ANSI C57.12.29-1991开关设备和变压器-衬垫安装。。。
- 格式:pdf
- 大小:75.67 KB
- 文档页数:12
DESCRIPTIONThe Megger MWA3xx Transformer Winding Analyzer is anadvanced 3-phase transformer test system delivering portability, reduced set-up time, increased job-site safety, and effortless productivity. The MWA3xx provides complete ratio, phase and winding resistance measurements for a 3-phase transformer. All ratio and winding resistance tests are performed in one instrument, with only one 3-phase lead-set connection. The MWA3xx utilizes PowerDB as a single software platform saving the user additional time with only one set-up and one easy-to-use test form.The MWA3xx effectively tests:n Power transformers n Distribution transformers nCTs and VTs (PTs)n Motors/generatorsTESTING PERFORMEDThe following tests are easily performed with the MWA3xx, all with one instrument and one 3-phase lead-set connection.n 3-phase turns ratio n 3-phase winding resistancen OLTC/continuity (make-before-break) n 3 phase core demagnetization n Magnetic balance / flux distribution n Excitation currentn Polarity and phase angle deviation n Auto vector detection nHeat-run test3-Phase test connection (no interconnect boxes)3-Phase, 2-Winding Transformers - Resistance on all six windingsOnce connected, the MWA3xx performs DC resistance measurements on all high- and low-side windings withoutreconnection. The test procedure is simple and efficient. Delivering eight-terminal/six-winding resistance measurement capabilitywithout the need for inter-connect boxes saves the user time by testing all six windings without having to disconnect and reconnect leads. The far-end of the measurement cable set is connected to each bushing/terminal of the transformer using a patented adjustable (100 mm – 4 in. opening) Kelvin clamp. This adjustable clamp removes the need for traditional dual leads (I & P) per phase, reducing the connections from 16 to 8 without the worry ofmisconnecting potential (P) for test current (I). The near-end of the cable is connected to the MWA3xx. Selected resistances of bothMWA300/330A3-Phase Ratio and Winding Resistance AnalyzernCombines TTR and resistance testing in one box - faster, more efficient testing n55% smaller, 40% lighter than individual instrumentsnOnly one set of leads required - lighter, smaller and less expensiven One test form - easier, faster to complete n Built-in demagnetizationMWA3xx3-Phase Ratio and Winding Resistance AnalyzerMWA330A with built-in 12-in industrial computer, shown above.HV and LV windings will then be measured. The test sequence can be selected as 6-winding with dual injection simultaneous winding magnetization, up to 4-winding measurement of HV and LV separately, or single-winding test.3-Phase turns ratioComplexity in the measured ratio versus nameplate ratio occurs with most three-phase power transformers due to multipliers, such as √3, which are required to match the measured ratio to the nameplate ratio. Additionally, transformers with zig-zag windings are handled correctly with internal compensation allowing usersto compare nameplate to actual with no corrections needed. The MWA3xx automatically applies the appropriate multiplier which provides a direct comparison to the nameplate ratio.Excitation currentThe excitation current test at low voltage is very useful in locating problems such as defects in magnetic core balance, in magnetic core structure, shifting of windings, failures in the turn-to-turn insulation, or problems in tap changers.Winding balanceWinding balance (also referred to as magnetic balance) is performed to assess the health of the windings, core assembly condition, and flux distribution within the transformer. This test, performed safely and efficiently by the MWA3xx, is a measure of how well balanced (electrically) the transformer is versus nameplate specifications. Check with the factory to ensure your vector group is available with this feature.Phase angle deviationPhase angle deviation is the phase relationship between in-phase vectors of the high-side windings versus the low-side windings. The phase deviation denotes the quality of the core and the winding and should exhibit very low values (0.01 degrees) when the core and windings are functioning properly. Shorted turns, a deteriorated, or damaged core can cause significant changes in the phase deviation values.LTC (OLTC) continuityIn normal LTC operation, continuity between the internal LTC contacts is maintained throughout each complete transition (from one tap position to the next). To check for this continuity, the MWA3xx continually monitors the transition current for each tap position. Any slight discontinuities are detected and reported. Vector recognitionWhen the transformer nameplate data is unavailable, or to confirm compliance to specified nameplate configurations, the MWA3xx provides the capability for automatic vector group detection. PolarityThe MWA3xx quickly and efficiently checks for correct polarity between high and low side windings.Automated heat-run interval testingThe MWA3xx performs automated single or multi-core heat run testing. It uses the standard accepted methods, IEC60076-2-1993 & C57.12.90 2013, for this test, allowing users to perform factory testing automatically. Reports included within software also meets IEEE and IEC standard requirements but does allow manipulation to fit individual customer requirements.Auto core demagnetizationIn order to avoid problems related to core saturation, the MWA3xx comes standard with a core demagnetization function which safely demagnetizes the transformer core after DC testing.PowerDB™ SoftwarePowerDB software provides the unit with a common “user interface” to minimize operator training and provides a seamless interface to the computer application – PowerDB Lite.Two Interface OptionsExternally controlled – MWA300The MWA300 is a “black box” style package that is remote-controlled by PowerDB software running on an external PC (not provided).Built-in 305 mm (12 in.) touch-screen computer –MWA330AThe optional built-in touch-screen computer software provides an industrial, high visibility screen for use on any day – bright or cloudy – and works under the toughest environments. Providing the same test capabilities as the MWA300, the MWA330A comes equipped with an internal computer providing a 305 mm (12 in.) color display with touch-screen interface.FEATURES AND BENEFITSn “One-time” 3-phase connection tests all six windings for faster and safer testing.n No switchbox required, ensuring easier and safer operation.n Unique Kelvin clamps with patented adjustable jaws each open to 100 mm (4-in.) as well as banana plug input for connectionto terminal blocks – no need for special lead sets, and minimal operator error due to lead connections.n Industrial grade 305 mm (12 in.) bright-color touch-screen display available as an option. Usable in direct sunlight, harsh environments – no need for IT intervention, safely stores results and reports.n Checks the contact and timing health of LTC (OLTC) tap changers.n Single-person testing of LTCs is provided standard for use with optional remote tap controller (RTC-1).n PC interface via USB for remote control operation and downloading of test results for ease of use.MWA3xx 3-Phase Ratio and Winding Resistance AnalyzerSPECIFICATIONSInput PowerMWA3xx: 108 to 132 V, (207 to 253 V*), 58 - 62 Hz, 660 VA MWA3XX-47: 207 to 253 V, (108 to 132 V*), 48 - 52 Hz, 660 VA *Input fuse change required - 6.3A fuse for 120 V nominal and 4.0A fuse for 230 V nominal line input.Internal Data StorageMWA330A (built-in computer): up to 100,000 data sets Communication/Control SoftwareMWA3xx: PowerDB LiteMWA330A: Controlled via built-in industiral PC or external customer PC.The MWA330A’s internal computer is designed to control a limited number of Megger instruments including the DELTA4000 as well as the Megger S1 and MIT Series DC insulation testers. EnvironmentalOperating: -10o C to +50o C (14o F to 122o F)Storage: -30o C to +70o C(-22o F to +158o F)Relative Humidity: 0-90% non-condensingCaseRuggedized case (metal/plastic trim) with removable lid andsoft-side pouch with carrying strapSafety/EMC/VibrationConforms to the requirements of:IEC 61010-1:2010ASTMD999.75,IEC 61326-1:2012* (both emissions and immunity)* - see manualDimensions/WeightDimensions290 x 290 x 460 mm (11 x 11 x 18 in.) does not include handles WeightStandard unit: 14.5 kg (32 lbs)Transformer Winding Phase RelationshipANSI C57.12.70-1978CEI/IEC 76-1:1993 and Publication 616:1978AS-2374, Part 4-1982 (Australian Standard)DC Specifications (Winding resistance, LTC/continuity, core demagnetization, heat-run)ResistanceResistance ranges:CurrentRange (A)ResistanceRange (W)Resolution(W)10 A 10 mW to 0.2 W0.00000110 A0.2 W to 2 W0.00011 A100 mW to2 W0.000011 A2W to 20 W0.001100mA 1 m W to 20 W0.0001100mA20 W to 200 W0.0110 mA10 m W to 200 W0.00110 mA200 W to 2000 W0.1Accuracy: ±0.25% Range ±0.25% RdgResolution: Up to 4 digitsExcitation Current SpecificationsRange and Accuracy0 to 500 mA, 3 digit resolution, ±(2% of reading + 1 digit)AC Specifications (Turns Ratio, Winding Balance) Range and Turns Ratio Accuracy:8 V AC:±0.1% (0.8 to 2000)±0.25% (2001 to 4000)±0.35% (4001 to 8000)40 V AC:±0.1% (0.8 to 2000)±0.15% (2001 to 4000)±0.3% (4001 to 10,000)±0.35% (10,001 to 25,000)80 V AC:±0.1% (0.8 to 2000)±0.15% (2001 to 4000)±0.25% (4001 to 10,000)±0.30% (10,001 to 45,000)Phase Specifications (Phase angle deviation, Phase-shift analysis, auto Vector detection)Input voltages: 8, 40, and 80 V ACRange and Accuracy±90 degrees, 2 decimal points for the degree display, or for the centi-radian displayAccuracy: ±3 minutes (from 0.8:1 – 2,000:1)MWA3xx 3-Phase Ratio and Winding Resistance AnalyzerHV Strobe and Leads Cat # 1004-639Length: 18 m (60 ft)Weight: 1.1 kg (2.3 lb)Foam Lined Transit Case Cat # 2005-115Test LeadsNewly designed test leads, shown in image below, are universal and can be used for winding resistance (MTO3XX) or turns ratio (TTR3xx) instruments. Expandable jaws, shown in inset, allow for testing any size transformer.This new design allows tangle and hassle free connection to transformer.Remote Tap ControllerThe RTC-1 is a manually operated remote tap controller designed to provide a more efficient method of controlling (on)load tap changer (LTC) while performing routine tests on power transformers. It removes the need to be physically close to the LTC while testing or to have a second person controlling the LTC while operating the test instrument. A 9 m (30 ft) three-conductor cable is provided to allow proximity to the test instrument while performing testing and advancing tap positions as required throughout the test.OPTIONAL ACCESSORIESAvailable in 9m (30 ft), 18 m (60 ft) and 30 m (100 ft) lengthsONE INTUITIVE, COMPREHENSIVE TEST FORMRATIORESISTANCESALES OFFICE4271 Bronze WayDallas, TX 75237-1019 USA T 1 800 723 2861 (USA only) T +1 214 333 3201F +1 214 331 7399******************MWA3XX_DS_US_V01ISO 9001The word ‘Megger’ is a registered trademark*Please refer to Input Power under Specifications above for details.。
a-nsi标准ANSI标准是美国国家标准协会(American National Standards Institute)制定的标准,其制定目的是为了规范和统一美国国内的各种标准,以保证产品的安全、高效和互通性。
ANSI标准已经广泛地应用于全球各行各业,尤其是在航空、电子、医疗、计算机、自动化、建筑和机械等领域,成为了行业里的重要参考标准。
本文将介绍一些与ANSI标准相关的参考内容。
1. ANSI/X9.100-181-2018密码学标准:本标准中规定了基于公钥密码学的数字证书和数字签名的要求以及相关测试程序的标准。
此标准为保障国家安全、金融安全、电子商务以及数字化社会等众多方面提供了核心的技术和标准。
2. ANSI/TIA-568.2-D-2018光纤电缆标准:该标准规定了光纤电缆的安装和测试的方法和要求。
通过该标准的应用可确保光纤电缆在安全运行的同时,不会因使用不当或机器故障而产生故障,保障数据传输的正确性。
3. ANSI/ISA-84.00.01-2004安全标准:该标准规定了工业控制系统能够运作时所必须满足的安全要求。
这些要求包括了硬件基础设施的安全防护、授权用户的实现、紧急事态下的应急处理、以及系统的操作和维护等方面,有助于保证工业控制系统的安全性能。
4. ANSI/NFPA 70国家电气安全标准:此标准是指美国国家消防协会(NFPA)的70号标准,它用来规范电力设备的安全操作和控制,这对于电力系统的平稳稳定运行是至关重要的。
5. ANSI/AWWA C652-92细菌隔离标准:该标准规定了水处理和输送系统的处理分界点和运行标准。
此标准规定了自来水处理系统在分界点位的发挥条件及污染物物质的种类、浓度、含量等指标,从而保证自来水的质量。
6. ANSI/IEEE C57.12.20-2005变压器标准:该标准怎样规定了变压器的安装和使用的所有细节,包括变压器的设计,安装、操作以及维修等方面。
cxb船用变压器标准船用变压器是一种在船舶上使用的电气设备,主要用于变换电压以适应船舶系统的电力需求。
为了确保船用变压器的正常性能和安全运行,国际上制定了一系列相关的技术标准和规范。
本文将介绍一些与船用变压器相关的参考内容,这些内容主要涉及国际标准化组织和国际电工委员会等权威组织所制定的标准。
1. IEC 60092-4 "海洋船舶电气装置":这是国际电工委员会制定的标准,规定了海洋船舶上的电气装置的要求,包括船用变压器的设计、制造、安装和运行等方面。
这一标准为船用变压器的设计和应用提供了指导。
2. IEC 60076 "电力变压器":这一系列标准是国际电工委员会制定的,其中包括IEC 60076-1至IEC 60076-12等多个标准,涵盖了电力变压器的各个方面。
其中,IEC 60076-10专门规定了海洋电力变压器的设计和性能要求,该标准在船用变压器设计中有较高的参考价值。
3. IEEE C57.12.50 "接地变压器":这是美国电气和电子工程师协会制定的标准,用于接地变压器(具有特殊绝缘和接地装置的变压器)的设计和应用。
船用变压器的接地设计需要符合该标准的相关要求。
4. ISO 9001 "质量管理体系":这是国际标准化组织制定的用于组织和实施质量管理的标准。
船用变压器制造商可以依据此标准建立和实施质量管理体系,以保证产品的质量和性能。
5. ISO 14001 "环境管理体系":这是国际标准化组织制定的用于组织和实施环境管理的标准。
船用变压器制造商可以依据此标准建立和实施环境管理体系,以满足环保要求并减少与生态系统的不良影响。
此外,还有一些国家和地区制定的标准和规范,如美国国家电气制造商协会(NEMA)制定的标准、欧洲电气厂商联盟(EUREL)制定的标准等,这些标准通常针对特定地区的要求和环境进行规范。
质量保证体系文件最终检验规范1 范围规范适用于我公司生产的所有高、低压成套设备产品2 引用标准GB/T311.1-1997 高压输变电设备的绝缘配合GB/T1408.1-1999 固体绝缘材料电气强度实验方法工频下的实验GB/T3309-1989 高压开关设备常温下的机械实验GB/T3909-1991 3-35KV交流金属封闭式开关设备GB/T9466-1988 低压成套开关设备基本实验方法GB/T11022-1999 高压开关设备通用技术条件GB/T2681-1981 电工成套装置中的导线颜色3 目的最终产品检验工作是保证产品质量的重要手段,为了保证最终产品质量达到设计要求,满足顾客需求及国家有关法令、法规、特制定本标准。
4 检验原则4.1 有出厂产品都必须进行最终检验且结论合格。
4.2 不具备最终检验依据的产品,检验人员不矛以检验。
4.3 产品最终检验必须逐台逐向检验,有问题及时调整、处理。
4.4 产品经简单调整后能够达到要求的,仍可判为合格品。
5 最终检验项目5.1 一般检查项目。
5.1.1 所装元器件规格型号应正确,并符号相应的技术条件。
5.1.2 主、辅电路接线应正确,并符号相应的技术条件:导线截面和颜色的选择应符合GB/T2681-1981的规定。
5.1.3 产品的铭牌、符号及标志应正确、清晰、齐全,安装位置应正确。
5.1.4 产品的涂覆层应牢固、均匀,无两处以上明显划痕,距产品一米处观查,无明显的色差和反光。
5.1.5 产品外形及安装尺寸应符合图纸、标准及技术文件的要求。
5.1.6 对于产品结构的搭接、零部件和电气元件的保护接地应有专用接地垫圈(或用其他措施),以保证保护电路的连续性。
5.2 对装有分体断路器的开关柜进行机械操作和机械特性试验,参照GB/T3309-1989的规定执行。
5.2.1 分闸时间:5.2.2 合闸时间:5.2.3 合闸同期性:5.2.4 行程、开距、超程:5.2.5 分合闸速度:5.2.6 联锁、保护、信号装置试验:5.2.7 分合闸操作电压、电流试验:5.2.8 脱扣器试验。
UDC中华人民共和国行业标准P MT 5010- 95煤矿安装工程质量检验评定标准standard for quality inspection andassessment of installation engineering of coal mine(上册)1995—04—14发布 1996—01—01实施中华人民共和国煤炭工业部发布目录1 总则 (11)2 质量检验评定的工程划分 (12)3 质量检验评定的等级 (14)4 质量检验评定的程序及组织 (16)5 基本规定 (17)6 多绳摩擦式提升机安装工程 (19)6.1 垫铁,基础螺栓及二次灌浆 (19)6.2 主轴安装 (21)6.3 减速器安装 (23)6.4 导向轮及车槽装置安装 (25)6.5 盘式制动器安装 (26)6.6 液压站安装 (27)6.7 辅助装置安装 (28)6.8 试运转 (29)7 缠绕式提升机及矿用提升绞车安装工程 (32)7.1 垫铁,基础螺栓及二次灌浆 (32)7.2 主轴安装 (32)7.3 滚筒组装 (33)7.4 传动系统安装 (35)7.5 制动系统安装 (36)7.6 液压站安装 (38)7.7 辅助装置安装 (39)7.8 试运转 (39)8 通风机安装工程 (42)8.1 垫铁,基础螺栓及二次灌浆 (42)8.2 机体安装 (42)8.3 反风装置安装 (44)8.4 试运转 (44)9 空气压缩机安装工程 (46)9.1 一般规定 (46)9.2 垫铁,基础螺栓及二次灌浆 (46)9.3 机体安装 (47)9.4 附属设备安装 (49)9.5 室内管道安装 (51)9.6 试运转 (51)10 水泵安装工程 (53)10.1 一般规定 (53)10.2 垫铁、基础螺栓及二次灌浆 (53)10.3 离心泵安装 (54)10.4 深井泵安装 (55)10.5 潜水电泵安装 (56)10.6 室内管道及附件安装 (57)10.7 试运转 (57)11 提升设施安装工程 (59)11.l 提升绳及悬挂装置安装 (59)11.2 平衡绳及悬挂装置安装 (60)11.3 游动天轮安装 (61)11.4 导向装置安装 (62)11.5 罐笼本体结构和阻车器安装 (63)11.6 平衡锤安装 (63)11.7 立井提煤箕斗本体结构安装 (64)11.8 斜井提煤箕斗本体结构安装 (64)11.9 试运转 (65)11.10 立井罐笼制动绳式防坠器提升架安装 (65)11.11 立井罐笼制动绳式防坠器缓冲器安装 (66)11.12 立井罐笼制动绳式防坠器捕绳器安装 (67)11.13 立井罐笼制动绳式防坠器制动绳拉紧装置安装 (68)11.14 立井罐笼木罐道刺入式防坠器安装 (68)11.15 立井罐笼防坠器试验 (69)12 钢结构井架安装工程 (70)12.1 一般规定 (70)12.2 井架制作 (70)12.3 铆接和焊接 (72)12.4 井架组装 (72)12.5 井架安装 (74)12.6 垫铁、基础螺栓、二次灌浆及防腐蚀 (76)12.7 天轮安装 (76)12.8 试运转 (77)13 立井井简装备安装工程 (78)13.1 构件制作及防腐蚀 (78)13.2 罐道梁安装 (80)13.3 树脂锚杆固定托架及梁的安装 (81)13.4 罐道安装 (84)13.5 液压伸缩罐道安装 (86)13.6 钢丝绳罐道安装 (87)13.7 防撞绳安装 (88)13.8 井上下联结部分罐道梁及四角罐道安装 (88)13.9 梁及楔形罐道安装 (89)13.10 井上下防撞梁安装 (90)13.11 管子梁、管座梁安装 (90)13.12 尾绳保护装置安装 (91)13.13 梯子间安装 (92)13.14 电缆支架安装 (94)14 井底箕斗装载设备安装工程 (95)14.1 立井提煤箕斗装载设备安装 (95)14.2 斜井提煤箕斗装载设备安装 (96)14.3 钢梁、基础螺栓安装 (97)14.4 试运转 (97)15 井底撒煤清理设备安装工程 (98)15.1 金属煤仓式清理设备安装 (98)15.2 扒斗式清理设备安装 (99)15.3 试运转 (100)16 井上下操车设备安装工程 (101)16.1 罐座安装 (101)16.2 摇台安装 (102)16.3 井上下平台安装 (104)16.4 井上下安全门安装 (105)16.5 阻车器安装 (106)16.6 链式推车机安装 (107)16.7 绳式推车机安装 (109)16.8 气动式推车机安装 (110)16.9 爬车机安装 (111)17 矿井输送设备安装工程 (114)17.1 胶带输送机安装 (114)17.2 钢丝绳牵引胶带输送机安装 (117)17.3 固定式刮板输送安装 (120)17.4 铸石槽锚链刮板输送机安装 (121)18 矿井其它机械设备安装工程 (124)18.1 无极绳、耙矿、风动、风门、回柱、调度和凿井绞车安装 (124)18.2 翻车机安装 (125)18.3 排矸设备安装 (126)18.4 桥式起重机安装 (127)18.5 卸载站安装 (129)18.6 空气加热室设备安装 (130)18.7 液压注浆泵安装 (131)18.8 泥浆泵安装 (132)18.9 起重葫芦梁,闸门和溜槽安装 (134)19 工业管道安装工程 (135)19.1 一般规定 (135)19.2 管子,管件及闸门的检验 (135)19.3 管道加工 (137)19.4 管道焊接 (140)19.5 管道安装 (142)19.6 管道系统试验及涂漆 (147)20 工业锅炉安装工程 (149)20.1 一般规定 (149)20.2 钢结构组装 (149)20.3 锅筒,集箱安装 (150)20.4 受热面管安装 (152)20.5 受压元件焊接 (154)20.6 省煤器、钢管式空气预热器安装 (156)20.7 水压试验 (157)20.8 仪表、阀门及吹灰器安装 (158)20.9 燃烧设备安装 (161)20.10 炉墙砌筑和绝热层施工 (165)20.11 烘炉、煮炉、严密性试验及试运行 (167)20.12 往复式蒸汽泵安装 (169)20.13 钠离子交换器安装 (171)20.14 除氧器安装 (171)20.15 引风机、鼓风机安装 (173)20.16 除尘设备安装 (174)20.17 出渣系统设备安装 (174)20.18 室内管道、附件安装及防腐蚀与保温 (175)21 井下净水设备安装工程 (177)21.1 预处理间设备安装 (177)21.2 电渗析器安装 (178)21.3 室外管路安装 (180)22 污水处理设备安装工程 (181)22.1 混凝剂投加间设备安装 (181)22.2 污水处理器安装 (183)22.3 曝气器设备安装 (184)22.4 空气压缩机安装 (185)22.5 泵房设备安装 (185)22.6 管道安装 (186)23 给煤设备安装 (187)23.1 一般规定 (187)23.2 往复式给煤机安装 (187)23.3 电磁铁振动给煤机安装 (189)23.4 圆盘给煤机安装 (190)23.5 叶轮给煤机安装 (192)23.6 调速试电机震动给煤机安装 (194)24 破碎设备安装工程 (196)24.1 一般规定 (196)24.2 辊式破碎机安装 (196)24.3 锤式破碎机安装 (198)24.4 颚式破碎机安装 (200)24.5 反击式破碎机安装 (202)24.6 球磨机安装 (205)25 筛分设备安装工程 (209)25.1 一般规定 (209)25.2 矿用座式振动筛安装 (209)25.3 旋转概率筛安装 (212)25.4 弧形筛安装 (214)25.5 电磁震动旋流筛安装 (215)26 主洗设备安装工程 (218)26.1 一般规定 (218)26.2 悬挂式电磁除铁器安装 (218)26.3 辊筒式磁选机安装 (219)26.4 跳汰机安装 (220)26.5 斜轮重介质选煤机安装 (223)26.6 离心式鼓风机安装 (226)26.7 重介旋流器安装 (228)27 脱水设备安装工程 (230)27.1 一般规定 (230)27.2 斗式提升机安装 (230)27.3 卧式振动离心脱水机安装 (232)27.4 立式振动离心脱水机安装 (234)27.5 沉降式过滤离心脱水机安装 (236)28 浮选设备安装工程 (238)28.1 一般规定 (238)28.2 搅拌桶安装 (238)28.3 矿浆准备器安装 (239)28.4 矿浆预处理器安装 (240)28.5 浮选机安装 (241)28.6 药剂站设备安装 (244)28.7 盘式真空过滤机安装 (245)28.8 水环式真空泵(或水环式压缩机)安装 (247)29 压滤设备安装工程 (249)29.1 一般规定 (249)29.2 500㎡及以下箱式压滤机安装 (249)29.3 660~1050㎡箱式压滤机安装 (251)29.4 带式压滤机安装 (253)30 转筒式干燥机安装工程 (257)31 浓缩设备安装工程 (261)31.1 周边传动浓缩机安装 (261)31.2 中心传动浓缩机安装 (263)32 斗轮式堆取料机安装工程 (267)32.1 轨道安装 (267)32.2 行走部件及机架安装 (268)32.3 传动部件及液压气路系统安装 (269)32.4 试运转 (270)33 门式堆取料机安装工程 (271)33.1 轨道安装 (271)33.2 行走部件及机架安装 (271)33.3 活动轮及斗轮机构安装 (272)33.4 开起机构及尾车安装 (273)33.5 试运转 (274)34 计量设备安装工程 (275)34.1 一般规定 (275)34.2 轨道衡安装 (275)34.3 电子皮带称安装 (278)34.4 非接触式计量装置——核称安装 (280)下册35 架空索道安装工程 (287)35.1 钢结构制作 (287)35.2 钢结构安装 (288)35.3 托索轮组(包括压索轮组)安装 (291)35.4 摇摆鞍座安装 (292)35.5 偏斜鞍座安装 (293)35.6 承载索展开和连接 (293)35.7 套筒安装 (295)35.8 承载索锚固 (295)35.9 牵引索安装 (296)35.10 牵引索编接 (297)35.11 驱动轮底座安装 (297)35.12 驱动轮安装 (299)35.13 从动轮安装 (300)35.14 减速器安装 (301)35.15 制动器控制泵站安装 (301)35.16 制动器安装 (302)35.17 驱动机组试运转 (302)35.18 导向轮安装 (303)35.19 迂回轮安装 (304)35.20 滚轮组安装 (305)35.21 吊梁(包括站内支架的支承梁)安装 (306)35.22 吊钩(包括吊架)安装 (306)35.23 轨道(包括扁轨、矩形轨和槽形轨)安装 (307)35.24 道岔安装 (309)35.25 导向板(包括护板和挡板)安装 (309)35.26 挂结器(包括脱开器)安装 (310)35.27 货车安装 (311)35.28 拉紧装置安装 (312)35.29 气动操作设备安装 (315)35.30 气动扇形装车闸门安装 (315)35.31 回转装料机安装 (316)35.32 气动阻发车装置安装 (317)35.33 杠杆计重装置安装 (318)35.34 自动停发车装置安装 (318)35.35 推斗小车安装 (319)35.36 链条推车装置安装 (319)35.37 试运转 (322)36 高压电器安装工程 (325)36.1 3~110kv高压油断路器安装 (325)36.2 3~110kv隔离开关、负荷开关及熔断器安装 (327)36.3 3~110kv阀型避雷器安装 (329)36.4 3~110kv排气式避雷器安装 (332)36.5 电力电容器安装 (333)36.6 水泥电抗器 (335)36.7 高压换向器安装 (337)36.8 真空开关安装 (339)37 电力变压器及互感器安装工程 (341)37.1 变压器安装(包括消弧线圈、油浸电抗器) (341)37.2 3~110kV互感器安装 (344)38 旋转电机安装工程 (347)38.1 电机安装 (347)38.2 特殊电机安装 (350)39 屏、柜及二次回路结线安装工程 (352)39.1 成套高压开关柜安装 (352)39.2 成套低压配电屏安装 (354)39.3 整流装置安装 (356)39.4 二次回路结线 (359)39.5 控制、保护、信号屏台安装 (361)40 低压电器安装工程 (365)40.1 蓄电池组安装 (365)40.2 金属电阻及变阻器安装 (368)40.3 起动器安装 (371)40.4 限位开关安装 (373)40.5 矿灯及充电架安装 (374)41 母线及滑接线安装工程 (377)41.1 母线、支柱绝缘子及套管安装 (377)41.2 地面电机车架线安装 (384)41.3 井下电机车架线安装 (386)41.4 滑接线和软电缆安装 (388)42 送、配电架空线路及电缆安装工程 (391)42.1 一般规定 (391)42.2 杆塔基础 (391)42.3 杆塔组立及拉线 (394)42.4 导线、避雷线架设 (400)42.5 配电线路杆上电器设备安装 (409)42.6 电缆敷设 (412)43 防爆电器安装工程 (423)43.1 高压防爆开关安装 (423)43.2 低压防爆开关安装 (425)43.3 防爆漏继电器安装 (427)43.4 井下照明电器安装 (429)44 接地装置安装工程 (431)45 通信线路及设备安装 (439)45.1 架空通信线路安装 (439)45.2 地面及井下通信设备安装 (442)45.3 光缆敷设 (446)45.4 光缆传输设备安装 (453)46 集控安装工程 (456)46.1 电动转辙器安装 (456)46.2 色灯信号机安装 (457)46.3 传感器及信息传输装置安装 (458)46.4 计算机安装 (459)46.5 模拟盘(屏)安装 (460)46.6 操纵台安装 (461)46.7 信号联络装置安装 (463)附录A 煤矿安装工程分项、分部及单位工程名称 (466)附录B 安装工程质量检验评定表 (477)B.1 分项工程质量检验评定表 (477)B.2 分部工程质量检验评定表 (478)B.3 质量保证资料核查表 (479)B.4 单位工程观感质量评定表 (482)B.5单位工程质量综合评定表 (483)附录C 机械设备通用部分安装质量检验标准 (484)C.1 垫铁 (484)C.2 螺栓连接 (485)C.3 二次灌浆 (488)C.4 铆接 (488)C.5 焊接 (491)C.6 皮带传动、链传动 (496)C.7 减速器安装 (498)C.8 联轴器装配 (498)C.9 齿轮装配 (506)C.10 滑动轴承装配 (512)C.11 滚动轴承装配 (515)C.12 球面轴承 (517)附录D 电气装置试验及技术参数 (521)D.1 电气装置绝缘的交流耐压试验电压标准 (521)D.2 变压器、消弧线圈和油浸电抗器的试验项目和标准 (522)D.3 高压油断路器的检验项目和标准 (526)D.4 交流电动机的试验项目和标准 (527)D.5 直流电动机的试验项目和标准 (531)D.6 悬式绝缘子交流耐压试验标准 (533)D.7 瓷横担绝缘子交流耐压试验标准 (534)D.8 油浸纸绝缘电力电缆长度为250m及以下时泄漏电流参考值 (535)D.9 高压少油断路器技术数据 (536)D.10 高压多油断路器技术数据 (540)D.11 其他几种断路器技术数据 (542)D.12 电磁操动机构技术数据 (543)附录E 电气装置通用部分安装质量检验标准 (547)E.1 二次结线 (547)E.2 硬母线安装 (547)E.3 电气装置接地 (548)附录F 本标准用词说明 (550)总则1.0.1 为统一煤矿安装工程质量标准和检验评定方法,促进企业加强管理,确保工程质量,特制定本标准。
35kv开关站设计规范35kv开关站设计规范篇一:10KV开关站设计规范一个35kV开闭所(开关站)容量一般是XX0kVA(20MVA),出线间隔视情况不同而定。
10kV开闭所(开关站)容量一般在6000~10000kVA(6MVA~10MVA)。
《城市电力规划规范》GB50293-1999第条10kV开关站最大转供容量不宜超过15000kVA 。
根据具体的要求不同,开闭所(开关站)的选择和规模也不同,这个没有固定标准:(1)解决变电站10kV出线开关数量不足,减少相同路径的电缆条数,为中小重要用户提供较为安全可靠的电源,增加电网运行的灵活性,根据具体情况,可建设10kV公用开闭所或配电所。
(2)10kV公用开闭所应配合城市规划和市政工程同时建设,争取与市政设施、公共绿地等合建。
10kV公用开闭所宜建于负荷中心和两座变电站供电范围分界之处,以便于加强电网联络,选址时应考虑设备运输方便,尽量选择在主要道路的附近。
(3)10kV开闭所应有明确的供电范围,出线电缆不宜跨越城市主要干道。
(4)开闭所的接线力求简化和规范,应按无人值班、遥测、遥信、遥控等要求设计,同时应满足防火、通风、防潮、防尘、防毒、防小动物和防噪声等各项要求。
(5)10kV公用开闭所及公用配电所的中压设备宜采用成套配电装置,开关选择要依据负荷性质而确定,一般进出线及1000kVA以上馈线选用真空开关,其它馈线选用负荷开关,有熔断器作保护,母线分段开关需设置备用电源互投装置。
(6)10kV开闭所的规模:每段10kV母线支接配电变压器总容量宜≤5000kVA,进出线回路宜≤8回。
开闭所内部采用单母不分段或分段接线,每座10kV开闭所内宜设置1至2段10kV母线。
(7)为了尽量减少专线,建议大于8000kVA才能申请专线供电,同时应明确每座开闭所最大转供容量,建议≤1XXkVA。
(8)为便于网络拓展和负荷调度,两段10kV母线之间,不宜设置母分开关。
注:下列列举的标准不是所有适用标准的一览表。
美国国家标准学会(ANSI)∙ANSI C1/NFPA 70 国家电气规范∙ANSI C37.20 开关装置组件,包括金属密封母线∙ANSI C37.90 与电力设备相关的标准继电器和继电器系统∙ANSI C39.1 电气模拟指示装置的要求∙ANSI C50.12 水轮机用凸极同步发电机和发电机/电动机的要求∙ANSI C57.12 配电、调压变压器和电抗器所需的术语和试验规程∙ANSI C57.13 仪表用变压器要求∙ANSI C80.1 镀锌钢制管道规范∙ANSI/ASQC E1 非核发电设备项目阶段的质量保证计划指南∙ANSI Z55.1 工业用仪器和设备的灰色装饰爱迪生照明公司协会∙AEIC CS6 额定电压5~46kV的凸出型绝缘屏蔽的电力电缆规范绝缘电缆工程师协会(ICEA)∙S-73-532 额定电压5~46kV的多用途屏蔽电力电缆标准∙S-97-682 额定电压5~46kV的多用途屏蔽的电力电缆标准∙T-29-520 理论热输入速率为每小时210,000 B.T.U.的导热垂直电缆托架试验电气与电子工程师协会(IEEE)∙IEEE 1 电子设备额定值中温度极限和电绝缘评定的一般原则∙IEEE 4 高压试验的IEEE标准技术∙IEEE 32 中性接地装置的终止和测试程序∙IEEE 43 检测旋转电机绝缘电阻的推荐实施规范∙IEEE 56 大型交流旋转电机(10,000kVA及以上)绝缘维护指南∙IEEE C37.013A 基于平衡电流的交流高压发电机断路器IEEE标准∙IEEE C37.110 保护继电器用电流互感器使用指南∙IEEE C37.2 标准的电力系统装置功能号码∙IEEE C37.20.1 金属密封低压电源断路器开关设备∙IEEE C37.20.2 金属密封开关设备IEEE标准∙IEEE C37.20.3 金属密封中断器开关设备IEEE标准∙IEEE C37.20.4 金属密封开关装置中使用的室内交流开关(1kV--38kV) IEEE标准∙IEEE C37.20.7 中压金属外壳开关设备内部跳火故障测试IEEE指南∙IEEE C37.23 金属包壳总线标准∙IEEE C37.90 与电源设备有关的继电器和中继系统∙IEEE C37.90.1 保护继电器和继电器系统的抗浪涌干扰能力(SWC)试验∙IEEE C57.12.00 油浸式配电、电力和调压变压器标准通用要求∙IEEE C57.12.01 包括固体浇铸和/或树脂密封绕组的干式配电和电力变压器∙IEEE C57.12.90 油浸式配电、电力和调压变压器的试验规程∙IEEE C57.12.91 干式配电变压器和电力变压器的试验规程∙IEEE C57.13 仪表用变压器IEEE标准要求∙IEEE C57.13.1 中继电流变压器现场试验IEEE指南∙IEEE C57.13.2 仪表用变压器IEEE标准合格测试程序∙IEEE C57.13.3 仪表用变压器次级线圈电路外壳接地IEEE 指南∙IEEE C57.13.6 高精度仪表变压器IEEE标准∙IEEE C57.91 加载矿物油浸式变压器IEEE指南∙IEEE C57.110 施加非正弦负载电流的变压器性能确定∙IEEE C50.12 5MVA及以上水轮机设备用50和60赫兹凸极其同步发电机和发电机/电动机标准∙IEEE 112 多相感应电动机和发电机IEEE标准试验规程∙IEEE 115 IEEE指南:同步电机的试验程序∙IEEE 286 旋转电机定子线圈绝缘的功率因数倾斜测量的推荐实施规程∙IEEE 383 核电站1E级电缆型式试验的现场拼接和联接用标准∙IEEE 421.1 同步电机励磁系统的定义∙IEEE 421.2 励磁控制系统动态性能鉴别、试验和评定的指南∙IEEE 432 旋转电机(5hp-10000hp以下)绝缘维护指南∙IEEE 522 交流旋转电机用模绕定子线圈的匝间绝缘试验指南∙IEEE 802.3 信息技术标准——局域网∙IEEE 810 水轮机和发电机整体锻制联轴器和轴偏转公差用标准∙IEEE 1043 成型缠绕棒和线圈的电压耐受试验的推荐规程∙IEEE 1095 水力电气用立式发电机和发电机/电动机安装指南∙IEEE 1310 大型发电机线绕定子棒和线圈的热循环试验推荐规程∙IEEE 1434 新线圈或者完备绕组(TVA/电晕探头、PD试验和介电损失试验)的PD试验及验收试验用的特定区域,或者试运行后新绕组验收测试用安装的EMC’s的使用∙IEEE 1553 水轮发电机新线圈的耐电压测试。
