当前位置:文档之家› 安置房一标段-施工组织设计

安置房一标段-施工组织设计

安置房一标段-施工组织设计
安置房一标段-施工组织设计

泰兴城北安置房项目一期一标段工程

江苏济川建筑安装工程有限公司

二0一0年六月九日

第一章、工程概况

SBS改性沥青同步碎石封层工程施工组织设计方案

目录 一、编制依据 (1) 二、工程概况 (1) 三、施工准备工作 (2) 四、施工技术方案、方法 (3) 五、施工注意事项 (6)

SBS改性沥青同步碎石封层施工方案 一、编制依据 1.《实施性总体施工组织设计》; 2.《公路工程集料试验规程》JTG E42-2005; 3.《公路工程质量检验评定标准》JTG F80/1-2004; 4.《公路沥青路面设计规》JTG D50-2006; 5.国家、交通运输部和地方政府的有关政策、法规和条例、规定; 6.承发包合同、招投标文件; 7.国家及地方关于安全生产和环境保护等方面的法律法规; 8.施工图纸及现场考查资料; 其他相关依据。 二、工程概况 351国道浦江家坞至联盟段公路工程第3施工标段由先高路桥工程承建,本标段起讫桩号为:K15+200~K22+422,长约7.195km。主要施工容包括:路基(含防护、排水工程)、路面、桥梁、涵洞、管线、交叉工程等的施工完成及缺陷责任期的缺陷修复。其中挖方约131万m3,填方约96万m3,沥青路面约28.4271万㎡,大桥629.1m/4座(其中戴宅大桥上部结构采用4×30m预应力砼T梁),中桥281.2m/6座,小桥22.5m/1座,涵洞43道,平面交叉5处,互通立交1处(即联盟互通,部分桥梁为钢混组合梁结构),分离式立交加设辅道1处。 路面结构为: a、主线、枢纽匝道路面结构 填方(土质挖方)路段:4cm细粒式改性沥青混凝土(AC-13C型)上面层+8cm中粒式改性沥青混凝土(Sup-20型)下面层+20cm水泥稳定碎石基层+32cm水泥稳定碎石底基层,总厚度64cm。 石质挖方路段再增设15cm级配碎石垫层,总厚度79cm。 b、一般互通立交匝道路面结构 填方(土质挖方)路段:4cm细粒式改性沥青混凝土(AC-13C型)上面层+8cm中粒式改性沥青混凝土(Sup-20型)下面层+20cm水泥稳定碎石基层+32cm水泥稳定碎石底基层,总厚度64cm。

施工组织设计一标段培训文件

肃州区东洞滩光电示范园C区公路建设工程 施 工 组 织 设 计

甘肃欧阳宏大建设工程有限公司二〇一五年七月二十日

目录 第一章编制依据、范围与原则 第二章总体施工组织布置及规划 第三章要紧工程项目的施工方案、方法与技术措施 第四章工期的保证体系及保证措施 第五章雨季施工方案 第六章工程质量治理体系及保证措施 第七章安全生产治理体系及保证措施 第八章环境爱护、水土保持保证体系及保证措施 第九章农民工工资保障措施 第十章文明施工、文物爱护保证体系及保证措施 第十一章紧急情况处理措施、预案以及抵抗风险的措施第十二章其他应讲明的事项

第一章编制依据、范围与原则 一、编制依据 1.肃州区东洞滩光电示范园C区公路建设工程一标段招标文件、设计文件及相关资料。

2.现行的国家和交通部、建设部颁发的设计技术标准、施工规范及检验规范。招标文件及设计文件中要求本工程遵循的技术标准和施工规范等法律法规文件。 3.GB/T19002-ISO9002标准和我单位质量保证体系有关程序文件的要求。 4.依照设计工程数量,我单位对项目现场和周围环境调查的有关资料及我单位拥有的相关科技成果、施工工艺及治理水平、技术能力、机械设备与劳力,以及多年来在公路工程施工实践中所积存的丰富经验。 二、编制范围 包括肃州区东洞滩光电示范园C区公路建设工程一标段合同段内的路基土方工程、路面工程、路缘石、涵洞及沿线设施等的施工直至竣工全过程。 三、编制原则 1.满足工期要求的原则: 实行机械化施工,配备充足的技术力量、劳力及物资,确保满足施工进度需求。全面应用网络打算进度动态治理技术,优化施工组织,确保工期目标实现。 2.确保工程质量的原则: 应用成熟可行的工程技术及施工工艺,实行专业化、规范化施工。建立质量保证体系,确保工程质量。 3.确保安全施工的原则:严格贯彻执行施工安全技术治理规程,建立安全保证体系,一切施工方案均将确保安全施工放在第一位。力争把本合同段建成“文明生产安全施工的标准化工地”。 4.搞好环境爱护及文明施工的原则:临时施工设施的布设、施工现场的治理、施工生产的实施,均应以文明施工和确保环境爱护

