苍穹入库流程
- 格式:doc
- 大小:49.00 KB
- 文档页数:10
1. 四个信息表的数据整理(1)发包方信息表Ø 发包方编码(14位)及发包方名称:严格按照《一标段发包方名称及编码(最终版)》填写。
Ø 证件类型:填写“居民身份证”。
Ø 电话号码:必须填写。
Ø 通信地址:填写身份证上的地址。
Ø 邮政编码:陈店镇统一填写463540,佛阁寺镇统一填写463503,余店镇统一填写463533。
Ø 发包方调查日期:一个村的所有发包方填写一个日期,格式为2015-8-24(示例)的形式。
Ø 发包方调查记事:记录发包方调查中需要说明的事项,包括:a)发包方及其负责人的变更情况(具体可参见农业部调查规程第4页 6.1.3 节,遇到类似问题再咨询我;一般发包方负责人在1980年后出生的,视为发包方负责人发生过变更,需要注明变更前的负责人姓名);b)其他需说明的情况。
(2)农户基础信息表(若有属于村、乡镇集体的地块,则将行政村名、乡镇名作为承包方名称,录入到单独的表格中;村民组名作为承包方姓名正常录入)Ø 承包方编码:填写18位(14位发包方编码+4位缩略码)完整编码,用工具“土地确权信息处理工具”将14位发包方编码统一加上去(数据备份,入库前再加上14位发包方编码)。
Ø 证件类型:填写“居民身份证”。
Ø 出生日期:填写“XXXX-XX-XX”形式的标准格式,如1988-11-6,用工具“土地确权信息处理工具”的自动填写标准格式出生日期统一处理。
Ø 电话:必须填写,确实没有电话空着。
Ø 邮编:陈店镇统一填写463540,佛阁寺镇统一填写463503,余店镇统一填写463533。
Ø 承包方单位:一般填写“家庭”。
Ø 住址:将身份证/户口薄地址上的“河南省新蔡县”去掉,从乡镇一级开始;住址不在新蔡县的除外,比如河南省驻马店市驿城区XXXX、新疆自治区石河子市XXX 等要保留全地址。
北京苍穹集体土地使用权管理系统操作手册北京苍穹数码测绘有限公司目录1系统初始运行 (1)1.1 系统运行环境 (1)1.2 系统运行准备 (1)1.2.1需安装的软件 (1)1.2.2 CAD中加载插件 (2)2使用权数据建库 (3)2.1 图形库创建 (3)2.1.1数据库字典设置 (3)2.1.2数据库标准化检查 (4)2.1.3新建数据库 (5)2.1.4要素分层设置结构更新 (5)2.2 数据转换 (6)2.2.1 DWG格式转换成SHP格式数据 (6)2.2.2 MAPGIS格式转换成SHP格式数据 (7)2.2.3 mapgis转换后的shp转换为标准shp (8)2.3 错误检查处理 (10)3数据入库 (10)4数据入库后维护 (12)4.1地类数据预处理 (12)4.2地籍区维护工具 (13)4.2.1 地籍子区设置 (13)4.2.2 地籍区融合 (13)4.2.3 地籍区面积维护 (14)4.3图形预检查 (14)4.4跨界检查及坐落维护 (15)4.4.1 坐落跨界检查 (15)4.4.2 小碎块剔除 (16)4.4.3 坐落单位代码维护 (16)4.5宗地房屋维护 (17)4.5.1 编号重复性检查 (17)4.5.2 宗地统一地籍号维护 (17)4.5.3 宗地面积维护 (18)4.5.4 宗地建筑密度容积率维护 (19)4.5.5 宗地层土地用途维护 (19)4.5.6 宗地拓扑及属性维护 (20)4.6地类维护功能(使用权里不考虑地类则省略该项维护) (21)4.6.1 地类图斑编号维护 (21)4.6.2 线状地物扣除维护 (21)4.6.3 图斑面积维护 (22)4.6.4 地类图斑属性名称维护 (22)4.7其他维护 (23)4.7.1 分幅数据生成 (23)4.7.2 所属图幅维护 (23)4.8数据预检 (24)4.9辅助工具 (24)4.9.1标识码维护 (24)5数据成果 (25)5.1使用权成果数据包 (25)5.2数据库转出shp (26)5.3VCT数据交换 (26)5.3.1输出VCT前预处理 (26)5.3.2输出VCT格式数据 (27)5.4图件成果 (27)5.4.1图件图层设置 (27)5.4.2模板管理 (28)5.4.3子图管理 (30)5.4.4行政区制图 (31)5.4.5分幅图制图 (32)5.4.6宗地图 (32)5.5成果管理 (33)5.5.1图件管理 (33)5.5.2基础资料管理 (34)1系统初始运行1.1 系统运行环境操作系统:WINDOWS 98/2000/2003/XP/WINDOWS 7GIS 平台:ARCGIS平台(使用ARCGIS平台,需在本机上安装ARCGIS Engine)KQGIS平台数据库类型:AccessSQL ServerOracle计算机硬件:CPU:2GHz以上内存:512M以上硬盘:100G以上网卡:千兆网卡第三方软件:OFFICE 办公软件(出报表使用EXCEL,推荐安装ACCESS)外部设施:外业数据采集设备(如测量仪器、电子手簿等)WINDOWS支持的打印机(可选)WINDOWS 支持的绘图仪(可选)A3/A4、A0/A1扫描仪(可选)注:免安装版程序使用前需做如下操作:(1)手工拷贝字体。