配电设备一二次融合技术方案二零一七年五月目录1 前言 (6)1.1 总体思路和目标 (6)1.1.1 总体推进思路 (6)1.1.2 总体目标 (6)2 柱上开关一二次成套技术方案 (7)2.1 一二次成套总体要求 (7)2.2 一二次成套功能要求 (8)2.2.1 分段/联络断路器成套功能要求 (8)2.2.2 分段/联络负荷开关成套功能要求 (9)2.2.3 分界断路器成套功能要求 (11)2.2.4 分界负荷开关成套功能要求 (11)2.3 一二次成套技术要求 (12)2.3.1 总体结构要求 (12)2.3.2 分段/联络断路器成套技术要求 (13)2.3.3 分段/联络负荷开关成套技术要求 (13)2.3.4 分界断路器成套技术要求 (14)2.3.5 分界负荷开关成套技术要求 (14)2.3.6 自动化部件技术要求 (15)2.3.6.2 电压/电流互感器(传感器)技术要求 (15)2.3.6.3 控制单元技术要求 (18)2.3.7 通信及接口要求 (19)2.4 抗凝露方案 (20)2.4.1 凝露问题分析 (20)2.4.2 柱上开关抗凝露方案 (21)2.4.3 环网柜抗凝露方案 (21)2.3.4 控制电缆及插头抗凝露方案 (21)2.3.5 控制单元抗凝露方案 (22)2.5 行程开关改进方案 (22)2.5.1 产生遥信抖动的原因分析 (22)2.5.2 解决方案 (23)3 环网柜一二次成套技术方案 (23)3.1 一二次成套化方案 (23)3.2 一二次成套技术要求 (24)3.2.1 开关柜典型分类和组成 (24)3.2.2 成套设备应用技术要求 (25)3.2.2.1 成套设备整体要求 (25)3.2.2.2 抗凝露要求 (26)3.2.3 开关柜技术要求 (26)3.2.4 互感器及DTU技术要求 (28)3.2.4.1 互感器技术要求 (28)3.2.4.2 控制单元技术要求 (29)3.2.5 接口要求 (31)3.2.5.1 操作电源的配置 (31)3.2.5.2 电缆及接线端子 (31)3.2.6 通信 (32)4 环网柜一二次融合技术方案 (32)4.1 一二次融合方案 (32)4.2 一二次融合技术要求 (33)4.2.1 开关柜典型分类和组成 (33)4.2.2 一二次融合设备应用技术要求 (34)4.2.2.1 一二次融合设备整体要求 (34)4.2.2.2 抗凝露要求 (36)4.2.3 开关柜技术要求 (37)4.2.4 互感器(传感器)及DTU技术要求 (39)4.2.4.1 互感器(传感器)技术要求 (39)4.2.4.3 控制单元技术要求 (40)4.2.5 接口要求 (41)4.2.5.1 操作电源的配置 (41)4.2.5.2 电缆及接线端子 (41)4.2.6 通信 (42)4 配电线损采集模块技术要求 (42)4.1 总体要求 (42)4.1.1 用于箱式FTU的配电线损采集模块 (42)4.1.2 用于罩式FTU的配电线损采集模块 (43)4.1.3 用于一二次成套化方案DTU的配电线损采集模块 (43)4.1.4 用于一二次融合方案DTU的配电线损采集模块 (43)4.2 规格要求 (43)4.2.1 准确度等级 (43)4.2.2 参比电压 (43)4.2.3 参比电流 (44)4.2.4 标准的参比频率 (44)4.2.5 配电线损采集模块常数 (44)4.3 接口及结构要求 (44)4.3.1 脉冲输出 (44)4.3.2 RS232/RS485通信接口 (45)4.3.3 电源及功耗要求 (45)4.3.4 结构及接口定义 (46)5 投标及检测要求 (49)5.1 投标检测资质要求 (49)5.2 供应商投标资格要求 (50)5.3 供货设备与入网专业检测样机元器件一致性要求 (50)附录A 接插件电气管脚定义(柱上开关一二次成套设备) (50)附表A.1 柱上开关26芯航空插件管脚电气定义 (50)附表A.2 FTU电源/电压航空插头引脚定义 (52)附表A.3 FTU电流输入接口引脚定义 (52)附表A.4 FTU控制信号航空插头引脚定义(配弹簧机构开关) (53)附表A.5 FTU控制信号航空插头引脚定义(配永磁开关) (53)附表A.6 FTU控制信号航空插头引脚定义(配电磁机构开关VSP5) (53)附表A.7 适用于箱式FTU的配电线损采集模块接口定义 (54)附录B 接插件电气管脚定义(环网柜一二次成套设备) (55)附表B.1 DTU工作电源航空插头引脚定义 (55)附表B.2 DTU电压输入端子定义 (55)附表B.3 DTU电流输入与控制信号端子定义 (56)附表B.4 DTU配电线损采集模块接口定义 (57)附录C 接插件电气管脚定义(环网柜一二次融合设备) (58)附表C.1 间隔单元33芯矩形连接器端子和对应引线信号定义 (58)附表C.2 间隔单元脉冲输出端子定义 (61)附表C.3 间隔单元通讯输出端口定义 (62)附表C.4 间隔单元维护端口定义 (62)附表C.5 公共单元电源端口定义 (62)附表C.6 公共单元RS485接口定义 (62)附表C.7 公共单元遥信接口定义 (63)附表C.8 电源电压总线PT控制柜二次室端子定义 (63)附表C.9 电源电压总线间隔柜二次室侧端子定义 (63)附表C.10 电流传感器航插接口定义 (64)附表C.11 公共单元柜端子定义 (64)附表C.12 以太网通讯线定义 (65)1 前言1.1 总体思路和目标1.1.1 总体推进思路通过提高配电一、二次设备的标准化、集成化水平,提升配电设备运行水平、运维质量与效率,满足线损管理的技术要求,服务配电网建设改造行动计划。
电气安装工程质量控制点主变压器本体安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日主变压器器身检查检查表工程名称:表S012检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日主变压器注油及密封试验检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日主变压器整体检查检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日油浸式变压器安装检查表工程名称:表W015表W015检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日干式电抗器安装检查表施工单位是否同步执行本质量操纵点对应的验评标准是□ 否□检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日封闭式组合电器本体检查安装检查表工程名称:表S014表S014(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日手车式高压成套配电柜安装检查表工程名称:表W019-1施工单位是否同步执行本质量操纵点对应的验评标准是□ 否□检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日固定式配电柜安装检查表工程名称:表W019-2表W019-2(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日真空断路器检查检查表工程名称:表W020检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日SF断路器安装(弹簧机构)检查表6工程名称:表W021-2表W021-2 (续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日中性点隔离开关安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日接地隔离开关安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日隔离开关安装检查表表W022-3(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日油浸式电流互感器安装检查表工程名称:施工单位是否同步执行本质量操纵点对应的验评标准是□ 否□检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日互感器安装检查表工程名称:表W023-5检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日油浸式电压互感器安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日中性点避雷器安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日避雷器安装检查表工程名称:表W024-2检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日电容器组安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日网栏安装检查检查表工程名称:表W025-4检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日管形母线安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日软母线安装检查表工程名称:表W027-2表W027-2(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日引下线及设备连线安装检查表表W027-3(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日软母线安装检查表工程名称:表W027-4表W027-4(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日硬母线安装检查表表W028-1(续)检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日避雷针及引下线安装检查表检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日屋外接地装置安装检查表工程名称:表H007表H007续检查(检验)项目数:合格项数:不合格项数:合格率(×100%)= 等级:合格(优□ 良□ 中□)不合格□检查人(签名):年月日注:①检查(检验)项目数是指依照工程进度实际检查(检验)的项目数。
美国电力标准(ANSI electric standards)中文名称英文名称ANSI A TIS0600311-2007 直流电力系统.电信环境保护DC Power Systems - Telecommunications Environment ProtectionANSI A TIS0600328-2007 从物理应力和放射影响及直流电力系统相关要求中对远程通信线路进行保护Protection of Telecommunications Links from Physical Stress and Radiation Effects andAssociated Requirements for DC Power SystemsANSI C29.1-1988 电力绝缘子.试验方法Electrical Power Insulators, Test Methods forANSI C37.16-2000 低压电力断路器和交流电力电路保护器的优选额定值、相关要求和应用建议Low-V oltage Power Circuit Breakers and AC Power Circuit Protectors, Preferred Ratings,Related Requirements and Application Recommendations forANSI C37.17-1997 交流和通用直流低压电力断路器的断开装置Trip Devices for AC and General Purpose DC Low-V oltage Power Circuit BreakersANSI C37.46-2000 电力熔断器和熔丝切断开关规范Power Fuses and Fuse Disconnecting Switches, Specifications forANSI C37.50-1989 开关设备.封装式低压交流电力线路断路器.试验程序Switchgear – Low-V oltage AC Power Circuit Breakers Used in Enclosures – Test ProceduresANSI C37.51-2003 金属封装低压交流电力断路器开关设备组件.合格试验规程Metal-Enclosed Low-V oltage AC Power-Circuit-Breaker Switchgear Assemblies -Conformance Test ProceduresANSI C37.85-2002 电力开关用交流高压电力真空断路器的X射线辐射极限Interrupters Used in Power Switchgear, X-Radiation Limits for AC High-V oltage PowerV acuumANSI C57.12.51-1981 三相,高压601至34500伏,低压208Y/120至4160伏容量不小于501千伏安,通风干式电力变压器的要求Dry-Type Power Transformers 501 kV A and Larger, Three-Phase with High-V oltage 601 to 34500 V olts, Low-V oltage 208Y/120 to 4160 V olts, Requirements for V entilatedANSI C57.12.52-1981 三相,高压:601至34500伏,低压:208Y/120至4160伏,容量不小于501千伏安,密封干式电力变压器的要求Dry-Type Power Transformers, 501 kV A and Larger, Three-Phase with High-V oltage 601 to 34500 V olts, Low-V oltage 208Y/120 to 4160 V olts, Requirements for SealedANSI C84.1-2006 电力系统和设备的美国国家标准.电压额定值(60Hz) American National Standard for Electric Power Systems and Equipment - V oltage Ratings (60 Hertz)ANSI C93.3-1995 电力线载波线路陷波器的要求Requirements for Power-Line Carrier Line Traps ANSI CC1-2005 变电站的电力连接Electric Power Connection for SubstationsANSI T1.337-2004 网络电力传输系统的最大电压、电流和功率级的要求Requirements for Maximum V oltage, Current, and Power Levels in Network-Powered Transport SystemANSI/ASABE/ISO 拖拉机、农林机械、电力草坪机和园艺设备.操作者控Tractors, machinery for agriculture and forestry, powered lawn and garden equipment -3767-2,AMD 1-3-2006 制和其他显示符号.第2部分:农业拖拉机和机械符号Symbols for operator controls and other displays - Part 2: Symbols for agricultural tractors andmachineryANSI/ASAE S323.2-1989 草坪与花坛电力设施的规定Definitions of Powered Lawn and Garden EquipmentANSI/ASHRAE 118.1-2008 燃气、电力和燃油热水器额定值的测试方法Method of Testing for Rating Commercial Gas, Electric, and Oil Service Water Heating EquipmentANSI/A TIS 0632000-2005 电信.