安置房住宅小区市政工程项目施工组织设计

无锡市滨湖区胡埭镇 农民拆迁安置房住宅小区市政工程 施 工 组 织 设 计

无锡市第六市政建设工程公司 2013年4月16日 目录 第一部分工程概况

第二部分施工方案 第三部分技术质量操纵措施 第四部分工程创优目标 第五部分质量治理体系网络 第六部分施工进度保证措施 第七部分安全施工保证措施 第八部分雨季施工保证措施 第九部分文明施工 第十部分附图、附表 一、劳动力打算表 二、质量治理体系网络 三、材料进场打算表 四、施工机具 第一部分工程概况 无锡市胡埭镇农民拆迁安置房住宅区(三期)位于滨湖区胡埭镇。 污水部分

管道DN225计1500米、DN300计1080米,管道采纳HDPE管。 管道采纳砂石基础。 窨井:庭院井采纳460*460小方井,井盖采纳钢筋混凝土井盖;DN300管窨井采纳700毫米砖砌圆形流槽式窨井,井座、井盖采纳非金属防盗材料。460*460小方井266座,700砖砌圆形流槽式窨井51座.化粪池:2#化粪池20座;3#化粪池9座。 雨水部分 主管:d500钢筋混凝土管计430米左右;d600钢筋混凝土管计245米左右;d800钢筋混凝土管计50米;d1000钢筋混凝土管计25米左右;DN400UPVC波浪管计140米;DN300UPVC波浪管计820米。 支管:DN225UPVC波浪管计6324米。 基础:钢筋混凝土管道基础采纳120度混凝土基础;UPVC管采纳砂石基础。 窨井:DN300、DN400管道窨井采纳甲型窨井;d500、d600、 d800、d1000管道窨井采纳圆形乙型窨井。甲型窨井计234座,乙型窨井计46座。井座、井盖采纳非金属防盗材料,混凝土预制井圈。道路范围内井盖周围基层混凝土加固。雨水井采纳350*460边沟式单篦雨水井,井盖采纳单篦钢格板防盗材料。边沟式单篦雨水井计325座,落水小方井计153座。 道路部分

市政养护施工组织设计(1标)

施工组织设计 目录 第一章…………………概况和编制依据 第二章…………………常见病害的养护方案及检查井周围的病害、桥 梁特殊结构病害等的处理 第三章…………………保证养护维修工期、质量措施 第四章夜间养护及突发事件应急救援措施 第五章…………………文明、安全施工保证措施 第六章…………………设施养护巡查人员配备 第七章养护管理制度和养护台账资料 第八章…………………合理化建议 第九章…………………附图

第一章、概况和编制依据 一、概况: 对于已建的市政设施,俗话说:三分建、七分养,养护工作对延长设施的使用寿命、确保城市稳定发展、人民生活安居乐业起着非常重要的作用,也直接体现了城市的管理水平,是城市文明形象的窗口工程。 所以我们应坚持日常保养,及时修复损坏部分,保持路面整洁,横坡适度,行车舒适,人行道平整,侧、平石顺直,及时清疏各类管道及检查井、收水井,排水出口,保持管道畅通,构造物完好,保障行车安全。保持道路的抽检单元综合设施完好得分达98分以上,桥梁达到A类桥梁完好状态,即BCI达到90分以上。 本工程名称为滨湖区2012年区管道路第一批市政养护作业采购项目,分为两个标段,其中一标段养护设施情况如下: 大池路(钱荣路——青山东路),道路全长3.4km,为城市支路。养护工作内容有:1、道路养护,沥青混凝土养护51120㎡、人行道块料铺设14280㎡、混凝土管道铺设(大型雨水井)1042.5m、混凝土管道铺设(中型雨水井)3453.7m、混凝土管道铺设(小型雨水井)5126.8m、出水口2处、现浇混凝土挡墙墙身350m。2、标牌制作2块。3、管道检测(大型雨水管)1042.5m、管道检测(中型雨水管)3453.7m、标志板清洗13块。 二、编制依据: 1、《滨湖区2012年区管道路第一批市政养护作业采购项目招标文件》。 2、有关规范、标准。 2.1《市政道路工程质量检验评定标准》(CJJ1-90)。 2.2《市政桥梁工程质量检验评定标准》(CJJ2-90)。 2.3《城市道路养护技术规范》(CJJ36-2006)。 2.4《城市桥梁养护技术规范》(CJJ99-2003)。 2.5《市政排水管渠工程质量检验评定标准》(CJJ3-90)。 2.6《砌体工程施工质量验收规范》(GB50203-2002)。 2.7《给水排水管道工程施工及验收规范》(GB50268-97)。 2.8《工程建设强制性条文》(城市建设部分)。 2.9无锡市《城市道路养护管理检查考核实施意见》(试行)(锡政公政【2008】15号文)。 2.10《滨湖区市政维护质量监管考评细则》。

