当前位置:文档之家› 建筑学外文翻译

建筑学外文翻译

建筑学外文翻译
建筑学外文翻译

建筑学外文翻译

————————————————————————————————作者:————————————————————————————————日期:

?

变频器外文翻译文献

变频器外文翻译文献 (文档含中英文对照即英文原文和中文翻译)

外文: Converter reference design (1)Converter Selection: Selection to determine the frequency converter when the following points: 1) The purpose of a variable frequency; constant pressure to control or constant current control. 2) the load converter types such as leaves or pump volume pumps, with special attention to load the performance curve, the performance curve of the decision of the ways and means. 3) the frequency converter and load matching Voltage match: a rated voltage converter with a rated voltage line with the load. Current matches: ordinary pump, the rated current inverter and motor rated current match. For special load such as deep-water pumps, and so on need to refer to the electrical performance parameters to determine the most current inverter current and Guozainengli. Torque match: in this case constant torque load or slow down when the device may have occurred. 4) the use of high-speed motor drive inverter, because of the high-speed motor, anti-small, high harmonics lead to increased output current value increases. So for high-speed motor inverter Selection, its capacity to be slightly larger than the ordinary motor selection. 5) If the frequency converter to a long cable run, this time to take measures to curb the long cable to the impact of capacitive coupling, inadequate efforts to avoid converter, so in this case, the drive to enlarge the capacity of a file or the converter Output installed output reactor. 6) For the application of some special occasions, such as high temperatures, high altitude, at this time would cause the down converter capacity, the drive to enlarge the capacity of a block.

建筑类外文文献及中文翻译

forced concrete structure reinforced with an overviewRein Since the reform and opening up, with the national economy's rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency. 1、steel mechanical link 1.1 radial squeeze link Will be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integrated with reinforced through reinforced steel sleeve and Wang Liang's Position will be two solid steel bars linked Characteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.

外文翻译-恒压供水变频器

Constant pressure water supply frequency changer The transistor frequency changer not only overcame has formerly exchanged velocity modulation many shortcomings, moreover the velocity modulation performance might compare favorably with the direct current motor velocity modulation performance. The three-phase asynchronous motor has the service to be convenient, merit and so on price small advantage, power and rotational speed adapt breadth, its frequency conversion velocity modulation technology in the miniaturization, the low cost and the redundant reliable aspect holds the obvious superiority. To the end of the 80's, the alternating current machine frequency conversion velocity modulation technology rapidly develops into a mature technology, it will supply the alternating current machine the labor frequency alternating current supply to turn direct current after the diode rectification, again by component and so on IGBT or GTR module counter will turn the alternating current supply which the frequency might move, will drive the electrical machinery by this power source to move under the speed change condition, and automatic suitable strain load condition. After it changed in the traditional industry the electrical machinery to start only can by the rated power, decide the rotational speed the sole movement way, thus achieved the energy conservation goal. The modern frequency conversion velocity modulation technology applies in the electric power water pump water supply system. Because the frequency conversion velocity modulation has the velocity modula -tion the physical characteristics well, efficiency high, velocity modulation scope -wide, precision high, adjusting character curve smooth, may continual realize, the steady velocity modulation, the volume small, the maintenance simple is conven -ient, the automated level higher a series of prominent merits but time people's favor. When it applies especially in the air blower, the water pump and so on the large capacity load, may obtain the energy conservation effect which other velocity modulation ways is unable to compare. The frequency conversion velocity modulation system main equipment is provides the frequency conversion power source the frequency changer, the frequency changer may divide into exchange - direct current - to exchange the frequency changer and the exchange - exchan

建筑学毕业专业外文翻译文献doc资料

本科毕业设计(外文翻译) 题目居住区交往空间规划与设计 院(系部)xxx学院 专业名称xx 年级班级xx 学生姓名xx 指导教师xx xx 年xx 月x 日 Planning and Design of Association Space of residential District