防高空电磁脉冲(HEMP)的指定电信中心局和类似机构的高空基线电力保护Telecommunications –Above-Baseline Electrical Protection for DesignatedTelecommunications Central Offices and Similar-Type Facilities against High-AltitudeElectromagnetic Pulse (HEMP)ANSI/CEA 600.31-1997 电力线物理层和介质规范Power Line Physical Layer and Medium SpecificationANSI/CEA 600.38-1997 电力线/RF符号编码子层Power Line/RF Symbol Encoding SublayerANSI/CEA 633.31-2000 电力线物理层一致性Power Line Physical Layer ConformancceANSI/CEA 709.2-A-2000 控制网络电力线(PL)信道规范Control Network Powerline (PL) Channel SpecificationANSI/ICEA S-108-720-2004 额定电压46至345KV的挤压绝缘电力电缆的标准Standard for Extruded Insulation Power Cables Rated Above 46 through 345 KVANSI/ICEA S-76-474-2005 中性线支撑的额定值600伏特的抗风化挤制绝缘电力电缆组件Neutral-Supported Power Cable Assemblies with Weather-Resistant Extruded Insulation Rated600 V oltsANSI/ICEA S-97-682-2007 多用途屏蔽的电力电缆额定电压5~46kV用标准Standard For Utility Shielded Power Cables Rated 5 Through 46 kVANSI/IEEE 1015-2006 工业和商业电力系统用低压断路器的推荐实施规程(蓝皮书)Recommended Practice for Applying Low-V oltage Circuit Breakers Used in Industrial andCommercial Power Systems (Blue Book)ANSI/IEEE 1015/Cor1-2007 工业和商业电力系统用低压电路断路器应用的推荐实施规程.技术勘误1Recommended Practice for Applying Low V oltage Circuit Breakers Used in Industrial andCommercial Power Systems - Corrigendum 1ANSI/IEEE 1048-2003 电力线保护接地用指南Guide for Protective Grounding of Power LinesANSI/IEEE 1070-2006 电力传输模块恢复结构元件设计和试验指南Guide for the Design and Testing of Transmission Modular Restoration Structure ComponentsANSI/IEEE 1120-2004 海底电力和通信电缆的规划、设计和安装中所考虑因素的指南Guide to the Factors to Be Considered in Planning, Design, and Installation of SubmarinePower and Communication CableANSI/IEEE 1138-1994 电气公用设施电力线用复合光纤接地线(OPGW)的标准结构Standard Construction of Composite Fiber Optic Groundwire (OPGW) for use on ElectricUtility Power LinesANSI/IEEE 1159-1995 检测电力质量的推荐实施规范Recommended Practice on Monitoring Electric Power QualityANSI/IEEE 1234-2007 屏蔽电力电缆系统故障定位技术指南Guide for Fault Locating Techniques on Shielded Power Cable SystemsANSI/IEEE 1235-2000 地下电力电缆和管道用可识别护套的特性指南Guide for the Properties of Identifiable Jackets for Underground Power Cables and DuctsANSI/IEEE 1260-2007 用电力导线预报、测量和分析AM广播再辐射的指南Guide on the Prediction, Measurement, and Analysis of AM Broadcast Reradiation by Power LinesANSI/IEEE 1276-2006 液浸式电力变压器的高温安装材料的使用指南Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Power TransformersANSI/IEEE 1291-1993 电力开关设备局部放电测量指南Guide for Partial Discharge Measurements in Power SwitchgearANSI/IEEE1299/C62.22.1-1996 保护绝缘屏蔽电力电缆系统的电涌放电器的连接指南Guide for the Connection of Surge Arresters to Protect Insulated, Shielded Electric PowerCable SystemsANSI/IEEE 1312-1993 电力系统.标称工作电压在230千伏以上的交流电力系统和设备用优选电压额定值Standard Preferred V oltage Ratings for Alternating-Current Electrical Systems and EquipmentOperating at V oltages Above 230 kV NominalANSI/IEEE 1346-1998 评估电力系统和电子处理设备兼容性的推荐实施规程Recommended Practice for Evaluating Electrical Power System Compatibility with ElectronicProcess EquipmentANSI/IEEE 1407-2007 使用水罐装容器进行中等电压(5kV-35kV)挤压电力电缆加速老化试验的指南Guide for Accelerated Aging Tests for Medium-V oltage (5 kV-35 kV) Extruded Electric PowerCables Using Water-Filled TanksANSI/IEEE 1410-2004 电力架空配电线的避雷性能提高的指南Guide for Improving the Lightning Performance of Electric Power Overhead Distribution LinesANSI/IEEE 142-2007 工业和商业电力系统接地的推荐实施规程Recommended Practice for Grounding of Industrial and Commercial Power SystemsANSI/IEEE 1427-2006 空气绝缘电力变电站适宜电间隙和绝缘水平指南Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power SubstationsANSI/IEEE 1453-2004 交流电力系统的电压闪变测量和限值推荐规程Recommended Practice for Measurement and Limits of V oltage Flicker on AC Power Systems ANSI/IEEE 1476-2000 火车客车辅助电力系统接口标准Standard for Passenger Train Auxiliary Power Systems InterfacesANSI/IEEE 1481-1999 延迟和电力计算系统标准Standard for Delay and Power Calculation SystemANSI/IEEE 1511-2004 额定电压为5kV至46 kV的系统上电力电缆、接头和终端故障的调查和分析指南Guide for Investigating and Analyzing Power Cable, Joint, and Termination Failures onSystems Rated 5kV Through 46 kVANSI/IEEE 1542-2007 位于附近或电力线下面的灌溉设备的安装、维修和操作指南Guide for Installation, Maintenance, and Operation of Irrigation Equipment Located Near orUnder Power LinesANSI/IEEE 1547-2003 带电力系统的互连分配资源标准Standard for Interconnecting Distributed Resources with Electric Power SystemsANSI/IEEE 1547.3-2007 分配资源与电力系统互连的监控、信息交流和控制导则Guide for Monitoring, Information Exchange, and Control of Distributed ResourcesInterconnected with Electric Power SystemsANSI/IEEE 1560-2005 100赫兹到10千兆赫范围内射频电力线路抗干扰滤波Standard for Methods of Measurement of Radio Frequency Power Line Interference Filter in器的测量方法标准the Range of 100 Hz to 10 GHzANSI/IEEE 1561-2007 远程混合电力系统中酸性铅蓄电池的性能和寿命的优化用指南Guide for Optimizing the Performance and Life of Lead-Acid Batteries in Remote HybridPower SystemsANSI/IEEE 1613-2003 电力变电站的通信网络装置的标准环境和试验要求Standard Environmental and Testing Requirements for Communications Networking Devices in Electric Power SubstationsANSI/IEEE 1621-2004 办公室/用户环境中使用的电子装置的电力控制中的用户接口元件标准Standard for User Interface Elements in Power Control of Electronic Devices Employed inOffice/Consumer EnvironmentsANSI/IEEE 1646-2004 电力变电所自动化用标准通讯传输时间性能要求Standard Communication Delivery Time Performance Requirements for Electric Power Substation AutomationANSI/IEEE 18-2002 并联电力电容器Shunt Power CapacitorsANSI/IEEE 242-2001 工业和商业电力系统的保护和协调的推荐实施规程Protection and Coordination of Industrial and Commercial Power Systems, Recommended Practice forANSI/IEEE 295-1969 电子设备电力变压器Electronics Power TransformersANSI/IEEE 308-2001 核电站1E级电力系统标准Standard Criteria for Class 1E Power Systems for Nuclear Power Generating StationsANSI/IEEE 336-2005 核装置的1E级电力、仪表和控制设备的安装、检验及试验指南Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, andControl Equipment at Nuclear FacilitiesANSI/IEEE 367-1996 电力故障导致的发电站地电位升高和感应电压测定的推荐操作规程Recommended Practice for Determining the Electric Power Station Ground Potential Rise andInduced V oltage from a Power FaultANSI/IEEE 400-2002 电力电缆系统现场进行直流高压试验的指南Direct V oltage Tests on Power Cables in the Field, Guide for MakingANSI/IEEE 400.1-2007 额定电压5kV和更高直流电压的层压介质护套电力电缆系统的现场测试指南Guide for Field Testing of Laminated Dielectric, Shielded Power Cable Systems Rated 5 kVand Above with High Direct Current V oltageANSI/IEEE 400.2-2004 使用超低频(VLF)的屏蔽电力电缆系统的现场试验指南Guide for Field Testing of Shielded Power Cable Systems Using V ery Low Frequency (VLF)ANSI/IEEE 400.3-2006 野外环境中屏蔽电力电缆系统局部放电测试用指南Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment ANSI/IEEE 446-1995 工业和商业用途的应急和备用电力系统Emergency and Standby Power Systems for Industrial and Commercial ApplicationsANSI/IEEE 493-2007 可靠的工业及商业电力系统设计用推荐实施规程Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems ANSI/IEEE 505-1977 发电站电力系统用名词Nomenclature for Generating Station Electric Power SystemsANSI/IEEE 516-2003 带电电力线路的维护方法指南Guide for Maintenance Methods on Energized Power LinesANSI/IEEE 532-2007 电力仪器和控制电缆护套的选择和试验用指南Guide for Selecting and Testing Jackets for Power, Instrumentation and Control CablesANSI/IEEE 539-2005 与架空电力线路电晕和磁场效应有关术语的标准定义Standard Definitions of Terms Relating to Corona and Field Effects of Overhead Power LinesANSI/IEEE 551-2006 工业和商用电力系统计算交流短路电流的推荐方法Recommended Methods for Calculating AC Short-Circuit Currents in Industrial and Commercial Power SystemsANSI/IEEE 576-2000 工业和商业用绝缘电力电缆的安装、端接和检测的推荐实施规程Recommended Practice for Installation, Termination, and Testing of Insulated Power Cable asUsed in Industrial and Commercial ApplicationsANSI/IEEE 62-1995 电力设备的诊断现场试验指南.