碎石封层施工组织设计

. 奈广线黑山岭到北门口改造工程施工组织设计 沈阳五洲公路养护有限公司二0一三年六月

目录 第一部分工程概况 (1) 第二部分编制原则及依据 (1) 一、编制原则 (1) 二、编制依据及技术标准: (1) 第三部分沈阳五洲公路养护有限公司施工组织机构 (2) 第四部分项目施工组织 (3) 一、工程量、材料用量: (3) 二、工期安排: (3) 三、人员动员周期、机械设备、材料人员运到施工现场的方法 (3) 1、劳动力动员周期及调遣方式 (3) 2、机械设备动员周期及调遣方式 (5) 三、施工工艺 (6) 第五部分施工管理 (7) 一、施工队伍管理 (7) 二、安全管理 (7) 三、环境保护措施 (8) 四、文明施工管理 (8) 第六部分工程施工计划 (9) 第七部分质量保证体系 (10) 第八部分安全保证体系 (12) 第九部分项目部主要人员岗位责任制 (13) 第十部分附录 (19) 附录一施工总平面布置图 (20) 附录二施工工艺流程图 (21) 附表三工程管理曲线 (22)

第一部分工程概况 奈广线黑山岭到北门口改造工程K104+430~K119+918,路面宽9米,近几年该段路面出现了坑槽、裂缝、沉陷、车辙等不同程度的破坏,,给行车造成不便.随着地区经济和社会发展,该路交通发展迅速,为改善该路通行能力和服务水平,拟采用橡胶沥青同步碎石封层车铺设橡胶沥青碎石层,从而提高路面的服务能力,延长路面的使用寿命。 第二部分编制原则及依据 一、编制原则 根据业主要求及工程实际情况,我方将组织精干、高效多功能的组织管理机构;配备各种专业技术人才;调遣专业化施工队伍,投入先进的施工机械设备和试验检测设备;实施科学组织管理;合理安排工程施工工序;控制进度,不断完善质量保证体系和安全管理体系,真正做到科学规范,经济合理。 二、编制依据及技术标准: 1、施工图纸及业主对本工程的要求 2、交通部颁发《公路工程沥青及沥青混合料试验规程》。 3、交通部颁发《公路养护技术规范》及《公路沥青路面养护技术规范》。 4、交通部颁发的《沥青路面技术规范》。 5、交通部颁发的《公路沥青路面施工规范》、《公路改性沥青路面施工技术规范》、《橡胶沥青及混合料设计施工技术指南》、《沥青路面再生技术规范》。 6、交通部颁发的《公路工程质量验收标准》。 7、省局制定的迎国检工程施工技术要点。 8、公司的实力和总体施工安排,以及对现场的调查及设备、人员、物质等准备情况。 9、我公司在其他类似工程中的施工经验、施工技术资料等。

城区春季植树工程一标段项目施工组织设计

城区春季植树工程一标段项目 施工组织设计

施工组织设计 第一章编制总说明 一、编制说明 2016年某城区春季植树工程一标段项目,愿为某的园林景观建设做出积极的贡献,并对与建设单位的合作充满信心。 在收到招标文件后,我公司组织有关的工程技术人员和预算人员对文件及施工图纸进行了细致的研究,并组织有关人员踏勘现场,仔细了解现场情况,精心编制了本技术标书。 本公司各级领导、有关部门对本工程给予了高度的重视,如我公司有幸中标,我们将把本工程列为我公司重点工程,决心在以往园林景观工程施工经验的基础上,运用科学管理,制定严格的质量、进度和安全生产的控制措施,大力采用新技术、新工艺和新材料,以科技推动生产,降低成本。在施工过程中,推行项目法施工,实行目标管理,确保优质、高效、高速、安全、文明生产。 二、编制依据 本施工组织设计主要依据以下几项编制: 1、2016年某城区春季植树工程一标段标书内容。 2、工程施工设计图纸。 3、现场踏勘、咨询获取的资料及施工条件。 4、建设领域相关的法律法规和地方性规定,工程建设强制性条文。 5、现行的国家、行业、地方规范规程及标准。具体执行规范、标准如下:(1)《城市绿化工程施工及验收规范》GJJ/T82-99; (2)《某市城市绿地系统规划》(2006年9月) (3)中华人民共和国行业标准《公园设计规范》CCJJ43-91 三、编制原则 1、严格遵守国家、地方的技术规范、施工规程和质量评定与验收标准。 2、以满足招标文件的全部要求为基本原则,领会设计理念,体现设计意图,达到优质高速、安全文明、技术先进、科学合理、经济实用性与实事求是相结合。 3、围绕质量目标,在质量控制上,以预控和过程控制为重点,确保工程质量。 4、确保施工过程无安全责任事故,文明施工,争创建筑安全生产文明工地。 四、编制范围 2016年某城区春季植树工程一标段项目图纸范围内的绿化及养护工程。 五、工程设想与目标