北京苍穹基本农田划定建库操作手册北京苍穹基本农田划定建库管理系统操作手册北京苍穹数码测绘有限公司目录1系统运行环境 (3)2基本农田划定的依据和流程 (4)2.1基本农田划定的依据 (4)2.2基本农田划定的技术路线和工作流程 (5)3 基本农田划定建库管理的作业过程 (10)3.1 基础数据处理 (10)3.1.1创建数据库 (10)3.1.2转换方案管理 (12)3.1.3二调数据入库 (12)3.1.4规划数据入库 (14)3.1.5数据预处理 (14)3.1.6值域检查 (17)3.1.7基本农田情况表 (18)2.1.8基本农田指标管理 (18)3.2图层数据制作 (19)3.2.1数据加载方式 (19)3.2.2导入外部数据 (22)3.2.3数据采集 (25)3.2.4图形拷贝 (26)3.2.5文本生成图形 (27)3.2.6解析编辑 (28)3.2.7面积微调 (28)3.2.8其他GIS功能 (29)3.2.9数据保存入库 (29)3.3基本农田的调整划定 (32)3.3.1变化数据检查 (32)3.3.2变化数据标准化处理 (33)3.3.3变化数据属性回填 (34)3.3.4生成划定保护片(块) (35)3.3.5生成划定保护图斑 (36)3.3.6生成划定保护区 (37)3.3.7编号维护 (37)3.3.8生成保护界线 (39)3.3.9责任信息管理 (39)3.3.10生成数量变化数据 (46)3.4划定成果管理 (47)3.4.1图件管理 (47)3.4.2注记操作 (48)3.4.3图件模板设置 (51)3.4.4调整划定成果输出 (52)3.4.5基本农田划定成果内容 (54)4 专题:MapGIS数据和SHP数据相互转换 (55)4.1MapGIS数据转换成SHP数据 (55)4.1.1 MapGIS程序转换成SHP数据 (55)4.1.2用FME将MapGIS数据转换成SHP数据 (63)4.1.3通过Map2shp工具进行转换 (68)4.2 SHP数据转换成MAPGIS数据 (69)4.2.1 shp直接转换成mapgis (69)4.2.2 shp转换成mapinfo,再转换成mapgis. (71)1系统运行环境硬件配置:●处理器:Pentium4 1.8GHz以上主频●内存:512 MB或以上●硬盘:要求在30G以上●显存:推荐显存32 MB或以上(安装显卡驱动程序)操作系统:苍穹基本农田管理系统的操作系统可选用Windows 2000/XP/Win7系列操作系统。
苍穹入库流程苍穹入库流程一、软件安装步骤:1.将授权文件拷贝到苍穹软件安装目录下。
2.首先安装4个.bat格式注册文件3.把以下文件拷贝到cad根目录下:4.打开cad→命令:appload→加载→内容加载5.将软件包里集体土地使用权建库系统.exe在桌面创建快捷方式二、软件工作配置:1.打开苍穹软件→数据库配置→图形库创建:(1.根据规定选择arcgis版本数据库或kqgis版本数据库2.比例尺要根据图形来设置)2.数据库配置:三、入库:1.创建地籍子区:(1)DWG数据转换:(DWG数据转换步骤1:CAD/CASS路径,第一次安装好加载一次以后不需要每次都需加载)(2)数据转换完后,点标识1页面全屏图形缩放出来,右击标识2移除此节点,右击标识3移除空节点。
(3)首先将房屋注记层取消显示,在符号代码中选择地籍子区代码,然后检查处理→其它常用处理功能→生成面结构:符号代码输入地籍子区代码。
(4)将房屋注记层显示,右击注记指定层入库→地籍子区注记(5)加载数据→已打开的连接:(6)选中地籍子区面层→查询编辑→图块更换层:注意图块更换层中有两个地籍子区,选择没有地籍子区面的地籍子区→搬移到层:(7)移除,除mdb数据库之外的所有层:----------------------------------------------------------------------------------------------------(8)加载进地籍子区注记,在工具条里点击图块属性浏览(标识1),在地籍子区面里左击弹出对话框将地籍子区注记输入(标识2)。
点击保存数据入库。
最后生成地籍子区界线:数据建库→其他维护→生成地籍子区界线:2.转换DWG村数据:(1)步骤同地籍子区dwg转换一样(DWG路径加载需要入库的村数据)(2)在工具条新建一个新工程2。
(3)转化完后将分层后数据右击进行图层排序和移除空节点,右击line_temp 层选择属性浏览批选字段south_1有值的,右击然后点击选中图块(注意进行此操作时保证全图是在没有任何图块选中情况下进行的,不然会有其他图块属性也会一同选中,进行此操作先在工具条点击)点击ctrl+c拷贝到新工程2中。
基本环境配置1、系统需要安装arcgis93、Office2003(必须要有Access和Excel)以及CAD2004或更高版本。
2、将KanqExport.arx和cad_cvs文件拷贝至CAD安装路径下。
3、启动CAD,在命令行输入appload,在弹出的对话框中。
点击“内容”按钮,将KanqExport.arx添加至启动组1 数据转换(1)进入平台单击图标,启动系统。
系统启动后选择进入平台,直接登陆系统。
(2)创建空数据库创建一个空的数据库,使用【使用权调查】——【数据库工具】——【标准MDB数据库创建】功能。
数据库类型选择2.KQGIS版集体土地所有权数据库(MDB),然后选择数据库路径和名字以及对应坐标系统等,点击创建数据库,完成后会弹出数据库创建成功对话框,点击确定则空的数据库就创建好了。
如下图。
(3)连接空库退出平台,重新打开程序,并且连接刚才新建立的空数据库再次进入平台。
(4)数据转换选择【使用权调查】——【DWG数据转换】输出的SHP格式即为完全符合数据库标准的数据,可直接使用程序将其打开进行入库。
2 数据入库连接建好的苍穹数据库,在【系统设臵】——【通用字典设臵】根据需要修改宗地的入库模式,入库模式选择直接入库(0为拓扑入库模式;1为直接入库模式)。
把转换后的数据(连同行政区数据)全部加载到平台中,点击“保存”进行入库。
3 数据检查处理(1)数据预处理【使用权调查】——【数据预处理】功能,包括图形规格化处理和田坎系数整理。
图形规格化处理:由于某些厂家生成的数据所写的格式以及对于图形的描述与我们有所不同,在完成数据入库后需要对面状图形中带岛的要素进行规格化处理,以保证面积正确。
可以选择对地类图斑、宗地、行政区进行维护。
(2)添加所有图层数据点击【文件】——【加载数据】,选择已打开的连接,添加所有图层数据。
(3)图形检查与处理右键点击要素代码树中的数据节点,移除空节点,取消其他图层的显示(去掉复选框中的勾),只显示当前要检查的图层,如房屋,对其进行图形检查。
