ds04
- 格式:ppt
- 大小:336.00 KB
- 文档页数:43
常见岩性符号一、松散堆积物:1.表土和堆土(DB01)2.红土(DB02)3.漂砾(DB03)4.卵石(DB04)5.砾石(DB05)6.角砾石(DB06)7.砂砾石(DB07)8.泥砾石(DB08)9.粉砂砾石(DB09) 10.粘土砾石(DB10)11.砂姜(DB11) 12.粗砂 (DB12) 13.中砂(DB13) 14.细砂 (DB14) 15.粉砂(DB15) 16.泥质粉砂 (DB16) 17.砂质粘土(DB17) 18.粉砂质粘土(DB18)19.粘土(DB19) 20.植物堆积物(DB20)21.腐蚀土层( DB21) 22.化学沉积(DB22)23.填筑土(DB23) 24.泥碳土(DB24)二、砾岩类:1.巨砾岩(DL01)2.粗砾岩(DL02)3.中砾岩(DL03)4.细砾岩(DL04)5.小砾岩(DL05)6.泥砾岩(DL06)7.角砾岩(DL07)8.灰质砾岩(DL08)9.灰质角砾岩(DL09) 10.铁质砾岩(DL10)11.硅质砾岩(DL11) 12.凝灰质砾岩 (DL12) 13.凝灰质角砾岩(DL13) 14.凝灰质砂砾岩 (DL14)15.砂砾岩(DL15) 16.泥砾岩(DL16)三、砂岩类:1.砾状砂岩(DS01)2.鲕状砂岩(DS02)3.粗砂岩(DS03)4.中砂岩(DS04)5.细砂岩(DS05)6.粉砂岩(DS06)7.中~细砂岩(DS07)8.粉~细砂岩(DS08)9.含砾细~细砂岩(DS09) 10.含砾中~细砂岩(DS10)11.含砾粗砂岩(DS11) 12.含砾中砂岩(DS12)13.含砾细砂岩(DS13) 14.含砾粉砂岩(DS14)15.含砾泥质粗砂岩(Ds15) 16.含砾泥质中砂岩(Ds16)17.含砾泥质细砂岩(DS17) 18.含砾泥质粉砂岩(DS18)19.海绿石粗砂岩(DS19) 20.海绿石中砂岩(DS20)21.海绿石细砂岩(DS21) 22.海绿石粉砂岩(DS22)23.石英砂岩(DS23) 24.长石砂岩(DS24)25.长石石英砂岩(DS25) 26.玄武质粗砂岩(DS26)27.玄武质中砂岩(DS27) 28.玄武质细砂岩(DS28)29.玄武质粉砂岩(DS29) 30.高岭土质粗砂岩(DS30)31.高岭土质中砂岩(DS31) 32.高岭土质细砂岩(DS32)33.高岭土质粉砂岩(DS33) 34.石膏质粗砂岩(DS34)35.石膏质中砂岩(DS35) 36.石膏质细砂岩(DS36)37.石膏质粉砂岩(DS37) 38.硅质粗砂岩(DS38)39.硅质中砂岩(DS39) 40.硅质细砂岩(DS40)41.硅质粉砂岩(DS41) 42.硅质石英砂岩(DS42)43.白云质粗砂岩(DS43) 44.白云质中砂岩(DS44)45.白云质细砂岩(DS45) 46.白云质粉砂(DS46)47.灰质粗砂岩(DS47) 48.灰质中砂岩(DS48)49.灰质细砂岩(DS49) 50.灰质粉砂岩(DS50)51.沥青质粗砂岩(DS51) 52.沥青质中砂岩(DS52)53.沥青质细砂岩(DS53) 54.沥青质粉砂岩(DS54)55.凝灰质粗砂岩(DS55) 56.凝灰质中砂岩(DS56)57.凝灰质细砂岩(DS57) 58.凝灰质粉砂岩(DS58)59.铁质粗砂岩(DS59) 60.铁质中砂岩 (DS60) 61.铁质细砂岩(DS61) 62.铁质粉砂岩(DS62)63.泥质粗砂岩(DS63) 64.泥质中砂岩(DS64)65.泥质细砂岩(DS65) 66.泥质粉砂岩(DS66)67.含磷粗砂岩(DS67) 68.含磷中砂岩(DS68)69.含磷细砂岩(DS69) 70.含磷粉砂岩(DS70)71.含角砾粗砂岩(DS71) 72.含角砾中砂岩(DS72)73.含角砾细砂岩(DS73) 74.含角砾粉砂岩(DS74)75.碳质粗砂岩(DS75) 76.碳质中砂岩(DS76)77.碳质细砂岩(DS77) 78.碳质粉砂岩(DS78)四、泥岩类:1.泥岩(DN01)2.粉砂质泥岩(DN02)3.砂质泥岩(DN03)4.含砂泥岩(DN04)5.含砾泥岩(DN05)6.灰质泥岩(DN06)7.碳质泥岩(DN07)8.白云质泥岩(DN08)9.石膏质泥岩(DN09) 10.含膏泥岩(DN10)11.含膏、含盐泥(DN11) 12.盐质泥岩(DN12)13.芒硝泥岩(DN13) 14.沥青质泥岩(DN14)15.硅质泥岩(DN15) 16.泥膏岩(DN16)17.凝灰质泥岩(DN17) 18.铝土质泥岩(DN18)19.玄武质泥岩(DN19) 20.沉凝灰岩(DN20)五、页岩类:1.页岩(DY01)2.油页岩(DY02)3.砂质页岩(DY03)4.碳质页岩(DY04)5.沥青质页岩(DY05)6.硅质页岩(DY06)7.灰质泥岩(DY07) 8.铝土质泥岩(DY08)六、石灰岩、白云岩类:1.石灰岩(Dh01)2.含白云灰岩(Dh02)3.含泥灰岩(Dh03)4.含白垩灰岩(Dh04)5.白云质灰岩(Dh05)6.沥青质灰岩(Dh06)7.硅质灰岩(Dh07)8.石膏质灰岩(Dh08)9.泥灰岩(Dh09) 10.泥质灰岩(Dh10)11.泥质条带灰岩(Dh11) 12.碳质灰岩(Dh12)13.砂质灰岩(Dh13) 14.页状灰岩(Dh14)15.薄层状灰岩(Dh15) 16.燧石条带灰岩(Dh16)17.燧石结核灰岩(Dh17) 18.溶洞灰岩(Dh18)19.角砾石状灰岩(Dh19) 20.竹叶状灰岩(Dh20)21.团块状灰岩(Dh21) 22.针孔状灰岩(Dh22)23.豹皮灰岩(Dh23) 24.鲕状灰岩(Dh24)25.假鲕状灰岩(Dh25) 26.葡萄状灰岩(Dh26)27.瘤状灰岩 (Dh27) 28.结晶灰岩(Dh28)29.碎屑灰岩(Dh29) 30.生物灰岩(Dh30)31.介壳灰岩(Dh31) 32.介形虫灰岩(Dh32)33.含螺灰岩(Dh33) 34.藻灰岩(Dh34)35.白云(Dh35) 36.含灰白云岩(Dh36)37.含泥白云岩(Dh37) 38.灰质白云岩 (Dh38) 39.硅质白云岩(Dh39) 40.石膏质白云岩(Dh40)41.凝灰质白云岩(Dh41) 42.泥质白云岩(Dh42)43.泥质条带白云岩(Dh43) 44.砂质白云岩(Dh44)45.竹叶状白云岩(Dh45) 46.角砾状白云岩(Dh46)47.针孔状白云岩(Dh47) 48.鲕状白云岩(Dh48)49.假鲕状白云岩(Dh49) 50.葡萄状白云岩(Dh50)51.燧石条带白云岩(Dh51) 52.燧石结核白云岩(Dh52)53.藻云岩(Dh53)七、岩浆岩之侵入岩:1.超基性侵入岩(Dg01)2.基性侵入岩(Dg02)3.中性侵入岩(Dg03)4.酸性侵入岩(Dg04)5.橄榄岩(Dg05)6.辉石岩(Dg06)7.辉长岩(Dg07) 8.苏长岩(Dg08)9.斜长岩(Dg09) 10.辉绿岩(Dg10)11.闪长岩(Dg11) 12.正长岩(Dg12)13.闪长玢岩(Dg13) 14.角闪岩(Dg14)15.花岗岩(Dg15) 16.幌斑岩(Dg16)17.云幌岩(Dg17)八、岩浆岩之喷发岩:1.基性喷发岩(Dp01)2.中性喷发岩(Dp02)3.酸性喷发岩(Dp03)4.玄武岩(Dp04)5.安山玄武岩(Dp05)6.安山岩(Dp06)7.安山玢岩(Dp07)8.粗面岩(Dp08)9.流纹岩(Dp09) 10.流纹斑岩(Dp10)11.英安岩(Dp11) 12.英安斑岩(Dp12)13.凝灰岩(Dp13) 14.集块岩(Dp14)九、岩浆岩之变质岩:1.变质岩(Df01)2.变质砂岩(Df02)3.变质砾岩(Df03)4.碎裂岩(Df04)5.构造角砾岩(Df05)6.糜棱岩(Df06)7.板岩(Df07)8.硅质板岩(Df08)9.绿泥石板岩(Df09) 10.碳质板岩(Df10)11.蛇纹岩(Df11) 12.大理岩(Df12)13.千枚岩(Df13) 14.绢云千枚岩(Df14)15.绿泥千枚岩(Df15) 16.片岩(Df16)17.石英片岩(Df17) 18.黑云片岩 (Df18) 19.绿泥片岩 (Df19) 20.片麻岩(Df20)21.花岗片麻岩(Df21)十、其它岩性:1.硅质岩(Dq01)2.磷块岩(Dq02)3.铝土岩 (Dq03)4.锰矿岩(Dq04)5.黄铁矿岩(Dq05)6.铁矿岩(Dq06)7.菱铁矿岩(Dq07)8.赤铁矿岩(Dq08)9.煤层(Dq09) 10.硼砂(Dq10)11.重晶石(Dq11) 12.石膏层(Dq12)13.盐层(Dq13) 14.钾盐(Dq14)15.含镁盐层(Dq15) 16.含膏盐层(Dq16)17.膏盐层(Dq17) 18.钙芒硝岩(Dq18)19.杂卤石(Dq19) 20.燧石层(Dq20)21.白垩土(Dq21) 22.膨润土.坩子土(Dq22)23.断层泥(Dq23) 24.断层角砾石(Dq24)25.介形虫层(Dq25) 26.砂质介形虫层(Dq26)27.泥质介形虫层(Dq27) 28.含灰(Dq28)29.含灰砾(Dq29) 30.含泥砾(Dq30)31.含介形虫(Dq31)。