回迁安置房工程施工组织设计方案书.docx

回迁安置房施工组织设计书 1.1 工程概况 本工程为海淀北部地区辛店居住区农民回迁安置房,位于海淀区西北旺镇, 东临辛店西二路、西临辛店西一路、东南临辛店北小街、西北临永丰北环路。施 工容主要有1-05# 、1-06# 两栋高层,1-05# 地下一层、地上十五层;1-06# 地下两层,地上十五层。1-05# 楼地下一层为室文体活动中心,1-06# 楼地下二层为设备用房和丁戊类库房,地下一层为供本楼住户使用的自行车库,首层以上为单元式住宅。± 0.000 相当于绝对标高为44.800 米。 1.2 编制依据 1、市测绘设计研究院提供的《普通测量成果报告书》; 2、《工程测量规》 GB50026-2007; 3、市《建筑工程施工测量规》(DB11/T446-2007); 4、本工程设计书及设计图纸 1.3 工程施工难点及保障措施 根据总体施工部署及相关技术规要求,针对本工程结构体系的特点将对重点 部位采取如下措施: 测量重点控制部位及保证措施表 001 序 重点控制部位测量方法测量设备 号 首级场区 1测设场区方格网TopconGTS-332N全站仪平面控制网 首级场区 2测设国家三等水准路线DS3水准仪标高控制网 主结构轴线:控传递法激光经纬仪3 S3 水平仪及 50m钢尺平面及标高控制标高:钢尺与水准尺联合测量

一、准备工作 1.1 概述 施工测量准备工作是保证施工测量全过程顺利进行的重要环节,包括图纸的审核,测量定位依据点的交接与校核,测量仪器的检定与校核,测量数据的演算处理,施工场地测量等 1.2 图纸审查及现场勘察 接收到施工图纸后,要认真系统的自审,根据图纸要求查阅相关技术规,并作好会审记录。到现场了解工程位置,测量定位依据点是否稳固,通视条件如何,勘察场区情况及周边情况,作好勘察记录,便于以后施工。 1.3 人员组织 根据本工程施工测量的工作量和工作难度,以及施工规技术要求,进行人员组织安排,并对所有施测人员进行:专业技术交底、安全技术培训、环保培训等。 人员安排表 002 职务人数(名)工作职能 负责工作组织安排,设备管理,质量安全管理,技术测量工程师1 方案的编制 测量责任师1工程施工进度,技术方案实施,施工技术交底 1施工质量措施,“三检”制度实施,技术资料的编写和 质量负责人 报验,及测量放线工作 1仪器的保管维护,监测仪器性能指标是否合格,及测 设备负责人 量放线工作 测量放线员4测量放线工作 , 按施工情况配置 合计8 1.4 设备调配 对所有进场的仪器设备进行重新检定,确保仪器运行正常,各项参数指标合格,并由主任工程师进行仪器技术交底。 设备安排表 003

下封层作业指导书

裕溪路改造工程沥青下封层作业指导书 一、编制依据 (1)巢湖市裕溪路改造工程道路工程施工图设计 (2)《公路沥青路面施工技术规范》(JTG F40-2004) (3)《公路工程集料试验规程》(JTG E42-2005) (4)《城镇道路工程施工与质量验收规范》(CJJ 1-2008) (5)我单位历年积累类似的工程施工经验、技术力量及设备条件 二、工程概况 2.1、线路概况 裕溪路(西坝路~太湖山路)改造工程位于巢湖市老城区外围,穿越老城区的东北和南部,是巢湖市内环路的重要组成部分。裕溪路西接银屏路,向东依次跨越巢湖、裕溪河和铁路,沿线与现状西坝路、巢湖南路、岗岭南路、向阳路、团结东路、健康东路、长江东路、太湖山路相交,东接金湖大道,路线总长为6.439km。道路等级为城市主干道。设计速度(局部50起点至K0+817)60km/h。 2.2、主线横断面 道路红线宽度46米,道路分幅为:4米人行道(横坡1.5%)+4.5米非机动车道(横坡2%)+3米分隔带(横坡8%)+11.5*2机动车道(横坡1.5%)+3米分隔带(横坡8%)+4.5米非机动车道(横坡2%)+4米人行道(横坡1.5%)=46米。 2.3、下封层施工主要技术要求 待透层沥青完全下透后,一般24小时后,进行封层乳化沥青喷洒,采用的乳化沥青品种及代号为PC-1,使用沥青洒布车及集料撒布机联合作业,下封层

厚度不宜小于6mm,且做到完成密水,乳化沥青用量及稠度应通过试洒确定,用量一般为每平方0.6-1.0Kg。喷洒封层沥青后应立即洒布3-5mm石屑,用量宜为6~8m3/1000m2,撒布石屑后应用6-8t双钢轮压路机稳压不粘轮为度。 三、计划投入的施工机械及施工人员 3.1、计划投入机械设备 为高质、高效顺利地完成下封层施工,经理部为下封层施工配套完整的机械设备。具体机械设备见下表。 碎石下封层施工机械设备表 (2)测量仪器:电子天平1台, 托盘3个。 (3)要求参加施工的人员数量能满足施工要求,至少需司机1人,操作手1人,配合试验检测1人以及人工辅助补洒乳化沥青2人,清扫人员12人。 四、下封层施工 4.1、施工准备 (1)技术准备:在下封层施工前,利用全站仪放好中桩、边桩,并洒上白灰线,以便控制封层乳化沥青及集料的撒布范围,确保乳化沥青洒布、集料撒布范围不多洒不漏洒。在下封层施工前认真做好下封层施工技术交底或作业指导书。(2)透层清理准备: ①首先进行人工清理透层,由2~4人一字排开全断面检查,清除透层所有的杂

