Traditional Construction Procedures As mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and services.

A general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general contractor.

Sometimes, in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the owner.

Sometimes also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the homes.

Administration of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager

negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and construction.

Construction contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their trade.

During construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s s uperintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent intervals.

In addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building code.

Following is a description of the basic traditional construction procedure for a multistory building.

After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway departments.

The general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to proceed.

Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.

Major construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of personnel.

Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and cleaned.

The owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.

传统的施工程序

众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。

一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。

有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。

施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。

建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。

在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。

此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。

以下是传统多层建筑施工的基本程序。

建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,

例如当地的建设,供水,污水处理,政府机构和公路部门。

下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。

建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。

由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。

业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。

施工组织设计外文翻译

摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工

土木工程外文翻译隧道与地下空间技术

隧道与地下空间技术 2006 年 5-7 月刊,第 21 期,章节 3-4,第 332 页 釜山——巨济的交通系统:沉管隧道开创新局面 1 1Wim Janssen Peter de Haas Young-Hoon Yoon 荷兰隧道工程顾问:大宇工程建设公司釜山—巨济交通线隧道工程技术顾问 韩国大宇工程建设公司摘要 釜山—巨济交通系统将会为釜山和巨济两岛上的大城市提供一条道路连接。该沉管隧道有许多特点:长度达到千米,处于水下 35 米处,海况条件严峻、地基土较为软弱和线型要求较高。基于以上诸多特点,隧道的设计和建造面临着巨大的挑战。可以预见的是这项工程将会开创沉管隧道施工技术的新局面。本文突出论述了这些特点以及阐述在土木和结构方面的问题。1.工程简介 釜山是韩国的第二大城市和一座重要的海港。它位于韩国的东南部,其南面和东面朝向朝鲜海峡同时在釜山北部山势较为陡峭。该市发展迅速,近年来的人口增长超过 370 万(总计 460 万人)。人口密度达到 4850 人/km2,约为香港的 3/4。釜山市的进一步发展由于其所处的地理位置而受到限制。釜山—巨济交通系统在釜山和巨济岛之间创造了一条直接的联系线,以从客观上满足釜山的城市扩展,在巨济岛上发展工业区,以及为釜山市民在较短的行车距离内增加休闲娱乐的去处。巨济岛西侧目前已经与朝鲜半岛相连,在本项连接工程完工之后,从釜山市到巨济岛的驾车时间将由原来的 2 小时缩短为现在的 45 分钟。釜山—巨济交通系统将在巨济岛与 Gaduk 岛之间提供一条连接,使其成为连接釜山新港地区至巨济岛的双重高速公路体系的一部分。这一系统总计公里长,穿越海峡并将Daejuk Jungjuk 和 Jeo 三个无人小岛连接在一起。原则上该系统由一条长度为 3240m 的双向四车道沉管隧道和两座主跨 475,两边跨 230m 的斜拉桥组成。2.规划组织该项目是作为一个公私合作,共同建设的工程,GK 交通系统公司可获得设计、施工和运营的特许权,经营期限为 40 年。特许权基于该系统设计理念的一个环节。GK 交通系统公司由大宇工程建设公司领衔的 7 家特许权法人组成。TEC/Halcrow 等合资公司作为技术顾问,从工程开始便参与该项工程。Halcrow 与 TEC 两个合资公司分别负责关于桥梁和隧道建设方面的技术问题。永久设施的设计工作已接近完成,后续的建设的准备工作也已经开始。图 1. 工程地理位置图 2. 空中鸟瞰效果图设计要求和基本闲置因素该项目将 Gaduk 岛与巨济岛经 Daejuk Jungjuk and Joe island 三个小岛连接在一起,基本布局由三条航道的要求决定。位于 Gaduk 岛和 Daejuk 岛之间的主航道宽 1800m, 18m。 深由于这条航道没有官方的水深规定,因此选择以隧道的方式穿越成为一种可行的方案。另外两条位于 Jungjuk—Jeo 岛和 Joe—巨济岛的次级航道,最小宽度分别为435m 和 404m,各自的通航净空要求分别为 52m 和 36m。两条次级航道的水深均为 16m。鉴于 Daejuk 岛和 Gaduk 岛之间相对较为陡峭的海岸,开挖作业又是在海床以下 25至 30 米处,这就使得工程无法满足两岛之间的对准开挖。而为了驾驶的舒适与安全又不得不延长梯度线和坡长。因此,将穿越该水域的沉管隧道设置在略低于海床平面成为一个合理的选择。图 3. 线路纵剖面图岩土条件 地层在隧道线路方向上呈现出不同但是在纵向自上而下依次为典型的海洋粘土、海砂、砾卵石和海床基岩。 在沉管隧道沿线的海床主要以海洋粘土为主,除了在海岸线附近露出地表的海床、