DS91M125 125 MHz 1:4 M-LVDS Repeater withLVDS Input Evaluation KitUSER MANUALPart Number: DS91M125EVK NOPBFor the latest documents concerning these products and evaluation kit, visit . Schematics andgerber files are also available at OverviewThe purpose of this document is to familiarize you with the DS91M125 evaluation board, suggest the test setup procedures and instrumentation, and to guide you through some typical measurements that will demonstrate the performance of the device. The board enables the user to examine performance and all functions of theDS91M125 as a standalone device.The DS91M125 is a high-speed 1:4 M-LVDS repeater with an LVDS input designed for multipoint applications with multiple drivers or receivers. The device conforms to TIA/EIA-899 standard. It utilizes M-LVDS technology for low power, high-speed and superior noise immunity.DescriptionFigure 1 below represents the top layer drawing of the board with the silkscreen annotations. It is a 2.5 x 3 inch 4 layer printed circuit board (PCB) that features a single DS91M125 (U2) device.Figure 1 -DS91M125EVK Top View DrawingDS91M125 Evaluation in a Point-to-Point LinkThe following is a recommended procedure for using and evaluating the DS91M125EVK. Figure 2 depicts a typical setup and instrumentation used.1. Select a single DS91M125 evaluation board.2. Apply the power to the board (3.3 V typical) between J3 and J4 power tabs, observe the value of I CC,and compare it with the expected value (refer to the datasheet) to ensure that the devices arefunctional.3. Enable one of the U2 driver outputs. This is accomplished by setting the DE0-3 pin to VDD (JP3-6).4. Connect a signal source to the driver input (DI+, DI-). The signal needs to be an LVDS/M-LVDS/CML/LVPECL compliant signal. Refer to the DS91M125 datasheet for the receiver inputcompatibility.5. Connect one of the U2 outputs (A0-3/B0-3) to an oscilloscope and observe the waveforms.Figure 2 – DS91M125 Test SetupFigure 3 shows an eye diagram acquired at the output of the DS91M125 driver loaded with a 100-ohm resistor. The generator connected to the driver input simulated a 100 Mbps PRBS-7 NRZ.Figure 3 – DS91M125 OutputIMPORTANT NOTICETexas Instruments Incorporated and its subsidiaries(TI)reserve the right to make corrections,modifications,enhancements,improvements, and other changes to its products and services at any time and to discontinue any product or service without notice.Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.All products are sold subject to TI’s terms and conditions of sale supplied at the time of order acknowledgment.TI warrants performance of its hardware products to the specifications applicable at the time of sale in accordance with TI’s standard warranty.Testing and other quality control techniques are used to the extent TI deems necessary to support this warranty.Except where mandated by government requirements,testing of all parameters of each product is not necessarily performed.TI assumes no liability for applications assistance or customer product design.Customers are responsible for their products and applications using TI components.To minimize the risks associated with customer products and applications,customers should provide adequate design and operating safeguards.TI does not warrant or represent that any license,either express or implied,is granted under any TI patent right,copyright,mask work right, or other TI intellectual property right relating to any combination,machine,or process in which TI products or services are rmation published by TI regarding third-party products or services does not constitute a license from TI to use such products or services or a warranty or endorsement e of such information may require a license from a third party under the patents or other intellectual property of the third party,or a license from TI under the patents or other intellectual property of TI.Reproduction of TI information in TI data books or data sheets is permissible only if reproduction is without alteration and is accompanied by all associated warranties,conditions,limitations,and notices.Reproduction of this information with alteration is an unfair and deceptive business practice.TI is not responsible or liable for such altered rmation of third parties may be subject to additional restrictions.Resale of TI products or services with statements different from or beyond the parameters stated by TI for that product or service voids all express and any implied warranties for the associated TI product or service and is an unfair and deceptive business practice.TI is not responsible or liable for any such statements.TI products are not authorized for use in safety-critical applications(such as life support)where a failure of the TI product would reasonably be expected to cause severe personal injury or death,unless officers of the parties have executed an agreement specifically governing such use.Buyers represent that they have all necessary expertise in the safety and regulatory ramifications of their applications,and acknowledge