萤火虫电光漆出车登记表中英文版
- 格式:xlsx
- 大小:13.65 KB
- 文档页数:2
标⽰牌中⽂英⽂标⽰冲压课 Stamping Section冲压区 Stamping Area冲压现场办公区 Stamping Section Office点焊区 Welding Area拉钉区 Riveting Area打磨区 Sanding Area拉钉现场办公区 Riveting Section Office废弃物存放区 Scrap Area烤漆课 Coating Section烤漆区 Coating Area液体/粉体 Liquid/Powder烤漆清洗线 Degreasing Process烤漆前处理区 Coating Prep Area超⾳波清洗区 Ultrasonic Cleaning Process粉体烤漆线 Powder Coating Line液体烤漆线 Liquid Painting Line粉体涂装室 Powder Coating Spraying Room液体涂装室 Liquid Painting Spraying Room烤漆课现场办公区 Coating Section Office集尘室 Dust Collector Room吹尘室 Dust Blow Off Room调漆室 Paint Mixing Room打磨房 Sanding Room煤⽓房 Natural Gas Control Room预脱脂槽 Degreasing Area Stage 1主脱脂槽 Degreasing Area Stage 2⽪膜槽 Metal Surface Phosphate Treating Area清⽔槽 Rinsing Area沉淀储⽔池 Waste Deposit⼩⼼吊物 Warning: Hooks in Operation⼩⼼碰头 Warning: Head Injury, Low Shelves更⾐间 Dressing Room闲⼈免进Warning: Only Authorized Personnel警告: 须着防静电⾐后才可⼊内. Warning: Antistatic Clothing is Required 贵宾⾐柜/鞋柜 For Visitors Use Only员⼯鞋柜 Employee Shoes Lockers杂项物料区 Miscellaneous Items Storage不合格品区 Non-Conforming Parts Area废弃物存放区 Scrap Area烤漆制具保养室 Masking Maintenance烤漆卸制具制程 De-Masking Process治具保养室 Fixture/Jig/Gauge Maintenance组配课 Assembly Section组配区 Assembly Area上班⼊⼝ Entrance下班出⼝ Exit组配现场办公区 Assembly Section Office包材作业区 Packaging Area备料区 Material Staging Area不合格品区 Non-conforming Parts Area换鞋间Changing Room为保持清洁,请您换鞋. For cleanliness, please change your shoes.组装线Assembly Line负责⼈ Line Leader前置加⼯线 Prep Line散件⼤宗线 Accessory Part Assembly Line会议室 Conference Room洗⼿间 Rest Room茶⽔间 Tea Room电脑机房 MIS Server Room复印室 Copy Room教育训练室 Training Room仓管课 Warehouse Management Section品管部 QC Dept.品管部资料室 document Control, QC Dept.品管部样品室 QC Sample Room塑料⼚ Plastic Plant塑料⼚⼚长室 Plastic Plant Manager塑料⼚经理室 Manager塑料成型课 Molding Section物料室 Raw Material Warehouse/Storage碎料室 Crusher Room模具存放区 Tooling Warehouse成型课现场办公区 Molding Section Office⼯具区 Accessorial Tools Storage治具柜放置区 Fixture/Jig/Gauge Racks设备维修区 Tooling Maintenance Area柜式烤炉 Oven不良品放置区 Non-Conforming Product Area重⼯区 Rework Area包材存放区 Packing Material Area塑料喷漆印刷课 Plastic Decoration Section周转包材放置区 Recycled Packaging Materials Rack⼤宗包材放置区 Packaging Material Rack待印刷产品放置区 Silkscreen/Pad Printing WIP Material待喷漆产品放置区 WIP Material"调漆房&治具房Paint Mixing Room & Fixture Shop重点防⽕区 No Fire Area喷漆房Painting Room谢绝参观Authorized Personnel Only浴尘室除尘 Dust Vacuum Room1.进门灯显⽰绿灯时开门进⼊浴尘室1. Enter the room when light turns green.2.将进门关上后⾃动除尘2.Close door to start vacuum3.除尘时间约为8秒,听到" 啪 "⼀声后开门⾛出3.Vacuum time 8 seconds. Exit room at the sound of the "pop".塑料⼚设计课 Plastic Molding Design Section塑料制模课 Tooling Fabrication Section修模区 Tooling Repair Area省模区 Polishing Area制模区 Tooling Fabrication AreaEDM加⼯区 EDM AreaCNC加⼯区 CNC Area检验区 Inspection Area外发区 Shipping Area模具⼚/中⼼ Tooling Plant/Center模具⼚办公室 Tooling Center Office五⾦模具⼚ Sheet Metal Tooling Shop五⾦加⼯设计课 Sheet Metal Tooling Design Section五⾦模具维修区Sheet Metal Tooling Maintenance Area五⾦模具制模区Sheet Metal Tooling Fabrication Area线割房 Wire Cutting Shop五⾦⼯具室 Tooling Parts StorageCNC加⼯区 CNC Area样品室 Sample Room试模区 Stamping Try-Out Area会议室 Conference Room⼚长室 Plant Manager铁材仓 Sheet Metal Warehouse ----Raw Materials 冲件仓 Stamping Warehouse ---- WIP包材仓 Packaging Material Warehouse塑料仓 Injection Molding Warehouse ---- WIP待验区 Holding Area贵重物品仓 High value Materials Warehouse特殊物料仓 Special Item Storage塑料原料区 Plastic Warehouse - Raw Materials 不合格仓 Non-conforming Parts Area烤漆件仓 Coating Parts Warehouse成品仓 Finished Product Warehouse⼩件仓 Small Parts Warehouse收料窗⼝ Receiving WindowIQC 检验台 IQC Inspection StationQA实验室 "Quality AssuranceLab I/1Lab II/2"QA量测室 QA Measurement Office模具仓 "Tooling WarehouseRack I/1Rack II/2"。
消防标识牌英文翻译排烟风机Smoke extractor压力开关Pressure swifch湿式报警阀Wet alarm valve水力警铃Water motor alarm消火栓水泵Fire hydrant pump喷淋水泵Sprinkler pump送风机V entilator消防水泵控制柜请将转换开关保持在“自动”位置Fire fighting pump control cabinet喷淋水泵控制柜请将转换开关保持在“自动”位置Sprinkler pump control cabinet 常闭式防火门为了您的安全请保持关闭Normally closed type fireproof door Keep closed for your safety送风口Air-supply vent送风口严禁遮挡No cover消防中心闲人免入Fire Control CenterStaff Only消防水泵房闲人免入Fire Fighting Pump RoomStaff Only排烟口Smoke exhaust vent排烟口严禁遮挡No cover防火卷帘门下严禁堵塞Fireproof rolling shutter door Never jam 消防专用Used for fire fighting声光报警器Sound-light Alarm消防专用Used for fire fighting手动报警按钮Manual Warning Button火灾时请按下Press if when meet fire非紧急情况勿动Press in case of emergency灭火器使用方法How to use Fire-extinguisher取出灭火器Take out fire entmguisher拔掉保险销Pull out Safety pin一手握住压把When holding the pressure handle, please hold the nozzle and Jet on the root of the flame一手握住喷管对准火苗根部喷射(人站在上风)消防栓的使用方法How to use Fire-fighting Hydrant打开或击碎箱门,取出消防水带Open or break fire-fighting hydrantdoor and take out water pipe展开消防水带Spread the water pipe水带一头接到消防栓接口上Connect one side of water pipe to Fire-fighting Hydrant 另一头接上消防水枪Connect the other side to water gun另外一人打开消防栓上的水阀开头The other person opens the valve of fire-fighting hydrant对准火源根部,进行灭火Aim at fire's root to put out fire。
汽车车灯中英文对照序号中文品名1远光信号灯2近光信号灯3雾灯信号灯4转向信号灯5危急报警信号灯6行车制动系警报灯7轮胎充气压力警报灯8安全带警报灯9门开警报灯10机油压力警报灯11机油油面警报灯12温度警报灯13蓄电池充电状况警报灯14燃油油面警报15挡风玻璃电加热器信号灯16驻车制动系警报灯17被动式乘员安全警报灯18乘客与驾驶员联系信号灯19无线电话信号灯20空气滤清器警报灯21机油滤清器警报灯22驾驶室锁止警告灯23灯光和照明系统24照明25灯光26光源27灯具的几何可见度角28外表面29基准轴线30基准中心31发光面32照明装置的光照面33反射镜的光照面34信号装置的光照面35灯组的调整36对中37光色特性38光度特性39光束亮度40光束中心41远光束42近光束43远光44近光45对称光46非对称光47眩目48眩光49认视距离50配光51透光直径52灯光颜色53蓝色54红色55局部黄色56绿色57琥珀色58紫色59谱值60CIE光色三角区61断路62阻抗63短路64瓦数65“切断”电路66线路图67电压波纹68起动电流69绝缘强度70闪频71瞬间超电压强度72通电时间73直流电74交流电75会车光束倾斜角76灯光明暗截止线77初始倾斜角78封闭式灯光组79半封闭式灯光组80配光镜81反射镜82配光屏83定焦盘84等照度曲线85等光强曲线86信号系统87闪光频率88起动时间89光度仪器90光学设备 optical device91校准器 aimer92光束轴 beam axle93校准屏幕 aiming screen94聚光装置 optical block95对光装置 alignment device96投影设备 projection equipment97远距离屏幕 distant screen98照明系统 lighting system99照明设备 lightig equipmetn100灯具 lamp101等效灯具 equivalent lamps102成对灯具 lamps constituting a pair103偶数灯 even number of lamps104操作指示灯 operational tell-tale105倒车灯 backup(reversing)lamp106车宽示廓灯 clearance lamp107复合灯 combined lamps108内藏灯(暗灯)concealable lamp109反射发光装置 reflex reflexting device110回射装置 retro0reflecting device111放电灯 discharge lamp112雾灯 fog lamp113组合灯 grouped lamps114危险警告灯 hazard warning lamp115近光前照灯 lower-beam (dipped beam)headlamp 116远光前照灯 upper-beam(main beam headlamp) 117前照灯水平调整装置 headlamp levelling device 118识别灯 identification lamp 119外形示廓灯 end outline marker lamp120牌照灯 license plate lamp121后牌照灯 rear registration plate lamp122可伸缩灯 retractable lamp123封闭式灯 sealed -beam lamp124搜索灯 search lamp125侧示廓灯 side marker lamp126单灯 single lamp127专用警告灯 special warning lamp128制动灯 stop lamp129工作灯 working lamp130混合灯 reciprocally incorporated lamp131停车灯 parking lamp132示廓灯 position lamp133转向信号灯 trun signal lamp134前照灯 headlamp135封闭式前照灯 sealed beam headlamp136半封闭式前照灯 semi-sealed beam headlamp137外装式前照灯 external mounted headlamp138内装式前照灯 flush mounted headlamp139辅助前照灯 auxiliary headlamp140组合前灯 comination headlamp141信号灯 signal lamp(indicator)142尾灯 tail lamp143组合尾灯 combination tail lamp144示宽灯 width lamp145示高灯 height lamp146警告灯 emergency warning lamp147门灯 door lock warning lamp148转向指示灯 turn light indicator(direction indicator lamp) 149反射器 reflex reflector150“回路接通”指示灯 "circuit closed" tell-tale151信号灯 pilot lamp152壁灯 bracket lamp153顶灯 ceiling lamp154阅读灯 reading lamp155踏步灯 step lamp (courtesy light)156仪表板照明灯 instrument panel lamp157携带式手提灯 portable lamp158防空灯 black-out lamp159发动机室照明灯 engine compartment lamp 160行李箱照明灯 luggage boot lamp161前照灯清洁器 headlamp cleaner162放电灯泡 discharge bulb163白炽灯泡 filament bulb164白炽灯 filament