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

施工组织设计外文翻译

XXXXXXXXX 毕业设计(论文)外文翻译 学生姓名: 院(系): 专业班级: 指导教师: 完成日期:

施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案 不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工程设计文件的重要组成部分,是编制工程投资概预算的主要依据和编制招投标文件的

桥梁结构设计外文文献翻译

桥梁结构设计外文文献翻译 (文档含中英文对照即英文原文和中文翻译) 结构设计 Augustine J.Fredrich 摘要:结构设计是选择材料和构件类型,大小和形状以安全有用的样式承担荷载。一般说来,结构设计暗指结构物如建筑物和桥或是可移动但有刚性外壳如船体和飞机框架的工厂稳定性。设计的移动时彼此相连的设备(连接件),一般被安排在机械设计领域。 关键词:结构设计结构分析结构方案工程要求 Abstract: Structure design is the selection of materials and member type ,size, and configuration to carry loads in a safe and serviceable fashion .In general ,structural design implies the engineering of stationary objects such as buildings and bridges ,or objects that maybe mobile but have a rigid shape such as ship hulls and aircraft frames. Devices with parts planned to move with relation to each other(linkages) are generally assigned to the area of mechanical . Key words: Structure Design Structural analysis structural scheme Project requirements Structure Design Structural design involved at least five distinct phases of work: project requirements, materials, structural scheme, analysis, and design.

土木工程毕业设计外文文献翻译修订版

土木工程毕业设计外文文献翻译修订版 IBMT standardization office【IBMT5AB-IBMT08-IBMT2C-ZZT18】

外文文献翻译 Reinforced Concrete (来自《土木工程英语》) Concrete and reinforced concrete are used as building materials in every country. In many, including the United States and Canada, reinforced concrete is a dominant structural material in engineered construction. The universal nature of reinforced concrete construction stems from the wide availability of reinforcing bars and the constituents of concrete, gravel, sand, and cement, the relatively simple skills required in concrete construction, and the economy of reinforced concrete compared to other forms of construction. Concrete and reinforced concrete are used in bridges, buildings of all sorts underground structures, water tanks, television towers, offshore oil exploration and production structures, dams, and even in ships. Reinforced concrete structures may be cast-in-place concrete, constructed in their final location, or they may be precast concrete produced in a factory and erected at the construction site. Concrete structures may be severe and functional in design, or the shape and layout and be whimsical and artistic. Few other building materials off the architect and engineer such versatility and scope. Concrete is strong in compression but weak in tension. As a result, cracks develop whenever loads, or restrained shrinkage of temperature changes, give rise to tensile stresses in excess of the tensile strength of the concrete. In

