桩基础子分部工程质量监理评估报告

我公司受业主委托,对该工程桩基础子分部进行施工阶段的工程监理,该 工程桩基础子分部工程于 XX 年11月6日开始施工,经业主方、监理方、施 工方三方共同努力于2019年1月10日完成颐荷-颐荷廊桥桩基础子,该工程 项目(部位)桩基础子分部目前已具备验收条件,我监理部对该桩基础子分部 工程施工过程中的实际监理情况及工程质量的评价意见如下: 、桩基工程简述 1、工程名称: 2、工程地点: 3、参加单位: 建设单位

设计单位 勘察单位 监理单位 施工单位:

二、监理质量评估依据:

《建筑地基基础工程施工质量验收规范》(GB50202-2002) 《城市桥梁工程施工与质量验收规范》

(CJJ2-2008)

10、本工程有关设计图纸、技术核定单、有关的标准图集及说明等技术文1、

2、 3、 4、 5、 6、

《公路桥涵施工技术规范》(JTJ 041-2011 《建筑工程施工质量检验统一标准》( GB 50300-2001) 《钢筋焊接及验收规范》(JGJ 18-2003

《混凝土结构工程施工质量验收规范》(GB 50204-2002) 《工程测量规范》(GB50026-2007) 《建筑桩基技术规范》(JGJ94-2008)

《建设工程监理规范》(GB50319-2000)

11、监理合同、施工合同、设计委托合同

12、国家和地方政府发布的工程建设标准强制性条文和相关的施工质量验收规范

13、经总监审批的施工组织设计

14、监理规划和监理实施细则

三、主要监理工作内容

1、施工企业现场管理制度执行情况

施工企业现场施工,安全保证体系,质量保证体系健全,特种作业人员持证上岗,在桩基子分部工程施工中,。施工班组在每道工序完成后进行自检,施工完成后在自检合格后报施工单位进行复检,认定工程质量符合设计和规范要求后报验,对存在的问题及时整改。

2、监理桩基工程质量控制要点

1)施工准备阶段

在冲孔灌注桩施工前,监理人员首先对施工单位提供的施工组织设计方案进行了认真的审核,并提出自己的审核意见,同时编制桩基监理实施细则。对进场的钻机、经纬仪及电焊机筝施工机械设备、仪器仪表审核其出厂合格证及检定证书等资料,符合要求,同意在工程中使用,对进场的钢筋、焊条等材料,检查其合格证,同时做好材料见证取样送检,实行材料使用监理审批制度,监理人员在施工用材料进场前,按规范要求现场见证取样并送检。核查商品砼公司的资质,经检查砼原材料质量控制资料齐全,均符合设计及有关规范要求,同意在工程中使用。经检查现场具备开工条件,同意柱基开始施工。

2)施工过程阶段

①、测量放样控制:根据与业主签订的《监理委托合同》,对施工阶段进行了全过程监理,监理过程中,监理人员首先对施工单位的控制点引测及各柱位放样结果进行认真复核,符合要求。

②为能更形象具体的体现性的施工情况以及每一根性的其体情况,项目多的监理人员对桩进行了认真汇总,对有异常情况的桩均反时与业主、设计院等单位联系征询意见,使质量达到设计及施工质量验收规范要求。在整个施工过程中牢固树立严格

监理,质量第一”的意识。

③施工工序控制与签证:工程桩按设计要求对桩长进行严格控制,工程桩施工过程中冲孔至岩面时,对渣样与勘察报告进行核对,严格按照设计及勘察单位要求进入持力层。检查钢筋笼的数量、规格、品种、焊接和搭接长度、焊缝的饱满度,箍筋的问距、保护层厚度,对钢筋笼焊接全过程进行旁站。钢筋

笼吊放主要控制好标高,到位后进行困定。

④清孔和混凝土浇捣:监理人员经常测试泥浆相对密度和沉渣厚度,清孔

合格的泥浆相对密度为:1.1-1.2,沉渣厚度符合设计要求应(v40mm).商品砼进场进行坍落度检查,合格后方可投入使用。除按混凝土浇接一般要求外,控制拔管长度在2-6m之间,拔管频率不要过于频繁,导管振捣时,不要用力过猛。见证留置砼试块,监理人员对砼施工全过程进行旁站监理,严格按照设计要求

控制超灌(超灌高度为1.5D,充盈系数为1.1)。

⑤桩身长度经监理人员确认后,现场及时签认施工记录。严格按照施工规范及施工单位提供的施工组织方案的有关规定开展监理工作。及时督促施工单位完善内业资料。加强各单位之间的交流,便利了各项工作的开展。

⑥安全文明施工:在桩基施工过程督促和检查施工单位进行安全文明施

工。审查施工单位编制的安全文明施工技术体系、施工组织设计中的施工安全

技术和保证措施,及专项施工方案中的安全措施。对施工过程存在安全文明施工的问题,项目监理部及时以书面或口头通知施工单位进行整改。在桩基施工

过程未发生安全问题。

四、工程技术资料

在桩基工程施工过程中,要求施工单位工程技术资料与施工进度保持同步,并形成各类施工技术资料均由我现场监理工程师签字认可,真实有效。工程资料核查:资料齐全,符合要求。

桩基工程质量验收资料核查表

五、桩基工程质量评估情况

1、原材料质保资料齐全。

2、焊接件检查合格、砼试块强度检验符合设计要求。

3、分项工程验收合格。

4、桩身偏位超过验收规范部分,按设计单位补强方案执行。

(1)、桩身完整性检测结果:总桩数为29根,声测29根,其中I类桩

26根,占89.6%, II类桩3根,占10.4%,无III类桩、IV类桩。

六、评估报告附件

本桩基子分部工程已按合同约定的要求完成施工图中的全部内容,工程质量符合设计和规范要求,混凝土试块强度检验报告符合要求,资料齐全。据此, 根据上述质量验收情况,本桩基子分部工程监理核定为合格,