and agree that they are solely responsible for all legal,regulatory and safety-related requirements concerning their products and any use of TI products in such safety-critical applications,notwithstanding any applications-related information or support that may be provided by TI.Further,Buyers must fully indemnify TI and its representatives against any damages arising out of the use of TI products in such safety-critical applications.TI products are neither designed nor intended for use in military/aerospace applications or environments unless the TI products are specifically designated by TI as military-grade or"enhanced plastic."Only products designated by TI as military-grade meet military specifications.Buyers acknowledge and agree that any such use of TI products which TI has not designated as military-grade is solely at the Buyer's risk,and that they are solely responsible for compliance with all legal and regulatory requirements in connection with such use. TI products are neither designed nor intended for use in automotive applications or environments unless the specific TI products are designated by TI as compliant with ISO/TS16949requirements.Buyers acknowledge and agree that,if they use any non-designated products in automotive applications,TI will not be responsible for any failure to meet such requirements.Following are URLs where you can obtain information on other Texas Instruments products and application solutions:Products ApplicationsAudio /audio Automotive and Transportation /automotiveAmplifiers Communications and Telecom /communicationsData Converters Computers and Peripherals /computersDLP®Products Consumer Electronics /consumer-appsDSP Energy and Lighting /energyClocks and Timers /clocks Industrial /industrialInterface Medical /medicalLogic Security /securityPower Mgmt Space,Avionics and Defense /space-avionics-defense Microcontrollers Video and Imaging /videoRFID OMAP Mobile Processors /omapWireless Connectivity /wirelessconnectivityTI E2E Community Home Page Mailing Address:Texas Instruments,Post Office Box655303,Dallas,Texas75265Copyright©2012,Texas Instruments Incorporated。
艾默生过程艾默生过程控制有限公司控制有限公司控制有限公司丹尼尔丹尼尔丹尼尔计计量与控制控制部门中国办事机构部门中国办事机构 北京 电话:010-5821 1188 上海 电话:021-2892 9000 广州 电话:020-8348 6098 成都 电话:028-8661 0618Daniel ® S600 流量计算机丹尼尔公司主要提供用于石油和天然气行业的贸易交接、流量控制、组分分析等工业产品,同时也向客户提供售前售后服务以及系统集成的解决方案,是该领域的领导者。
Daniel S600作为新一代流量计算机中的代表作,其研发的目的是为了满足全球贸易计量的需要,它不仅在易于使用方面达到了新的标准,而且代表了综合性能和灵活性的最高水平。
Daniel S600在石油和天然气领域都可以应对自如,它的强大功能可以帮助您在减少成本的同时提高了生产率。
不管您未来的需求是什么,S600的功能都能快速、轻松地满足您的要求,而且还可以为您节约成本。
适用于: ■ 贸易交接 ■ 传输系统 ■ 批量控制 ■ 仪表校验 ■ 多回路计量多处理器的性能Daniel S600装有一个50MHz 的Intel 486微处理器和数字协处理器,每块I/O 板上有6个微处理器,它有一条强制执行线,以提供快速、准确的计算。
它的模块化设计和出色的通用性将给您的维护工作带来极大的方便。
减少支持成本S600既可以作为一个独立的解决方案,也可以作为一个系统组件来使用。
智能I/O 板不但适合气体和液体的计量,而且还支持两个回路和汇管。
使用相同的板卡,用任何类型的常用流量计,例如孔板、超声波、涡轮、容积式和科里奥利可以配置多达六个回路和两个汇管。
对于不同应用不需要多个插件。
特性:■ Intel 486性能 ■ 高精确度 ■ 基于Windows 的界面 ■ 模块化的I/O, 易于扩展■ 出色的通讯能力 ■ 结构紧凑 ■ 远程I/O 性能 ■ 一台计算机可同时用于液体和气体领域 ■ 多达六个回路■ 可以与任何类型的常用流量计相连接 ■ 检验能力 ■ 内置API 和ISO 计量标准艾默生过程艾默生过程控制有限公司控制有限公司控制有限公司丹尼尔丹尼尔丹尼尔计计量与控制控制部门中国办事机构部门中国办事机构 北京 电话:010-5821 1188 上海 电话:021-2892 9000 广州 电话:020-8348 6098 成都 电话:028-8661 0618Daniel™ S600 高性能、精密测量■计算速度高■ 所有通用计算类型 ■ 换算成美国/欧洲标准 ■ 自校正■快速PID 回路在今天的石油和天然气工业中,速度、精确度和稳定性是最主要的指标 — 这也是我们为什么要使用当今最先进的技术来开发Daniel S600的原因。
《管理信息系统》课程实验报告六
二、实验内容
1.在认真分析下列题目及其对现有系统描述的基础上,按照管理信息系统开发的工作步骤和工作内容,独立完成给定系统的分析、设计任务。
2.提交提供包含下述内容的实验报告。
a.系统分析部分
1)业务流程图
2)数据流程图
3)功能分析图
4)数据字典
5)数据加工处理的描述
6)某大学工资管理信息系统流程设想图(新系统模型)
b.系统设计部分
1)功能结构图设计
2)新系统信息处理流程设计
3)输出设计(主要指打印输出设计)
4)存储文件格式设计(数据库结构设计)
5)输入设计(主要指数据录入卡设计)
6)代码设计(职工证号和部门代号)
7)系统设计说明书
某大学现行工资管理系统简单描述如下:
某大学共有教职员工3758人。
学校下设教务处、财务处和房产处等二十六处室,还设有计算机系、自动控制系和管理工程系等十八个教学系,此外还附设一个机械工厂、一个电子厂和一所校医院。
该校财务处负责全校教职工的工资管理工作,其工资管理业务情况如下:每月25日至28日,房产处将本月职工住房的房费和水电费扣款清单报送财务处,总务处将托儿费扣款和通勤职工的交通补贴费清单报送财务处。
财务处按期列出一份职工借支应扣款清单。
所有这些清单的格式如表SJ-l和表SJ-2所示。
车牌ds是什么牌子DS,法国汽车工业顶级设计豪华品牌,DS的法文全称为Déesse,即法语:女神。
下面是店铺给大家整理的车牌ds是什么牌子,供大家参阅!车牌ds是什么牌子DS(标致雪铁龙旗下高端品牌)法国汽车工业顶级设计豪华品牌,DS的法文全称为Déesse,即法语:女神。
1955年,DS于巴黎车展首次亮相就以设计和技术上的创新引起了轰动,并引发了汽车业的革命,在汽车发展史上有着非常重要的地位。
DS极受法国政要的欢迎,被誉为“总统座驾”,从戴高乐到奥朗德,DS都是法国总统的不二之选。
2011年,长安标致雪铁龙汽车有限公司成立。
2012年,DS品牌携旗下产品正式登陆中国,作为标致雪铁龙汽车集团旗下的新世代豪华汽车品牌,致力于为消费者提供创新、个性化以及激发灵感的驾乘感受。
车牌ds品牌历程1955年DS在巴黎汽车展上第一次亮相。
独特的外形和超前的技术几乎在一夜之间就将整个汽车行业与公众俘虏。
车展开场后,15分钟内就收到了743份订单。
而车展第一天,DS的订单数达到了12,000份。
当时大多数记者完全把精力放在了DS上。
除了滔滔不绝地讲述DS是如何戏剧性地将技术与设计相结合,从而创造出汽车动力与操控(ride vs handling)真正统一的新可能,他们对其它的事件再没什么兴趣了。
二战后,法国正试图在后殖民世界中树立其独特的标签,而DS几乎成为法兰西创造力最有力的象征。
她是如此独特,以至于可以这样认为,这是一件脱离了现实的机械艺术品。