施工组织设计外文文献翻译最新译文

文献出处: Phillip Yetton. The Study of Construction Organization Design [J]. International Journal of Project Management, 2015, 9(2): 33-43. 原文 The Study of Construction Organization Design Author: Phillip Yetton Abstract Building construction is a complex work, huge building products, the production cycle is long, is a collection of architectural art, architecture, function, structure, decoration, water supply, power supply, intelligent system for a wind. Need to complete a project unit, type of work well together, and in the process of implementing, also under the influence of various subjective and objective conditions around. In order to meet the quality, cost, time limit for a project, under the premise of safety goal task to complete a project, must according to the requirement of the construction unit and the characteristics of the proposed construction project, the various raw materials on the basis of full investigation, compile an used to guide the whole process of technology, economy and management of project construction comprehensive document, this document is the construction organization Keywords: Construction; Organization design; Project cost 1 Introduction Construction organization design is a construction project for the object establishment, to guide the project bidding, construction contracts, construction preparation, construction installation until the whole process of the final acceptance of the technology, economy and management comprehensive document, is to ensure that project smooth implementation effective programmatic document. Construction organization design is proper or not, will directly relate to the quality of the proposed construction project, cost, time limit, safety, etc. The smooth realization of the intended target. With the development of The Times, modern engineering project scale and the demand is higher and higher, project management has become increasingly complex, and the construction organization design also put forward higher requirements. The construction organization design, construction organization

隧道施工外文翻译

超大型土压平衡式盾构在 隧道施工中引发的地面沉降分析 1 摘要: 使用盾构法进行隧道施工会导致隧道周边的土体位移和地面的沉降,这就使得估测土体的位移和沉降变得尤为重要了。由于之前已做过很多研究,所以在该领域已取得突破。然而,对于超大型土压平衡式盾构机在隧道施工中所引发土体移位与沉降的研究还很罕见,其原因是该工法在世界范围内很少被应用,但近年来,该工法已经在城市地下铁道运输结构的施工中有所应并且前景广阔。由于高含水地层中的切应力作用会使土体中产生超孔隙水压力。在盾构停止推挤土体后孔隙水会逐渐消散,土压力也会逐渐减小。而且,土质移位和地面沉降将会发生。与小型盾构机相比,上述现象在超大型土压平衡式盾构机施工中更为明显,原因就是它超大的开挖面面积。通过对监测数据和工程实际的隧道参数进行分析,可以发现盾构隧道施工参数对开挖面上土压力的影响规律和超孔隙水压力的大小。而且,通过调整隧道的开挖参数,可以减小地面沉降。盾构尾部的空隙填充量可以由反演算法与镜像法来确定。可以依据空隙量来调整注浆量以减少地面的沉降量。在上海的两个工程实例证明了这种方法在以后工程施工中的价值。 2 关键词 超大型土压平衡式盾构、盾构法隧道施工、地面沉降、镜像法 3 概述 盾构法隧道施工因其低噪音和对路面交通影响小的优点而被广泛的应用在城市地下隧道工程的施工中。但是,对原状土的扰动和土层损失将不会导致土层形变和地面沉降,而且会破坏建筑与结构的稳定。盾构法施工已被广泛研究以至于取得了许多的瞩目成就。但是超大型土压平衡式盾构在世界范围内很少被使

用,而且盾构施工过程中的土体沉降也少有被研究。在以往对其他类型盾构隧道施工研究中,有两方面被作为主要的研究对象,即开挖面和盾构尾部。首先,现在对于开挖面失效模式的研究重点主要在破坏区形状方面而不是在土压力和超孔隙水压力方面。实际上,后来提到的两方面对于地面沉降是很重要的,特别是在砂土和粉土地层中。相比于小型盾构机,超大型土压平衡式盾构机的大断面开挖会引发土压力和超孔隙水压力的更大影响。通过研究这两方面因素,超大型土压平衡式盾构开挖面的土压平衡机质会被揭示出来。其次,在盾构隧道的尾部后端形成的空隙会在施工过程中被同步注浆。但是,在绝大多数情况下,空隙是不会被完全充填的,之后则会导致地面沉降。当凝结开始后,同步注浆的体积会有所减少,隧道衬砌结构的形变和扰动土的固结被视为引发盾构尾部土体沉降的首要诱因。然而,由于空隙未被充填完全而导致的泥浆渗入周围土层则很少作引发盾构尾部土体沉降的诱因而被进一步研究。对于超大型土压平衡式盾构机施工而言,这一点尤为重要。而且,在确定同步注浆质量方面具有很高的实践价值。 4 开挖面的研究 4.1 超孔隙水压力在隧道盾构中的浮动原则 超大型土压平衡式盾构机的施工方法主要是在开挖面后的土压力与土舱中的土压力之间寻求一个平衡。土舱中的土压力在计算时要考虑水文地质和隧道的埋深,表达式为h p k γ0 =,其中P 是平衡土压力和开挖面前端土体压力而且包括水压力;γ是土层的平均重度可以取为m kN 30.18;h 是土舱内压力传感器的 埋置深度,k 0是土的侧压力系数,范围是0.75~0.90,并且根据地面沉降的监测数据进行调整。 超大型土压平衡式盾构施工中的平衡状态是理想状态。当封闭结构前端的土体被刀盘挤压时,这种理想的平衡就会在刀盘的敞开面形式。随着刀盘的旋转和向前不断推进,土压力与超孔隙水压力也会有所增加,在此之后超孔隙水压力就会形成了。该压力在后期会逐渐消散而且导致土体固结和地面沉降。在超孔隙水压力增大时,土质结构会被更严重的破坏;当超孔隙水压力消散后,土层固结与

