eja120a[1]中文说明书
- 格式:pdf
- 大小:876.41 KB
- 文档页数:10
•Cleaning process can be validated using Alfa LavalRotacheckStandard designThe choice of nozzle diameters can optimize jet impact length and flow rate at the desired pressure.Alfa Laval offers a wide range of tank cleaning machines suitable for different duties and industries. An alternative that offers performance similar to the Alfa Laval SaniJet 20 is the Alfa Laval SaniJet 20 UltraPure for hygienic applications that require full traceability of product-contacted parts and smooth qualification and validation processes through the Alfa Laval Q-doc documentation package.Certificates2.2 material certificate, Q-doc and ATEX.Working principleThe high-impact jet stream from the rotary jet head covers the entire surface 360° of the tank interior in a successively denser pattern. This achieves a powerful mechanical impact with a low volume of water and cleaning media.The flow of the cleaning fluid makes the nozzles perform a geared rotation around the vertical and horizontal axes. In the first cycle, the nozzles lay out a course pattern on the tank surface. The subsequent cycles gradually make the pattern denser until at full cleaning pattern is reached.Once the full cleaning pattern is reached, the machine will start over again and continue to perform the next full cleaning pattern.TECHNICAL DATAAir motor:Must NOT be operated non-lubricatedMin. tank opening:3" clamp - rotacheck N/ACIP media recommended pressure: 5 - 8 barDry, dew point max.: 5 °C Must NOT be operated non-lubricated. MUST be lubricatedAir supply pressure:Max. 6 barAir consumption at max. speed: 6 l/sec. (22 m3/h)Adjustable speed: 3 - 14 RPMCleaning time: 4 - 18 min. (adjustable)Sealing:EPDM1 (standard), FPM1 FFKM11 FDA compliance 21CFR§177Max. ambient temperature:140 °CAir-driven machine:11.7 - 19.2 kgTank connection:Clamp: 4" ISO 2852Tank connection:Clamp: 3" 1ISO 28521Note! 3" Tank connection has no possibility of integrated rotacheck.in the supply line is recommended. Do not use for gas evacuation or air dispersion. For steaming we refer to the manual.Options•Electronic rotation sensor to verify 3D coverage•Improved surface finish•3.1 certification for metallic parts by request•With FFKM or FPM seal ring•ATEXQualification DocumentationQ-doc •EN 1935/2004 DoC•EN 10204 type 3.1 inspection Certificate and DoC •FDA DoC•GMP EC 2023/2006 DoC•EU 10/2011 DoC•ADI DoC•QC DoCATEX ATEX approved machine for use in explosive atmospheresMedia/Air driven:Cleaning unit:Catagory 1 for installation in zone 0/20 in accordance with Directive 2014/34/EU II 1G Ex h IIC 85 °C ... 175 °C GaII 1D Ex h IIIC T85 °C ... T140 °C DaAir driven:Air motor unit:Catagory 2 for installation in zone 1/21 in accordance with Directive 2014/34/EU II 2G Ex h IIC T4 GaII 2D Ex h IIIC T135 °C DaFlow Ratem A = 4 x Ø4.2 mm B = 2 x Ø3.8 mm LS C = 2 x Ø2.0 mm987654322345678910111213barInlet pressureRecommended operating pressure 5-8 bar1Impact Throw Length, Media DrivenmNozzles4107-015487654322345678910111213barInlet pressureA = 4 x Ø4.2 mmB = 2 x Ø3.8 mm LSC = 2 x Ø2.0 mm1ABCCleaning Time, Complete Pattern, Media driven4567891113152015ptm (pattern time minutes)min. rpm of machine bodyNozzles 4107-0156105322345678910111213barA = 4 x Ø4.2 mmB = 2 x Ø3.8 mm LSC = 2 x Ø2.0 mmInlet pressurerpmA BCImpact Throw Length, Air Drivenm876543212345678*********barNozzlesInlet pressureA = (5 rpm) 4 x Ø4.2 mmB = (5 rpm) 2 x Ø3.8 mmC = (16 rpm) 4 x Ø4.2 mmD = (5 rpm) 2 x Ø2.0 mmE = (16 rpm) 2 x Ø3.8 mmF = (16 rpm) 2 x Ø2.0 mm4107-0158ABC D E FDimensions (mm)Media Driven1687311500157.25132172Ø119Ø69112.523Ø119Air Driven1376 - 1673311200 - 1500142117340Ø119168Ø691307019.5This document and its contents are subject to copyrights and other intellectual property rights owned by Alfa Laval AB (publ) or any of its affiliates (jointly “Alfa Laval”). No part of this document may be copied, re-produced or transmitted in any form or by any means, or for any purpose, without Alfa Laval’s prior express written permission. Information and services provided in this document are made as a benefit and service to the user, and no representations or warranties are made about the accuracy or suitability of this information and these services for any purpose. All rights are reserved.200006926-3-EN-GB© Alfa Laval AB How to contact Alfa LavalUp-to-date Alfa Laval contact details for all countries are always availableon our website at 。