lamp165斜度计 inclinometer166灯泡接头 bulb adaptor167管状灯泡 tubular bulb168小型灯泡 miniature bulb169卤素灯泡 halogen bulb170石英碘灯泡 quartz iodine bulb171闪光器 flasher172电容式闪光器 capacitor type flasher173热丝式闪光器 hot wire type flasher174翼片式闪光器 vane type flasher175晶体管闪光器 transistor flasher176危险报警闪光器 hazard warning signal flasher 177卡口插座 bayonet socket178灯丝 filament179灯泡接电触点 bulb contact180灯泡灯座片 bulb socket tag181灯泡灯座 contact holder182灯座 lamp seat183调光座盘 beam adjusting disc plate 184灯圈185装饰圈186灯壳187遮光罩188灯孔189灯总成190灯黑191灯泡192灯头、灯座193灯座,车灯支架194灯组件195灯孔196灯罩【灯圈】197灯玻璃198灯头、灯座199灯壳200灯组件201灯套件202灯玻璃,配光镜203(辅助灯)灯套件204车灯板 l205车灯反射镜206全封闭式前照灯灯芯固定圈207灯壳座208(辅助灯)灯组件【套件】209灯座210前照灯【散热器】固定框211(照明系统)灯组件【单元】212灯玻璃213车灯(配)线英文名(upper)(high)beam tell-tale (dipped )(low)beam tell-tale fog light tell-taledirection indicatorhazard warning system tell-taleservice braking system warning tell-tale tyre inflation pressure warning tell-tale seat belt warning tell-taleautomatic door warning tell-taleoil prssure warning tell-taleoil level warnig tell-talltemperature warnig tell-talebattery charging condition tell-talefuel level tell-talewindscreen eletric heater tell-tale parking braking sytem warning tell-tale passive restraint tell-talepassenger-driver communication tell-tale radio communication sytem tell-taleair filter tell-taleoil filter tell-talecab lock tell-talelight and lighting sytemlightinglightlight sourceangles of geometric visibility of a lamp apparent surfacereference axisreference centerlight-emitting surfaceilluminating sruface of a lighting device illuminating surface of a reflex reflextor illuminating surface of a signalling device adjustment of settingalignmentcolorimetric characteristicsphotometric characteristicsbeam intensitybeam centermain beamdipped beamhigh beamlower eamsymmetrical beam asymmetrical beamdazzleglarebright viewing distanceluminous intensity distribution transmission diameter lamp colorblueredselective yellowgreenamberpurplespectral valuezone of te CIE color triangle breakimpedanceshort circuitwattage"off"circuitwiring diagramripple voltageinrush currantdielectric strengthflash ratetransient overvoltage strength current"on"time direct currentalternating currentdipped beam inclinatin "cut-off"lineinitial inclinationsealed beam unitsemi-sealed beam unitlens(glass lens)reflectorfilament shieldprefocus plateisolux curveisocandela curvesignal sytemflash ratestarting tiemphotometric deviceoptical deviceindicator lamp)lamp ringornamentlamp housinglight shieldlamp aperturelamp assemblylamp blacklamp bulblamp caplamp carrierlamp complamp compartmentlamp doorlamp glasslamp holderlamp housinglamp insertlamp kitlamp lenslamp packageamp panellamp reflectorlamp sealed beam unit retaining ring lamp seat lamp setlamp socketlamp supportlamp unitlamp windowlamp wiring。
(整理)多专业标识中英文翻译标识类中英文翻译对照表1 当心触电Danger!High Voltage2 当心碰撞Beware of Collisions3 当心台阶Mind the Step/Watch Your Step4 小心玻璃Caution! Glass5 小心滑倒/小心地滑Caution! Slippery/Caution! Wet Floor6 小心碰头Mind Your Head/Watch Your Head7 注意安全CAUTION!/Caution!8 注意防火Fire Hazard Area9 非公莫入Staff Only10 禁止鸣笛No Horn11 勿扔垃圾/请勿乱扔废弃物No Littering12 禁止停车No Parking13 禁止停留No Stopping14 禁止吸烟No Smoking15 拉PULL/Pull16 推PUSH/Push17 入口ENTRANCE/Entrance18 出口/安全出口/安全通道EXIT/Exit19 紧急出口Emergency Exit20 紧急救护电话(120)First Aid Call 12021 紧急疏散地Evacuation Site22 请勿跨越No Crossing23 请勿拍照No Photography24 请勿摄影No Filming / No Video25 请勿使用闪光灯No Flash Photography26 火警电话119 Fire Call 119/Fire Alarm 11927 投诉电话Complaints Hotline28 危难时请速报110 Emergency Call 11029 危险,请勿靠近Danger! Keep Away30 请绕行Detour31 请勿打电话No Phone Calls32 请勿带宠物入内No Pets Allowed33 请勿抚摸/请勿触摸Don't Touch34 请勿践踏草坪Please Keep Off the Grass34 请勿坐卧停留No Loitering35 请爱护公共财产Please Protect Public Property36 请爱护公共设施Please Protect Public Facilities37 请节约用水Please Save Water /Don't Waste Water38 请您保管好自己的物品Take Care of Your Belongings39 请按顺序排队Please Line Up40 安全疏散指示图/紧急疏散指示图Evacuation Chart41 保持安静/请勿大声喧哗Quiet Please42 残疾人专用Disabled Only43 留言栏Complaints & Suggestions44 伸手出水Automatic Tap45 随手关门Keep Door Closed/Please close the door behind you.46 禁止入内/严禁入内No Entry/No Admittance47 闲人免进/请勿入内Staff Only /No Admittance48 谢绝参观/游客止步No Admittance49 正在维修Repairs in Progress50 有电危险Danger! Electric Shock Risk51 请勿随地吐痰No Spitting52 严禁携带易燃易爆等危险品Dangerous Articles Prohibited53 暂停服务/临时关闭Temporarily Closed54 老年人、残疾人、军人优先Priority for Seniors and Disabled55 请在此等候Please Wait Here56 消防通道,请勿占用Fire Engine Access. Don't Block! 表A.2 功能设施信息序号中文名称英文名称1 停车场Parking2 医务室Clinic3 厕所Toilet4 男厕所Gents/Men5 女厕所Ladies/Women6 女更衣室Women's Dressing Room7 男更衣室Men's Dressing Room8 步行梯/楼梯Stairs9 自动扶梯Escalator10 电梯Elevator/Lift11 问询处/咨询(台)Information12 前台/服务台/接待Reception13 消防栓Fire Hydrant14 *** ****** Station15 急救中心First Aid Center16 公用电话Telephone17 磁卡电话Magnetic Card Phone18 餐厅Restaurant19 员工通道Staff Only20 疏散通道Escape Route21 消防通道Fire Engine Access22 废物箱/垃圾箱Trash/Litter23 紧急呼救设施/紧急报警器Emergency Alarm24 自行车停放处Bicycle Parking25 出租车Taxi26 残疾人设施For Disabled27 火情警报设施Fire Alarm28 紧急呼救电话Emergency Phone29 失物招领Lost & Found30 收银台/收款台/结帐Cashier31 商店Shop32 食品部Food Shop33 酒吧Bar/Pub34 快餐厅Snack Bar/Fast Food35 西餐厅Western Restaurant36 中餐厅Chinese Restaurant37 咖啡馆/咖啡厅Café38 一/二/三/四/五层(楼)F1/F2/F3/F4/F539 地下一层/二层/三层B1/B2/B340 灭火器Fire Extinguisher41 饮水处Drinking Water42 自动取款机ATM43 吸烟室Smoking Room44 吸烟区Smoking Area45 报刊亭Kiosk46 消防应急面罩Fire Mask47 配电柜Power Distribution Cabinet48 配电箱Power Distribution Box49 衣帽寄存Cloakroom50 行李寄存Left Luggage/Luggage Deposit 会议场所大礼堂Auditorium演讲厅Auditorium国际会议厅Conference Hall会议室Conference Room第一会议室Conference Room I第二会议室Conference Room II1111会议室Conference Room 1111会议准备室Staff Room会议中Meeting in Progress简报室Briefing Room多媒体简报室Briefing Room orMultimedia Room开标室Bidding Room视听室Audio-Visual Room音控室Audio Control Room录音室Recording Room放映室Screening Room教室、研究室及办公室实验室Laboratory /Lab LaboratoryLab 讨论室Seminar Room/Meeting Room研讨室Seminar Room/Meeting Room教师研究室Hsiao-Ming Wang 标示英文姓名Wang, Hsiao MingHsiao-Ming Wang, Ph.D. 标示英文姓名及最高学位缩写Hsiao-Ming Wang, Professor 标示英文姓名及职称Faculty Office第一研究室Faculty Office I第二研究室Faculty Office II院办公室College OfficeAdministration Office ofCollege所办公室Graduate Institute (School) OfficeAdministration Office ofGraduate Institute(School)系办公室Department OfficeAdministration Office ofDepartment院长室Dean’s OfficeDeanDean of College ofDean, College of所长室Director’s Office 另请参考院长室之标示法系主任办公室Chairperson’s Office Chairman’s Offi ce 另请参考院长室之标示法客座教授研究室Visiting Faculty Office助教室T eaching Assistant Office助理办公室(Research) Assistant Office研究生研究室Graduate Student Study Room Study Room for Graduates教师休息室Faculty Lounge兼任教师休息室Adjunct Faculty Lounge计算机教室Computer LaboratoryComputer Classroom计算机(工作)室Computer Room教室Classroom普通教室General Classroom第一教室Classroom I第二教室Classroom II阶梯教室Lecture Hall讲堂Lecture Hall专题教室Seminar Room多功能教室Multifunction Classroom纪念室Memorial Room学生活动室Student Activity Room学生联谊室Student Lounge阅览室Reading Room读书室Study Room自习室Study Room团体室Group-Work Room准备室Preparation Room展示室Exhibition Room教具室T eaching Aids Room仪器室Instrument Room共同仪器室Common Instrument Room贵重仪器室Precision Instrument Room院史室College Archives校史室University Archives讲义油印室Printing Room编辑室Editorial Room/Editorial Office出版品室Publication Room暗房Dark Room新闻影棚Studio教学馆Classroom Building研究大楼Research Building研究大楼Graduate Building综合大楼Common Building旧总图书馆The Old Main Library Building座位示意图Seating Plan秘书室座位示意图Secretariat Seating Plan系学会Student Association Student Society 出入口及专用道入口Entrance出口Exit管制入口Access Control汽车出入口Vehicles Exit入口车道Parking Entrance限高M Maximum Clearance __M限速Speed Limit ___kph身心障碍专用坡道Wheelchair Ramp导盲砖Route for the Visually Impaired Route for Disabled 遵行方向This Way上(下)坡请勿停车No Parking on Ramp车位已满请勿进入No Vacancy请勿停车No Parking请勿暂停No Standing停车检查Check Point慢行Slow停车场售票处Ticketing停车场Parking Lot停车区Parking Lot地下停车场Underground Parking立体停车场Parking Tower平面停车场Parking Lot机车停车位Motorcycle Parking脚踏车停车位Bicycle Parking来宾专用停车位Visitor Parking身心障碍专用停车位Disabled Parking Only主管车停车位编号Reserved Parking本立体停车场专供本署员工停放Staff Only车库Garage直升机停机坪Heliport临时洽公停车区T emporary Parking洽公来宾车辆请勿停放,谢谢合作No Parking电扶梯及楼梯电梯Elevator电扶梯Escalator楼梯Stairs/Stairways贵宾专用电梯Guest Only身心障碍专用电梯Disabled Only本电梯直达6、8楼Floor 6 and 8 Only本电梯限停B1,1,4,6,8,10楼层B1, 1, 4, 6, 8, 10 Only本电梯通达各楼层[第二,三层楼除外] All Floors (Except 2 and 3Fl.) 