土木工程毕业设计外文翻译---土方工程的地基勘察与施工

DESIGN AND EXECUTION OF GROUND INVESTIGATION FOR EARTHWORKS PAUL QUIGLEY, FGS Irish Geotechnical Services Ltd ABSTRACT The design and execution of ground investigation works for earthwork projects has become increasingly important as the availability of suitable disposal areas becomes limited and costs of importing engineering fill increase. An outline of ground investigation methods which can augment …traditional investigation methods? particularly for glacial till / boulder clay soils is presented. The issue of …geotechnical certification? is raised and recommendations outlined on its merits for incorporation with ground investigations and earthworks. 1. INTRODUCTION The investigation and re-use evaluation of many Irish boulder clay soils presents difficulties for both the geotechnical engineer and the road design engineer. These glacial till or boulder clay soils are mainly of low plasticity and have particle sizes ranging from clay to boulders. Most of our boulder clay soils contain varying proportions of sand, gravel, cobbles and boulders in a clay or silt matrix. The amount of fines governs their behaviour and the silt content makes it very weather susceptible. Moisture contents can be highly variable ranging from as low as 7% for the hard grey black Dublin boulder clay up to 20-25% for Midland, South-West and North-West light grey boulder clay deposits. The ability of boulder clay soils to take-in free water is well established and poor planning of earthworks often amplifies this. The fine soil constituents are generally sensitive to small increases in moisture content which often lead to loss in strength and render the soils unsuitable for re-use as engineering fill. Many of our boulder clay soils (especially those with intermediate type silts and fine sand matrix) have been rejected at the selection stage, but good planning shows that they can in fact fulfil specification requirements in terms of compaction and strength. The selection process should aim to maximise the use of locally available soils and with careful evaluation it is possible to use or incorporate …poor or marginal soils? within fill areas and embankments. Fill material needs to be placed at a moisture content such that it is neither too wet to be stable and trafficable or too dry to be properly compacted. High moisture content / low strength boulder clay soils can be suitable for use as fill in low height embankments (i.e. 2 to 2.5m) but not suitable for trafficking by earthwork plant without using a geotextile separator and granular fill capping layer. Hence, it is vital that the earthworks contractor fully understands the handling properties of the soils, as for many projects this is effectively governed by the trafficability of earthmoving equipment.