她完全无视了那个时代所有的汽车设计思路。
另外值得一提的是,DS诞生与成长在冷战这一其特殊的时代背景中。
1957年前苏联向太空发射了第一颗人造地球卫星,拉开了太空竞赛(Space Age)的帷幕。
当人类对太空的迷狂被第一次释放时,DS强烈的未来主义色彩也成为狂热公众所追捧的对象。
结构主义哲学家罗兰〃巴特(Roland Barthes)在一篇文章形容DS看起来好像“从天上掉下来的”。
承包单位:中铁七局集团有限公司监理单位:广合同号:DS04 编号:监表2工程分项开工申请批复单附注:分项工程开工申报表编号:DS04001分部工程名称:袋装砂井合同段:DS04起讫桩号:K6+258-K7+700 申报日期:2004年7月30日所属单位工程:中铁七局和北公路DS04标项目部施工组织设计报审表工程名称:佛山市和北公路DS04标段软基处理袋装砂井广东省公路工程监理站:现报上:DS04标段袋装砂井组织设计已由我单位上级部门审查批准,详细说明及图表见附表,请给予审查和批准。
施工单位:中铁七局集团有限公司佛山市和北公路DS04标段项目经理部项目技术负责人:报审日期:2004年月日监理工程师意见:1、同意2、不同意3、按以下主要内容修改补充专业监理工程师:总监理工程师:日期:本表由施工单位填写一式三份,连同施工组织设计一份一并送监理单位审查,建设、监理及施工单位各留一份。
佛山市和顺至北港公路主干线工程DS-04标段袋装砂井施工组织设计编制: ________________审核: ________________批准: ________________中铁七局集团有限公司佛山市和北公路DS-04标段项目经理部^OO四年七月一、工程概况:U概况佛山市和顺至北港公路主干线工程DS-04标段属一环线东线工程。
起讫里程为K6+258.8~K7+700,全长1.441公里。
工程内容主要包括路基填筑、排水、防护和桥涵工程。
本施工组织设计中主要内容是袋装砂井处理。
软基地基采用是的袋装砂井结合砂垫层+土工格栅+预压的处理方案,袋装砂井直径7cm,间距1.3m,正三角形布置。
主要工程数量如下表:(见下页)2、地形地貌本项目位于东经112°58,57”~113°10'20”,北纬2204Γ16”〜23。
19'O(T之间。
地形以平原区为主,海拔高度一般为1.6m~3.8m,地势由北向南倾斜,沟渠纵横,鱼塘密布。
20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intSOP 408 Annex AWHO PUBLIC INSPECTION REPORT(WHOPIR)Active Pharmaceutical Ingredient ManufacturerPart 1: General informationName of ManufacturerKunming Pharmaceutical Corporation (KPC)Unit numberPhytochemistry Plant No.4 (PCP4). Production BlockPhytochemistry Plant No.4 (PCP4). Physical address Qigongli, West Suburb, Kunming City 650100, YunnanProvince, P.R. ChinaContact persons and email address. 1. Mr. Ma Weipeng, International Technical DirectorPhone No.: +86-871-831 9868 Ext:5620Mobile: +86-139-87169836E mail: weipeng.ma@2. Ms. Liu Yanxia QA Head Quality Dept.Tel / Fax: +86-871-818 1968Mobile: +86-135-770 17290email: lyx0709@Date of inspection14, 15 and 16 September 2009 Type of inspection Routine inspectionWHO product categories covered by the inspectionAPIs for use in products against malaria (MA)Active Pharmaceutical Ingredient(s) included in theinspectionActive Pharmaceutical Ingredients against Malaria (MA) Summary of the activities performed by the manufacturer Manufacturing, packaging, control and release of Anti- Anti-Malarial active pharmaceutical ingredients.20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intPart 2: SummaryGeneral information about the company and siteGeneral information about the company and siteThe site inspected was Kunming Pharmaceutical Corporation,Qigongli, West Suburb, Kunming City 650100, Yunnan Province, P.R. China, hereafter called KPC. The focus of the inspection was Phytochemistry Plant No. 4 (PCP4). The company corporate office was located at Plot No.166 Key Road, State New and High Technology Development Zone, Kunming650106, Yunnan Province, P.R. China.According to the Site Master File effective 25 August 2009 and the presentation given at the opening meeting, KPC was established in 1951. In 2000, it was listed on the Shanghai stock exchange and the major shareholders were Holley Group in Zhejiang Province (22%), Provincial Industrial Investment Co., Ltd and Hongta Group. KPC owns 1sub-pharmaceutical sale, 7 pharmaceutical holding companies, 1 Joint venture company, 4 manufacturing factories, 1 drug research institute and 1 pharmaceutical engineering design institute.The site of KPC was about 170,000m2 in size with a built up area of 100,000m2. The manufacturing facilities at the site included:⇒Oral dosage plant manufacturing several products including antinfectives.⇒Oral dosage forms belonging to Kunming Becker-Norton Pharmaceutical Co., Ltd, a joint venture company with Teva Pharmaceuticals, which produces generic penicillin finished pharmaceutical products.⇒Two injection Plants,⇒ 4 Phytochemistry Plants (PCP) for APIs:o PCP1: old production plant.o PCP2: plant dedicated to a certain series of APIs.o PCP3: extraction and concentration plant (2 blocks).o PCP4: new production plant.PCP4, which was the focus of inspection was built in 2005 and was dedicated to production of one API through 4 steps:⇒Step I: Reduction.⇒Step II: Methylation and crystallization.⇒Step III: Dissolution and recrystallization.