本电梯请勿载运货物No Cargo载重:1600KG载人:24人速度:210米/分Maximum Load:1600KgsPersons:24Speed:211M/Min开放空间大厅Lobby中庭Atrium广场Plaza阳台Balcony庭院Courtyard艺廊Gallery喷水池Fountain正门Main Entrance / Main Gate侧门Side Entrance后门Rear Entrance(东、北、西、南)区中央区East, West, South, North Wing Central Area顶楼Roof走廊Hallway骑楼Arcade通道Corridor楼层Floor吸烟区Smoking Area地下室Basement平面图Floor Plan平面配置图Floor Plan1楼平面配置图1F Floor Plan行政大楼1楼平面配置图1F Floor Plan, AdministrationBuilding您现在位置You Are Here展示厅Gallery / Exhibition Room / Exhibition Hall (大型)行政信息陈列室Exhibition Room标本陈列室Exhibition Room(植物)标本馆Herbarium文物陈列馆Cultural Artifacts Exhibition Hall语音导览Audio Tour多媒体展示区Multimedia Exhibition Room展售中心Sales Center / Gift Shop / Show Room (大型)出版品展售中心Sales Center照片资料区Photo Exhibition Room温室Conservatory /Greenhouse服务台Information/Information Desk询问处Information民众服务中心Service Center生活信息站Kiosk流通台Reader Services / Circulation Desk身心障碍服务Disabled Service办公时间Office Hours星期六、日及国定假日休息Closed on Saturday, Sunday and National Holiday 开放时间Service Hours柜台收件时间Service Hours民众意见箱Suggestions员工意见箱Suggestions检举信箱Complaints公布栏、公告栏Bulletin Board台湾大学公告栏Bulletin Board, National Taiwan UniversityNational Taiwan UniversityBulletin Board通告(公告) Announcement人事广告Career Opportunities自动提款机ATM公用电话Public Telephone邮局Post Office乘车处Bus Stop打卡刷卡区Clock In / Out巡逻箱Patrol Box来宾会客洽公请至会客室办理登记换证Visitor Registration 来宾请登记Visitor Registration访客登记处Visitor Registration行政大楼Administration Building蓄水池Reservoir待分配T o Be Assigned失物招领Lost and Found接待、服务及休闲区会客室Reception Room接待室Reception Room贵宾接待室Guest Reception Room贵宾室VIP Lounge休息室Lounge收发室Mail Room档案室Archives/File Room资料室Archives/Information Room发言人室Spokesperson's Office记者招待室Press Room新闻发布室Press Room影印室Copy Room传真室Fax Room茶水间Kitchen饮水机Drinking Fountain托儿所Day Care Center育婴室Nursery哺乳室Nursery / Nursing Room心理谘商室Counseling Room心辅室Counseling Room交谊厅Lounge康乐室Lounge网球场T ennis Court篮球场Basketball Court健身房Gym游泳池Swimming Pool储物柜Lockers物品寄放处Bag Check员工消费合作社(销售场所) Convenience Shop员工消费合作社(办公场所) Employee's Cooperative 卖店/纪念品Sales Center / Gift Shop / Souvenirs 点心贩卖部Snack Bar理发厅Barbershop美发院Beauty Salon餐厅Restaurant中餐厅Chinese Restaurant西餐厅Western Restaurant小餐厅Cafeteria执勤室Duty Room值班室Duty Room警卫室Security Room司机室/司机调度室Drivers' Lounge管理员室Custodian Office第一宿舍Dormitory I课外活动申请Extra-Curricular Activities Application经费补助Budget Supplement场地借用Facilities Service社团管理Student Club Management导师及操行Student Advisor and Conduct Grades学生奖惩Student Merits and Punishments学杂费减免Tuition and Miscellaneous Fees Exemption 谘商辅导Student Counseling奖学金Scholarships工读Part-Time Job请假Student Leave of Absence学生平安保险Student Accident Insurance图书、期刊区图书室Library期刊室Periodical Room(现期)期刊区Current Periodicals(装订)期刊区Bound Periodicals中文(现期)期刊区Current Chinese Periodicals西文(现期)期刊区Current Western Periodicals中文(过期)期刊区Back Issues, Chinese西文(过期)期刊区Back Issues, Western中日韩文图书区East Asian Publications中文图书区Chinese Publications西文图书区Western Publications法律图书室Law Library参考图书区Reference Room (Area)中文参考书区Reference Collection(Chinese)西文参考书区Reference Collection(Western Languages) 教师指定参考书区Course Reserves Area过期报纸阅览区Old Newspapers Reading Area当日报纸阅览区Current Newspapers ReadingArea博硕士论文区Dissertations/Theses目录检索区Catalog(s) 信息检索区OPAC and Information Retrieval Area电子数据库检索区Database Search Room卡片目录区Card Catalogue本校出版品区University Publications人文/社会科学资料区Monograph Collection (Humanities/Social Sciences)日据旧藏台湾资料区Pre-1949 Collections, Taiwan Information Area日据旧藏资料区Pre-1949 Collections,Information Area新书展示区New Acquisitions Display Area微缩资料区Microform Materials编目室Cataloging Room书库Book Vault公报室Bulletin Office地图室Map Room阅览室Reading Room阅卷室Reading Room缮本阅览室Rare Books Reading Room参考室Reference Room官书室Official Publications参考咨询台Reference Desk流通柜台Circulation Desk还书箱Book Drop盥洗场所洗手间/盥洗室Restroom/Lavatory女化妆室/女厕所Ladies' Room男化妆室/男厕所Men's RoomGentlemen's Room身心障碍专用厕所Disabled Restroom请靠近一点Please Stand Closer浴室Shower机械及电器场所总机Operator计算机机房Computer Facilities发电机房Generators空调机房Air Conditioning Facilities变电室Transformer Room电气室Electrical Control Room配电室Electricity Distribution Facilities水电室Pump & Electricians中控室Central Control Room机械室Machine Room帮浦间Pump Room冷冻空调室Air Conditioning Room空调机械室Air Conditioning Facilities维修室Maintenance Room锅炉间Boiler储藏及仓库库房Storeroom / Storage消耗品库房Storeroom / Storage备用库房Storeroom / Storage文具用品室Stationery弹药室Armory卸货区Loading Zone货车装卸专用30分钟Loading Zone (30 Minutes Only) 储藏室Storeroom / Storage样品室Samples Room工具间T ool Room清洁工具室Janitorial Supplies Room紧急逃生及救援缓降机/缓降梯Escape Sling紧急用升降机Emergency Elevator紧急专用电梯Emergency Elevator通报设备Alert Facilities紧急照明Emergency Light安全门Emergency Exit逃生梯Emergency Ladder室内逃生梯Emergency Ladder / Emergency Staircase室外逃生梯Emergency Escape紧急避难梯Emergency Ladder /Emergency Staircase紧急出口Emergency Exit疏散路线Evacuation Route紧急疏散方向图Evacuation Plan各楼层配置及紧急避难方向图Floor Plan & Evacuation Route 防火门火警时随手关门Fire Escape - Please Keep Closed东[西]侧逃生梯请随手关门East [West] Fire Escape - Please Keep Closed 防空避难处Air-raid Shelter浓烟逃生袋Emergency Smoke Bag避难引导Emergency Evacuation Routes避难方向Evacuation Route or Evacuation Path避难出口高楼逃生缓降机Emergency Exit &Escape Sling消防栓Hydrant消防箱Fire Hose灭火器Fire Extinguisher消防水Water for Emergency Use消防沙Sand for Emergency Use消防设备Hydrant紧急电源Emergency Power医务室Medical Room/Infirmary护理站First Aid Station紧急应变联络表Emergency Response Contact Chart 自动火灾受信器Automatic Fire Detection System警告标示危险Danger水深危险Danger:Deep Water高压危险,有电勿靠近Keep Clear - High Voltage高压电气设备请勿开启靠近Keep Clear - High Voltage 安全第一Safety First注意Caution施工中Under Construction修理中Under Repair载重Maximum Load注意-辐射区域Caution:Radiation Area中辐射管制区Medium Radiation Control Area白色管制区White Zone放射性燃料池Radiation Fuel Pool高辐射管制区High Radiation Control Area低辐射管制区Low Radiation Control Area黄色管制区Yellow Zone绿色管制区Green Zone辐射污染区Contaminated Area辐射侦测中心Radiation Detection Center辐射区域Radiation Area辐射管制区Radiation Control Area禁止吸烟No Smoking禁止饮食No Food or Drink禁止携带宠物No Pets禁止通话Turn Off Cell Phone禁止拍摄No Photo严禁烟火No Open Flames禁止闪光灯No Flash禁止左(右)转No Left (Right) Turn禁止回转No U Turn禁止触摸No Touch / Hands Off当放射灯闪烁时烟铬尽[ Inergen]气体放射中危险禁止进入Hazardous Gas - No Entry When Flashing往厕所Restroom → (←)此门不通No Exit请勿进入No Entry请用雨伞套Please Use Plastic Umbrella Sheath闲人勿进Authorized Personnel Only非公共空间Non-Public Area节约用水Please Conserve Water请勿践踏草坪Keep Off the Grass请勿攀爬No Climbing维护清洁你我有责Keep Clean请关紧Turn off Completely随手关门Keep Closed随手关灯Turn Off Lights When Leaving排烟栅门手动开关Ventilation Switch冷气开放中请随手关门Air-Conditioned Keep Door Closed请按区域电灯开关节省能源Please Use the Lights You Need进入大门请出示佩挂识别证Please Show ID在办公处所请佩挂识别证Please Display ID at All Times本大楼室内全面禁烟若欲吸烟请至大楼左侧楼梯间Smoking Area Located ____员工专用游客止步Staff Only监视系统Monitoring System资源回收及垃圾资源回收Recycling铁类Iron铝类Aluminum玻璃类Glass塑料类Plastic纸类Paper废纸回收Used Paper电池回收筒Battery Recycling Bin垃圾分类Recycling资源回收筒请勿投入一般垃圾Recyclables