澳大利亚矿业权评估指南1
- 格式:pdf
- 大小:704.90 KB
- 文档页数:37
Cover photo. Aerial view of Challenger Mine, 2004. (Courtesy of Dominion Mining NL; photo 400953)
Preferred way to cite this publication. Primary Industries and Resources South Australia 2009. Guidelines for miners: mining approval processes in South Australia, Minerals Regulatory Guidelines MG1, Mineral Resources Group. V 1.9. Department of Primary Industries and Resources South Australia, Adelaide.
PIRSA and the Crown in the right of the state of South Australia does not accept responsibility for and will not be held liable to any recipient of the information for any loss or damage however caused (including negligence) which may be directly or indirectly suffered as a consequence of use of these materials. PIRSA reserves the right to update, amend or supplement the information from time to time at its discretion.
Disclaimer. The information contained in this guideline has been compiled by the Department of Primary Industries and Resources South Australia (PIRSA) and originates from a variety of sources. Although all reasonable care has been taken in the preparation and compilation of the information, it has been provided in good faith for general information only and does not purport to be professional advice. No warranty, express or implied, is given as to the completeness, correctness, accuracy, reliability or currency of the materials.
Revision history Version 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Date 05/01/06 09/02/07 26/02/07 08/03/07 04/04/07 22/05/07 12/06/07 28/06/07 20/08/08 30/12/08 Comment Initial draft. Split process and document contents. Flowchart of proposal/ MARP differences. Minor revisions. Minor revisions. Major revisions to statutory requirements; requirement for mine completion report. Flowchart redrafted to one page; contacts list reviewed; MARP/proposal flowchart revised. Pegging figure quality improved; contact info revised. Reformatted; edited. Minor edits
.au
© Government of South Australia 2009. This work is copyright. Apart from any use as permitted under the Copyright Act 1968 (Cwlth), no part may be reproduced by any process without prior written permission from the Government of South Australia available through Primary Industries and Resources South Australia. Requests and inquiries concerning reproduction and rights should be addressed to the Executive Director, Division of Minerals and Energy Resources, PIRSA, GPO Box 1671, Adelaide SA 5001.
Mineral Resources Group Division of Minerals and Energy Resources Primary Industries and Resources South Australia Level 7, 101 Grenfell Street, Adelaide GPO Box 1671, Adelaide SA 5001 Phone Fax Email +61 8 8463 3000 +61 8 8463 6518 pirsa.customerservices@.au
Minerals Regulatory Guideloup
Version 1.9 February 2009
A guide to the two-stage authorisation process for mining in South Australia
Guidelines for miners: mining approval processes in South Australia
Contents
SHORTENED FORMS .......................................................................................................................................5 1 INTRODUCTION .............................................................................................................................................6 2 STATUTORY REQUIREMENTS.....................................................................................................................7 2.1 Tenement approvals .....................................................................................................................................7 2.1.1 Mineral claim ........................................................................................................................................7 2.1.2 Mining lease .........................................................................................................................................7 2.1.2.1 Application for a mining lease....................................................................................................7 2.1.2.2 Term and renewal of a mining lease .........................................................................................8 2.1.2.3 Annual rent and royalty..............................................................................................................8 2.1.2.4 Major developments and EPBC Act referrals .............................................................