⇒Step IV: Milling and blending.The API under focus was produced under two codes.1.One (DS04) produced solely for a specific customer.2.Another (DS00) produced up to step III for KPC and other customers. The steps of synthesis,manufacturing instructions, reactors and specifications used for DS00 were similar to those for DS04 except there was no step IV (milling and blending) and the specifications of the key intermediates were based on Chinese Pharmacopoeia (Ch.P2005).20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intistory of WHO and/or regulatory agency inspectionsccording to the SMF and company presentation, KPC got GMP certificates issued by the State ng the API the specific⇒ inspection by TGA in 2001 and 2005.CP1 was previously inspected by WHO-PQ in September 2004 and subsequently approved. ocus of the inspectionhe inspection focused on the production and control of the API for the specific customer (DS04) nspected Areasay 1he inspection started with and opening meeting in the conference room, where the inspectors he inspectors proceeded with a detailed review of the following areas of the quality intermediates and final API in PCP4.PI code and plant used. HA Food and Drug Administration of China (SFDA) for Active Pharmaceutical Ingredient, Powder for Injection, Small Volume Injection, and Oral Dosage. It was stated also that:⇒ PCP4 passed the GMP inspection by US FDA in Nov. 2008 focusi customer (DS04).PCPI passed GMPPFT in PCP4. The inspection covered all the sections of ICH Q7, including premises, equipment, documentation, materials, validation, sanitation and hygiene, production, quality control and utilities.IDT introduced themselves and exchanged business cards with the key staff of KPC. The inspectors explained the procedure for WHO Prequalification Programme, the procedures and standards used for inspection and timelines for the processing the report and company responses to the inspection observations. The procedures for closing the inspection including the WHO public inspection report (WHOPIR), Notice of Concern (NOC), Notice of Suspension (NOS) were explained. The tentative inspection plan was discussed and confirmed. This was followed by a presentation from KPC about the company and the site to be inspected. The presentation highlighted the capacities, Quality Management Systems and inspection history of the site. The synthesis and purification process of the API starting from key API starting material were presented highlighting the starting materials, the equipment used (reactors, filters, tanks centrifuges, dryers, mills and blender) and their location, keys process parameters, and batch sizes at different stages of the process. A copy of the presentation was obtained and will be filed in the company file.T management systems and related documents and records:1. SOP on the procedure for allocating batch numbers to The batch numbering format was CODE YYYY P XXX: Where:• CODE was the product code, which differed according to the A • YYYY was the year of production, e.g. 2008.• P was the production type:on batch.1 = Normal producti2 = Trial production batch.3 = Reworked batch.4 = Validation batch.20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intonce.the second time.2. Batch s3. SOP on ntermediates and final API in PCP4. The scribed the conditions and procedures for reprocessing and reworking. A batch 4. ons of the key starting material and finished API for the different codes (DS04 and5. hes was6. d of purified water was used in the first step of 5 batches ame ⇒ ⇒ tch processing e DRA was7. Sup and solvents used in the m8.9. release.ocuments.of selected employees, namely:5 = Batch reprocessed6 = Batch reprocessed izes.the procedure for handling unqualified i procedure de could be reprocessed twice and but reworking could only be done once. Reworking was only allowed if the API before milling and blending failed the test for clarity. There was an approved procedure for reworking (effective 06.09.2008) which included re-purification by addition of filter aids. Reworked or reprocessed batches could be identified from their batch numbers.Specifications of key API starting material, intermediates and final API. Although the specificati DS00) used different specifications, their intermediates used the same specifications.SOP on the annual product quality review (APQR) for DSO4 and DS00 for all the 4 steps for the years 2005, 2006, 2007 and 2008. The content of polymorph A in most of batc 100% and none was less than 99%.Deviation and control procedures with the following examples reviewed in detail:⇒ One where potable water instea to assess the impact of ozone on the quality of the key intermediate.