Only认识回收标志做好垃圾分类Please Recycle铁罐,铝罐,玻璃瓶,PET瓶,塑料容器,铝箔包,纸容器Please Recycle 垃圾桶Trash博物馆museum游船码头Cruise wharf餐厅Cafeteria停车场Parking area遗址厅Site hall贵宾厅VIP Room办公区Administrative area会议室Conference Room陈列厅Exhibit hall学术报告厅Academic report hall服务台Reception desk展教部Department of Exhibition & Education文保部Department of Cultural Relics Protection临时展厅Provisional Hall标识标牌---旅游景区景点标识标牌中英文对照1 导游服务/讲解服务Tour Guide Service2 照相服务Photo Service3 邮政服务Postal Service4 声讯服务Audio Guide5 票务服务Ticket Service/Tickets6 残疾人服务Service for Disabled7 免费Free Admission8 赠票Complimentary Ticket9 欢迎光临Welcome10 宣传资料Tourist Brochure/Travel Brochure11 半价50% Off/Half Price/50% Discount12 谢谢合作Thanks for Your Cooperation13 信用卡支付Credit Cards Accepted14 提供拐杖Crutches Available15 提供轮椅Wheelchairs Available16 游程信息Itinerary Information/Travel Info 二:1 售票处Ticket Office/Tickets2 游客中心Tourist Center3 客房部Guest Room Department4 游船码头Cruise T erminal5 办公区Administrative Area6 公园管理处Park Administrative Office7 广播室Broadcasting Room8 游船Sightseeing Boat9 索道Cableway10 缆车Cable Car11 拱桥Arch Bridge12 展览馆/陈列馆Exhibition Hall/Exhibition Center13 陈列室Exhibition Room/Display Room14 展区Exhibition Area/Display Area15 展厅Exhibition Hall/Display Hall16 故居Former Residence17 团体接待Group Tour18 休息处Lounge19 导游处Guide Service20 表演区Performance Area21 游乐场/游乐园Amusement Park22 儿童游乐场/儿童乐园Children’s Playground23 民族歌舞Folk Dances24 手工艺展示Handicraft Display25 特色餐饮Food Specialties26 民族特色街Ethnic Culture Street27 导游亭T our Guide Booth28 模型Model29 主廊Main Corridor30 车道Vehicle Lane31 农家院Farm House32 专题展区Theme Display33 大石桥Great Stone Bridge34 博物馆Museum35 塔Pagoda/Dagoba(藏式塔)36 宫、院Palace37 亭、阁Pavilion38 寺Monastery (T emple)39 牌楼Memorial Archway40 桥Bridge41 廊Corridor42 牌坊Memorial Gateway43 庙Temple44 观堂Taoist Temple45 遗址Historic Site46 书房Study Room47 瀑布Waterfall48 滑雪场Ski Field49 滑雪道Ski Slope50 拓展区Outdoor Development Area51 狩猎区Hunting Area52 XX 养殖场XX Farm53 宠物乐园Pet Paradise54 无障碍售票口Wheelchair Accessible55 中央展厅Central Exhibition Hall/Central Display Hall56 报告厅Auditorium57 展厅入口Entrance58 休闲区Leisure Area59 贵宾厅VIP Hall60 序厅Lobby61 阅览室Reading Room62 贵宾通道VIP Only63 员工通道Staff Only64 租赁车Car Rental65 上楼楼梯Upstairs66 下楼楼梯Downstairs67 步行街Pedestrian Street68 货币兑换Currency Exchange69 走失儿童认领Lost Children Information70 行李手推车Trolley71 三轮车接待站Tricycle T our72 电动游览车Sightseeing Trolley73 服装出租处Costume Rental74 自行车租赁处Bicycle Rental75 租船处Boat Rental76 旅游纪念品商店Souvenir Shop77 字画店Calligraphy & Painting Shop78 公园Park79 儿童公园Children’s Park80 雕塑公园Sculpture Park81 体育公园Sports Park82 动物园Zoo83 植物园Botanical Garden84 街旁游园Community Park85 盆景园Mini-Scape Garden/Bonsai Garden86 景观Scenery87 景区Scenic Area88 景点Scenic Spot89 森林浴Forest Bath90 空气浴Air Bath91 温泉浴Hot Spring Bath92 日光浴Sun Bath93 泥沙浴Mud and Sand Bath94 摄像室Photo Studio95 无烟景区Smoke-Free Scenic Area96 大型水滑梯/戏水滑道Water Slide97 收费停车场Pay Parking ,98 茶室Tea House99 游泳池Swimming Pool100 残疾人客房Accessible Guestroom101 吸烟区Smoking Area102 非吸烟区Non-Smoking Area103 国家级文物保护单位State Protected Historic Site104 市级文物保护单位Municipality Protected Historic Site/City Protected Historic Site 105 区级文物保护单位DistrictProtected Historic Site106 爱国主义教育基地Patriotic Education Base107 浅水区Shallow Water108 深水区Deep Water109 采摘区Fruit-Picking Area110 工农业旅游示范点Industrial and Agricultural Site 111 游览观光车Sightseeing Trolley/Sightseeing Bus 112 标本室Specimen Room113 观赏区Viewing Area114 投喂区Feeding Area115 触摸区Petting Area116 科技馆Science & Technology Hall117 导览册Guide Book118 导览机Audio Guide119 世界文化遗产World Cultural Heritage三:1 自动控制Auto-Control2 多媒体Multi-Media3 地质年代Geologic Age4 大事年表Chronology of Events5 自画像Self-Portrait6 碑记Tablet Inscription7 雕塑作品Sculpture8 石刻Stone Carving9 草原Grassland10 古树名木Old and Famous Trees11 温室采摘Greenhouse Fruit Picking12 数字特技Digital Stunt13 花卉Flowers & Plants14 野营露营Camping15 消闲散步Strolling16 郊游野游Outing17 垂钓Fishing18 登山攀岩Mountaineering/Rock-Climbing19 揽胜探险Expedition20 科普教育Popular Science Education21 游戏娱乐Entertainment22 健身Bodybuilding23 演艺Art Performance24 水上运动Aquatic Sports25 滑水Surfing26 潜水Scuba Diving27 冰雪活动Ice Skating & Skiing28 滑草活动Grass Skiing29 滑沙Sand Skiing30 水上漂流Drifting31 数字特技Digital Stunt32 电影录音Film Recording33 电影剪辑Film Editing34 电影洗印Film Processing35 电影拍摄Filming36 电影动画Film Animation体育场馆标识公共场所标识中英文双语翻译对照表序号中文名称英文名称1 禁坐栏杆Don't Sit on the Handrail/No Sitting on the Handrail2 小心轻放Handle with Care3 请勿外带食品No Food from Outside4 易碎Fragile5 报警指示牌Police Alarm6 消防指示牌Fire Alarm7 请在此处开票Get Your Invoice Here8 先试后买Try Before You Buy9 不外售Not for Sale10 单号入口Odd Numbers Entrance11 双号入口Even Numbers Entrance12 热Hot13 冷Cold14 按Press15 营业时间Open Hours/Business Hours16 场馆示意图Map/Sketch Map序号中文名称英文名称1 票务室/售票处Ticket Office/Tickets2 桑拿浴房Sauna3 更衣室Locker Room4 女淋浴室Women's Shower Room5 男淋浴室Men's Shower Room6 按摩室Massage Room7 医务室Clinic8 贵宾休息室/贵宾厅VIP Lounge9 力量训练房Strength Training Gymnasium10 运动员休息室Athletes' Lounge11 记者休息室Press Lounge/Media Lounge12 运动员席Athletes' Seats/Athletes' Box序号中文名称英文名称13 新闻发布厅Press Conference Hall/Media Conference Hall14 新闻办公室Press Office/Media Office15 文字记者席Press Seats/Press Box16 电视评论席TV Commentators17 播音室Broadcasting Room18 广播席Radio Commentators19 摄影记者区Photo Zone/Pool Positions (Pool Positions仅用于奥运场馆内)20 兴奋剂检查室Doping Control Room21 场地器材室Venue Equipment Room22 竞赛办公室Competition Office23 技术代表室Technical Delegates' Office24 裁判员室Referees' Office25 仲裁办公室Jury's Office26 公告栏Notice Board27 吸烟处Smoking Area28 运动员专用通道Athletes Only29 残疾人专用通道Wheelchair Accessible30 散场通道EXIT/ Exit31 观众通道For Spectators32 检录处Call Room/Call Area33 观众席Spectator Seats34 贵宾席VIP Box35 主席台Rostrum36 等候区Waiting Area37 残疾人(无障碍)观众席Seats for Disabled38 储藏室Storeroom39 风机房Ventilator Room40 电气室Power Supply Room41 计时控制室Timing Control Room42 公共广播系统PA(Public Address/Announcement system)43 运营区/场馆工作区BOH (Back of House)44 通行区/场馆公众区FOH (Front of House)45 打印复印室Photocopy46 洗衣房Laundry47 客房Guest Room48 警卫室Guard Room序号中文名称英文名称1 田径Athletics2 足球Football3 游泳Swimming4 跳水Diving5 竞技体操Artistic Gymnastics6 蹦床Trampoline7 射击Shooting8 篮球Basketball9 赛艇Rowing10 场地自行车Track Cycling11 皮划艇Canoe/ Kayak12 摔跤Wrestling13 乒乓球Table Tennis14 柔道Judo15 跆拳道Taekwondo16 羽毛球Badminton17 艺术体操Rhythmic Gymnastics18 现代五项Modern Pentathlon19 手球Handball20 拳击Boxing21 山地自行车Mountain Biking/Mountain Cycling22 水球Water Polo23 击剑Fencing24 飞碟射击Trap Shooting25 排球Volleyball26 举重Weightlifting27 棒球Baseball28 射箭Archery29 铁人三项Triathlon30 沙滩排球Beach Volleyball31 网球Tennis32 小轮车BMX (Bicycle Motocross)33 马术Equestrian。
附:船舶涂装词汇(中英文对照)及其它术语1图纸(船舶涂装用图纸)PLAN与船体1.1图纸名称(部分)1.1.1总布置图general arrangement1.1.2分段结构图block construction1.1.3油漆明细表painting scheml1.1.4除锈涂装工艺de-rusting procedure1.1.5隔音隔热绝缘布置图arrangement of heatand sounding insulation1.1.6甲板敷料布置图arrangement of deck covering1.1.7外加电流阴极保护系统安装工艺installation technique for impressed current andcathodic protection system1.1.8船体舷外标志hull marking plan1.1.9机仓布置图arrangement of engine room1.1.10水尺及载重线标志draught and load line mark1.1.11船体密性试验图hull tightness test plan1.1.12船体建造工艺孔布置图arrangement of temporary access holes for hull construstion1.2图纸词汇(部分)1.2.1中心线center line缩写C.L1.2.2基准线base line缩写B.L1.2.3肋骨符号frame space N缩写F.S.或F,N表示阿拉伯数字1.2.4比例proprotion1.2.5设计载重水线designed water line 1.2.6水尺draft mark1.2.7左port缩写P1.2.8右starboard缩写S1.3船舶部位1.3.1船体外板hull outside1.3.1.1船底bottom1.3.1.2水线boottop1.3.1.3干舷topside1.3.1.4舵rudder1.3.1.5舵杆洞rudder trunk1.3.1.6锚anchor1.3.1.7锚链chain1.3.1.8桨paddle1.3.1.9螺旋桨screw propeller1.3.2露天甲板weather decks1.3.2.1主甲板main deck1.3.2.2锚机甲板anchor deck1.3.2.3起居甲板accommodation deck 1.3.2.4艇甲板boat deck1.3.2.5驾驶甲板navigate deck1111.3.2.6罗径甲板compass deck1.3.2.7甲板室deckhouse1.3.2.8上层建筑外围壁superstructure outside well1.3.2.9烟囱funnel1.3.2.10舷墙bulwarks1.3.2.11游泳池swimming pool1.3.3舾装件fitting1.3.3.1前桅foremast1.3.3.2雷达桅radarmast1.3.3.3吊艇架boat davit1.3.3.4吊杆derrick boom1.3.3.5食品吊provision davit1.3.4各类仓柜1.3.4.1压载仓ballast tanka)双层底压载水仓double bottom ballast water tank缩写b)艏尖水仓forepeak water tank缩写F.W.T.c)艉尖水仓afterpeak water tank缩写A.W.T.d)顶边水仓ballast wing tank缩写B.W.T.1.3.4.2油柜oil tanka)主机滑油循环仓main engine lube oil circulation tankb)油类:滑油lube oil缩写L.O.船用柴油marine diesel oil缩写M.D.O.船用柴油heary fuel oil缩写F.O.液压油hydraulie oil齿轮箱油gear oilc)仓柜类:贮存柜storage tank日用柜day tank沉淀柜settling tank泄放柜drain tank溢流仓overflow tank污油仓waste oil tank油渣仓sludge oil tank注:油类和仓柜类可以组合。