一标段工程施工组织设计

资料范本 本资料为word版本,可以直接编辑和打印,感谢您的下载 一标段工程施工组织设计 地点:__________________ 时间:__________________ 说明:本资料适用于约定双方经过谈判,协商而共同承认,共同遵守的责任与义务,仅供参考,文档可直接下载或修改,不需要的部分可直接删除,使用时请详细阅读内容

xxxxxxxxxxx农民公寓及公共设施建设项目一标段工 程 编制日期:二○○九年三月 目录 TOC \o "1-4" \h \z \u HYPERLINK \l "_Toc224526266" 1 编制说明 PAGEREF _Toc224526266 \h 1 HYPERLINK \l "_Toc224526267" 1.1 总体简介 PAGEREF _Toc224526267 \h 1 HYPERLINK \l "_Toc224526268" 1.2 编制依据 PAGEREF _Toc224526268 \h 1 HYPERLINK \l "_Toc224526269" 1.3 编制说明 PAGEREF _Toc224526269 \h 1 HYPERLINK \l "_Toc224526270" 1.4 专项施工方案编制计划PAGEREF _Toc224526270 \h 2 HYPERLINK \l "_Toc224526271" 2 工程概况 PAGEREF _Toc224526271 \h 3 HYPERLINK \l "_Toc224526272" 2.1 建筑概况 PAGEREF _Toc224526272 \h 3 HYPERLINK \l "_Toc224526273" 2.2 结构概况 PAGEREF _Toc224526273 \h 7 HYPERLINK \l "_Toc224526274" 2.3 给排水概况 PAGEREF _Toc224526274 \h 9 HYPERLINK \l "_Toc224526275" 2.4 电气概况 PAGEREF _Toc224526275 \h 9 HYPERLINK \l "_Toc224526276" 2.5 工程地质、水文及气象情况 PAGEREF _Toc224526276 \h 10

安置房、商品房施工组织设计

如有你有帮助,请购买下载,谢谢! 镇海民联集中居住区A-5地块 (茗莲春晓二期)项目 施 工 组 织 设 计 编制人: 审核人: 编制单位:镇海民联集中居住区A-5地块(茗莲春晓二期)项目部 编制日期:年月日 审核人: 批准人: 审批单位:浙江省二建建设集团有限公司 批准日期:年月日 1页

如有你有帮助,请购买下载,谢谢! 目录 第一章、综合说明及编制依据······································································错误!未定义书签。 第一节、承包范围:············································································错误!未定义书签。 第二节、工程施工目标:······································································错误!未定义书签。 第三节、编制依据:············································································错误!未定义书签。第二章、工程概况·····················································································错误!未定义书签。 第一节、工程概述···············································································错误!未定义书签。 第二节、工程相关单位·········································································错误!未定义书签。 第三节、工程设计···············································································错误!未定义书签。 第四节、场地施工条件·········································································错误!未定义书签。第三章、施工部署·····················································································错误!未定义书签。 第一节、总体部署···············································································错误!未定义书签。 第二节、项目组织部署·········································································错误!未定义书签。 第三节、主要资源配置计划···································································错误!未定义书签。 第四节、施工总平面布置原则································································错误!未定义书签。 第五节、特殊过程控制重点···································································错误!未定义书签。 第六节、关键质量控制点······································································错误!未定义书签。第四章、主要分部分项施工方法···································································错误!未定义书签。 第一节、工程测量、放线施工································································错误!未定义书签。 第二节、工程桩施工············································································错误!未定义书签。 第三节、挖土及支撑施工······································································错误!未定义书签。 第四节、地下室后排水处理:································································错误!未定义书签。 第五节、钢筋工程···············································································错误!未定义书签。 第六节、模板工程···············································································错误!未定义书签。 第七节、砼工程··················································································错误!未定义书签。 第八节、外脚手架及防护施工:·····························································错误!未定义书签。 第九节、屋面工程···············································································错误!未定义书签。 第十节、砌体工程···············································································错误!未定义书签。 第十一节、装饰工程············································································错误!未定义书签。第五章、施工总平面布置············································································错误!未定义书签。第六章、主要施工机械设备、材料、人员配备计划···········································错误!未定义书签。 第一节、主要施工机械设备计划·····························································错误!未定义书签。 第二节、劳动力配备计划······································································错误!未定义书签。第七章、施工进度计划···············································································错误!未定义书签。第八章、季节性施工技术措施······································································错误!未定义书签。 第一节、夏季施工技术措施···································································错误!未定义书签。 第二节、冬季施工技术措施···································································错误!未定义书签。 第三节、雨季台风季节施工技术措施: ···················································错误!未定义书签。第九章、质量保证措施···············································································错误!未定义书签。 第一节、质量目标:············································································错误!未定义书签。 第二节、确保质量主要管理措施·····························································错误!未定义书签。 第三节、确保质量技术措施:································································错误!未定义书签。 第四节、确保质量检验试验计划:··························································错误!未定义书签。第十章、样板引路措施···············································································错误!未定义书签。 2页