⇒ One to distinguish the master batch processing instructions and related records for DS04 and DS00 following starting to manufacture DS00 in PCP4. Hitherto in PCP1, the s batch processing instructions and records were used for DS04 and DS00.One for introduction of cool storage for the API before milling and blending.One for change of several process parameters and update the Master ba instruction. Evidence of submission and approval of the changes to responsibl available.plier audit, qualification and approval and list of approved suppliers for starting materials anufacture of the API. The process involved evaluation of a questionnaire filled by the supplied, full analysis of samples from several batches and audit of the facilities and systems of the supplier. There were different suppliers of key starting material for DS04 and DS00. The customer for DS04 was responsible for the approval of the suppliers for key starting material for DS04 and it was first collected in a central warehouse managed by an agent on behalf of the customer and only transferred to KPC according to production the schedule. Some of the key starting material used in the manufacture of DS00 used to be extracted on site and some was still purified on site. Suppliers of the other starting materials and solvents were identified and approved by KPC.SOP on Complaints handling.SOP on Product Recall.10. SOP on Artemether API batch 11. SOP on management of d 12. SOP on how to write an SOP.on 13. Organization charts and job descripti o Head of QA/QCo Head of QA.o Head of QC.20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.inthe inspectors proceeded to inspect the warehouses used to store finished API (Cold room), solid he inspection ended late in the evening so the review of the progress of the activities of the day, ay 2he inspectors started by reviewing the areas inspected the previous day and gave feed back on e production activities in the common production area for steps I and II and clean area for val from the fridge was reviewed as he inspection ended late in the day so the review of the progress of the activities of the day, and ay 3he inspectors started by reviewing the areas inspected the previous day and gave feed back on he morning was dedicated to the inspection of the QC laboratory. The following labs were or (Ground floor) : sample receiving arean samples room and Packaging material⇒ Raw material wet chemistry testing laboratory, instruments laboratory, samples ⇒ ndard solution preparation lab, UV analysis lab.d purified water analysis. consisting of procedures, records, specificationsT starting materials, key starting material (and related sampling and dispensing room), reagents and a quick visit to PCP1.T and giving the day's feed back were differed to the next day.DT the observations made.Th steps III and IV of PCP4 were inspected. The corresponding documents in the area were reviewed including use and cleaning log books, batch processing instructions and records. The intermediate storage area and washing areas of equipment, tools and fiters bags for the filters and centrifudge were inspected. The API was stored in the fridge before milling and blending operations. The IPQC lab was inspected followed by review batch records of selleceted batches DSB and its intermediates as well as DS00 and its intermediates. The stock control book showed that all the batches of DS00 were transfered to the KPC injection plant.The monitoring of holding time for unmilled API after remo described in the corresponding SOP.T giving the day's feed back were differed to the next day.DT the observations made.T inspected:⇒ First Flo ⇒ Second Foor: Stabilty chambers room, Retentio testing lab.Third Floor:prepartion roomFourth Floor: Sta ⇒ Fifth Floor: Microbiology testing lab: seperate labs for limit test an.1QUALITY MANAGEMENT2PC had an acceptable documentation system K and related documentation, approaches and policies to support quality management and quality assurance. The responsibilities of the Quality and production units were defined. There was a system and records for Annual product quality review.20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intts regular monitoring and continuous provement.PC had adequate numbers of qualified and experienced personnel to carry out the tasks in pplicable GMP. Individual responsibilities were generally defined in the rganograms and individual job descriptions.ersonnel interviewed reflected that they were aware of the principles of GMP although the uction, storage and uality control areas was restricted to only authorized personnel. Personnel were provided with he building and facilities of PCP4 were designed to