英文夜航命令簿记录范文Navigating through the darkness of the night sky, the cockpit of the aircraft becomes a place of intense focus and precision. The hum of the engines blends with the soft clicks and beeps of instruments, creating a symphony of sounds that is both familiar and comforting to the seasoned pilot. The night flight logbook, an essential document, sits open on the small table next to the pilot's seat, its pages aglow with the soft light from the instrument panel.The logbook is a meticulous record of the journey, each entry a testament to the pilot's vigilance. As the aircraft cruises at altitude, the pilot records the time, position, altitude, and fuel levels. The handwriting is neat, each letter and number crafted with care to ensure clarity and accuracy. The logbook is not just a record; it's a narrative of the flight, a story written in data and observations.The night brings its own set of challenges and beauty. Stars twinkle above, a celestial tapestry that guides the way. Below, the world is a patchwork of darkness and light, cities glowing like clusters of fireflies. The pilot notes the weather conditions, the visibility, and the smoothness of the air. Turbulence, when it comes, is recorded with a brief description of its intensity and duration.Communication with air traffic control is constant, a lifeline to the world below. The pilot records the frequencies used, the clearances received, and any notable exchanges. These entries serve as a legal record, but also as a reminder of the invisible network of support that spans the globe, keeping the aircraft safe on its nocturnal voyage.Fuel management is critical, and the logbook reflects this. Entries detail the fuel at takeoff, the consumption rate, and the remaining reserves. Calculations are precise, margins are conservative, and the pilot is always aware of the nearest airports, should an unscheduled stop become necessary.As the journey progresses, the pilot records the waypoints passed, the changes in course, and the adjustments in altitude. The logbook tells the story of a journey that is asmuch about navigation and strategy as it is about flying. It's a dance between the pilot and the aircraft, between the sky and the earth, a dance that requires skill, patience, and an intimate knowledge of the elements.The logbook is also a personal document. It contains the reflections of the pilot, the moments of quiet awe at the beauty of the night sky, the satisfaction of a well-executed maneuver, the relief when a potential issue is resolved. These entries are brief, but they capture the essence of night flying, the solitude, and the camaraderie with the crew.As the aircraft begins its descent, the pilot prepares for the approach. The logbook entries become more frequent, detailing the configuration of the aircraft, the settings for the approach, and the communication with the tower. The tension is palpable, but there is also a sense of anticipation, the culmination of hours of work.The landing is recorded with the time, the runway used, and the conditions on the ground. The engines wind down, and the aircraft taxis to the gate. The pilot makes the final entry in the logbook, closing the narrative of this flight. The logbook is complete, a document of precision and care, a record of a journey through the night sky.In the quiet of the cockpit, the pilot takes a moment to review the logbook. It's more than just a legal requirement; it's a chronicle of a flight, a piece of history, a story that has been written in the skies. With the logbook closed, the pilot steps out into the cool night air, the journey recorded, the story told. 。
FENWAL SAFETY SYSTEMSCOMPONENT MAINTENANCE MANUAL35008-138TO:HOLDERS OF COMPONENT MAINTENANCE MANUAL 26-10-10, PART NUMBER 35008-138HIGHLIGHTSThis page transmits Rev. 6, dated Jul 27/06, to Component Maintenance Manual 26-10-10. Replace, add and remove the pages as shown below.REVISED PAGES DATEDJul 27/06T-1, T-2, RR-1, RR-2, LEP-1, LEP-2, TC-1, TC-2, 1-2, 101, 401,901-908, 1001-1025ADDED PAGES DATED909-910Jul 27/06 DELETED PAGES DATED1026-1027Apr 16/044200Airport Drive NWWilson,North Carolina27896-8630USATelephone:252-237-7004Fax:252-246-7183CAGE:73168COMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LISTPOWER SUPPLY CARD35008-138(BAC S283N001-2)CONFIDENTIALThis document and the information contained herein are the property of Kidde Technologies,Inc.(KTI)and contain confidential and proprietary information of KTI.The named recipient of this document agrees to hold all such information in strict trust and confidence and agrees that it shall be used only for the maintenance of KTI equipment in accordance with the applicable OEM product support contracts,and shall not be used for any other purpose.The named recipient agrees not to disclose such information to any third party without KTI’s prior written permission.Copying or disclosure by anyone without KTI’s written permission is not authorized and may result in criminal and/or civil liability.ORIGINAL ISSUE:Jul16/82REVISION6:Jul27/06FSS27226-10-10Page T-1Jul27/06THIS PAGE INTENTIONALLY LEFT BLANKORIGINAL ISSUE:Jul16/82REVISION6:Jul27/0626-10-10Page T-235008-138RECORD OF REVISIONSKeep this page in front of the manual.When you get a revision,put the changed pages in the manual,and write the revision number,the date you put the pages in,and your initials in the areas given below.INSERTED INSERTED Rev No.ISSUE DATE DATE BYRevNo.ISSUEDATEDATE BY1Nov 26/86Nov 26/86FSS 2Jul 30/89Jul 30/89FSS 3May 28/99May 28/99FSS 4Oct 27/00Oct 27/00FSS 5Apr 16/04Apr 16/04FSS 6Jul 27/06Jul 27/06FSS26-10-10Page RR-135008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page RR-235008-138RECORD OF TEMPORARY REVISIONSTEMPORARY REV.NO.PAGE NO.ISSUE DATE BYDATE REMOVED BY1T-1,RTR-1,LEP-1thru3,andINTRO-1and2Jan22/99FSS May28/99FSS26-10-10Page RTR-135008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page RTR-235008-138 SERVICE BULLETIN LISTSB NO.REVINCLUDEDINREVISIONDATE OFINCORPORA-TION TITLEPage SBL-135008-138THIS PAGE INTENTIONALLY LEFT BLANKPage SBL-2Fenwal Safety SystemsCOMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LISTPOWER SUPPLY CARD35008-138LIST OF EFFECTIVE PAGESSubject Page Date T-1Jul 27/06TITLE T-2Jul 27/06RR-1Jul 27/06RECORD OF REVISIONS RR-2Jul 27/06RTR-1Apr 16/04RECORD OF TEMPO-RARY REVI-SIONS RTR-2Apr 16/04SBL-1Apr 16/04SERVICE BULLETIN LIST SBL-2Apr 16/04LEP-1Jul 27/06LIST OF EFFECTIVE PAGES LEP-2Jul 27/06TC-1Jul 27/06TABLE OF CONTENTS TC-2Jul 27/06INTRO-1Apr 16/04INTRODUC-TION INTRO-2Apr 16/041Jul 27/062Jul 27/06DESCRIP-TION AND OPERATION3Apr 16/044Apr 16/04101Jul 27/06102Jul 27/06TESTING AND FAULT ISOLATION103Apr 