1、施工组织总体设想、方案针对性及施工标段划分86210

一、施工组织总体设想、方案针对性及施工标段划分 A、施工组织总体设想及方案针对性: 1、工程概况: 工程名称:盛泽吉祥苑安置房工程一期一标 工程地点:盛泽镇 所属地区:吴江区 工程规模:建筑面积19330.81平方米、建筑高度53.3 米 2、主要施工依据: (1)GB50007-2002 《建筑地基基础设计规范》 (2)GB50009-2001 《建筑结构荷载规范》 (3)GBJ17-2011 《钢结构设计规范》 (4)GB50010-2002 《混凝土结构设计规范》 (5)GB50003-2001 《砌体结构荷载规范》 (6)GB5001-2001 《建筑抗震结构设计规范》 (7)DBJ08-9-2011 《建筑抗震结构设计规程》 (8)GB50068-2001 《建筑结构可靠度设计统一标准》

(9)DBJ08-31-2011 《平战结合人民防空工程设计规程》 (10)GB50300-2001 《建筑工程施工质量验收统一标准》 (11)GB50202-2002 《建筑地基与基础工程施工质量验收规范》 (12)GB50203-2002 《砌体工程施工质量验收规范》 (13)GB50204-2002 《混凝土结构施工质量验收规范》 (14)GB50206-2002 《木结构工程施工质量验收规范》 (15)GB50207-2001 《屋面工程施工质量验收规范》 (16)GB50208-2002 《地下防水工程施工质量验收规范》 (17)GB50209-2002 《建筑地面工程施工质量验收规范》 (18)GB50210-2001 《建筑装饰装修工程施工质量验收规范》(19)JGJ94-2011 《建筑桩基技术规范》 (20)业主与施工单位签订的总包合同以及相关法规和文件。 3、施工工期和计划开竣工日期: 1、施工日期:本工程总工期为643天。 2、计划开工日期为2016年10月25日;竣工日期为 2018年7 月 29日。

公路雾封层施工组织设计.doc

高速公路 沥青路面雾封层专项养护工程 施 工 组 织 设 计 -----公路建设开发有限责任公司

一、工程概况 为了加强沥青路面的预防性养护,提高路面的使用寿命,保证路面的使用性能,延缓路面的老化速度,根据业主要求在高速公路K698+500-k745+000上行线,K698+500—K745+000下行线使用路面雾封层技术进行预防性养护,将解决的主要问题:1.沥青路面空隙率较大,主要表现为雨后路面返潮严重;2.沥青路面中石料与沥青的粘附力不好,造成路面水湿磨耗较大,主要表现为部分集料散失;3.部分路面存在着微细裂缝。根据以上具体情况,坚持实事求是原则的基础上,为确保工程质量及施工进度,以充分发挥我公司的专业化、机械化联合养护作业特点,科学组织,安全生产,特制定以下施工方案: 二、施工组织 1、该工程将利用我国内最先进的---沥青撒布设备,调配相关技术骨干人员,根据该高速公路的日通行量、气候条件,结合养护工作的适时性、高效性和实用性的特点,确保施工生产、原材料供应、后勤保障等工作的落实,成立项目部领导小组如下: 项目经理:——负责整个工程的材料组织,技术质量控制,施工进度安排,人员安排调度,资料管理与相关项目部及业主等部门进行联系等工作。 项目副经理:——主要负责施工段落原路面的清扫、交通疏导以及雾封层现场安全措施的落实、施工过程中的质量控制和突发事件的应急处理等

现场技术人员——主要负责现场技术工作和资料整理工作。 试验负责人:——主要负责工程用原材料的质量检测、施工现场各指标的检测,以及工程资料的整理和申报。 安全负责人:----负责施工前场的全面安全工作。 2、施工队计18人(包括施工负责人1名、质检员1名、操作手2名) 3、项目部和料场设置 项目部和料场占地约500m2,设在收费站旁养护工区,作为人员办公、设备存放、停置维护的场地,最大限度的对人员、设备进行集中管理提高施工作业的工作效率。 4、工期安排 根据实际情况,结合当地气候条件,合理安排工期,计划工期为-年-月-日至-年-月-日。