工业工程英文文献及外文翻译

附录 附录1:英文文献 Line Balancing in the Real World Abstract:Line Balancing (LB) is a classic, well-researched Operations Research (OR) optimization problem of significant industrial importance. It is one of those problems where domain expertise does not help very much: whatever the number of years spent solving it, one is each time facing an intractable problem with an astronomic number of possible solutions and no real guidance on how to solve it in the best way, unless one postulates that the old way is the best way .Here we explain an apparent paradox: although many algorithms have been proposed in the past, and despite the problem’s practical importance, just one commercially available LB software currently appears to be available for application in industries such as automotive. We speculate that this may be due to a misalignment between the academic LB problem addressed by OR, and the actual problem faced by the industry. Keyword:Line Balancing, Assembly lines, Optimization

施工组织设计中英文对照外文翻译文献

施工组织设计中英文对照外文翻译文献(文档含英文原文和中文翻译)

施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。

建筑类外文翻译范例-毕业设计外文翻译范例

土木工程概论 摘要:土木工程是个庞大的学科,但最主要的是建筑,建筑无论是在中国还是在国外,都有着悠久的历史,长期的发展历程。整个世界每天都在改变,而建筑也随科学的进步而发展。力学的发现,材料的更新,不断有更多的科学技术引入建筑中。以前只求一间有瓦盖顶的房屋,现在追求舒适,不同的思想,不同的科学,推动了土木工程的发展,使其更加完美。 关键词:土木工程;建筑;力学;材料 土木工程是建造各种工程的统称。它的原意是与“军事工程”相对应的。在英语中,历史上土木工程、机械工程、电气工程、化工工程都属于Civil Engineering ,因为它们都具有民用性。后来,随着工程科学技术的发展,机械、电气、化工都已逐渐形成独立的科学,Civil Engineering 就成为土木工程的专门名词。至今,在英语中,Civil Engineering 还包括水利工程、港口工程;而在我国,水利工程和港口工程也成为与土木工程十分密切的相对独立分支。土木工程既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。 土木工程是一种与人们的衣、食、住、行有着密切关系的工程。其中与“住”的关系是直接的。因为,要解决“住”的问题必须建造各种类型的建筑物。而解决“行、食衣”的问题既有直接的一面,也有间接的一面。要“行”,必须建造铁路、道路、桥梁;要“食”,必须打井取水、兴修水利、进行农田灌溉、城市供水排水等,这是直接关系。而间接关系则不论做什么,制造汽车、轮船也好,纺纱、织布、制衣也好,乃至生产钢铁、发射卫星、开展科学研究活动都离不开建造各种建筑物、构筑物和修建各种工程设施。 土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。 土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要

外文翻译 建筑施工 外文文献 英文文献 文献翻译

反思前瞻规划优化施工流程 Farook Hamzeh Glenn Ballard Iris D. Tommelein 摘要 研究的问题:如何改善前瞻规划在建设行业的做法来提高生产计划的可靠性?目的:为了评估前瞻规划的性能,寻找一个标准化的做法,使前瞻规划与活动执行有紧密的联系,来提高生产计划的可靠性。 研究设计/方法:本研究采用案例分析,行业访谈,和行业调查,以评估目前在北美、南美和欧洲的建设项目执行的前瞻规划。 研究结果:研究结果显示存在与去年规划系统规则的不符合,前瞻规划与标准化做法的不足,识别和清除限制的迟缓,而且没有对计划失败的分析。 关键词:前瞻规划,生产计划,生产控制,精益建设,最后的规划系统,规划建设。 简介 建筑、工程与施工是受变化问题的困扰的,即破坏项目绩效和扰乱施工流程导致对项目时间、成本和质量造成的不利影响(Hamzeh等,2007年,霍普和Spearman2008年,萨利姆等。 2006年,克莱顿1966年)。组织使用许多种不同的方法来维持生产流程的一致性和屏蔽产量内部业务流程以及外部环境的变化。汤普森(1967)着重介绍了这些方法,其中包括: ?预测 ?缓冲 ?平滑 各种预测方法是用于预测在内部流程和生产原料中的变化。然而,预测不能满足所有的变化,并且有许多限制:越详细的预测越不准确,越遥远的预测越容易出错。(纳米亚斯2009年)。 缓冲用于减轻同时在输入侧和输出侧的工艺变化。输入通常需要成功执行的任务包括:信息,先决条件工作,人力资源,空间,材料,设备,外部条件和资金(巴拉德&Howell公司1994年,科斯基拉2000年)。 缓冲区可以采取的三种主要形式:时间,库存和产能。时间缓冲 是分配松弛的活动,利用额外的库存缓冲库存以应对供应的变化,以及用容量缓