简述入库的流程入库流程的主要环节和步骤通常包括:1.准备工作2.接收和检验3.记录和标识4.质量检验5.入库操作6.更新系统信息7.库存管理准备工作是入库流程的第一步。
在入库之前,需要进行一些准备工作,包括准备好入库所需的空间和设备,为入库人员提供必要的培训和指导,确保入库的物料或产品符合公司的规定和标准,并准备好必要的入库文件和记录表格。
这些准备工作可以帮助入库流程顺利进行,并避免出现不必要的延误或错误。
接收和检验是入库流程的第二步。
当物料或产品到达公司或组织时,入库员需要进行接收和检验。
这包括确认收货单或发票的准确性,检查物料或产品的数量和质量是否与订单中的要求一致,以及对物料或产品的外观和包装进行检查。
如果发现有任何问题或不一致,需要及时通知相关部门进行处理,并进行记录和报告。
记录和标识是入库流程的第三步。
入库员需要对接收的物料或产品进行记录,并为其标识。
记录包括入库的时间、数量、来源等信息,而标识包括给物料或产品贴上标签或标记,以便于后续的管理和使用。
这些记录和标识可以帮助管理人员对库存进行跟踪和查询,同时也可以帮助入库员对库存进行分类和整理。
质量检验是入库流程的第四步。
在入库之前,需要对物料或产品进行质量检验。
这包括使用相关的检测设备或工具对物料或产品进行检测和测试,以确保其符合公司或组织的质量标准和要求。
如果发现有任何质量问题,需要及时通知相关部门进行处理,并进行记录和报告。
入库操作是入库流程的第五步。
一旦物料或产品经过检验和质量确认,入库员就可以进行入库操作。
这包括将物料或产品按照公司或组织的规定进行分类和整理,然后将其放置到相应的库位或货架上。
在进行入库操作时,需要特别注意物料或产品的防护和保管,以避免造成任何损坏或丢失。
更新系统信息是入库流程的第六步。
入库完成后,需要及时更新系统中的库存信息。
这包括更新物料或产品的数量、位置、状态等信息,以确保系统中的库存信息与实际情况保持一致。
农村土地承包经营权管理信息系统建库操作手册北京苍穹数码测绘有限公司2014.8目录1系统运行环境 ··································································································································2.系统登录 ·······································································································································2.1专题设置 ·····························································································································2.2登录系统 ·····························································································································3数据建库 ·······································································································································3.1数据库字典设置 ····················································································································3.2空数据库创建 ·······················································································································4数据处理与入库 ······························································································································4.1数据收集与转换 ····················································································································4.1.1环境准备 ···················································································································格式转换为SHP格式文件····································································································4.1.3附加说明 ···················································································································4.1.2影像数据矢量化 ··········································································································4.2图形检查处理 ·······················································································································4.2.1常见错误 ···················································································································4.2.2图形错误检查 ·············································································································4.2.3图形错误处理 ·············································································································4.3属性录入及检查 ····················································································································4.4数据入库 ·····························································································································5数据库维护 ····································································································································5.1数据预处理 ··························································································································5.2行政区维护 ··························································································································5.2.1行政区设置 ················································································································5.2.2行政区融合 ················································································································5.3座落跨界检查座落维护及微小图块合并 ······················································································5.3.1座落跨界检查 ·············································································································5.3.2座落单位代码维护 ·······································································································5.3.3微小图块合并 ·············································································································5.4发包方信息管理 ····················································································································5.4.1模板编辑(一般情况不需操作) ·····················································································5.4.2发包方信息导入 ··········································································································5.5承包方信息管理 ····················································································································5.6地块编码维护 ·······················································································································5.7地块信息管理 ·······················································································································5.8地块维护 ·····························································································································5.8.1地块ID及状态更新 ·····································································································5.8.2地块属性检查 ·············································································································5.8.3地块代码维护(若地块编码已唯一确定,此步操作略) ·······················································5.8.4地块拓扑及属性维护 ····································································································5.8.5地块面积维护 ·············································································································5.8.6地块东西南北长维护 ····································································································5.8.7四至维护 ···················································································································5.8.8地块起点重排 ·············································································································5.8.9界址点打断界址线 ·······································································································界址线所属宗地维护···········································································································界址线毗邻指界人、权利人维护····························································································5.9基本农田保护区维护 ··············································································································5.10其他维护功能······················································································································5.10.1坡度面积维护 ···········································································································5.10.2分幅数据生成及维护 ··································································································5.10.3界线生成 ·················································································································5.10.4标识码维护 ··············································································································5.10.5要素代码维护 ···········································································································5.10.6承包合同附着附维护 ··································································································5.10.7承包方出生日期和年龄维护 ·························································································。