facilitate logical flow of production he building and facilities were in a good state of repair nd were adequately cleaned. They were dedicated to the synthesis and purification of the API in nd ceilings were smooth to facilitate cleaning. The areas where highly flammable aterials like nitrogen were used were separated by explosion proof doors and were under ty were regularly monitored.he process equipment were designed and installed to facilitate containment and logical flow of cleaned and maintained according to approved procedures and cords were maintained. There was a system to indicate the status of the equipment.here was a system for documentation in form of SOPs, manufacturing procedures, log books, designed, approved and controlled according to stablished SOPs.aterials were sourced from approved suppliers. On receipt they were quarantined, sampled and stores for subsequent use, although a weakness was On of the key customers had supported KPC in establishing a comprehensive quality management system and had been involved in i im2.2 PERSONNELK accordance to the a oThe heads of production and quality control were independent of each other.P routine GMP training could be strengthened further. Entry to critical prod q appropriate protective clothing.2.3 BUILDINGS AND FACILITIEST activities and to avoid contamination. T a focus.The clean areas for purification stage were separate from those for the synthesis stages and floors, walls a m negative pressure compared to the surrounding areas.All the production areas were supplied with appropriately filter air and purified water. The pressure differentials, temperature and relative humidi2.4 PROCESS EQUIPMENTT production. They were regularly re2.5 DOCUMENTATION AND RECORDST specifications, testing procedures. These were e2.6 MATERIALS MANAGEMENTM tested before acceptance into approved20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intdentified in inspecting the labels of received solvents. The storage of starting materials, roduction processes were guided by well documented procedures and detailed instructions. ities. There were in-process controls onducted at appropriate stages of synthesis to monitor the quality of the intermediates and APIs. proce d finished APIs were packed using packaging materials meeting the levant specifications. Packaging operations took place in segregated areas. There was PC had appropriate and separate storage warehouses and areas for starting materials, packaging shed APIs. Conditions of storage were monitored and ppropriate records for stock and distribution were maintained. The records could support here was a separate block for QC and QA department. The premises, facilities and utilities were a good state of repair. There were dedicated rooms for ctivities like sample receipt and storage, wet chemistry, instrumentation and balance room. tivities.available and consistent with the protocols and regulatory quirements.in intermediates and finished APIs was generally adequate and the storage conditions were regularly monitored. Materials under a different status and stage of processing were adequately segregated.Materials at different stages processing were identified with a unique batch numbers and stage of processing.2.7 PRODUCTION AND IN-PROCESS CONTROLSP Production processes were conducted in dedicated facil c The process used was generally similar to those outlined in the dossiers submitted to WHO. The cleaning procedures, design of the buildings and equipment, plus the planning of production facilitated prevention of possible contamination.2.8 PACKAGING AND IDENTIFICATION LABELLING OF APIs ANDINTERMEDIATESMaterials at different stages processing were identified with a unique batch numbers and stage of ssing. Intermediates an re appropriate reconciliation of packaging materials at the end of each packaging operation. The label for final API needed to be improved (see deficiencies).2.9 STORAGE AND DISTRIBUTIONK materials, solvents, intermediates, and fini a traceability of the batches distributed.2.10 LABORATORY CONTROLST separate from production and were in a There were adequate pieces of equipment with up to date calibration status.Records of sample receipt and allocation, analysis were maintained. The assembly of records of analysis could be improved.The microbiology laboratory was separated from the chemical laboratory. It had adequate room for segregation of different acThere were stability chambers for the different storage