According to the load, it can be divided into()(2.0分)2.0 分A、Axially loaded columnsB、Eccentrically loaded columnsC、Biaxially loaded columnsD、All of the above are right正确答案:D D35The compressive capacity of unreinforced masonry is far greater than its()capacity(2.0分)2.0 分A、tensileB、bendingC、shearD、All of the above are right正确答案:D D36If the bearing soil capacity is different under different foundations—for example, if the foundations of a building are partly on soil and partly on rock—a()settlement will occur(2.0分)2.0 分A、differentB、differentialC、identicalD、same正确答案:B B37The grade of asphalt is divided according to () technical index(2.0分)2.0 分A、PenetrationB、ductilityC、softening pointD、flash point正确答案:A A38The reinforced concrete confining elements are horizontal members called ()and vertical members called()(2.0分)2.0 分A、ring beams, structural columnsB、structural columns, ring beamsC、ring beams, ring beamsD、structural columns, structural columns正确答案:A A39The advantages of steel structure residence are()(2.0分)2.0 分A、Good seismic performanceB、Low comprehensive costC、Fit with the development direction of housing industrializationD、All of the above are right40Three different types of composite columns:()(2.0分)2.0 分A、steel reinforced concrete columnsB、rolled section columns partly encased in concreteC、concrete filled steel tubesD、All of the above are right正确答案:D D41()was founded in 1969(2.0分)2.0 分A、SSCIB、ISSHPC、ISSD、HCV正确答案:A A42Which of the followings is mechanical imperfection of steel members?()(2.0分)2.0 分A、initial out-of-straightnessB、initial eccentricityC、residual stressD、initial crookedness43The whole instability of solid web compression member refers to()(2.0分)2.0 分A、Flexural bucklingB、Torsion bucklingC、Flexural-torsional bucklingD、All of the above are right正确答案:D D44The section form of compression member is()(2.0分)2.0 分A、doubly symmetricB、singly symmetricC、unsymmetricD、All of the above are right正确答案:D D45The characteristics of vocabulary are()(2.0分)2.0 分A、Professional vocabulary and semi professional vocabularyB、Get used to using compound wordsC、Get used to using abbreviationsD、All of the above are right二、多选题(题数:5,共10.0 分)1As English majors pay attention to the ()of technical problems, the translation standards of professional English are more focused on "faithfulness" and "expressiveness"(2.0分)2.0 分A、scientificityB、logicalityC、correctnessD、strictness正确答案:ABCD ABCD2Factors affecting the properties of steel include()(2.0分)2.0 分A、chemical compositionB、process of steelmakingC、time-hardeningD、cold work正确答案:ABCD ABCD3Applications of steel structures include()(2.0分)2.0 分A、Large-span structuresB、Multi-story &high-rise buildingsC、Buildings of heavy duty plantsD、Portal frames正确答案:ABCD ABCD4Masonry structure can be divided into()(2.0分)2.0 分A、Brickwork structureB、stone masonry structureC、Block masonry structureD、Reinforced masonry structure正确答案:ABCD ABCD5Major Courses You will learn()(2.0分)2.0 分A、Engineering GeologyB、Engineering MeasuremenC、Soil MechanicsD、Foundation Engineering正确答案:ABCD ABCD。
《土木工程专业英语》一、单项选择(共15小题;每小题2分,满分30分)1. Before designing a project, civil engineers should survey both the ( ) and subsoil features of the proposed site.A. photographyB. geographerC. topographyD. graphy2. Dams, ( ), water supply systems, and other large projects ordinarily employ several engineers to work together.A. beamB. columnC. brickD. bridge3. In modern road constructions, powerful modern machines are employed to move mountains and fill valleys to make the ( ) as direct as possible.A. routesB. rootsC. surfacesD. lane4. Between the buildings ()a primary school.A. standB. standsC. to standD. standing5. Tensile failure of ( ) concrete happens easily and involves progressive micro-cracking.A. forcedB. reinforcedC. steelD. unreinforced6. ( ) concrete is used only for footings and concrete slabs laid on the ground, and for other massive structures.A. forcedB. reinforcedC. steelD. Plain7.The laws that ()how the buildings maybe made are building codes.A. tellB. tellsC. toldD. telling8. The steel bars in concrete take the ( )component of