第1部分:充油电力变压器、调节器和电抗器Guide for Diagnostic Field Testing of Electric Power Apparatus –Part 1: Oil Filled PowerTransformers, Regulators, and ReactorsANSI/IEEE 635-2003 电力电缆铝护套的选择和设计指南Guide for Selection and Design of Aluminum Sheaths for Power Cables ANSI/IEEE 643-2004 电力线路载波器指南Guide for Power-Line Carrier ApplicationsANSI/IEEE 644-1994 交流电力线工频电场和磁场的测量程序Procedures for Measurement of Power Frequency Electric and Magnetic Fields from AC Power LinesANSI/IEEE 741-2007 核电站1E级电力系统和设备保护的标准准则Standard Criteria for the Protection of Class 1E Power Systems and Equipment in Nuclear Power Generating StationsANSI/IEEE 835-1994 标准电力电缆的载流容量表Standard Power Cable Ampacity TablesANSI/IEEE C37.10-1996 电力断路器的诊断和故障调查指南Guide for Diagnostic and Failure Investigation of Power Circuit BreakersANSI/IEEE C37.111-1999 电力系统用瞬态数据交换(COMTRADE)通用格式Common Format for Transient Data Exchange (COMTRADE) for Power Systems ANSI/IEEE C37.118-2005 电力系统同步矢量度标准Standard for Synchrophasors for Power SystemsANSI/IEEE C37.119-2005 电力线路断路器的断路器故障保护指南Guide for Breaker Failure Protection of Power Circuit BreakersANSI/IEEE C37.13.1-2006 金属封装低电压功率电力断路器专用开关设备标准Standard for Definite Purpose Switching Devices for Use in Metal-Enclosed Low-V oltage Power Circuit Breaker SwitchgearANSI/IEEE C37.14-2002 外壳用低压直流电力断路器Low-V oltage DC Power Circuit Breakers Used in EnclosuresANSI/IEEE C37.2-2008 标准电力系统装置功能编号、首字母缩略词和连接标记Standard Electrical Power System Device Function Numbers, Acronyms and ContactDesignationsANSI/IEEE C37.20.1-2002 带金属包壳的低压电力断路开关设备Metal-Enclosed Low-V oltage Power Circuit Breaker SwitchgearANSI/IEEE C37.20.1a-2005 金属壳密封的低压电力线路断路器开关设备标准.修改1:短时间和短路可耐电流测试;多电缆连接的最小区域Standard for Metal-Enclosed Low-V oltage Power Circuit Breaker Switchgear - Amendment 1:Short-Time and Short-Circuit Withstand Current Tests; Minimum Areas for Multiple CableConnectionsANSI/IEEE C37.20.1b-2006 金属密封的低压电力断路器开关设备标准.修改件2:Standard for Metal-Enclosed Low-V oltage Power Circuit Breaker Switchgear - Amendment 2:直流电(DC)牵引电力开关控制和辅助电力布线的附加要求Additional Requirements for Control and Auxiliary Power Wiring in DC Traction Power SwitchgearANSI/IEEE C37.91-2008 电力变压器防护用指南Guide for Protecting Power TransformersANSI/IEEE C57.113-2002 充液电力变压器和并联电抗器的局部放电测量指南Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt ReactorsANSI/IEEE C57.117-1986 公用电力系统的电力变压器和并联电抗器失效数据报告指南Guide for Reporting Failure Data for Power Transformers and Shunt Reactors on ElectricUtility Power SystemsANSI/IEEE C57.119-2002 超出铭牌额定值的负荷下进行油浸电力变压器升温试验的推荐惯例Recommended Practice for Performing Temperature Rise Tests on Oil Immersed PowerTransformers at Loads Beyond Nameplate RatingsANSI/IEEE C57.12.01-2005 包括固体浇铸和/或树脂密封绕组的干式配电和电力变压器的标准.一般要求Standard General Requirements for Dry-Type Distribution and Power Transformers IncludingThose with Solid-Cast and/or Resin Encapsulated WindingsANSI/IEEE C57.12.56-1994 通风干燥型电力和配电变压器绝缘系统热评价的试验程序Test Procedure for Thermal Evaluation of Insulation Systems for V entilated Dry-Type Powerand Distribution Transformers (reinstatement of administratively withdrawn standard)ANSI/IEEE C57.12.60-1998 固体浇铸和树脂密封的电力和配电变压器绝缘系统热评定试验程序指南Guide for Test Procedures for Thermal Evaluation of Insulation Systems for Solid Cast andResin-Encapsulated Power and Distribution TransformersANSI/IEEE C57.12.70-2000 输电及电力变压器用终端标志和连接标准Standard Terminal Markings and Connections for Distribution and Power Transformers ANSI/IEEE C57.12.80-2002 电力分配变压器术语Terminology for Power and Distribution TransformersANSI/IEEE C57.120-1992 电力变压器和电抗器的损耗评价指南Loss Evaluation Guide for Power Transformers and ReactorsANSI/IEEE C57.125-2005 电力变压器和分流扼流器故障研究、记录和分析指南Guide for Failure Investigation, Documentation, and Analysis for Power Transformers and Shunt ReactorsANSI/IEEE C57.127-2007 油浸电力变压器和电抗器中局部放电声排放的探测和定位的指南Guide for the Detection and Location of Acoustic Emissions from Partial Discharges inOil-Immersed Power Transformers and ReactorsANSI/IEEE C57.136-2000 额定功率大于500kV A的油浸式电力变压器和并联电抗器的声级抑制和测定指南Guide for Sound Level Abatement and Determination for Liquid-Immersed PowerTransformers and Shunt Reactors Rated Over 500 kV AANSI/IEEE C57.18.10-1998 半导体电力整流变压器要求和标准实施规程Standard Practices and Requirements for Semiconductor Power Rectifier Transformers ANSI/IEEE C57.19.00-2004 电力装置套管的标准一般要求和试验程序Standard General Requirements and Test Procedure for Power Apparatus Bushings ANSI/IEEEC57.19.100-1995电力设备套管应用指南Guide for Application of Power Apparatus BushingsANSI/IEEE C57.93-2007 液浸式电力变压器的安装和维护用指南Guide for Installation and Maintenance of Liquid-Immersed Power TransformersANSI/IEEE C57.94-2000 干式通用配电及电力变压器的安装、应用、操作和维护的推荐规程Recommended Practice for Installation, Application, Operation, and Maintenance of Dry-TypeGeneral-Purpose Distribution and Power TransformersANSI/IEEE C62.41.1-2002 低压(1000V及1000V以下)交流电力电路的电涌环境指南Guide on the Surge Environment in Low-V oltage (1000 V and Less) AC Power CircuitsANSI/IEEE C62.48-2005 电力系统干扰和过压保护装置之间相互作用的指南Guide on Interactions Between Power System Disturbances and Surge Protective DevicesANSI/IEEE C62.72-2007 低压(1000V或1000V以下)交流电力电路用过电压保护装置的应用指南Guide for the Application of Surge Protective Devices for Low V oltage (1000 V olts or Less)AC Power CircuitsANSI/IEEE C62.92.1-2000 电力设施系统中线接地应用指南.第1部分:说明Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part 1 - IntroductionANSI/IEEE C62.92.2-1989 公用电力系统中线接地应用指南.第2部分:同步发电机系统电涌保护器件的接地Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part II -Grounding of Synchronous Generator SystemsANSI/ISA61010-1(82.02.01)-2004 电力和电子试验、测量、控制和相关设备:一般要求Electric and Electronic Test, Measuring, Controlling, and Related Equipment: GeneralRequirementsANSI/ISA 96.02.01-2008 阀门电力传动装置的规范指南Guidelines for the Specification of Electric V alve ActuatorsANSI/NEMAICEAS-93-639/WC 74-2006用于电能输电和配电的5~46kV铠装电力电缆5-46kV Shielded Power Cable for Use in the Transmission and Distribution of Electric EnergyANSI/NSF 4(i11)-2006 商业烹饪.可再加热和电力加热食品架和传输设备Commercial Cooking, Rethermalization and Powered Hot Food Holding and Transport EquipmentANSI/UL 1047-2003 绝缘电力系统设备标准Standard for Isolated Power Systems EquipmentANSI/UL 1072-2007 中压电力电缆的安全标准Standard for Safety for Medium-V oltage Power Cables (Proposal dated February 24, 2006)ANSI/UL 1277-2005 任选光纤构件的电力电缆和控制盘电缆的安全标准(第4版)Standard for Safety for Electrical Power and Control Tray Cables with Optional Optical-FiberMembers (4th edition)ANSI/UL 1561-2005 干式通用和电力变压器Dry-Type General Purpose and Power Transformers ANSI/UL 583-2007 工业用蓄电池电力货车标准Standard for Electric-Battery-Powered Industrial Trucks ANSI/UL 705-2006 电力通风机Power V entilatorsANSI/UL 844a-2006 电力照明固定设备在(分级)危险场所应用的安全性标准Standard for Safety for Electric Lighting Fixtures for Use in Hazardous (Classified) LocationsANSI/UL 977-2003 熔断的电力线路装置Fused Power-Circuit Devices ASME B 31.1a 电力管线.补充件(Power piping; Addenda)Addenda-2002ASME B31.1-2001 电力管线(Power piping)ASME BPVC Section 1-2001 ASME锅炉和压力容器规程.第1节:电力锅炉建造规则(ASME Boiler & Pressure V essel Code - Section 1: Rules for Construction of Power Boilers)ASME BPVC Section 7-2001 ASME锅炉和压力容器规程.第7节:电力锅炉维护的推荐指南(ASME Boiler & Pressure V essel Code - Section 7: Recommended Guidelines for the Care ofPower Boilers)ASNI C92.2-1987 标称工作电压大于230kV的交流电气系统和设备用电力系统.首选电压额定值for power systems- alternating-current electrical systems and equipment operating at voltagesabove 230 kV nominal - preferred voltage ratingsASTM A1009-2005 高频(10kHz-1MHz)电力变压器和滤波感应器用软磁性MnZn铁芯材料标准规范Standard Specification for Soft Magnetic MnZn Ferrite Core Materials for High Frequency (10kHz-1 MHz) Power Transformer and Filter Inductor ApplicationsASTM F855-2004 断开的电力线及设备上使用的临时保护性接地装置的标准规范Standard Specifications for Temporary Protective Grounds to Be Used on De-energizedElectric Power Lines and EquipmentHD 543.2 S1-1995 电力系统远方保护设备的性能和试验第2部分:模拟比较系统Performance and testing of teleprotection equipment of power systems - Part 2: Analoguecomparison systems (IEC 60834-2:1993, modified)HD 632 S1-1998 额定电压36 kV 至150 kV的挤压绝缘电力电缆及其附件Power cables with extruded insulation and their accessories for rated voltages above 36 kV(Um = 42 kV) up to 150 kV (Um = 170 kV)IEEE 1015-1997 工业和商业电力系统用低压断路器的推荐规程. (Recommended practice for applying low-voltage circuit breakers used in industrial and commercial power systems)IEEE 1046-1991 电力设备分布式数字控制及监视的应用指南(Application guide for distributed digital control and monitoring for power plants) IEEE 1048-2003 电力线的保护接地(Protective grounding of power lines)IEEE 1120-1990 规划,设计和安装海底电力电缆和通讯电缆时考虑因素指南(Guide to the factors to be considered in the planning, design, and