conditions and records of charging and withdrawal of samples for testing were re20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intalidation of manufacturing processes had been done and the relevant protocols and reports were cols were well designed and executed. All validation stages were preceded ith an elaborate quality risk analysis to identify the critical process parameters and their here was a procedure for change control which included evaluation of the validation status of propriate control measures to preserve the validated status. There as a change control register and appropriate records were maintained. Several changes were o recovered solvents were used in any stage of synthesis or purification. All solvents and ks in PCP3 and sold to an outside client. n agreement with this vendor was in place and records of dispatch of the solvents were aterial ad to meet the same specifications as routine materials but they were identified by a different re sting and stability testing if found necessary. Up to date, no batch had been reworked. here were procedures for handling customer and market complaints and product recall. No d since the last inspection.here was no contract manufacturing done for the API under focus. Specialized test in QC were ntracts with the2.11 VALIDATIONV available. These proto w acceptance limits. Generally, the conclusions reached were supported by the results of validation and they were used to design routine process instructions and related in-process controls.Major pieces of equipment had been qualified and records of qualification of selected equipment showed that the programme was comprehensively executed.2.12 CHANGE CONTROLT the system and prescribed ap w reviewed which proved that the change control in place was well designed and adequately implemented.The introduction of synthesis of DS00 in PCP4 was done through a well documented change procedure.2.13 REJECTION AND RE-USE OF MATERIALSN mother liquors from PCP4 were collected in several tan A reviewed and no matter of concern was observed.Reprocessing of materials was allowed at all stages of synthesis and purification. This was guided by well documented procedures which had been covered during validation. Reprocessed m h batch number. The policy allowed materials to be reprocessed up to a maximum of two times.Reworking was only allowed in case of the un-milled API failing to comply with specifications for clarity. The rework process was well documented and required careful evaluation and mo te2.14 COMPLAINTS AND RECALLST complaints or recalls had been encountere2.15 CONTRACT MANUFACTURERS (INCLUDING LABORATORIES)T contracted out but the agreements with the vendors were not reviewed. The co20, avenue Appia – CH-1211 Geneva 27 – Switzerland – Tel central +41 22 791 2111 – Fax central +41 22 791 3111 – www.who.intendor used to handle waste solvents for 2008 and 2009 were reviewed. The responsibilities of ased on the areas inspected, the people met and the documents reviewed, and considering the ction, including the observations listed in the Inspection Report, as well as e corrective actions taken and planned, Kunming Pharmaceutical Corporation, Workshop cted in the WHOPIR, were addressed by the manufacturer, to a satisfactory level, rior to the publication of the WHOPIRv KPC and the vendor were well spelt out.Part 3: ConclusionB findings of the inspe th PCP4, Qigongli, West Suburb, Kunming City 650100, Yunnan Province, P.R. China, was considered to be operating at an acceptable level of compliance with WHO GMP guidelines and in particular, ICH Q7: Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients..All the non-compliances observed during the inspection that were listed in the full report as well as those refle pThis WHOPIR will remain valid for 3 years, provided that the outcome of any inspection conducted during this period is positive.。
麦克斯韦方程组微分形式及其意义
麦克斯韦方程组公式是∮D·dS=∫rdV=q;∮E·dL=-∫(B关于t的偏导)·dS;∮B·dS=04,∮H·dl=∫(j+D关于t的偏导)·dS。
麦克斯韦方程组关于电磁波等的预言为实验所证实,证明了位移电流假设和电磁场理论的正确性,这个电磁场理论对电磁学、光学、材料科学以及通讯、广播、电视等等的发展都产生了广泛而深远的影响,它是物理学中继牛顿力学之后的又一伟大成就。
麦克斯韦方程组,是英国物理学家詹姆斯·克拉克·麦克斯韦在19世纪建立的一
组描述电场、磁场与电荷密度、电流密度之间关系的偏微分方程,它由四个方程组成:描述电荷如何产生电场的高斯定律、论述磁单极子不存在的高斯磁定律、
描述电流和时变电场怎样产生磁场的麦克斯韦-安培定律、描述时变磁场如何产生电场的法拉第感应定律。
1873年前后,麦克斯韦提出的表述电磁场普遍规律的四个方程。
其中:
1、描述了电场的性质。
在一般情况下,电场可以是自由电荷的电场也可以是变
化磁场激发的感应电场,而感应电场是涡旋场,它的电位移线是闭合的,对封闭曲面的通量无贡献。
2、描述了磁场的性质。
磁场可以由传导电流激发,也可以由变化电场的位移电
流所激发,它们的磁场都是涡旋场,磁感应线都是闭合线,对封闭曲面的通量无贡献。
3、描述了变化的磁场激发电场的规律。
4、描述了传导电流和变化的电场激发磁场的规律。