the bending moment.A. shearB. compressiveC. tensileD. draw9.It is expensive ()future cities on the sea.A. buildB. builtC. to buildD. builds10. Cracks would not only be unsightly but would ( ) the steel bars to corrosion by moisture and other chemical action.A. adoptB. exposeC. employD.make11. The()cements are widely used on the construction site.A. above-mentionedB. above-mentioningC. above-mentionD. above-mentions12. Besides its ability to sustain loads, concrete is also required to be ( ).A. capableB. considerableC. durableD. beautiful13. It is our duty to ()the specification .A. comply withB. completeC. knowD. make14. Concrete is ( ) a porous material.A. natureB. inherentlyC. madeD. not15. Conclusions can be ( ) from the above discussion.A. drawnB. tensileC. towed C. looked二、单词填空(共10空;每空2分,满分20分)1. The Romans bound their empire together with an extensive system of roads radiating in many directions from Rome.2. Portland cement must pass a series of chemical and physical tests before it can be shipped.3. Concrete consists of water , cement , aggregate and sand .(admixture)4. A simple contract consists of an agreement entered into by two or more parties.5. The presence of cracks in concrete reduces its resistance to the action of corrosion of reinforced bars.6. Concrete is a widely used material in numerous civil engineering structures三、英译中(短句翻译,共10句,每句2分,满分20分)1. Later in history, when well-traveled routes were made sturdier with rocks and stones, the path was raised above the surrounding land, it became a “high way”.史上记载,当交通量大的道路用更坚实的岩石和石头来建造,且路面被建在路基上,它就变成了一条“高速公路”。
《土木工程专业英语》考点提炼二
一、词汇汉译英
1.初步设计:preliminary design :
2.屈服强度:yield strength
3.水灰比:water-to-cement ratio
4.空气调节:air conditioning
5.园艺:horticultural
6.承重墙:bearing wall
7.管道;沟渠:conduit
8.骨架:framework
9.有限的;临界的:terminate
10.分层:stratification
二、词汇英译汉
1.Residential:住宅
2.high-rise building:高层建筑
3.boundary:界限
4.refuse disposal:垃圾处理
5.sedimentation:沉降
6.reinforced concrete:钢筋混凝土
7.construction management:工程管理
8.refuse disposal:垃圾处理
9.water treatment and disposal:水处理
10.Air-pollution control:空气污染控制
三、句子英译汉
1、The superstructure is that part of a building above ground, and the substructure and foundation,is that part of a building below ground.
上部结构是建筑物在地面上的部分 , 而下部结构以及基础是建筑物的地下部分。
2、Good planning guides the visitor to his destination in the structure and impresses him,perhaps subconsciously,by visibly relating the several units of the edifice.
好的方案可以使来访者在建筑中找到其目的地并留下印象,这种印象也许是下
意识地通过把大的建筑体系中一些单元明显地联系起来而造成的。
3、Foundations still are a hidden but costly part of many buildings.
基础仍然是许多建筑物隐蔽的而且花费昂贵的部分。
4、In a steel structure,the economy can be defined in terms of the total average quantity of steel per square foot of floor area of the building.
在钢结构中,可以根据建筑物的每平方英尺楼板面积所需要钢材的总平均数量
来限定经济。
5、Uneven settlements can have damaging effects---the building may lean, walls and partitions may crack, windows and doors may become inoperative, and, in the extreme, a building may collapse.
不均匀沉降会造成破坏性作用——建筑物发生倾斜,墙体和隔墙会发生裂缝,
窗户和门无法打开,最严重的是,建筑物坍塌。
6、Stone has been so dominant in the architecture of the Western world that forms appropriate to it have been preserved even in
buildings constructed of wood.
石料在西方世界的建筑中占很大的优势以至于适合它的形式即使在木材修建的
大楼里都得到了保存。
四、句子汉译英
1、运输工程师在设计每一个工程的过程中,既要运用技术知识,也要考虑经济、政治和社会的因素。
Transportation engineers apply technological knowledge as well as consideration of the economic, political, and social factors in designing each project.
2、在地表附近的土壤不能支撑建筑物的重量的情况下,打下木桩、钢桩、混凝土桩使土壤密实性提高。
In cases where the soil near the surface is unable to support the weight of the building, piles of wood, steel, or concrete are driven down to firm soil.
3、基础的设计取决于许多土壤的因素,比如土壤的类型,土壤的分层组成,土层的厚度以及它们的密实性和地下水的情况。
The design of a foundation depends on many soil factors, such as type of soil, soil stratification, thickness of soil layers and their compaction, and groundwater conditions.
4、更大的高度需要增加柱和梁的尺寸来使建筑物的刚性更大,以便于它们在风荷载作用下不会倾斜到允许的范围之外。
Greater height entails increased column and beam sizes to make
buildings more rigid so that under wind load they will not sway beyond an acceptable limit.。