重大产业一标段施工组织设计

第一章编制原则及工程概况 1.1编制说明 1.2编制依据 1.3工程概况 第二章总体施工目标 2.1质量品质 2.2工期计划 2.3安全施工目标 2.4文明施工目标 2.5环境保护目标 第三章项目管理机构配备 3.1设立工程项目管理体系的原则 3.2设立工程项目管理体系的依据 3.3工程项目管理组织机构设置 3.4工程项目管理人员岗位职责 第四章资源配备计划 4.1施工前的准备 4.2施工机械设备和实验、测量、质检仪器的配备 4.3劳动力安排计划 4.4施工部署 第五章工期及进度计划 5.1施工进度计划 5.2施工进度管理 5.3施工工期组织措施 5.4工期保证措施 第六章施工总平面布置

6.1总平面布置 6.2施工现场总平面管理 第七章主要施工方案与技术措施 7.1施工准备 7.2土石方工程 7.3 拆除工程 7.4排水工程 7.5道路及便道、便桥工程 7.6人行道工程 7.7交通工程 7.8河道工程 7.9提升泵站 7.10绿化工程 7.11技术保证措施 第八章质量控制措施 8.1质量目标 8.2质量管理体系 8.3质量保证措施 8.4施工准备阶段的质量控制 8.5施工阶段的质量控制 8.6竣工验收阶段质量控制 第九章安全和文明施工措施 9.1安全生产管理方针、目标 9.2安全管理体系 9.3安全生产组织管理措施 9.4文明施工、减少扰民、降低环境污染保证措施

9.5文明施工制度 第十章环境保护及管理措施 10.1环境保护管理体系 10.2环境保护及控制措施 10.3施工噪音控制措施 10.4减少对周围环境影响的措施 10.5防止环境污染措施 10.6水土及生态环境的保护措施 10.7防止水污染的保护措施 10.8固体废弃物的处理措施 10.9防止大气污染措施 10.10节能减排措施 第十一章季节性施工措施及夜间施工措施 11.1雨季施工技术安全措施 11.2夏季施工技术安全措施 11.3冬季施工技术安全措施 11.4夜间施工措施 第十二章交通组织措施 12.1 交通组织管理体系 12.2 交通组织的整体规划 第十三章地下管线及其他地上地下设施的保护加固措施 13.1调查分析 13.2保护措施 13.3地下管线及地上地下设施的加固措施 13.4地下管线加固 第十四章施工期间应急预案

安置小区施工组织设计完整

明光市府家园西区北安置房及配套 工程 施 工 组 织 设 计

目录 第一章工程概况 第二章主要工程项目施工法 第三章拟投入的主要物资计划 第四章工程投入的主要施工机械设备情况、主要施工机械进场计划 第五章劳动力安排计划 第六章确保工程质量的技术组织措施 第七章确保安全生产的技术组织措施 第八章确保工期的技术组织措施 第九章确保文明施工的技术组织措施 第十章施工总平面图及临时用地表 第十一章施工组织设计的针对性、完整性 第十二章工程施工的重点和难点及保证措施 附表: 附表1 拟投入的主要施工设备表 附表2 劳动力计划表 附表3 进度计划 附表4 施工总平面图

第一章工程概况 1、编制依据 1、《明光市府家园西区北安置房及配套工程招标文件》; 2、相关施工规及行业标准; 3、施工现场所获得的有关资料; 4、我单位现有的企业管理水平及人员、机械设备技术能力。 2、工程概况 1、工程实施地点:明光市。 2、工程规模:造价约 2.5 亿元。 3、计划工期:540 日历天。具体开工日期以监理发布开工令为准。 4、招标围:具体详见图纸及工程量清单容。 5、质量要求:合格。 3、工程难难点重点 本工程是明光市府家园西区北安置房及配套工程,工程质量特别重要,因此质量标准要求高,要求我们保持谨的科学态度,精心组织,精心施工。 施工中要加强协调力度,防止相互干扰,影响工程工期。 4、施工目标 发挥公司整体优势,科学组织,精心施工,格履行合同,干一项工程,交一朋友,树一座丰碑. 工期目标:540 日历天。具体开工日期以监理发布开工令为准。 质量目标:合格。符合验收规合格要求的前提下,争创优质工程标准。 安全生产目标:杜绝重伤及伤亡事故,杜绝火灾机械事故,杜绝交通事故,事故负伤频率控制在1‰以下。 环保与水土保持目标:遵守环境保护法律、法规和规章制度,做到水土不流失,施工不造成环境污染。 5、施工组织体系 若我公司有幸中标,则将本工程列为公司重点项目,成立工程项目部,并成立公司专家顾问组。专门协调本项目施工中难点和技术关键点,在集团围选派有类似的工程施工经验的优秀施工管理人员,成立具有丰富施工经验的项目领导班

施工组织设计5标段word模板可修改

XXXX小型农田水利重点县建设工程(五标段) 合同编号:XXXXXXX 施 工 组 织 设 计 XXXXX安装工程总公司 XXXXX小型农田水利重点县工程施工五标项目部 2012年11月29日

