工程建设现场英语口语:谈论计划和进度
- 格式:docx
- 大小:38.14 KB
- 文档页数:3
工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START—UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。
很好,谢谢。
4 I am very well, Thank you.我很好,谢谢你。
Person A: Hi, John. How's the progress on the construction project?Person B: Hi, Alice. Everything is going smoothly so far. The foundation has been laid, and the walls are being constructed.Person A: Great to hear that. By the way, have you faced any challenges so far?Person B: Yes, we encountered a few issues. The weather has been quite unpredictable, causing delays in the construction process. Additionally, some suppliers didn't deliver the materials on time.Person A: That's a common problem in construction projects. How did you handle these challenges?Person B: We communicated with the suppliers and requested an extension of the delivery date. Regarding the weather, we adjusted the work schedule to ensure minimal disruption.Person A: I see. How's the project budget looking so far?Person B: The budget is still on track. We've allocated funds for unexpected expenses, and we've managed to stay within the allocated budget so far.Person A: Good. What about the project timeline? Are you on schedule?Person B: Yes, we are. We've established a realistic timeline, and we are currently on schedule. However, we will continuously monitor the progress and make adjustments if necessary.Person A: That's important. How do you handle project changes and updates?Person B: We have a well-defined change management process. Any proposed changes are reviewed, approved, and documented. This ensures that we maintain control over the project scope and minimize risks.Person A: Excellent. How do you communicate with the project team and stakeholders?Person B: We hold regular meetings to discuss project progress, challenges, and updates. We also use project management software totrack tasks, share documents, and communicate with the team. Additionally, we keep stakeholders informed through progress reports and meetings.Person A: That's a great approach. How do you handle conflicts withinthe team?Person B: We address conflicts openly and constructively. We encourage team members to express their concerns and work together to find solutions. It's important to maintain a positive work environment and foster teamwork.Person A: Absolutely. Lastly, how do you ensure quality control in the project?Person B: We have a comprehensive quality control plan in place. We conduct regular inspections, follow industry standards, and involve experts when needed. This ensures that the project meets the required quality standards.Person A: That's great to hear. Keep up the good work, John. We're confident that the project will be successful.Person B: Thank you, Alice. We appreciate your support and guidance throughout the project.This dialogue showcases the importance of effective communication, change management, and quality control in engineering project management. It also highlights the need for collaboration, teamwork, and proactive problem-solving to ensure project success.。
(完整)建筑施工英语常用对话范本1: 建筑施工英语常用对话1. 问候与交流 (Greeting and Communication)1.1 打招呼 (Greetings)- Good morning/ afternoon/ evening! (早上/下午/晚上好!)- Hello! How are you today? (你好!你今天怎么样?)1.2 自我介绍 (Self-Introduction)- My name is [Your Name]. I am a construction worker. (我叫[你的名字],我是一名施工人员。
)- Nice to meet you! I work for [Company Name]. (很高兴见到你!我在[公司名称]工作。
)1.3 交流基本内容 (Basic Conversation)- How can I assist you? (我能提供吗?)- Could you please repeat that? I didn't catch it. (你能再说一遍吗?我没有听清楚。
)- Thank you! That's very helpful. (谢谢!这对我很有。
)2. 工程计划 (Project Planning)2.1 讨论施工进度 (Discussing Construction Schedule)- What is the current status of the project? (项目目前的进展情况如何?)- Are we on track to meet the deadline? (我们能按时完成工程吗?)2.2 确定工作流程 (Determining Workflow)- How should we proceed with the next phase of construction? (我们应该如何进行下一阶段的施工?)- Who will be responsible for coordinating the different teams? (谁将负责协调不同的团队?)2.3 协商设备需求 (Negotiating Equipment Requirements)- We need additional machinery for this task. Can we arrange for that? (我们需要额外的机械设备来完成这项。