Xia dong liang 【Abstract】:The association space refers to the indoor and outdoor space for communication between residents.The article presents an overall discussion of the necessity,hierarchy and functionality of association space,with a wish to create positive and healthy association atmosphere and stimulate good communication among residents so that the residential area can become a homeland full of love and harmony. 【Keyword】:residential area;association space;necessity;hierarchy;Functionality 【Foreword】:As the housing system reform and the rapid development of real estate, urban residential areas large urban settlements have emerged on the layout of residential buildings, public buildings, public green space, life and living facilities such as roads, to provide urban residents live in the community and The establishment, is an integral part of the city. Exchanges between the living room area residents is to communicate and exchange of indoor and outdoor space. At this stage, people's living standards greatly improved the living environment of continuous improvement district. Developers should not only focus on residential construction and the reasonable comfort, paying greater attention to the construction of residential environment. However, the current environment in the construction of residential areas, they are often the natural ecology of greening the environment is much more to consider, and the promotion of exchanges between the residents of the space environment to consider less, environmental construction can not meet the occupants of the psychological characteristics and needs. From the basic physiological needs gradually to meet the psychological and cultural fields of promoting a higher level, the residential area is not only the function of living, but also people's thinking and feelings of the local exchange. Therefore, the strengthening of exchanges between the residential areas of space construction, increase residential neighbourhood affinity, should be developed in the planning and construction of residential areas should also consider the issue. How to conduct exchanges between the residential areas of space planning and design, improve people's quality of life, the author of his own real estate development

工程管理专业毕业设计外文翻译(外文+翻译)

Study on Project Cost Control of Construction Enterprises By: R. Max Wideman Abstract With the increasing maturity of construction market, the competition between construction enterprises is becoming fierce. The project profit is gradually decreasing. It demands that all construction enterprises enhance their cost control, lower costs, improve management efficiency and gain maximal profits. This paper analyses the existing problems on project cost control of Chinese construction enterprises, and proposes some suggestions to improve project cost control system. Key Words :Construction enterprises, Project management, Cost control After joining the WTO, with Chinese construction market becoming integrated, the competition among architectural enterprises is turning more intense. Construction enterprises must continually enhance the overall competitiveness if they want to develop further at home and abroad construction market. Construction Enterprises basically adopt the "project management-centered" model, therefore, it is particularly important to strengthen project cost control. 1.The Current Domestic Project Cost Classification and Control Methods Cost refers to the consumption from producing and selling of certain products, with the performance of various monetary standing for materialized labor and labor-consuming. Direct and indirect costs constitute the total cost, also known as production cost or manufacturing cost. Enterprise product cost is the comprehensive indicator to measure enterprise quality of all aspects. It is not only the fund compensation scale, but also the basis to examine the implementation of cost plan. Besides, it can provide reference for product pricing According to the above-mentioned definition and current domestic cost classification, construction project cost can be divided into direct costs and indirect costs. Direct costs include material cost, personnel cost, construction machinery cost, material transportation cost, temporarily facility cost, engineering cost and other direct cost. Indirect costs mainly result from project management and company's cost-sharing, covering project operating costs (covering the commission of foreign projects), project's management costs (including exchange losses of

毕业设计--基于PLC的变频调速恒压供水系统(含外文翻译)

毕业设计--基于PLC的变频调速恒压供水系统(含外文翻 译) 山东科技大学学士学位论文摘要 摘要 本论文根据中国城市小区的供水要求,设计了一套基于PLC的变频调速恒压供水系统, 并利用组态软件开发良好的运行管理界面。变频恒压供水系统由可编程控制器、变频器、水泵机组、压力传感器、工控机等构成。 本系统包含三台水泵电机,它们组成变频循环运行方式。采用变频器实现对三相水泵电机的软启动和变频调速,运行切换采用“先启先停”的原则。压力传感器检测当前水压信号,送入PLC与设定值比较后进行PID运算,从而控制变频器的输出电压和频率,进而改变水泵电机的转速来改变供水量,最终保持管网压力稳定在设定值附近。通过工控机与PLC的连接,采用组态软件完成系统监控,实现了运行状态动态显示及数据、报警的查询。 关键词:变频调速,恒压供水,PLC,组态软件 山东科技大学学士学位论文 ABSTRACT ABSTRACT According to the requirement of China's urban water supply, this paper designs a set of water supply system of frequecey control of constant voltage based on PLC, and have developed good operation management interface using Supervision Control and Data Acquisition.The system is made up of PLC, transducer,units of pumps,pressure sensor and control machine and so on.