installation of submarinepower and communications cables)IEEE 1159-1995 监测电力特性用推荐规程(Recommended practice for monitoring electric power quality)IEEE 1235-2000 地下电力电缆和管道用可识别护套的性能指南(Guide for the properties of identifiable jackets for underground power cables and ducts) IEEE 1248-1998 水力发电站的电力系统使用指南(Guide for the commissioning of electrical systems in hydroelectric power plants) IEEE 1249-1996 水力电力发电厂自动化用计算机控制指南(Guide for computer-based control for hydroelectric power plant automation)IEEE 1260-1996 用电力线对AM 广播再放射进行预测、测量和分析(Guide on the prediction, measurement, and analysis of AM broadcast reradiation by power lines)IEEE 1276-1997 油冷电力变压器中高温绝缘材料使用的试用指南(Trial-use guide for the application of high-temperature insulation materials in liquid-immersedpower transformers)IEEE 1325-1996 电力断路器的野外故障演习报告(Reporting field failur practice for power circuit breakers) IEEE 1344-1995 电力系统用同步移相器(Synchrophasors for power systems)IEEE 1346-1998 评估电力系统和电子处理设备兼容性的推荐规程(Recommended practice for evaluating electric power system compatibility with electronic process equipment)IEEE 1366-1998 电力分配可靠性指数试验用指南(Trial-use guide for electric power distribution reliability indices)IEEE 1406-1998 电力电缆系统用液体中气体分析的使用指南(Guide to the use of gas-in-fluid analysis for electric power cable systems)IEEE 1407-1998 使用充水罐进行中压挤制电力电缆加速老化试验的试验指南(Trial-use guide for accelerated aging tests for medium-voltage extruded electric power cablesusing water-filled tanks)IEEE 141-1993 工厂电力分配的推荐规程(Recommended practice for electric power distribution for industrial plants)IEEE 1410-1997 提高电力架空配电线路避雷性能指南(Guide for improving the lightning performance of electric power overhead distribution lines) IEEE 142-1991 工商业电力系统的接地推荐规程(Recommended practice for grounding of industrial and commercial power systems)IEEE 1459-2000 试验用标准定义. 在正弦曲线,非正弦曲线,平衡和非平衡条件下电力数量测量的试验用标准定义(Trial-use standard definitions for the measurement of electric power quantities undersinusoidal, nonsinusoidal, balanced, or unbalanced conditions)IEEE 1476-2000 客车辅助电力系统接口(Passenger train auxiliary power systems interfaces)IEEE 1547-2003 有电力系统的互连配电资源(Interconnecting distributed resources with electric power systems)IEEE 1613-2003 电力分站中通信网络设备的环境及测试要求(Environmental and testing requirements for communications networking devices in electric power substations)IEEE 18-2002 并联电力电容器(Shunt power capacitors)IEEE 241-1990 商业建筑物电力系统推荐规程(Recommended practice for electric power systems in commercial buildings)IEEE 242-2001 工业及商业电力系统保护及配合用推荐规程(Recommended practice for protection and coordination of industrial and commercial power systems)IEEE 277-1994 水泥厂电力分配的推荐规程(Recommended practice for cement plant power distribution)IEEE 295-1969 电子设备用电力变压器(Electronics power transformers)IEEE 308-1991 核电站1E级电力系统的标准(Criteria for class 1E power systems for nuclear power generating stations)IEEE 336-1985 核装置的电力、仪表和控制设备的安装、检验及试验要求(Installation, inspection, and testing requirements for power, instrumentation, and controlequipment at nuclear facilities)IEEE 399-1997 工业及商业电力系统分析用推荐规程(Recommended practice for industrial and commercial power systems analysis)IEEE 400-2001 铠装电力电缆系统绝缘的现场试验和评定指南(Guide for field testing and evaluation of the insulation of shielded power cable systems)IEEE 493-1997 可靠的工业及商业电力系统设计用推荐规程(Recommended practice for design of reliable industrial and commercial power systems) IEEE 505-1977 发电站电力系统术语命名(Nomenclature for generating station electric power systems)IEEE 516-2003 带电电力线维修方法指南(Guide for maintenance methods on energized power lines)IEEE 539-1990 架空电力线路电晕和无线电噪声用术语的定义(Definitions of terms relating to corona and field effects of overhead power lines)IEEE 576-2000 石化工业用绝缘电力电缆的安装、端接和试验推荐规程(Recommended practice for installation, termination, and testing of insulated power cable asused in industrial and commercial applications)IEEE 62-1995 电力装置鉴别现场试验指南.第1部分:油浸式电力变压器,调节器和电抗器(Guide for diagnostic field testing of electrical power apparatus - Part 1: Oil filled powertransformers, regulators, and reactors)IEEE 635-1989 电力电缆铝护套的选择和设计指南(Guide for selection and design of aluminium sheaths for power cables)IEEE 643-1980 电力线载波应用指南(Guide for power-line carrier applications)IEEE 644-1994 交流电力线路工业频率电场和磁场的测量方法(Measurement of power frequency electric and magnetic fields from AC power lines)IEEE 664-1993 单芯电缆风振阻振器电力分散特性实验室测量指南(Guide for laboratory measurement of the power dissipation characteristics of aeolian vibration dampers for single conductors)IEEE 666-1991 发电站电力服务系统设计指南(Design guide for electric power service systems for generating stations)IEEE 741-1997 核电站1E级电力系统和设备保护标准(Criteria for the protection of class 1E power systems and equipment in nuclear power generating stations)IEEE 824-1994 电力系统中的串联电容器(Series capacitors in power systems)IEEE 835-1994 电力电缆的载流量表(Power cable ampacity tables)IEEE 928-1986 地面光电电力系统性能标准(Recommended criteria for terrestrial photovoltaic power systems)IEEE C 37.10-1995 电力断路器的诊断和故障调查导则(Guide for diagnostic and failure investigation of power circuit breakers)IEEE C 37.111-1999 电力系统瞬态数据交换的通用格式(Common format for transient data exchange (COMTRADE) for power systems) IEEE C 37.2-1996 电力系统设备功能数目及接触名称与符号(Electrical power system device function numbers and contact designations)IEEE C 37.90.1-2002 与电力装置相关的继电器和中继系统的耐电涌性能试验(Surge withstand capability (SWC) tests for relays and relay systems associated with electricpower apparatus)IEEE C 57.113-1991 充液电力变压器和分路扼流器部分放电测量指南(Guide for partial discharge measurement in liquid-filled power transformers and shunt reactors)IEEE C 57.117-1986 电业局电源系统电力变压器和分流扼流器故障数据报告指南(Guide for reporting failure data for power transformers and shunt reactors on electric utilitypower systems)IEEE C 57.12.00-2000 油浸式配电,电力和调压变压器的一般要求(General requirements for liquid-immersed distribution, power, and regulating transformers)IEEE C 57.12.01-1998 包括固体浇铸和/或树脂密封绕组式在内的干式配电和电力变压器的一般技术要求(General requirements for dry-type distribution and power transformers including those withsolid-cast and/or resin-encapsulated windings)IEEE C 57.12.56-1986 通风干式电力和配电变压器绝缘系统热评定的测试程序(Test procedure for thermal evaluation of insulation systems for ventilated dry-type power anddistribution transformers)IEEE C 57.12.60-1998 固体浇铸和树脂密封的电力和配电变压器用绝缘系统的热评定试验程序指南(Guide for test procedures for thermal evaluation of insulation systems for solid-cast andresin-encapsulated power and distribution transformers)IEEE C 57.12.80-2002 电力和配电变压器的术语(Terminology for power and distribution transformers)IEEE C 57.12.90-1999 油浸式配电、电力和调压变压器的试验规程(Test code for liquid-immersed distribution, power, and regulating transformers) IEEE C 57.12.91-2001 干式配电和电力变压器试验规程(Test code for dry-type distribution and power transformers)IEEE C 57.127-2000 油浸电力变压器局部放电所发出声音探测的试用指南(Trial-use guide for the detection of acoustic emissions from partial discharges in oil-immersedpower transformers)IEEE C 57.136-2000 额定功率大于500kV A的液浸式电力变压器和并联电抗器的声级抑制和测定(Sound level abatement and determination for liquid-immersed power transformers and shuntreactors rated over 500 kV A)IEEE C 57.18.10-1998 半导体电力整流器变压器的要求和实施规范(Practices and requirements for semiconductor power rectifier transformers) IEEE C 57.19.100-1995 电力设备套管应用指南(Guide for application of power apparatus bushings)IEEE C 57.93-1995 液体浸入电力变压器的安装指南(Guide for installation of liquid-immersed power transformers)IEEE C 57.94-1982 干式通用配电和电力变压器的安装,使用,操作和维护推荐规程(Recommended practice for installation, application, operation, and maintenance of dry-typegeneral purpose distribution and power transformers)IEEE C 57.96-1999 加载干式配电和电力变压器(Loading dry-type distribution and power transformers)IEEE C 62.22.1-1996 绝缘保护铠装电力电缆电涌放电器的连接指南(Guide for the connection of surge arresters to protect insulated, shielded electric power cable systems)IEEE C 62.41.1-2002 低压(1000V及1000V以下)交流电力电路电涌环境指南(Guide on the surge environment in low-voltage (1000 V and less) ac power ciruits)IEEE C 62.41.2-2002 低压(1000V及1000V以下)交流电力网中电涌特性规程(Practice on characterization of surges in low-voltage (1000 V and less) ac power circuits)IEEE C 62.48-1995 电力系统干扰和过压保护装置之间相互作用的说明(Guide on interactions between power system disturbances and surge-protective devices)IEEE C 62.92-1987 电力事业系统中性接地应用指南.第一部分:引言(Guide for the application of neutral grounding in electrical utility systems; part 1: introduction)IEEE C 62.92.1-2000 电力设施系统中线接地的应用.第1部分:说明(Application of neutral grounding in electrical utility systems - Part 1: Introduction)。