目录 第一章工程概况 (2) 第二章施工总体布置 (8) 第三章渠道工程施工程序、方法说明 (11) 第四章渠系建筑物工程施工程序、方法说明 (20) 第五章施工总进度计划及工期保证措施 (22) 第六章质量控制与管理措施 (26) 第七章安全控制与管理措施 (46) 第八章施工组织机构 (54) 第九章环境保护、文明施工保证措施 (59) 第十章冬、雨季及节假日施工措施 (62) 附表一:施工总进度横道图 (64) 附表二:施工组织机构及主要人员计划表、劳动力计划表 (65) 附表三:拟投入本标段的主要施工设备表 (66)

第一章工程概况 一、工程概况 XXXXX2012年小型农田水利工程其中一个项目位于XXXXXXXX,工程场内外交通较为方便,对外交通有XX公路,对内交通依托乡级公路与渠道临近的机耕路,施工设备及各类建材可直达工地,个别可修建临时公路。施工场地可利用渠道及附属建筑物占地范围内及周边空地工程,可利用施工场地较为宽松。生活及施工管理临时用房,就近租用民房或搭临时工棚。 钢材采用南钢或新钢生产的品牌钢,水泥采用品牌XX水泥,木材和油料等可就地购买,工程所需砂、砾、石从采砂场就近购买,所需块石从采石场购买,平均运距18km,沿支渠附近滩地、荒丘土料储量丰富,其数量和质量均可满足要求,所需土料可就近取得近距1-2km。 施工期供水:施工用水可就近解决,生活用水可取自当地村庄处地下水。 施工期用电:施工点都靠近村庄,施工用电可就近搭临时线路供电。 XXX灌区位于XXXXXXX,涉及XXX1个行政村,XX、XX、XX家等7个自然村,人口XX人。灌片内耕地面积XX亩,其中水田XX亩、旱地XX亩,设计灌溉面积XX亩,有效灌溉面积XX亩,本次高标准农田建设面积0.30万亩。主要建设内容: (1)水源工程: 对三座水陂进行加固处理。 (2)灌溉渠道工程:渠道整治总长23.57km,其中衬砌长度23.57km (U型槽衬砌23.57km)。

施工组织设计(编辑)

目录 1、编制依据和原则......................................................... 错误!未指定书签。 1.1编制依据.................................................................... 错误!未指定书签。 1.2编制原则.................................................................... 错误!未指定书签。 2、工程概况..................................................................... 错误!未指定书签。 2.1工程位置与主要特点................................................ 错误!未指定书签。 3、主要施工方案............................................................. 错误!未指定书签。 3.1管线保护及施工方案................................................ 错误!未指定书签。 3.1.1现有管线保护方案................................................ 错误!未指定书签。 3.2排水工程.................................................................... 错误!未指定书签。 3.2.1雨污水管道............................................................ 错误!未指定书签。 3.3土方工程.................................................................... 错误!未指定书签。 3.3.1场地清理................................................................ 错误!未指定书签。 3.3.2路基挖方(包括借土开挖)................................ 错误!未指定书签。 3.3.3路基填方................................................................ 错误!未指定书签。 3.4块石施工工艺............................................................ 错误!未指定书签。 3.5碎石灰土施工工艺..................................................... 错误!未指定书签。 3.6土工布、土工格栅施工、土工格室、玻纤格栅.... 错误!未指定书签。 3.7水泥稳定碎石基层施工方案和工艺(包括低剂量水稳(底基层)) ........................................................................................... 错误!未指定书签。 3.7.1施工工艺................................................................ 错误!未指定书签。 3.7.2施工方案................................................................ 错误!未指定书签。 3.8粘层、封层施工........................................................ 错误!未指定书签。 3.8.1粘层施工方案和工艺............................................ 错误!未指定书签。 3.8.2下封层.................................................................... 错误!未指定书签。 3.9沥青砼面层施工方案及工艺.................................... 错误!未指定书签。 3.9.1沥青材料要求........................................................ 错误!未指定书签。 3.9.2配合比设计............................................................ 错误!未指定书签。 3.9.3下承层准备............................................................ 错误!未指定书签。 3.9.4试验段施工............................................................ 错误!未指定书签。 3.9.5施工工艺................................................................ 错误!未指定书签。 3.10路灯工程.................................................................. 错误!未指定书签。 3.11路缘石、人行道道板安装...................................... 错误!未指定书签。 3.12标志标线施工方案.................................................. 错误!未指定书签。 4、工程质量控制体系及技术组织措施......................... 错误!未指定书签。 5、确保安全施工的技术组织措施................................. 错误!未指定书签。 6、环境保护措施和文明施工技术组织措施................. 错误!未指定书签。 7、工程进度计划及施工总体计划表............................. 错误!未指定书签。 8、确保工期组织措施..................................................... 错误!未指定书签。 9、施工组织与资源配备计划......................................... 错误!未指定书签。 10、施工总平面图及临时用地....................................... 错误!未指定书签。 11、本项目施工的重点、难点工程及施工中需特别注意的要点错误!未指定书签。