建筑学专业毕业设计方案外文翻译二44

毕业设计英文资料翻译 Tran slati on ofthe En glish Docume nts for Graduati on Desig n 课题名称_____________________________________ 院< 系)_____________________________________ 专业 _____________________________________ 姓名 _____________________________________ 学号 _____________________________________ 起讫日期 _____________________________________ 指导教师 _____________________________________ 2018 年2月25日 原文: Abstract:Gree n buildi ng refers to do its best to maximize con servati on of resources (en ergy, land, water, and wood> , protecti ng the environment and reduce polluti on in its life cycle. Provide people with healthy, appropriate and efficient use of space, and nature in harmony symbiosis buildings. Idescribed more details of green building design ' notion, green building ' design, as well as the sig ni fica nee of the con

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

最新外文翻译模板精编版

2020年外文翻译模板 精编版

精品好文档,推荐学习交流 华北电力大学 毕业设计(论文)附件 外文文献翻译 学号:201001000826姓名:郑蓓 所在院系:电力工程系专业班级:电力1002 指导教师:刘英培 原文标题:Simulation of PMSM Vector Control System based on Non-linear PID and Its Easy DSP Realization 2014年4月10日

基于非线性PID永磁同步电机矢量控制系统仿真及其DSP实现 摘要 本文给出空间矢量脉宽调制(SVPWM)的基本原理,以及构建两条闭合回路矢量控制永磁同步电机(PMSM)的仿真模型方法。同时,在速度闭环对于新型非线性PID控制器进行了研究。仿真结果表明它具有无超调和小速度脉动良好的动态和静态性能。此外,利用在MATLAB中嵌入式目标为TI C2000(C2000 ETTI)的工具,我们将SVPWM仿真模型转换成可执行代码,并下载到TMS320F2812,实现基于DSP永磁同步电机的开环控制。这种方法避免了繁琐的编程工作,缩短了系统开发周期,实现了同步模拟和DSP实现永磁同步电机矢量控制系统的目标。 1 引言 永磁同步电机被广泛使用在交流伺服系统,因为它有如快速响应,出色的操控性能,尺寸小和重量轻等优点。最近,SVPWM技术逐渐取代了传统的SPWM。SVPWM的目的是产生磁通矢量来接近交流电机实际气隙磁通圆,通过在逆变器装置调整切换时间和控制电功率的通断模式。相较于SPWM,SVPWM 技术降低了谐波含量和开关损耗,其直流电压利用率也提高了很多。此外,它很容易被数字化。因此,我们在本文应用SVPWM技术。 原文出处及作者:Wang Song; Shi Shuang-shuang; Chen Chao, "Simulation of PMSM vector control system based on non-linear PID and its easy DSP realization," Control and Decision Conference, 2009. CCDC '09. Chinese , vol., no., pp.949,953, 17-19 June 2009

建筑-外文翻译

外文文献: Risk Analysis of the International Construction Project By: Paul Stanford Kupakuwana Cost Engineering Vol. 51/No. 9 September 2009 ABSTRACT This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong. KEY WORDS:Arbitration, claims, construction, contracts, litigation, project and risk The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick & Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof

建筑外文文献及翻译

外文原文 Study on Human Resource Allocation in Multi-Project Based on the Priority and the Cost of Projects Lin Jingjing , Zhou Guohua SchoolofEconomics and management, Southwest Jiao tong University ,610031 ,China Abstract----This paper put forward the a ffecting factors of project’s priority. which is introduced into a multi-objective optimization model for human resource allocation in multi-project environment . The objectives of the model were the minimum cost loss due to the delay of the time limit of the projects and the minimum delay of the project with the highest priority .Then a Genetic Algorithm to solve the model was introduced. Finally, a numerical example was used to testify the feasibility of the model and the algorithm. Index Terms—Genetic Algorithm, Human Resource Allocation, Multi-project’s project’s priority . 1.INTRODUCTION More and more enterprises are facing the challenge of multi-project management, which has been the focus among researches on project management. In multi-project environment ,the share are competition of resources such as capital , time and human resources often occur .Therefore , it’s critical to schedule projects in order to satisfy the different resource demands and to shorten the projects’ duration time with resources constrained ,as in [1].For many enterprises ,the human resources are the most precious asset .So enterprises should reasonably and effectively allocate each resource , especially the human resource ,in order to shorten the time and cost of projects and to increase the benefits .Some literatures have

