当前位置:文档之家› 最大关井套压计算

最大关井套压计算

最大关井套压计算

Well Name :

Location :

Rig :

PD287

Engineer :G.THOMSON Date :

2006-7-12

Casing Size, mm 219.1Vertical Csg Shoe Depth, m 617Leak Off Gradient, kPa /m 18.0Well MTD, m 2914

Well TVD, m 2839Csg Shoe Fracture Press, kPa Csg Shoe Fracture Mud Wt. kg /m 31835

MACP with WATER filled Csg, kPa 5053

95

Mud Wt.

Mud Grad.

MACP

Mud Wt.

Mud Grad.

MACP

Mud Wt.

Mud Grad.

MACP

Mud Wt.Mud Grad.MACP

kg /m

3

kPa /m kPa kg /m

3

kPa /m kPa kg /m

3

kPa /m kPa kg /m

3

kPa /m kPa

10009.815053110010.794448120011.773843130012.75323710109.914993111010.894387121011.873782131012.853*********.014932112010.994327122011.973722132012.953116103010.104872113011.094266123012.0736********.0530********.204811114011.184206124012.163601134013.152995105010.304751115011.284145125012.263540135013.242935106010.404690116011.384085126012.363480136013.342874107010.504630117011.484024127012.463419137013.442814108010.594569118011.583964128012.563358138013.5427531090

10.694508

1190

11.673903

1290

12.653298

1390

13.642693

C AUSES of K ICKS

W ARNING S IGNS F LOW C HECK

Insufficient Mud Density Drilling Break While Drilling (Any Warning Signs )Improper Hole Filling

Mud Contamination After Drilling a metre or less into a porous Zone Swabbing Erratic Table Torque Prior to Tripping the Drilling String Lost Circulation Variation in String Force While Tripping (any Warning Signs)

Mud Contamination Variation in Pump Pressure or Pump Speed After POOH 5% of D.P. Stands

Equipment Failure Pit Gain or Loss Half Way Out Abnormal Pressure

Loss Circulation At the Last D.P. Stand Before D.C.

Hole Does not Take Correct Fill-up Volume While Out of the Hole every 30min

Pipe Pulls Wet After Pulling Dry When in Doubt !!!

W hile D rilling

W hile T ripping

1 Position Kelly Above Table 1 Position Tool Joint at Table, Release Elevators

2 Shut off Mud Pump

2 Install Stabbing Valve Open, then Close

3 Open HCR Valve to an Open Choke & Degasser 3 Install Kelly, Open Stabbing Valve

4 Close Hydril

4 Open HCR Valve to an Open Choke & Degasser

5 Close Choke Slowly

5 Close Hydril

6 Record: SICP, SIDPP & Pit gain every 2min.6 Close Choke Slowly

7 Do not Exceed MACP

7 Record: SICP, SIDPP & Pit gain every 2min.8 Do not Exceed MACP

Personnel on Location, N o Baryte on Location, sacks

Total Depth, m 2914TVD, m 2839

Mud Wt. Kg /m 3

Baryte to Order, sacks

Mud Viscosity :

Total Circ. Mud Volume, m 3

TIME

D.P.P. kPa

C.P. kPa

Pit Gain m 3

TIME

D.P.P. kPa

C.P. kPa

Pit Gain m 3

TIME D.P.P. kPa C.P. kPa

Pit Gain m 3

NOTES:

BP PINE CREEK

1-17-57-19W5M

M AXIMUM A LLOWABLE C ASING P RESSURE

S HUT -I N W ELL D ATA

F LOW C HECK P ROCEDURES

CALL ALERT ( If while Out of the Hole Proceed from: E nsure Hole is Full … )

11106

Hoist Kelly above R. Table and shut-off the pump. (If Tripping , position tool joint above table, install Stabbing Valve

properly, E nsure Hole is Full and Shut off Hole fill pump.) Divert flow to Trip tank. Zero trip tank volume indicator.Monitor tank for flow for 5 to 10 minutes. If the Well is Flowing Shut it in Immediately . Record any Trip tank Gains.

CALL ALERT

PROCEDURES FOR SHUT-IN THE WELL

Other Mud Chem. to Order :

相关主题
文本预览
相关文档 最新文档