使用手册EJA110A,EJA120A,EJA130A差压变送器IM01C21B01-01C目录1前言.............................................................................................................................................1-11.1安全预防................................................................................................................................1-21.2质保....................................................................................................................................1-2 2使用注意事项..............................................................................................................................2-12.1型号规格确认.........................................................................................................................2-12.2拆包......................................................................................................................................2-12.3保管.....................................................................................................................................2-12.4安装场所................................................................................................................................2-22.5加压....................................................................................................................................2-22.6电气接口的防水处理..............................................................................................................2-22.7无线电收发机的使用限制.......................................................................................................2-22.8绝缘电阻与耐电压测试..........................................................................................................2-22.9防爆型变送器的安装..............................................................................................................2-32.9.1 FM防爆许可................................................................................................................2-32.9.2 CSA防爆许可..............................................................................................................2-42.9.3 SAA防爆许可.............................................................................................................2-52.9.4 CENELEC ATEX(KEMA)防爆许可.............................................................................2-62.10 EMC认证标准......................................................................................................................2-82.11PED(压力设备指导)..............................................................................................................2-8 3部件名称......................................................................................................................................3-1 4安装.............................................................................................................................................4-14.1注意事项................................................................................................................................4-14.2安装.......................................................................................................................................4-14.3过程接口的变更.....................................................................................................................4-24.4高低压侧的转换.....................................................................................................................4-24.4.1 180o旋转测压部法.......................................................................................................4-24.4.2BT200智能终端使用方法.............................................................................................4-24.5转换部的旋转.........................................................................................................................4-3 5导压管的配装..............................................................................................................................5-15.1 配装导压管的注意事项.........................................................................................................5-15.1.1 导压管与变送器的连接...............................................................................................5-15.1.2 导压管的配装方法......................................................................................................5-25.2 导压管的配管示例................................................................................................................5-3 6配线...........................................................................................................................................6-16.1 配线注意事项........................................................................................................................6-16.2 电缆线选定...........................................................................................................................6-16.3 外部接线盒连接....................................................................................................................6-16.3.1 电源连接.....................................................................................................................6-16.3.2 外接指示计连接..........................................................................................................6-16.3.3 BT200智能终端连接...................................................................................................6-16.3.4校验仪表的连接...........................................................................................................6-16.4.1 回路结构.....................................................................................................................6-26.4.2 配线安装.....................................................................................................................6-26.5接地.....................................................................................................................................6-36.6 电源电压与负载电阻.............................................................................................................6-3 