工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。
很好,谢谢。
4 I am very well, Thank you。
工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS2、交谈语言(24句)TALKING ABOUT LANGUAGES3、日期和时间(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、计划与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量管理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START—UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构附录四、度量衡表一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do?你好吗?(初次见面)2 How are you?你好吗?(日常见面)3 Fine,thanks。
很好,谢谢。
4 I am very well, Thank you。
工程施工对话英语Scene: A construction site bustling with activity, workers moving to and fro, heavy machinery in motion, and the sound of hammering and drilling filling the air.Characters:1. Jack - Construction foreman leading the project2. Sarah - Civil engineer overseeing the structural aspects of the project3. Mike - Construction worker responsible for carpentry work4. Lisa - Electrical engineer managing the installation of electrical systems5. Tom - Crane operator handling heavy lifting tasksJack: (addressing the team) Alright everyone, welcome to another day at the construction site. We have a lot to get done today so let's make sure we are all working efficiently and safely.Sarah: (approaching Jack) Jack, I wanted to discuss the status of the foundation work. Have we completed pouring the concrete for the footings?Jack: (checking his notes) Yes, Sarah, we finished pouring the footings yesterday. The concrete has set and the foundation walls are ready to be erected. I will assign a team to start working on that right away.Sarah: Great, let's make sure we follow the structural plans to ensure the walls are built properly and securely.Mike: (approaching the group) Hey Jack, do you want me to start working on the framing for the walls?Jack: Yes, Mike, that would be great. Get your team together and start setting up the wall frames. Make sure everything is level and plumb.Lisa: (joining the conversation) Jack, I need to coordinate with Mike to make sure we have electrical outlets and wiring conduits integrated into the walls as they are being built.Jack: Good point, Lisa. Make sure you are in constant communication with Mike to ensure the electrical systems are being installed correctly.Tom: (on the radio) Jack, I am ready to start lifting the steel beams into place for the roof. Are we clear to proceed?Jack: (responding on the radio) Yes Tom, go ahead and start lifting the beams. Make sure to follow all safety protocols and communicate with the ground crew to position the beams accurately.As the day progresses, the construction site hums with activity. Jack coordinates the various teams to ensure the project stays on schedule and meets quality standards. Sarah inspects the structural work to ensure it meets engineering specifications, while Mike and his crew focus on carpentry tasks. Lisa oversees the installation of electrical systems, making sure everything is wired correctly and safely. Tom uses the crane to lift heavy materials into place, working with precision and care.Jack: (addressing the team at the end of the day) Another productive day, everyone. Let's wrap up our tasks and make sure the site is clean and secure before we leave. Great job today!The team nods in agreement and begins to wind down their work, packing up tools and equipment. The construction site transforms as the sun sets, the sounds of activity giving way to a peaceful quiet. Tomorrow is another day of hard work and progress towards completing the project.(The scene fades to black as the team finishes up their tasks, ready to start anew the next day)。