国标和IEEEC57.12.90-2010标准声级试验解析作者:李春霞,赵祥光来源:《海峡科技与产业》 2017年第3期变压器所发出的噪声是由铁心的磁滞伸缩变形和绕组、油箱及磁屏蔽内的电磁力引起的。
随着城乡用电量日益增加,变压器安装点越来越靠近居民区,甚至在居民区安装。
为了保护环境不受噪音污染,必须控制变压器噪声[1]。
美国标准IEEE C57.12.90-2010中的要求与国标GB/T1094.10-2003差异较大。
本文对国标和美准中声级试验进行分析。
本文只分析常用的A计权声压级。
1 实验条件美标中要求变压器放在周围3米之内除了地面和天花板外没有放射面的地方。
变压器应在主分接施加额定电压额定频率,不需要施加负载[2]。
冷却泵和风扇应该安装合理。
如果冷却设备没有和变压器相连接,应该记录。
如果制造商和客户同意,变压器声级应该加上冷却设备的声级。
测量应该在变压器供电且达到稳定声级水平时进行。
如果不能在额定频率下进行试验,美标附录B给出了50/60Hz的转换方法。
2 背景噪声美标中规定试验环境的背景噪声的声级低于变压器和背景噪声的合成声级至少5dB。
当环境的背景噪声的声级低于变压器和背景噪声的合成声级5dB或以上时,给出了差值在5~lOdB 时对应的校正值。
校正值加上变压器和背景噪声的合成声级来得到变压器的声压级。
这比国标中环境修正更直观,更容易计算。
只需要简单的加法计算。
环境修正值K考虑了不希望出现的试验室边界或邻近变压器的反射物体所产生的声反射的影响。
K主要取决于试验室吸声面积A对测量表面积S的比值。
K的计算值与变压器在试验室的位置无明显关系。
K用式(1)计算。
需要计算试验室吸声面积A,和测量表面积S。
相比表1中给出的修正值,此方法繁琐,还需要计算实验室的面积,耗费时间。
3 基准面和测量点选择美标中基准发射面是与变压器的轮廓线(包括散热器,不包括套管和小的突起部分)垂直的表面。
测量面是距离基准发射面0. 3m的垂直面。
Rolls-Royce300 MW汽轮发电机静止励磁系统·第三部分第一章说明手册1Rolls-Royce公司300 MW 汽轮发电机静态励磁系统安装、调试、操作、运行和维护手册第三部分第1章运行说明手册(译自Rolls-Royce 公司资料)2001年9月缩写注释& 逻辑“与”℃摄氏度>=1逻辑“或”2oo3三中取二ac 交流ARU 自动运行AVR 自动电压调节器CB 断路器CCR 中控室CMR 连续最大额定值D/A 数模转换dc 直流DCS 分布控制系统EHG 电液调速器FCB 磁场断路器FPGA 可编程门阵列2Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册HV 高电压I/O 输入/输出LCP 就地控制盘mA 毫安MCB 小型电路开关mm 毫米MMI 人机接口MVAr 兆乏MW 兆瓦N/C 常闭N/O 常开NA 未使用PID 比例积分微分调节PSS 电力系统稳定器pu 单位标幺值R-R IC R-R工业控制有限公司RAM 随机存储器ROM 只读存储器TBA 等待建议TMR 三模冗余V 伏特(电压)3VDU 显示屏运行使用说明书目录1 励磁系统概述1.1 环境1.2 系统参数2 AVR系统概述2.1 冗余2.1.1 三模冗余理论2.1.2 冗余和系统输入/输出2.2 功能描述2.2.1 标幺值定义2.2.2 AVR2.2.2a) 电压、有功、无功及转速的测量2.2.2b) 运行方式选择2.2.2c) AVR自动运行方式4Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册2.2.2d) AVR手动运行方式2.2.2e) AVR与整流器手动同步2.2.2f) 手动整流柜控制2.2.2g) AVR与整流器手动控制的关系2.2.2h) 给定值设置2.2.2i) 励磁和灭磁2.2.2j) 动态限制2.2.2k) 电力系统稳定器(PSS)2.2.2l) 无功补偿(调差)2.2.2m) 恒功率因数运行方式2.2.2n) 恒无功功率运行方式2.2.2o) 操作接口2.3 事故检测2.4VT和CT接口2.5转子平均温度测量方法2.6 继电器模块2.6.1 高度集成继电器表决模块2.6.2 单继电器表决模块2.7 系统输入和输出2.8 可整定参数2.9可编程试验输出指示52.10 AVR的可用数据通过串口连接到DCS系统3 整流器辅助柜系统描述3.1 励磁系统中的主要控制信号3.2EG809整流器辅助模块功能说明3.2.1输入/输出3.2.1a) 输入3.2.1b) 输出3.2.1c) 触发脉冲3.2.2故障检测3.2.2a) “看门狗”(watchdog)3.2.3 整流器辅助模块的逻辑功能3.2.3a) 励磁和灭磁逻辑3.2.3b) AVR或整流器手动控制选择3.2.3c) 通讯3.2.3d) 脉冲与模块之间电压协调3.2.3e) 起励请求3.2.3f) 风机故障检测逻辑3.2.3g) 风机事故检测逻辑3.2.3h) 整流器跳闸逻辑6Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册3.2.3i) 风机选择逻辑3.2.3j) 可控硅故障检测3.2.4 选择开关3.2.4a) 选择A组和停止B组3.2.5 CROWBAR跨接器3.2.6 过滤器报警3.3 通讯/手动控制器模块EG810功能说明3.3.1定义3.3.1a) 同步电压与励磁电流3.3.1b) 最小整流控制角3.3.1c) 最大逆变角3.3.1d) 触发角补偿3.3.1e) 相位微调3.3.1f) 数字信号输入/输出3.3.2 电路结构3.3.2a) 通讯与报警接口3.3.2b) 手动控制3.3.3触发脉冲输出3.3.4报警输出3.4 系统电源73.4.1 电源故障3.5 继电器输出3.6 系统输入/输出3.6.1 输入3.6.2 输出3.6.3 报警输入3.6.4 模拟量输入信号3.6.5 可调整参数3.6.5a) 整流器B预置3.6.5b) 故障设置旋转开关3.6.5c) 正常设置旋转开关3.7 逻辑图4整流器4.1 EX4014 +ve可插拔式可控硅模块4.2 EX4015 -ve可插拔式可控硅模块4.3 EX4016 抑制单元4.4 EX3006 触发脉冲板5 硬件说明5.1 AVR柜5.1.1 电源配电8Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册5.1.1a) 110V直流控制电源5.1.1b) 220V 50Hz控制电源5.1.1c) 220V 50Hz 伺服电源5.1.2EG8503 AVR功能板分装配5.1.3EG800 自动控制器模块5.1.4EG802 自动电源模块5.1.4a) 输入数据5.1.4b) 输出数据5.1.5 EG812 VT和CT 信号调理单元(PC3170)5.1.6 EG901表决单继电器输出模块(PC3108)5.1.7 EG903三重继电器输出模块(PC3107)5.2 整流器柜5.2.1 电源配电5.2.1a) 220V 50Hz伺服电源5.2.1b) 380V 3相50Hz电源5.2.1c) 941V 3相50Hz电源5.2.2 EX4014 ac/dc +Ve整流器模块组件5.2.3 EX4015 ac/dc -Ve整流器模块组件5.2.4 EX4016 扼流圈组件5.2.5EX3006 触发脉冲板5.2.5a) 逻辑要求95.3 整流器辅助柜5.3.1 电源配电5.3.1a) 220V 50Hz伺服电源5.3.1b) 220V 50Hz控制电源5.3.1c) 110V dc 控制电源5.3.1d) 380V 3相50Hz备用电源5.3.1e) 941V 3相50Hz电源5.3.2 EX4107整流器辅助柜就地控制盘5.3.3 EG8506 三模冗余整流器辅助柜功能板分装配5.3.4 EG809 三模冗余整流器辅助柜逻辑模块5.3.4a) 输入5.3.4b) 输出5.3.5 EG810 通讯/手动控制器模块5.3.5a) 电源5.3.5b) 附件5.3.5c) 盘后连线5.4 磁场断路器(灭磁开关)柜5.4.1 电源配电5.4.1a) 220V 50Hz伺服电源5.4.1b) 110V dc控制电源5.4.1c) 380V 3相50Hz起励电源5.4.2 磁场断路器(灭磁开关)10Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册5.4.3 MC1309 GP2 跨接器(Crowbar)单元5.4.4 MC2635 跨接器隔离单元5.4.5 EX4018起励回路5.4.6 EX4021转子电压隔离器5.5 励磁变压器11表格标题1 额定及详细说明2 AVR参数3 高集成继电器表决模块触点容量4 单继电器表决模块触点容量5 系统输入和输出代码6 模拟量和数字量输入/输出7 可整定参数8可编程试验输出指示9辅助通讯信号列表10通讯故障标志-仅仅对通讯输出的11硬连接线数字量输入/输出-仅仅对通讯输出的12通讯/手动到AVR数据位格式13 手动控制器触发角数据位格式14 通讯控制器触发角数据位格式15AVR至通讯/手动数据位格式16控制器配置参数表17 背板安装继电器容量18 数字量输入19 模拟输入信号范围20 模拟输入信号21 EG802模块电气输入特性Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册22EG802模块电气输出特性23 EX3006单个触发脉冲卡输入和输出24 EX3006单个触发脉冲卡频率选择25 EG809输入DIN 41612联接器PL1安装26 EG809输入DIN 41612联接器PL2安装27 EG809输出DIN 41612联接器安装28 EG810 DIN41612联接器PL1安装29 EG810 DIN41612联接器PL2安装13图表目录1 典型的励磁系统2 典型输入/输出方框图3 AVR冗余策略4 AVR方式选择5 自动控制器-方框图6 AVR手动控制器-方框图7 整流器手动控制器-方框图8 动态限制容量特性9 PSS电力系统稳定器方框图10 无功功率补偿11 恒功率因数和恒无功运行方式12 整流器辅助柜方框图13 主要控制信号14 整流器手动控制状态图15 励磁/灭磁逻辑16 起始/励磁波形图17 灭磁波形图18 灭磁示意图19 事件序列波形20运行顺序原理框图Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册21公共FPGA通讯22辅助FPGA通讯23机器初始状态及Abel列表24机器传送状态及Abel列表25 机器接收状态及Abel列表26 起励回路选择27Crowbar跨接器操作原理方块图28EG810 通讯/手动模块方框图29EG810模块通讯通道30公共通讯就地显示31典型信号显示页32 主报警信号菜单33 典型综合报警组1定义页34 报警输入典型定义35 典型报警页36 磁场电流控制器37 PI选择38 给定跟踪控制39 操作/AVR给定控制40控制器配置主菜单15图表目录41 逆变/跨接器时间溢出逻辑42 励磁/灭磁逻辑图43 磁场断路器合闸逻辑44 AVR/整流器手动选择45 整流器A跳闸逻辑回路46 整流器B跳闸逻辑回路47 整流器跳闸逻辑图48 闭合起励输入接触器逻辑图49 闭合起励输出接触器逻辑图50 触发起励可控硅整流器逻辑图51 断开起励输入/输出接触器逻辑图(仅对DC起励电路)52 风机故障检测逻辑图53 风机事故检测逻辑图54 整流器A风机选择逻辑图55 整流器B风机选择逻辑图56 对一个桥臂故障/跳闸检测逻辑图57 启动报警/跳闸逻辑图58 触发脉冲表决时间延迟逻辑图59 选择开关逻辑图60 延迟无激励信号逻辑图Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册61 磁场断路器跳闸逻辑图62延迟励磁信号逻辑图63系统电源配电图64EG802模块布置图65EG802模块方框图66EG809模块前面板67EG810通讯/手动模块前面板68 辅助柜背板电源配电17附图列表Rolls-Royce IC 图号名称M100-1210 EX4017整流器辅助柜GA的就地控制盘总装配M100-1475 励磁控制系统总体布置M100-1482 AVR柜总体布置M100-1478 整流器辅助柜总体布置M100-1477 ( 4 张) 整流器柜总体布置M100-1480 ( 2 张) 磁场断路器柜总体布置M320-1250 图1 整个励磁系统原理图M320-1250 图2 整个励磁系统方框图M320-1254 ( 4 张) AVR柜原理图M310-1252 ( 6 张) 整流器辅助柜原理图M320-1251 ( 3 张) 整流器柜原理图M320-1253 ( 3 张) 磁场断路器柜原理图PL-M100-1482( 3 张) AVR柜零零部件清单PL-M100-1477( 4 张) 整流器辅助柜零部件清单PL-M100-1478( 7 张) 整流器柜零部件清单PL-M100-1480( 6 张) 磁场断路器柜零部件清单PL-M100-1210 EX4017整流器辅助柜就地控制盘部件清Rolls-Royce 300MW汽轮发电机静态励磁系统·第三部分第1章说明手册单M320-1119 就地控制盘原理图191.励磁系统概述励磁系统的主要任务:通过控制发电机励磁电流来维持发电机端电压;维持其它发电机的运行特性;在系统发生故障时进行灭磁或停机;系统参数在运行手册第二章给出。
zic标准
ZIC标准是指我国电力行业中关于低压开关设备和控制设备的标准。
ZIC标准是由中国国家标准化管理委员会(CSB)制定的,全称为《低压开关设备和控制设备》。
这些标准涵盖了低压开关设备和控制设备的性能、结构、材料、制造工艺、试验方法、检验规则等方面。
ZIC标准主要包括以下几个部分:
1. ZIC 1001-2006 低压开关设备和控制设备总则
2. ZIC 1002-2006 低压开关设备和控制设备的结构要求
3. ZIC 1003-2006 低压开关设备和控制设备的材料要求
4. ZIC 1004-2006 低压开关设备和控制设备的制造工艺要求
5. ZIC 1005-2006 低压开关设备和控制设备的试验方法和要求
6. ZIC 1006-2006 低压开关设备和控制设备的检验规则
这些标准适用于低压开关设备和控制设备的制造、安装、使用、维护等方面,以确保产品的质量和安全性能符合相关要求。
需要注意,随着技术的发展和行业标准的更新,ZIC标准可能会有所调整。
因此,在实际应用中,应关注相关标准的最新版本,并按照最新的标准进行操作。
ANSI/IEEE C57.12.01-2005美国国家标准协会/电气和电子工程师协会C57.12.01-2005IEEE Standard Test Code for Dry-Type Distribution and Power Transformers Abstract:Methods for performing tests specified in IEEE Std C57.12.01-1998 and other referenced standards applicable to dry-type distribution and power transformers are described. This standard is intended for use as a basis for performance, safety, and the proper testing of dry-type distribution and power transformers. This standard applies to all dry-type transformers except instrument transformers, step-voltage and induction voltage regulators, arc furnace transformers, rectifier transformers, specialty transformers, and mine transformers.摘要:在IEEE Std C57.12.01-1998和其它的参考文献中,列出了干式配电变,干式电力变压器的试验方法。
本标准列举了更详细,更周全,更安全的干式变压器试验方法。
这个标准涵盖了所有的干式变压器,除了以下几种变压器:试验变压器,起动变压器,工业变压器,调压变压器,弧炉变压器,整流变压器,专用变压器,矿用变压器等。