7操作.............................................................................................................................................7-17.1启动准备................................................................................................................................7-17.2零点调整................................................................................................................................7-27.3启动.....................................................................................................................................7-27.4停机.....................................................................................................................................7-27.5测压部排液汽.........................................................................................................................7-37.5.1 排液..........................................................................................................................7-37.5.2 排气..........................................................................................................................7-37.6 测量范围设置........................................................................................................................7-3 8智能终端BT200的操作...............................................................................................................8-18.1 BT200操作注意事项.............................................................................................................8-18.1.1 BT200的连接..............................................................................................................8-18.1.2 通讯线路状况.............................................................................................................8-18.2 BT200操作方法....................................................................................................................8-18.2.1 键面排列.....................................................................................................................8-18.2.2操作键的功能..............................................................................................................8-28.2.3 操作键调示菜单..........................................................................................................8-38.3 BT200的参数设置................................................................................................................8-48.3.1参数总表......................................................................................................................8-48.3.2 参数意义和选择..........................................................................................................8-68.3.3参数设置......................................................................................................................8-78.4 BT200数据显示..................................................................................................................8-158.4.1显示测量数据............................................................................................................8-158.4.2显示变送器型号规格..................................................................................................8-158.5自诊断..................................................................................................................................8-158.5.1故障检查....................................................................................................................8-158.5.2错误与纠正................................................................................................................8-17 9维修...........................................................................................................................................9-19.1概述.......................................................................................................................................9-19.2校验仪表的选用.....................................................................................................................9-19.3校验 ...................................................................................................................................9-19.4拆卸与再安装..............................................................................................错误!未定义书签。
Y okogawa Electric Corporation IM 01C22A00-12E 2nd EditionIM 01C22A00-12E1.INTRODUCTIONThank you for purchasing the DPharp electronic pressure transmitter.This manual contains important note and handling cautions for the DPharp EJA Series DifferentialPressure/Pressure Transmitters with NEPSI certifica-tion, option code /NS2 and /NF2.Refer to each of the following user’s manuals for standard specifications, functions, handling cautions,and operations, etc.Table 1 List of Individual User’s ManualsEJA110A, EJA120A, and EJA130A IM 01C21B01-01E EJA210A and EJA220A IM 01C21C01-01E EJA310A, EJA430A, and EJA440A IM 01C21D01-01E EJA510A and EJA530A IM 01C21F01-01E EJA110 and EJA120 IM 01C22B01-01E EJA210 and EJA220 IM 01C22C01-01E EJA310 and EJA430 IM 01C22D01-01E EJA118W, EJA118N, and EJA118Y IM 01C22H01-01E EJA438W and EJA438N IM 01C22J01-01E EJA115 IM 01C22K01-01ET01.EPSDocument No.Model2. NEPSI Certificationa.NEPSI Intrinsically Safe TypeCaution for NEPSI Intrinsically safe type.Note 1.Model EJA Series differential, gauge, andabsolute pressure transmitters withoptional code /NS2 are applicable for use in hazardous locations• Applicable Standard: GB3836.1:2000,GB3836.4:2000• Type of Protection and Marking Code: Ex ia IIC T4• Ambient Temperature :–40 to 60°C • Max. Process Temp.: 120°C • Enclosure: IP67Note 2.Entity Parameters• Intrinsically safe ratings are as follows:Maximum Input Voltage (Ui) = 30 V Maximum Input Current (Ii) = 165 mA Maximum Input Power (Pi) = 0.9 WMaximum Internal Capacitance (Ci) = 22.5 nF Maximum Internal Inductance (Li) = 730 µH Maximum Internal Inductance (Li) = 730 µH • Installation RequirementsUo ≤ Ui, Io ≤ Ii, Po ≤ Pi,Co ≥ Ci + Ccable, Lo ≥ Li + Lcable Uo, Io, Po, Co, and Lo are parameters of barrier.Note 3.Installation• In any safety barreir used output current must be limited by a resistor 'R' such that Io=Uo/R.