土木工程岩土类毕业设计外文翻译

学号: 10447425 X X 大学 毕业设计(论文)外文翻译 (2014届) 外文题目 Developments in excavation bracing systems 译文题目开挖工程支撑体系的发展 外文出处 Tunnelling and Underground Space Technology 31 (2012) 107–116 学生 XXX 学院 XXXX 专业班级 XXXXX 校内指导教师 XXX 专业技术职务 XXXXX 校外指导老师专业技术职务 二○一三年十二月

开挖工程支撑体系的发展 1.引言 几乎所有土木工程建设项目(如建筑物,道路,隧道,桥梁,污水处理厂,管道,下水道)都涉及泥土挖掘的一些工程量。往往由于由相邻的结构,特性线,或使用权空间的限制,必须要一个土地固定系统,以允许土壤被挖掘到所需的深度。历史上,许多挖掘支撑系统已经开发出来。其中,现在比较常见的几种方法是:板桩,钻孔桩墙,泥浆墙。 土地固定系统的选择是由技术性能要求和施工可行性(例如手段,方法)决定的,包括执行的可靠性,而成本考虑了这些之后,其他问题也得到解决。通常环境后果(用于处理废泥浆和钻井液如监管要求)也非常被关注(邱阳、1998)。 土地固定系统通常是建设项目的较大的一个组成部分。如果不能按时完成项目,将极大地影响总成本。通常首先建造支撑,在许多情况下,临时支撑系统是用于支持在挖掘以允许进行不断施工,直到永久系统被构造。临时系统可以被去除或留在原处。 打桩时,因撞击或振动它们可能会被赶入到位。在一般情况下,振动是最昂贵的方法,但只适合于松散颗粒材料,土壤中具有较高电阻(例如,通过鹅卵石)的不能使用。采用打入桩系统通常是中间的成本和适合于软沉积物(包括粘性和非粘性),只要该矿床是免费的鹅卵石或更大的岩石。 通常,垂直元素(例如桩)的前安装挖掘工程和水平元件(如内部支撑或绑回)被安装为挖掘工程的进行下去,从而限制了跨距长度,以便减少在垂直开发弯矩元素。在填充情况下,桩可先设置,从在斜坡的底部其嵌入悬挑起来,安装作为填充进步水平元素(如搭背或土钉)。如果滞后是用来保持垂直元素之间的土壤中,它被安装为挖掘工程的进行下去,或之前以填补位置。 吉尔- 马丁等人(2010)提供了一个数值计算程序,以获取圆形桩承受轴向载荷和统一标志(如悬臂桩)的单轴弯矩的最佳纵筋。他们开发的两种优化流程:用一个或两个直径为纵向钢筋。优化增强模式允许大量减少的设计要求钢筋的用量,这些减少纵向钢筋可达到50%相对传统的,均匀分布的加固方案。 加固桩集中纵向钢筋最佳的位置在受拉区。除了节约钢筋,所述非对称加强钢筋图案提高抗弯刚度,通过增加转动惯量的转化部分的时刻。这种增加的刚性可能会在一段时间内增加的变形与蠕变相关的费用。评估相对于传统的非对称加强桩的优点,对称,钢筋桩被服务的条件下全面测试来完成的,这种试验是为了验证结构的可行性和取得的变形的原位测量。 基于现场试验中,用于优化的加强图案的优点浇铸钻出孔(CIDH)在巴塞罗那的几个非对称加强桩的施工过程中观察到混凝土桩沿与测得的变形的结果在常规和描述优化桩。实验证据表明,非对称地增强桩变形比观察到在常规增强那些小。两桩类型(对称和非对称)具有相同的直径,并设计为抵抗基于极限强度设计相同的弯曲力矩;离散杆的尺寸和使用的条全数字的,导致类似的名义抗弯强度。

相关主题
文本预览
相关文档 最新文档