16/04104Apr 16/04105Apr 16/04106Apr 16/04SubjectPageDate107Apr 16/04108Apr 16/04109Apr 16/04110Apr 16/04111Apr 16/04112Apr 16/04113Apr 16/04114Apr 16/04201Apr 16/04202Apr 16/04SCHEMAT-ICS AND WIRING DIA-GRAMS 203Apr 16/04204Apr 16/04301Apr 16/04DISASSEM-BLY 302Apr 16/04401Jul 27/06CLEANING 402Apr 16/04501Apr 16/04CHECK 502Apr 16/04601Apr 16/04602Apr 16/04REPAIR603Apr 16/04604Apr 16/04701Apr 16/04ASSEMBLY 702Apr 16/04801Apr 16/04FITS AND CLEAR-ANCES802Apr 16/0426-10-10Page LEP-1Fenwal Safety Systems COMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LIST POWER SUPPLY CARD 35008-138Subject Page Date 901Jul 27/06902Jul 27/06903Jul 27/06SPECIAL TOOLS,FIXTURES,EQUIPMENT AND CON-SUMABLES 904Jul 27/06905Apr 16/04906Apr 16/04907Jul 27/06908Jul 27/06909Jul 27/06910Jul 27/061001Jul 27/061002Jul 27/06ILLUS-TRATED PARTS LIST 1003Jul 27/061004Jul 27/061005Jul 27/061006Jul 27/061007Jul 27/061008Jul 27/061009Jul 27/06Subject Page Date 1010Jul 27/061011Jul 27/071012Jul 27/071013Jul 27/061014Jul 27/061015Jul 27/061016Jul 27/061017Jul 27/061018Jul 27/061019Jul 27/061020Jul 27/061021Jul 27/061022Jul 27/061023Jul 27/061024Jul 27/061025Jul 27/0626-10-10Page LEP-235008-138TABLE OF CONTENTSSubject Page RECORD OF REVISIONS................................................................................................RR-1 RECORD OF TEMPORARY REVISIONS...........................................................................RTR-1 SERVICE BULLETIN LIST..............................................................................................SBL-1 INTRODUCTION.......................................................................................................INTRO-1 General...............................................................................................................INTRO-1 Related Publications:..............................................................................................INTRO-1 Verification...........................................................................................................INTRO-1 DESCRIPTION AND OPERATION.. (1)Description (1)Specified Data (2)Operation (2)TESTING AND FAULT ISOLATION (101)General (101)Equipment and Materials (101)Make a Power-Supply-Card-Test-Set (101)Preparation to Do the Functional Test (102)Functional Test (102)Fault Isolation (105)SCHEMATICS AND WIRING DIAGRAMS (201)General (201)Schematics (201)DISASSEMBLY (301)General (301)CLEANING (401)General (401)Equipment and Materials (401)Procedure (402)CHECK (501)General (501)Procedure (501)REPAIR (601)General (601)Equipment and Materials (601)Procedure (602)ASSEMBLY (701)General (701)Movement and Shipping (701)FITS AND CLEARANCES (801)General (801)Fits and Clearances (801)Torque Values (801)SPECIAL TOOLS,FIXTURES,EQUIPMENT AND CONSUMABLES (901)General (901)Special Tools,Fixtures and Equipment (901)26-10-10Page TC-135008-138Consumable Materials (902)Power-Supply-Card-Test-Set (903)Special Tools,Fixtures,Equipment,and Consumables Vendors (907)ILLUSTRATED PARTS LIST (1001)Introduction (1001)Numerical Index (1004)Equipment Designator Index (1008)26-10-10Page TC-235008-138INTRODUCTION1.GeneralA.This manual gives the data and procedures to do tests and repair the powersupply card.B.Section1gives data about the power supply card and tells how it operates.C.Section101gives the necessary data to do tests and troubleshooting of the unit.D.Section201gives the schematics and wiring diagrams for the power supply card.E.Section301gives the procedures to disassemble the power supply card for repairor to replace damaged or defective components.F.Section401gives a list of materials and the procedure to clean components ofthe power supply card.G.Section501gives the procedures to do an inspection of the unit before,during,orafter maintenance is completed.H.Section601gives the procedure to replace defective components and repair amalfunction in the power supply card.I.Section701gives the procedures to assemble the power supply card after repairhas been done.J.Section801gives the torque values necessary to assemble the power supply card.K.Section901gives a list of the special tools,fixtures,test equipment and consumables necessary for maintenance of the power supply card.L.Section1001is an illustrated parts list(IPL)that gives a list of the parts you can replace in the power supply card and shows their location.2.Related Publications:A.CMM26-10-11,Control Card,P/N35008-38B.CMM26-14-02,Control Unit,P/N35008-302C.CMM26-14-42,Control Unit,P/N35008-3073.VerificationA.Testing and Fault Isolation:Jul27/89B.Disassembly:Jul27/89C.Assembly:Jul27/8926-10-10Page INTRO-135008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page INTRO-235008-138DESCRIPTION AND OPERATION1.DescriptionA.The power supply card,Figure1,is part of a fire-and-overheat-detection-system.The fire-and-overheat-detection-system has three primary parts:a control card,a power supply card,and sets of continuous-fire-detection-elements.Refer toRelated Publications.B.The power supply card is a printed wiring board assembly that operates from a+28V dc aircraft supply bus and supplies+5V dc and+18V dc to the control card,P/N 35008-72.The power supply card also supplies+20V dc output for the35008-38 control card.All input and output connections pass through one connector.Figure1.Power Supply Card26-10-10Page135008-1382.Specified DataA.Table1gives the specified data for the power supply card.Table1.Specified DataSPECIFIED ITEM OR FUNCTION DATADimensions(max.)7.468in.(18.969cm)L x1.287in.(3.269cm)W x5.610in.(14.249cm)HWeight13oz.(364g)Temperature Range for Operation-40to+70ºC(-40to158ºF)with cooling air. Normal Voltage Range22.0to29.5V dcMax.Surge Voltage50V dc for10secondsMax.Voltage Spike600V dc for0.010secondsPower Input 6.0W max.Outputs:+5V dc 5.0±0.1V dc@750mA min.+18V dc19.0±1.0V dc@300mA min.+20V dc20.5±0.4V dc@12mA min.Mating Connector300052-001(Boeing BACC65L66)3.OperationA.Figure2shows a block diagram of the power supply card.The paragraphs thatfollow give the operation of each block.Refer to SCHEMATICS AND WIRINGDIAGRAMS for the schematics.26-10-10Page235008-138Figure2.Power Supply Card Block DiagramB.Aircraft supplied power comes into the power supply card through diode CR4.Diode CR4protects the power supply card from reverse-polarity.After CR4is an EMI filter(L2,C8,and C9)and an over-voltage transient suppressor CR5.Power then goes to the+5,and+18/20V dc voltage regulators.C.The+5V dc output is supplied to the control card for the microprocessor memoryand associated logic circuits.The+5V regulator input is isolated from the+18/20V regulator by CR2.Capacitors C6and C7block switching transients.The+5V regulator is a pulse-width-modulator integrated circuit(U1)that drives darlington-connected switching transistors Q1and Q2.Coil L1provides current continuity and energy storage.The fast recovery diode CR1provides thecontinuity path when the switching transistors are off.Capacitors C1and C2store energy for transient load demands.Resistor R6maintains a minimum load on the regulator if normal load is lost.Zener diode CR3protects the load circuits from regulator over-voltage.D.To control timing,the switching regulator has an internal oscillator that isexternally set to20kHz by R4and C3.C4and R5prevent over-dissipation of the switching transistors when power is turned on by providing a"soft start"to increase the