苍穹数据库建库流程目录建库流程: (4)1.创建数据库 (4)2.不同数据库的转换 (4)3.数据来源: (4)3.1 GPS或全站仪数据 (4)3.2其它格式数据 (4)4.土地利用数据采集流程 (4)4.1字典设置 (7)4.1.1设置地类字典 (7)4.1.2权属系统字典 (7)4.1.3设置管理区、行政区字典、设置村民小组 (7)4.2生成分幅信息 (7)4.3数据采集 (7)4.3.1采集拐点层 (9)4.3.2行政界线采集 (10)4.3.3线状图斑采集 (13)4.3.4图斑边界采集(采链) (16)4.3.5生成图斑 (17)4.3.6生成村(街坊界) (18)4.3.7批量赋权属单位、坐落单位 (19)4.3.8分幅图文件接边 (20)4.4数据入库 (23)4.5分幅数据间图斑融合 (23)4.6融合界线 (23)4.7坡度级别赋值 (24)4.8数据维护 (25)4.8.1管理区、行政区维护 (25)4.8.2田坎系数维护 (25)4.8.3椭球面积维护 (26)4.8.4平差 (26)4.8.5图斑面积维护 (27)4.9数据库整理 (27)4.10数据变更 (28)4.10.1调整数据 (28)4.10.2变更数据 (28)4.10.3临时库变更 (34)5.城镇地籍建库流程 (37)5.1基本资料 (38)5.2数据处理原则 (38)5.3主要类型数据源的图形数据转换流程 (39)5.3.1测量数据 (39)5.3.2数据转换 (39)5.3.3其它来源 (39)5.4库体建设 (40)5.4.1字典设置 (40)5.4.2生成分幅信息 (40)5.4.3数据整理 (40)5.4.4数据检查 (41)5.4.5生成图斑 (43)5.4.6数据入库 (43)5.4.7控制点、网入库 (43)5.4.8数据库整理 (44)5.4.9城镇地籍登记发证属性资料入库 (45)一、农村数据采集建库流程:1.创建数据库通过创建数据库工具,可以创建标准的数据库。
仓库管理入库流程仓库管理-入库流程随着电子商务的迅速发展,仓库管理成为企业供应链管理中至关重要的一环。
而仓库的入库流程对于保证产品质量、提高工作效率以及减少错误率都起到了至关重要的作用。
本文将从仓库管理的角度,介绍入库流程的具体步骤和注意事项。
1. 接收货物入库流程的第一步是接收货物。
当货物到达仓库时,仓库管理员需要仔细核对货物的数量和品质,并与送货单进行比对。
如果发现货物有损坏或数量与送货单不符,需要及时与供应商联系进行沟通和解决。
2. 上架货物接收货物后,需要对货物进行分类和标识,然后将其上架。
上架的目的是为了方便仓库管理员能够快速找到货物,同时也是为了保护货物的安全和防止损坏。
在上架过程中,需要按照货物的分类和特点进行合理的摆放,同时要注意货物之间的隔离和防火防潮等措施。
3. 入库登记入库登记是入库流程中非常重要的一步。
在入库登记时,需要记录下货物的基本信息,如货物名称、规格、数量、生产日期等,并分配唯一的入库编号。
这些信息将作为仓库管理的依据,方便后续的库存管理和出库操作。
4. 货物质检为了保证仓库中的货物质量,入库流程中通常需要进行质检。
质检的目的是检查货物的外观、包装、完整性以及其他特定的质量要求。
如果发现货物有质量问题,需要及时与供应商联系并进行退换货或其他处理。
5. 更新库存信息入库流程的最后一步是更新库存信息。
在入库登记和质检通过后,需要将相关的信息记录到仓库管理系统中,并实时更新库存数量。
这样可以方便仓库管理员和其他相关人员随时了解库存情况,避免出现过多或过少的库存情况。
在进行入库流程时,还需要注意以下几点:1. 保持仓库的整洁和安全。
定期清理仓库,清除过期或损坏的货物,确保货物的安全和整齐摆放,避免因为混乱而出现错误。
2. 做好货物的防护措施。
根据货物的特性,采取适当的防潮、防火等措施,确保货物的安全和完整性。
3. 建立有效的沟通机制。
与供应商、质检部门和其他相关人员建立良好的沟通渠道,及时解决入库过程中的问题和疑虑。
北京苍穹基本农田划定建库管理系统用户手册北京苍穹数码测绘有限公司目录1、系统简介 (5)1.1系统运行环境 (5)1.2 系统运行及介绍 (5)2、常用GIS工具 (6)2.1文件操作 (7)2.1.1新建 (7)2.1.2打开 (7)2.1.3另存为 (7)2.1.4视图另存为图像 (8)2.1.5打印操作 (8)2.1.6关闭 (8)2.1.7加载数据 (8)2.2编辑操作 (9)2.2.1编辑功能 (9)2.2.2检查功能 (15)2.2.3处理功能 (17)2.2.4拓扑处理 (18)2.2.5叠置分析 (20)2.2.6缓冲分析 (22)2.2.7屏蔽处理 (23)2.2.8地物操作 (24)3、基础数据处理 (24)3.1创建数据库 (24)3.2土地利用现状调查数据入库 (25)3.3规划数据入库 (26)3.4数据预处理 (26)3.4.1标准化预处理 (27)3.4.2行政区设置 (28)3.4.3行政区融合 (28)3.5基期预检 (29)3.6规划转基期 (29)3.7基本农田面积重算 (30)3.8地类图斑面积重算 (31)3.9基本农田情况表 (32)3.10基本农田指标管理 (32)4、调整划定生成 (33)4.1编辑基本农田 (33)4.1.1图件配置 (33)4.1.2基本农田编辑 (34)4.1.3划定基本农田保护图斑 (35)4.1.4划定基本农田质量变化片块 (35)4.1.5划定基本农田数量变化片块 (38)4.1.6数量变化图斑提取 (41)4.1.7数量变化属性回填 (43)4.2调整变化数据布局 (46)4.2.1变化数据检查 (46)4.2.2变化数据标准化处理 (46)4.2.3变化数据属性维护 (47)4.3基本农田调整划定入库及保护责任落实 (48)4.3.1划定数据生成 (48)4.3.2责任质量信息管理 (54)4.3.3农户查询 (58)4.3.4土地质量信息管理 (59)4.4专题功能集 (62)4.4.1其他功能维护 (62)4.4.2任意区域分析 (63)4.4.3编号维护 (64)4.4.4面积维护 (66)4.4.5注记维护 (70)4.4.6报表分析 (75)4.4.7任意区域分析 (76)4.4.8生成变化数据 (76)5、划定成果管理 (77)5.1图件管理 (77)5.2成果检查 (79)5.3输出VCT前预处理 (79)5.4成果数据包输出 (80)5.5报表输出 (81)5.6图形输出 (81)5.7专题成果管理 (82)5.7.1文档管理 (82)5.7.2责任书管理 (82)5.7.3责任卡管理 (83)5.7.4土地登记卡 (83)5.7.5标志牌管理 (84)5.7.6界桩管理 (85)5.8专题应用 (86)5.8.1专题表预处理 (86)5.8.2隶属示范区维护 (86)5.8.3示范区片块统计表 (87)5.8.4农户信息查询 (87)5.8.5 导入保护责任信息 (88)5.8.6专题报表查看 (89)5.8.7基本农田质量等别饼状图 (89)6、占用补划管理 (89)6.1 占补数据准备 (89)6.1.1 拷贝划定数据至占补成果图层 (90)6.1.2 项目编号规则设置 (90)6.1.3 图件设置 (91)6.2 项目管理 (91)6.2.1新建项目 (91)6.2.2加载项目数据 (92)6.2.3关联地块 (93)6.2.4项目审核 (97)6.2.5提交并更新成果 (100)6.2.6 加载项目数据 (101)6.2.7浏览前后对比图 (102)6.2.8撤销浏览对比图 (102)6.2.9撤销提交项目 (103)6.2.10删除项目 (104)6.2.11项目属性 (105)6.3占补成果管理 (105)6.3.1VCT预处理 (106)6.3.2报表输出 (107)6.3.3图形输出 (108)7、系统设置 (108)7.1常用设置 (108)7.1.1符号管理器 (108)7.1.2数据库标准化检查 (109)7.1.3用户及权限设置 (109)7.1.4建库字典设置 (110)7.2字典设置 (111)7.2.1通用字典设置 (111)7.2.2地类字典设置 (112)7.2.3坡地级别设置 (112)7.2.4权属系统设置 (113)7.2.5其他字典设置 (113)7.2.6行政区设置 (114)7.2.7要素分层设置 (114)7.2.8要素代码字典设置 (114)7.2.9拓扑规则设置 (115)7.2.10注记模板设置 (115)7.2.10分幅信息设置 (116)7.2.11空间参考信息参数设置 (117)7.3工具 (118)8、工具条 (118)8.1文件操作 (118)8.2选择工具 (119)8.3输入工具 (121)8.4高级操作 (121)9、列表 (124)9.1要素列表 (124)9.2符号作图 (124)9.3模板管理 (125)9.4子图管理 (125)9.5行政区 (126)9.6分幅表 (126)9.7占补项目 (127)1、系统简介1.1系统运行环境硬件配置:●处理器:Pentium4 1.8GHz以上主频●内存:512 MB或以上●硬盘:要求在30G以上●显存:推荐显存32 MB或以上(安装显卡驱动程序)操作系统:苍穹基本农田管理系统的操作系统可选用Windows 2000/XP/Win7系列操作系统。
苍穹入库流程
一、软件安装步骤:
1.将授权文件拷贝到苍穹软件安装目录下。
2.首先安装4个.bat格式注册文件
3.把以下文件拷贝到cad根目录下:
4.打开cad→命令:appload→加载→内容加载
5.将软件包里集体土地使用权建库系统.exe在桌面创建快捷方式
二、软件工作配置:
1.打开苍穹软件→数据库配置→图形库创建:
(1.根据规定选择arcgis版本数据库或kqgis版本数据库 2.比例尺要根据图形来设置)
2.数据库配置:
三、入库:
1.创建地籍子区:
(1)DWG数据转换:
(DWG数据转换步骤1: CAD/CASS路径,第一次安装好加载一次以后不需要每次都需加载)
(2)数据转换完后,点标识1页面全屏图形缩放出来,右击标识2移除此节点,右击标识3移除空节点。
(3)首先将房屋注记层取消显示,在符号代码中选择地籍子区代码,然后检查处理→其它常用处理功能→生成面结构:符号代码输入地籍子区代码。
(4)将房屋注记层显示,右击注记指定层入库→地籍子区注记
(5)加载数据→已打开的连接:
(6)选中地籍子区面层→查询编辑→图块更换层:
注意图块更换层中有两个地籍子区,选择没有地籍子区面的地籍子区→搬移到层:
(7)移除,除mdb数据库之外的所有层:
----------------------------------------------------------------------------------------------------
(8)加载进地籍子区注记,在工具条里点击图块属性浏览(标识1),在地籍子区面里左击弹出对话框将地籍子区注记输入(标识2)。
点击保存数据入库。
最后生成地籍子区界线:数据建库→其他维护→生成地籍子区界线:
2.转换DWG村数据:
(1)步骤同地籍子区dwg转换一样(DWG路径加载需要入库的村数据)
(2)在工具条新建一个新工程2。
(3)转化完后将分层后数据右击进行图层排序和移除空节点,右击line_temp 层选择属性浏览批选字段south_1有值的,右击然后点击选中图块(注意进行此操作时保证全图是在没有任何图块选中情况下进行的,不然会有其他图块属性也会一同选中,进行此操作先在工具条点击)点击ctrl+c拷贝到新工程2中。
Area_temp层同样将south_2中有属性(姓名)按此方法操作拷贝到新工程2。
(4)在工具条关闭新工程1,重新加载dwg转化好的全部shp格式村数据(dwg 转化的村数据保存在哪里查找范围在哪里加载)
(必须进行此步骤重新加载一次dwg转换好的村数据不然下一步属性赋值mdb 数据库保存不能入库)