• The safety barrier must be NEPSI certified.• Input voltage of the safety barrier must be less than 250 Vrms/Vdc.• The instrument modification or parts replacement by other than authorized representative of Yokogawa Electric Corporation and will void NEPSI Intrinsically safe certification.• The cable entry devices and blanking elements for type n shall be of a certified type providing a level of ingress protection of at least IP54, suitable for the conditions of use and correctly installed.• Electrical Connection:The type of electrical connection is stamped near the electrical connection port according to the following marking.Note 4. Operation • WARNING:WHEN AMBIENT TEMPERATURE ≥ 55°C,USE THE HEAT-RESISTING CABLES ≥ 90°C.Note 5. Special Conditions for Safe Use • WARNING:IN THE CASE WHERE THE ENCLOSURE OF THE PRESSURE TRANSMITTER IS MADE OF ALUMINUM, IF IT IS MOUNTED IN AN AREA WHERE THE USE OF ZONE 0 IS REQUIRED,IT MUST BE INSTALLED SUCH, THAT, EVEN IN THE EVENT OF RARE INCIDENTS, IGNI-TION SOURCES DUE TO IMPACT AND FRICTION SPARKS ARE EXCLUDED.[Intrinsically Safe]FD No. IM 01C22A00-12E 2nd Edition: June 2011(YK)All Rights Reserved, Copyright © 2007, Yokogawa Electric Corporationb.NEPSI Flameproof TypeCaution for NEPSI flameproof type.Note 1.Model EJA Series differential, gauge, andabsolute pressure transmitters withoptional code /NF2 are applicable for usein hazardous locations:• Applicable Standard: GB3836.1:2000,GB3836.2:2000• Type of Protection and Marking Code:Ex d IIC T6...T4• Enclosure: IP67• Maximum Process Temperature: 120°C (T4),100°C (T5), 85°C (T6)• Ambient Temperature: –40 to 75°C (T4), –40 to80°C (T5), –40 to 75°C (T6)• Supply Voltage: 42 V dc max.• Output Signal: 4 to 20 mA dcNote 2.Wiring• In hazardous locations, the cable entry devices shallbe of a certified flameproof type, suitable for theconditions of use and correctly installed.• Unused apertures shall be closed with suitableflameproof certified blanking elements. (The plugattached is certificated as the flame proof IP67 as apart of this apparatus.)• In case of ANSI 1/2 NPT plug, ANSI hexagonalwrench should be applied to screw in.Note 3. Operation• WARNING:AFTER DE-ENERGIZING, DELAY 10 MINUTESBEFORE OPENING.• WARNING:WHEN AMBIENT TEMPERATURE ≥ 70°C,USE THE HEAT-RESISTING CABLES ≥ 90°C.• Take care not to generate mechanical sparkingwhen accessing to the instrument and peripheraldevices in a hazardous location.Note 4. Maintenance and Repair• The instrument modification or parts replacementby other than authorized representative ofYokogawa Electric Corporation is prohibited andwill void NEPSI Certification.Revision RecordJanuary 20071st edition New PublicationJune 20112nd edition Delete certificaion No.IM 01C22A00-12E。
尊敬的顾客感谢您购买本公司大电流发生器。
在初次使用该仪器前,请您详细地阅读本使用说明书,将可帮助您安全熟练使用该仪器。
我们的宗旨是不断地改进和完善公司的产品,因此您所使用的仪器可能与使用说明书有少许差别。
若有改动,我们不一定能通知到您,敬请谅解!如有疑问,请与公司售后服务部联络,我们定会满足您的要求!由于输入输出端子、测试柱等均有可能带电压,您在插拔测试线、电源插座时,会产生电火花,小心电击,避免触电危险,注意人身安全!◆慎重保证本公司生产的产品,在发货之日起三个月内,如产品出现缺陷,实行包换。
一年(包括一年)内如产品出现缺陷,实行免费维修。
一年以上如产品出现缺陷,实行有偿终身维修。
◆安全要求请阅读下列安全注意事项,以免人身伤害,并防止本产品或与其相连接的任何其它产品受到损坏。
为了避免可能发生的危险,本产品只可在规定的范围内使用。
只有合格的技术人员才可执行维修。
—防止火灾或人身伤害使用合适的电源线。
只可使用本产品专用、并且符合本产品规格的电源线。
正确地连接和断开。
当测试导线与带电端子连接时,请勿随意连接或断开测试导线。
确保产品接地。
本产品除通过电源线接地导线接地外,产品外壳的接地柱必须接地。
为了防止电击,接地导体必须与地面相连。
在与本产品输入或输出终端连接前,应确保本产品已正确接地。
注意所有终端的额定值。
为了防止火灾或电击危险,请注意本产品的所有额定值和标记。
在对本产品进行连接之前,请阅读本产品使用说明书,以便进一步了解有关额定值的信息。
请勿在无仪器盖板时操作。
如盖板或面板已卸下,请勿操作本产品。
使用适当的保险丝。
使用符合本产品规定类型和额定值的保险丝。
避免接触裸露电路和带电金属。
产品有电时,请勿触摸裸露的接点和部位。
在有可疑的故障时,请勿操作。
如怀疑本产品有损坏,请本公司维修人员进行检查,切勿继续操作。
请勿在潮湿环境下操作。
请勿在易爆环境中操作。
保持产品表面清洁和干燥。
-安全术语警告:警告字句指出可能造成人身伤亡的状况或做法。
横河EJA系列力变送器设备维护及操作规程1 目的为保证YOKOGAWA EJA系列压力变送器测量准确性和工作稳定,特制定本规程。
2 范围2.1 规定了YOKOGAWA EJA系列压力变送器接线、手操器操作、维护及故障排除等内容。
2.2 本规程适用于横河EJA100A/120A/130A/210A/220A/310A/430A/440A/510A/530A型压力变送器。
3 引用文件横河EJA100A/120A/130A/210A/220A310A/430A/440A/510A/530A型压力变送器的使用说明书。
4 术语和定义本文件无相关术语和定义。
5 职责5.1 维修中心仪表专业负责检修和维护。
6 维护及操作规程6.1 接线6.1.1 电源供电连接☑连接电源线到端子SUPPLY +/-,如下图所示:6.1.2 外部Indicator接线☑连接外部指示器到CHECK+/-端子,如下图所示。
☑连接的外部Indicator内电阻小于等于10欧。
6.1.3 BT200连接☑连接BT200到SUPPLY+/-。
☑通讯需要串联一个250到600欧的电阻,如下图所示。
6.1.4 Check Meter接线☑连接Check meter到CHECK +/-端子。
☑Check meter内阻小于等于10欧。
☑CHECK+/-端子上4-20mA输出信号,如下图。
6.2 操作规程6.2.1 启动前的准备工作☑检查低压和高压侧工艺压力隔离阀(Tap valve),排污阀,三阀组截止阀,全部关闭。
☑三阀组平衡阀打开。
6.2.2 按照以下步骤投用变送器☑打开低压和高压侧一次隔离阀(Tap valve)使导压管充满工艺介质。
☑缓慢打开高压侧截止阀(Stop valve),使变送器压力检测部分充满液体。
☑关闭高压侧截止阀(Stop valve)。
☑逐步打开低压侧截止阀阀(Stop valve),使变送器检测部分充满工艺液体。
☑关闭低压侧截止阀(Stop valve)。