voltage slowly.The output voltage feeds back to voltage divider R8and R9and is compared in the regulator internal-error-amplifier.Thereference voltage is generated by the internal reference divider R10,R11,and R12.The regulator keeps the reference and output feedback the same.R11 is adjustable to compensate for variation in the reference voltage.R17is the feedback-gain-control for the amplifier.26-10-10Page335008-138E.Operational amplifiers U2B and U2D provide protection from over-voltage andover-current conditions on the+5V dc output.The outputs of the two circuits are ORd by Q7,Q8,and associated components.If either an over-voltageor over-current(sensed by R7)condition occurs,then Q5,Q6,and associated components cause a high voltage on pin5of U1to disable the output.F.The filtered voltage from the+28V dc input supply is connected to the emitter ofthe series-pass-regulator-transistor Q3.The base of Q3is biased at a voltage determined by error amplifier U2A.The reference voltage for this amplifier is the +5V dc of U1.The+20V dc output is sensed by voltage divider R33,R34,and R35.The output is set by R34.G.The+20V dc output goes through CR12and CR13to reduce the output to+18Vdc.Diode CR14provides reverse-polarity protection for Q3.26-10-10Page435008-138TESTING AND FAULT ISOLATION1.GeneralCAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.A.This section gives the procedure to do a test and fault isolation(troubleshooting)of the power supply card.B.Tests will simulate aircraft voltages.2.Equipment and MaterialsA.Table101gives a list of test equipment and materials necessary to do tests andtroubleshooting of the power supply card.NOTE:You can use equivalent equipment and materials except where"NO ALTERNATIVE PERMITTED"is written.Refer to SPECIAL TOOLS,FIXTURES,EQUIPMENT,AND CONSUMABLES for the specifications andwhere to get the items.Table101.Test Equipment and MaterialsDESCRIPTION MODEL/PART NUMBERDC Power Supply Model6633BTrue RMS Digital Multimeter(DMM)Model175Oscilloscope Model TDS1012Test Set,Power Supply Card None-Make Locally3.Make a Power-Supply-Card-Test-SetA.Make a power-supply-card-test-set to do tests of the power supply card.Referto SPECIAL TOOLS,FIXTURES,EQUIPMENT,AND CONSUMABLES for thenecessary data to make a test set.26-10-10Page10135008-1384.Preparation to Do the Functional TestA.Connect the power supply card to the power-supply-card-test-set.See Figure101.Figure101.Power Supply Card Test SetupB.Set the switches on the power-supply-card-test-set as follows(see Figure901):–S4POWER to OFF–S15V LOAD to A–S218V LOAD to A.C.Connect the power supply to the power-supply-card-test-set(see Figure101).(1)Connect the positive cable to the test set DC INPUT+.(2)Connect the negative lead to the test set DC INPUT-.5.Functional TestA.Do paragraph4,Preparation to Do the Functional Test,before you do the stepsthat follow.B.Do the functional test given in Table102.If these tests do not give the correctresults,refer to Table103,Power Supply Card Fault Isolation,and the flow charts on Figures102thru107to find the cause of the malfunction.26-10-10Page10235008-138Table102.Functional TestTEST NO.PROCEDURE1.0PRELIMINARY1.Measure the resistance between TP-P1-28and TP-1.RESULT:≤1Ω.2.Connect the DMM to DC CAL+and DC CAL-on the test set.3.Adjust the power supply to28±1.0V dc.RESULT:DMM indicates28±1.0V dc.Indicator light comes on.2.0+5V dc SWITCHING REGULATOR OUTPUTOutput Voltage 1.Measure and record the voltage between TP-1and TP-2.RESULT:5±0.05V dc.Load Regulation 2.Set switch S1to B.3.Measure and record the voltage between TP-1and TP-2.4.Find the difference between the recorded value of step1andthe recorded value of step3.RESULT:<50mV dc.5.Set S1to A.Line Regulation 6.Adjust the power supply to22.0±0.1V dc.RESULT:DMM indicates22.0±0.1V dc.7.Measure and record the voltage between TP-1and TP-2.8.Adjust the power supply to29.5±0.1V dc.RESULT:DMM indicates29.5±0.1V dc.9.Measure and record the voltage between TP-1and TP-2.10.Find the difference between the recorded value of step7andthe recorded value of step9.RESULT:<50mV dc.11.Adjust the power supply to28.0±0.1V dc.RESULT:DMM indicates28.0±0.1V dc.Ripple12.Set the DMM to ac.13.Measure the voltage between TP-1and TP-2.RESULT:DMM indicates≤50mV true RMS.14.Set the DMM to dc.26-10-10Page10335008-138TEST NO.PROCEDUREOvercurrent Shutdown 15.Press and hold switch S3.Monitor the voltage between TP-2and TP-1.RESULT:After you press S3,the voltage will decrease to<1.0V dc in5seconds.16.Release S3.RESULT:The voltage will return to5±0.05V dc.3.0LINEAR REGULATOR OUTPUTOutput Voltage 1.Measure the voltage between TP-1and TP-3.RESULT:DMM indicates19.0(+0.8,-0.5)V dc.2.Measure and record the voltage between TP-1and TP-4.RESULT:DMM indicates20.5±0.2V dc.Load Regulation 3.Set S2to B.4.Measure and record the voltage between TP-1and TP-4.5.Find the difference between the recorded value of step2andthe recorded value of step4.RESULT:<0.1V dc.6.Set S2to A.Line Regulation7.Adjust the power supply to22.0±0.1V dc.RESULT:DMM indicates22.0±0.1V dc.8.Measure and record the voltage between TP-1and TP-3.9.Measure and record the voltage between TP-1and TP-4.10.Adjust the power supply to29.5±0.1V dc.RESULT:DMM indicates29.5±0.1V dc.11.Measure and record the voltage between TP-1and TP-3.12.Measure and record the voltage between TP-1and TP-4.13.Find the difference between the recorded value of step8andthe recorded value of step11.RESULT:<200mV dc.14.Find the difference between the recorded value of step9andthe recorded value of step12.RESULT:<200mV dc.Set S4to OFF.END OF FUNCTIONAL TEST26-10-10Page10435008-1386.Fault IsolationA.Figure201is schematic of the power supply card.It shows typical voltages ateach location when the card is in correct operation.Figure202shows waveforms at points on the schematic.CAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.e the data in Table103and Figures102thru107to troubleshoot the powersupply card.Table103.Fault Isolation DataFAULT PROBABLE CAUSE CORRECTION Incorrect5V dc output.Switching regulator notoperating properly.See Figure102.Incorrect load of line regulation on5V dc output.Defective switchingregulator component(U1,R17,R22,or C13).Examine and replacecomponents as necessary.Too much ripple on5V dc output.Inadequate filter.Defectivecomponent(C2or L1).Examine and replacecomponents as necessary.Incorrect overcurrent shutdown on5V dc output.Defective shutdown circuitcomponents(U2B,Q5,Q6,Q7,and associated parts).Examine and replacecomponents as necessary.Incorrect linear regulator output.Defective linear regulatorcomponent.See Figure102.Incorrect load or line regulation on linear regulator outputs.Defective linear regulatorcomponent(U2A).Examine and replacecomponents as necessary.26-10-10Page10535008-138Figure102.Troubleshooting Flow Chart,Power Supply Card26-10-10Page10635008-138Figure103.Troubleshooting Flow Chart,5V Supply Output(4.5to5.5V)26-10-10Page10735008-138Figure104.Troubleshooting Flow Chart,5V Power Supply(Sheet1of2)26-10-10Page10835008-138Figure104.Troubleshooting Flow Chart,5V Power Supply(Sheet2)26-10-10Page10935008-138Figure105.Troubleshooting Flow Chart,20V Supply(Sheet1of2)26-10-10Page11035008-138Figure105.Troubleshooting Flow Chart,20V Supply(Sheet2)26-10-10Page11135008-138Figure106.Troubleshooting Flow Chart,18V Supply26-10-10Page11235008-138Figure107.Troubleshooting Flow Chart,20V