工程建设现场英语五百句目录1、问候和介绍(36句)GREETINGS AND INTRODUCTIONS 2、交谈语言(24名)TALKING ABOUT LANGUAGES3、日期和时刻(20句)DATES AND TIMES4、天气和环境(20句)WEATHER AND ENVIRONMENT5、在会议上(34句)AT THE MEETING6、工程项目(20句)ENGINEERING PROJECT7、打算与进度(20句)PLANNING AND SCHEDULING8、技术资料与图纸(34句)TECHNICAL DOCUMENTS AND DRAWINGS 9、公用工程(20句)UTILITY10、施工现场(44句)AT THE JOB SITE11、设备检验(30句)INSPECTION OF THE EQUIPMENT12、土建工程(18句)CIVIL ENGINEERING13、施工机械(18句)CONSTRUCTION MACHINERY14、常用工具(22句)COMMON TOOLS15、工程材料(18句)附录四、度量衡表ENGINEERING MATERIALS16、设备安装(24句)ERECTION OF THE EQUIPMENT17、工艺管道(22句)PROCESS PIPING18、质量治理(20句)QUALITY CONTROL19、试车和开工(30句)TEST RUN AND START-UP20、在宴会上(26句)AT THE BANQUET附录一、基数和序数、分数、倍数、百分数附录二、常见各国标准代号附录三、常见外国学会和协会机构一、问候和介绍(36句)GREETINGS AND INTRODUCTIONS1 How do you do? 你好吗?(初次见面)2 How are you? 你好吗?(日常见面)3 Fine, thanks. 专门好,感谢。
4 I an very well, thank you. 我专门好,感谢你。
谈论工程项目常用英语口语句子-工程建设现场英语500句20工程项目ENGINEERING PROJECT135 A project execution is usually divided into some elementary phases, such as :engineering, procurement and transportation, and field construction.一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工。
136 We are building an ethylene plant with an annual capacity of 300,000 metric tons.我们正在建设一座年产三十万吨的乙烯工厂。
137 The contract number of this project is CJC78-8.这个项目的合同号是CJC78-8。
138 The Seller(vendor) is Toyo Engineering Corporation(TEC)of Japan.卖方(卖主)是日本的东洋工程公司。
139 The Buyer (customer, client) is China NationalTechnical Import Corporation.(CNTIC)买方(主顾、顾客)是中国技术进口总公司。
(简称CNTIC)140 China National Chemical Construction Corporation (CNCCC) contracts for domestic and overseas chemical projects. 中国化工建设总公司(简称CNCCC)承包国内和海外的化工工程。
141 We can contract to build turn-key plant, undertake single items of projects as a subcontractor or provide labor services. 我们可以承建成套工厂或分包单项工程或提供劳务。
工程建设现场英语口语:谈论计划和进度155 We should work according to the overall schedulechart(the construction time schedule )of the project.我们应该按照工程项目的总进度表(建设进度表)工作。
156 The effective date of this contract will begin from July sixth , nineteen eight-three.这个合同的有效期将从一九八三年七月六日开始。
157 The Seller will provide preliminary (final )technical documents for Buyer in May.卖方将于五月份向买方提供初步(最终)技术文件。
158 The basic (detailed) process design will be issued before August.基本的(详细的)工艺设计资料将于八月前发出。
159 Our major planning items contain estimating of cost and construction schedule.我们主要的计划工作项目包括费用预算和施工进度。
160 We shall have a design collecting (preliminary design, final design) meeting next month.下个月我们将召开设计数据收集(初步设计、最终设计)会议。
161 On our most projects Critical Path Method (CPM) is used for scheduling.在我们的绝大部分工程项目中都采用”统筹法”(即关键路线方法,简称CPM)安排计划。
162 Field erection work (civil work) will begin inOctober this year and complete on June first next year.现场安装工作(土建工作)将自今年十月开始至明年六月一日完工。
建设工程施工进度计划英语作文{z}Construction Project Schedule PlanIntroduction:A construction project schedule plan is a crucial aspect of any construction project.It outlines the timeline, tasks, and resources required to complete the project successfully.This document aims to provide a comprehensive construction project schedule plan for a hypothetical project.Project Overview:The project is a residential building consisting of 10 floors, located in the heart of the city.The project aims to provide modern and luxurious living spaces for families.The total estimated cost of the project is $50 million, and the expected completion date is 2 years from the start of construction.Construction Phases:The construction project will be divided into three main phases:1.Pre-construction Phase: This phase includes land acquisition, permits and approvals, design, and planning.It is expected to last for 6 months.2.Construction Phase: This phase includes the actual construction of the building, including foundation, columns, beams, slabs, and finishes.It is expected to last for 18 months.3.Post-construction Phase: This phase includes handover of the building to the client, defect liability period, and maintenance.It is expected to last for 6 months.Construction Schedule:The construction schedule is as follows:1.Pre-construction Phase:- Land acquisition: 3 months- Permits and approvals: 2 months- Design and planning: 1 month2.Construction Phase:- Foundation: 3 months- Columns and beams: 2 