施工组织设计文献综述[宝典]

施工组织设计文献综述[宝典] 5层框架结构教学楼施工组织设计文献综述 前言 校园是人类精神的殿堂,校园建筑应该力图营建一个以人为本的,体现当代校园文化精神的美好环境。校园建筑设计的主要对象是学生。学生是校园中最活跃的因素,除学习、运动、休息等最基本的校园生活外,更需要交流,因此建筑中交往空间的创造往往是设计成败的关键。同时,校园建筑有必要突破局部封闭独立的部分,创造更多可以融汇不同学科领域知识的交往空间,以有利于资源共享和学科交流。近些年来,随着高校招生规模的扩大,全国各地的高校建设进入了一个高速发展的阶段,涌现出许多优秀的高校建筑设计。在高校建设中,由于用地紧张等原因,经常建设一些综合性的高层建筑,对高校综合性高层建筑的设[ 1 ] 计有一些思考和体会。 主题 建筑是生活的空间,而设计是对生活空间理想的追求。建筑也是围城,住在城里的人向往田野的生活,住在乡村的人则向往城市的水泥丛林。但是城市的发展和乡村的发展毕竟要使这两个截然不同环境达成一个新的空间。新的空间不是凭空而来的,是从土地上几千年慢慢生长出来的,它结合了人对传统的怀念和对未来的向往。粉墙黛瓦是传统的建筑形式。而新型的建筑材料和平面布局则赋予了建筑以时代感。精心组织的穿堂风设计既节能又使居住者感到舒适。平面布局上楼上楼下动静分离,居室布局合理,并且每一个房间都可以共享自家院子的景[2]观。下面就现代教学楼设计和框架结构设计两方面内容来浅述一下框架结构教学楼的设计思路。 1.现代教学楼发展的新要求

(1)在总体构思阶段就将教学楼平面确定为简洁的矩形,并且取对称布局,这是最经济合理、适用的平面形式。由于任务书中要求设计10,12 个150 人大教室,设计中考虑到大教室的采光、通风和疏散等要求,把大教室布置在高层主体之外,是比较合理的选择。但设计时考虑到学校的环境要求和节约用地的原则,通过合理的结构形式和建筑处理,最终采用了紧凑的平面布局,把大教室安排到高层主体内部。 (2)教学楼的高层化近些年来,随着高校招生规模的扩大,全国各地的高校建设进入了一个高速发展的阶段,涌现出许多优秀的高校建筑设计。在高校建设中,由于用地紧张等原因,经常建设一些综合性的高层建筑,笔者通过进行大量调研和实际完成河北农业大学综合教学楼方案设计,对高校综合性高层建筑的设计有一些思考和体会。 (3)高校高层建筑应采用清新活泼、新颖质朴的建筑风格,同时,应该强调时代感与独创性,使之成为校园的标志性建筑。 (4)在高校建设进入快速发展阶段的形势下,在短时间内涌现了大量的高校建筑,这些建筑设计水平高低不齐,这种情况应该引起设计人员和建设管理人员的高度重视。在一般情况下,学校面临招生入学压力,总是要求设计人员在尽可能短的时间内拿出最好的设计方案,这就要求设计人员要有更强的责任心,并多与校方沟通,从专业角度提出合理化建议,帮助校方修改完善设计任务书,使建筑功能更趋经济合理。在大量调研和功能分析的基础上,我们认为,在高校建设高层建筑是非常不合理的。首先,在功能组织方面,由于学校人流较大且比较集中,给高层建筑带来很大的垂直交通压力,并且大量人流还会给其它功能的使用带来很大的不便。另外,在校园景观方面,高层建筑不利于创造温馨宜人、学术气氛浓厚的校园环境,并且容易给校园造成紧张、压迫或空间尺度过大等不良空

相关主题
文本预览
相关文档 最新文档