(5)用空间关系赋值将值赋到对应的层中
(6)赋完值后工具条保存入库:
(7)建立地籍子区树:数据建库→地籍区维护工具→地籍子区设置:
根据空间库创建保存后右击左上角编码层依次编辑对应村子的乡县市的名称然后保存,上传无误后下载:
(8)地籍区、县级行政区融合:
数据建库→地籍区维护工具→地籍区融合:
(9)地籍区面积维护:
数据建库→地籍区维护工具→地籍区面积维护:
(10)图形预检:
数据建库→图形预检查:检查修改错误后保存入库
(11)跨界检查与处理:
数据建库→跨界检查及座落维护→座落跨界检查:
检查内容现在我们只选房屋跨宗地,宗地跨地籍子区、房屋跨地籍子区因为国土局未定方案,现在不做检查修改。
只打开临时层,双击右边检查结果定位到错误图块在工具条量取最大宽度,未超过的图块在右侧检查结果勾选上点击裁剪。
数据建库→跨界检查及座落维护→小碎块剔除:
检查内容选择房屋,小碎块面积改为1㎡,检查小碎块然后全选剔除。
(11)维护座落单位代码:数据建库→跨界检查及座落维护→座落单位代码维护:
(注意:进行此项前数据必须入库保存一遍)
3.宗地属性填写:
(1)可以软件批量填写的(代码按苍穹属性表.xlsb填写):
加载全部数据,单独只打开宗地层,使用或全选图块,查询编辑→地物属性批量修改:
a.权属性质:43(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,权属性质需单独找到图块用查看属性根据要求填写)
b.使用权类型:22(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,使用权类型需单独找到图块用查看属性根据要求填写)
c.土地用途:将72改为072(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,土地用途需单独找到图块用查看属性根据要求填写)
d.新地类号:将72改为072将72改为072(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,新地类号需单独找到图块用查看属性根据要求填写)
e.旧地类号:和新地类号填写内容一致
f.是否争议:否(若特别记录争议情况填写是)
g.原始地籍号:同地籍号
h.宗地特征码:C(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,宗地特征码需单独找到图块用查看属性根据要求填写)
i.预编地籍号:同地籍号
j.权属单位代码:同座落单位代码
k.单位性质:12(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,单位性质需单独找到图块用查看属性根据要求填写)
l.邮政编码:根据所在地邮政编码填写
m.权利设立情况:1
n.土地实际用途:和土地用途填写一致(无特殊情况一般和土地用途一致)o.宗地代码:同地籍号
(2)特殊批量填写方法:
a.地籍号:临时在通讯地址栏里填写:座落单位代码+JC00,然后批量赋值;在地籍号栏里填写:TXDZ,DJH,然后字段拼接;地籍号赋好值后,将通讯地址
栏清空点击批量赋值。
(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,地籍号需单独找到图块用查看属性根据要求填写)
b.宗地编号:同地籍号赋值方法一样,赋值为没有地籍号JC00后面三位(批刷后若图内存在学校、村委会、清真寺和其他单位院落的,宗地编号需单独找到图块用查看属性根据要求填写)
(3)注意事项:此赋值功能用到的命令在地物属性批量修改的下方有具体介绍;红圈处显示此标志才打上了标记才可以用这些命令赋值。
(4)在Access数据库下(mdb)填写方法:
(4)其他批量填写方法:
Mdb制作:苍穹入库保存后关闭苍穹软件,双击打开保存路径下的mdb,打开ZD层,在任意字段上右击选择取消隐藏字段打钩只显示的需要的字段:DJH、TXDZ、TDZL、DZ、NZ、XZ、BZ、QLR、SM、QLRZJH,右击DJH选择升序,按从小到大排好序。
Excel制作:打开所填写村的台账(以泾源县兴民乡先锋村权属调查台账.xls 为例)第一行只留表头,在excel工具栏选择视图→冻结窗格→冻结首行,全选d列右击插入一列空列将mdb中DJH列复制过来,将有单位院落的地籍号删除,注意选择单元格上移(删除前要将这类地籍号复制保留在其他地方单独根据台账赋值)
在Excel表里检查宗地号和复制过来的DJH是否对应,若对应将excel对应mdb的字段复制过去,若不对应查找错误原因,根据实际情况处理。
赋完全部值后保存。
4.房屋属性填写:
右击房屋层→属性浏览→找到房屋结构字段将是4的全选右击选中图块→地物属性批量修改赋值为5(cass房屋结构代码为4,苍穹软件为5,都代表结构为砖)
四.系统快捷键
Q:增加块(画图铅笔)
W:捕捉
E:取消选亮
R:删除点
P:选取点
A:要素选取(单选)
S:要素选取(多选)
D:移动块
G:加点
J:线面切割
Z:画线后退一步
V:移动点
FF:画线结束
五.快捷键设置
右击菜单栏空白处,具体操作方法然后如下图,先分配要设置的快捷键,点击添加,Current Keys中出现了刚才分配的键,关闭确定就设置好了。
(快捷键设置苍穹软件关闭后需重新设置)
7.维护
(1)数据预处理(数据库里有什么勾选什么)
(1)苍穹属性表
苍穹软件根目录下→SysSet→→ATT_DIC层
(2)cass编码转苍穹代码(修改对应转化关系)
苍穹软件根目录下→SysSet→Dic→南方CASS转换苍穹代码模板城镇地籍版(宁夏)
(3)分幅地籍图、地形图(制图)模板
苍穹软件根目录下→SysSet→TKMoBan→XXX .xml
(4)地籍调查表
苍穹软件根目录下→Template→地籍调查表模板(宁夏).xls
(5)→OA2_SYSDIC。