months- Slabs: 2 months- Finishes: 2 months- Other construction activities (elevators, HVAC, electrical, plumbing): 3 months3.Post-construction Phase:- Handover to client: 1 month- Defect liability period: 3 months- Maintenance: 2 monthsKey Milestones:The key milestones for the project are as follows:nd acquisition: Completion within 3 months of the project start date.2.Permits and approvals: Completion within 2 months of the project start date.3.Design and planning: Completion within 1 month of the project start date.4.Foundation completion: Completion within 3 months of the construction phase start date.5.Columns and beams completion: Completion within 2 months of the construction phase start date.6.Slabs completion: Completion within 2 months of the construction phase start date.7.Finishes completion: Completion within 2 months of the construction phase start date.8.Handover to client: Completion within 1 month of the post-construction phase start date.Resources:The resources required for the project include:1.Manpower: A team of 200 skilled workers, 50 engineers, and 10 project managers.2.Machinery and equipment: Cranes, excavators, concrete mixers, and other construction-related equipment.3.Materials: Cement, steel, concrete, bricks, and other construction materials.Risk Management:Risks associated with the project include delays in land acquisition, permits, and approvals, unfavorable weather conditions, and labor strikes.To mitigate these risks, the project management team will closely monitor the progress of the project, maintain effective communication with stakeholders, and have contingency plans in place.Conclusion:The construction project schedule plan provides a detailed timeline, tasks, and resources required for the successful completion of the residential building project.By closely monitoring the progress and managing risks effectively, the project team aims to deliver the project on time and within budget.。
工程建设现场英语口语:谈论计划和进度
155 We should work according to the overall schedule
chart(the construction time schedule )of the project.
我们应该按照工程项目的总进度表(建设进度表)工作。
156 The effective date of this contract will begin from July sixth , nineteen eight-three.
这个合同的有效期将从一九八三年七月六日开始。
157 The Seller will provide preliminary (final )technical documents for Buyer in May.
卖方将于五月份向买方提供初步(最终)技术文件。
158 The basic (detailed) process design will be issued before August.
基本的(详细的)工艺设计资料将于八月前发出。
159 Our major planning items contain estimating of cost and construction schedule.
我们主要的计划工作项目包括费用预算和施工进度。
160 We shall have a design collecting (preliminary design, final design) meeting next month.
下个月我们将召开设计数据收集(初步设计、最终设计)会议。
161 On our most projects Critical Path Method (CPM) is used for scheduling.
在我们的绝大部分工程项目中都采用”统筹法”(即关键路线方法,简称CPM)安排计划。
162 Field erection work (civil work) will begin in
October this year and complete on June first next year.
现场安装工作(土建工作)将自今年十月开始至明年六月一日完工。
163 This contract plant will start-up (put in commissioning ) on November thirty this year.
这座合同工厂将于今年十一月三十日开车(投产)。
164 The date of acceptance of this plant will be April sixth, nineteen eighty-four.
这座工厂的交工验收期将在一九八四年四月六日。
165 The plant is scheduled to be completed around 1985.
工厂计划于一九八五年前后建成。
166 The Seller’s operating group (A crew of specialists) will remain on the job until guarantees are met.
卖方操作组(专业工作组)将在现场,一直工作到生产符合保证条件。
167 We must take the plant through the test run and
finally into commercial operation.
我们必须使工厂通过试运转并最终投入工业生产。
168 Every month we shall establish construction schedule
每个月我们都要制订建设进度计划。
169 We shall also make the project schedule report every day .
我们也将每天提出项目进度报告。
170 We are going to begin this work tomorrow.(next week ,next month).
我们准备明天(下周、下月)开始这项工作。
171 We must take this work plan into consideration.
我们必须考虑这个工作计划。
172 We have to change our plan for lack of materials (construction machinery, erection tools)
因缺少材料(施工机械、安装工具),我们只能改变计划。
173 What is your suggestion about this schedule?
你对这个计划进度有何建议?
174 Give me your opinion on this plan.
请把你对这个计划的意见告诉我。