Supply(18.5to22.5V)26-10-10Page11335008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page11435008-138SCHEMATICS AND WIRING DIAGRAMS1.GeneralA.This section contains the schematic of the power supply card.B.No wiring diagram is necessary for the power supply card.2.SchematicsA.Figure201shows the power supply card schematic.26-10-10Page20135008-138Figure201.Power Supply Card Schematic(Sheet1of3)26-10-10Page20235008-138Figure201.Power Supply Card Schematic(Sheet2)26-10-10Page20335008-138Figure201.Power Supply Card Schematic(Sheet3)26-10-10Page20435008-138DISASSEMBLY1.GeneralA.There is no disassembly necessary for the power supply card.26-10-10Page30135008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page30235008-138CLEANING1.GeneralA.This section gives the equipment,materials,and procedures to clean the powersupply card.2.Equipment and MaterialsA.The equipment and materials to clean the power supply card are given in Table401.NOTE:You can use equivalent equipment and materials.Refer to SPECIAL TOOLS, FIXTURES,EQUIPMENT,AND CONSUMABLES for the specifications andwhere to get the items.Table401.Cleaning Equipment and MaterialsEQUIPMENT OR MATERIAL USED ONBristle Brush,Soft Card surfaceIsopropyl Alcohol Metal parts,electronics components,andconnector pinsNitrogen or Clean,Dry Air Parts and card surface26-10-10Page40135008-1383.ProcedureWARNING:CONCENTRATION OF COMPRESSED AIR OR UNWANTEDMATERIAL MOVED BY COMPRESSED AIR CAN CAUSEINJURY TO PERSONS.ALWAYS POINT COMPRESSED AIRAWAY FROM E APPLICABLE EYE PROTECTIONTO PREVENT INJURY TO YOUR EYES.CAUTION:THE POWER SUPPLY CARD IS COATED WITH CONFORMALCOATING.MAKE SURE YOU DO NOT DAMAGE THE COATING THATIS NOT TO BE REMOVED.CAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.A.Remove dust from the power supply card with a soft bristle brush,nitrogen,and/orclean,dry e a maximum of30psig(206.84kPa).WARNING:ALCOHOL IS FLAMMABLE AND POISONOUS.KEEP AWAYFROM OPEN FLAME.WEAR GLOVES AND EYE PROTECTIONTO PREVENT INJURY.DO NOT DRINK THE ALCOHOL.B.Clean the connector pins with isopropyl alcohol.WARNING:CONCENTRATION OF COMPRESSED AIR OR UNWANTEDMATERIAL MOVED BY COMPRESSED AIR CAN CAUSEINJURY TO PERSONS.ALWAYS POINT COMPRESSED AIRAWAY FROM E APPLICABLE EYE PROTECTIONTO PREVENT INJURY TO YOUR EYES.C.Clean metal parts with isopropyl alcohol.Let the parts dry fully.You can usenitrogen or clean,dry air to dry the e a maximum of30psig(206.84kPa).26-10-10Page40235008-138CHECK1.GeneralA.This section contains the data to do a check of the power supply card.2.ProcedureCAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.A.Examine all parts for wear,damage,missing parts,correct installation,and correcthardware size.Repair or replace as necessary.B.Examine parts to make sure they are tightly attached to the circuit card.Repair orreplace as necessary.C.Examine the connector for unwanted materials and bent or broken pins.Repair orreplace as necessary.NOTE:Pins4and60are removed when the connector is installed.D.Examine the circuit card for cracks,indications of too much heat,burnedcomponents,or defective solder connections.Repair or replace as necessary.E.Examine the conformal coating.Replace any missing or damaged coating.F.Make sure the parts you replace have correct part numbers and are installed inthe correct locations.26-10-10Page50135008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page50235008-138REPAIR1.GeneralA.This section gives the procedures to do a repair of the power supply card.2.Equipment and MaterialsA.Table601gives the equipment and materials necessary to repair the powersupply card.NOTE:You can use equivalent equipment and materials except where"NO ALTERNATIVE PERMITTED"is written.Refer to SPECIAL TOOLS,FIXTURES,EQUIPMENT,AND CONSUMABLES for the specifications andwhere to get the items.Table601.Repair Equipment and MaterialsEQUIPMENT OR MATERIAL PART NUMBERBristle Brush,Soft N/ACable Tie PLT1M-CGrease,Heat Conducting Thermalcote251Isopropyl Alcohol N/ALoctite Sealant242Mandrel,0.187in.(0.475cm)N/ANitrogen A-A-59503Solder,Rosin Core*ANSI/J-STD-006,ROL1,Sn63Pb37WRMA Urethane Coating*Hysol PC18Wire,22AWG N/A*NO ALTERNATIVES PERMITTED26-10-10Page60135008-1383.ProcedureCAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.e standard shop procedures to replace components on the power supply card.B.Clean the surface of the circuit card before you install a new part.Refer toCLEANING.C.Transistor Q1Replacement(1)Remove the screws.(2)Remove the transistor and heat sink.(3)Remove the heat sink ring from the transistor.WARNING:WEAR GLOVES.LOCTITE IS POISONOUS.(4)Apply Loctite to the threads on the heat sink.(5)Install the heat sink ring on the transistor.(6)Install the heat sink and transistor.(7)Install the screws.Torque to120in.oz.(0.847Nm).D.Transistor Q3Replacement(1)Apply heat conducting grease to the bottom of the transistor before youinstall it in the heat sink.E.Capacitor C8and C9Replacement(1)Figure601shows the correct installation of the cable ties.26-10-10Page60235008-138Figure601.Install Cable TiesF.Diode CR3Replacement(1)Cut22AWG lead wire to1.125±0.125in.(2.8575±0.3175cm)long.Stripends to0.250±0.062in.(0.635±0.1575cm).G.Inductor L1Replacement(1)Use a0.187in.(0.475cm)mandrel to bend the leads for a strain relief.H.Capacitor Cradle Replacement(1)Remove the capacitor from the cradle.(2)Remove the rivet(s).(3)Remove the cradle.(4)Install the cradle.(5)Install the rivet(s)from the solder side of the card.(6)Install the capacitor.I.Connector(P1)Replacement(1)Remove and discard pins4and60.WARNING:WEAR GLOVES.LOCTITE IS POISONOUS.(2)Put Loctite sealant on the threads of the screws.J.Conformal Coating(1)Apply urethane conformal coating to the repaired area after you completeall repairs.Follow the manufacturer’s instructions for cure before you do atest of the card.26-10-10Page60335008-138THIS PAGE INTENTIONALLY LEFT BLANK26-10-10Page60435008-138ASSEMBLY1.GeneralA.There is no assembly necessary for the power supply card.2.Movement and ShippingCAUTION:THE POWER SUPPLY CARD CONTAINS ELECTROSTATICDISCHARGE SENSITIVE(ESDS)COMPONENTS.THESECOMPONENTS ARE IDENTIFIED BY(ESDS)IN THE ITEMDESCRIPTION CONTAINED IN THE ILLUSTRATED PARTS LIST(IPL).FOLLOW ESDS PRECAUTIONS WHEN YOU TOUCH THE CARD ORDAMAGE TO COMPONENTS CAN OCCUR.A.Pack the power supply card in ESD protective materials.B.Put the power supply card in a suitable container that will keep it dry and protectit from damage.C.Keep the power supply card in a dry area.26-10-10Page701。
动火作业审批表Hot Work Approval Form分包单位Subcontractor: 时间Date:操作人员名单Operator作业内容Work Content动火位置Hot Work Position动火时间Hot work TimeFrom to安全检查及防护措施Safety Inspection and Preventive Measures 配备足够数量的灭火器材Enough fire fighting equipments are provided.是否Yes No 易燃品离火源10米以上Inflammables are at least 10m away from the fire source.是否Yes No 氧气瓶与乙炔瓶相距5米以上The distance between oxygen cylinder and acetylene cylinder is more than 5m. 是否Yes No作业前检查周边环境不可有易燃易爆物品Inflammables and explosives are forbidden nearby the hot work area. 是否Yes No作业完后要检查残渣余火熄灭Remaining fire is extinguished after the hot work is finished. 是否Yes No是否设有监火人员Fire monitor is provided. 是否Yes No申请人签名:Applicant: 动火作业人:Hot-work operator:监火人:Fire monitor:总包审核意见:Comment by Contractor:审核人:年月日Checked by: Date:注:1.本表一式二份,供动火单位及总包存档。
Remark: This form is in duplicate for Contractor and hot-work operating company.2.动火作业必须持有此表,接受SCP-JO及现场保安的核查。