XX有限公司

廊桥工程项目监理部总监理工程师:

年月曰

桩基础监理评估报告

桩基础子分部工程质量监理评估报告 我公司受业主委托,对该工程桩基础子分部进行施工阶段的工程监理,该工程桩基础子分部工程于2013年4月2日开始施工,经业主方、监理方、施工方三方共同努力于2013年6月7日完成,该工程桩基础子分部目前已具备验收条件,我监理部对该桩基础子分部工程施工过程中的实际监理情况及工程质量的评价意见如下: 一、工程概况 建设单位: 勘察单位: 设计单位: 施工单位: 监理单位: 二、桩基工程简述 根据地质勘查报告及现场实际情况,本工程桩基础采用的就是抗拔桩,抗拔桩桩型:AZH-50-16B,桩砼标号:C35,桩长为16m。 桩数量与规格: 建筑设计标高±0、000,其绝对标高为+9、500m。 三、监理质量评估依据: 1、国家与地方政府发布的工程建设标准强制性条文与相关的施工质量验收规范。 2、本工程有关设计图纸、技术核定单、有关的标准图集及说明等技术文件。 3、监理合同、施工合同、设计委托合同。 4、经总监审批的施工组织设计。 5、监理规划与监理实施细则。

6、《建设工程监理规范》 7、《地基基础设计规范》 四、主要监理工作内容 1、施工企业现场管理制度执行情况 施工企业现场施工,安全保证体系,质量保证体系健全,特种作业人员持证上岗,在桩基子分部工程施工中,。施工班组在每道工序完成后进行自检,施工完成后在自检合格后报施工单位进行复检,认定工程质量符合设计与规范要求后报验,对存在的问题及时整改。 2、监理桩基工程质量控制要点 1)施工前首先进行图纸会审,审核压桩施工方案。 2)对桩基施工单位资质审查,施工机械设备,特种作业人员审查;审查进场成品桩、接桩用焊条等厂家资质及产品合格证,做外观检验,并做好记录,并留有影像资料; 3)对压桩用压力表、规格及质量应进行检查,并审查压力表与油压系统配套校验证书。 4)基础桩工程施工前,先进行压桩试验,以确定压桩的有关参数。 5)接桩时应保持上、下节桩身轴线一致,并尽可能缩短接桩时间间隙。当采用焊接法接桩时,应两人同时对角对称的进行,焊缝应连续饱满,并用垫块填实接桩处的缝隙,以防止节点变形不均匀引起桩身倾斜; 6)施工过程中,对桩的定位、接桩与送桩终止的标高进行旁站并留有影像资料; 做好压桩监理日记,重点记录压桩压力、桩垂直度、接桩间歇时间、桩的连接质量及压入深度。送桩留下的桩孔,应立即用碎石或道渣回填密实。 五、检验批、分项分部验收情况 1、工程质量验收及评定情况 1)、预应力钢筋混凝土管桩,采用静压沉桩方式;质量控制按建筑地基基础工程施工质量验收规范进行验收。检查桩位布置尺寸与测量定位,对基桩定位、桩身垂直度、沉桩、接桩焊接、桩顶标高控制实施全过程监控与旁站,并做好详细的旁站检查记录,桩基施工处于受控状态。

基础工程监理评估报告

基础工程监理评估报告

地基与基础分部工程质量评估报告 编制:_______________ 审批:_______________ 、工程概况: 该工程位于西安建设路与幸福南路十字东北角,建筑面积 34817.2 〃,地下2层,地上为1栋32层高层住宅,为剪力墙结构;一栋4 层商铺,为框架结构。建筑高度为98.3 米。建筑物抗震设防烈度为8 度,工程设计等级1 级,建筑设计使用年限:三类、50 年。二、工程主体单位: 设计单位: 勘察单位: 建设单位: 监理单位: 施工单位:

三、施工质量依据: 1 )《地基与基础工程施工质量验收规范》 ( GB50202-2002) 2)《建筑地基处理技术规范》 (JGJ79-2002) 3)《建筑地坑探查与处理暂时规程》 (Q/XJ 1 04) 4)《建筑工程施工质量验收统一标准》 ( GB50300-2002) 5)《混凝土结构工程施工质量验收规范》 ( GB50204-2002) 6)《砌体工程施工质量验收规范》 ( GB50203-2002) 四、地基与基础工程特点: 本场地地下水属潜水类型,勘察期间地下水稳定水位埋深为 11.80-12.00 米,稳定水位标高为418.38-418.94 米m。 本工程基础形式为桩筏基础,基础采用桩基础,桩型为钢筋混凝土钻孔灌 注,成孔机械采用旋挖钻机,灌注混凝土采用商品混凝土,本工程共布置 工程桩156 根,混凝土强度等级C35,Quk=7700KN, ± 0.000=432.65 米m,其中一类桩148根,桩径为700mm桩长为39m其中二类桩8根,桩径为d=600mm桩长为20米,依据工程勘察资料,设计桩基参数,施工成 孔采用旋挖钻机成孔,成孔至设计深度后,安设钢筋笼及导管进行混凝土 浇筑,施工流程为:施放桩位一钻机就位一钻进成孔一钢筋笼制作与安设 一安装导管一商品混凝土到场一浇筑混凝土一成桩一钻机移位,完工后经 检测公司对灰土垫层进行检测符合要求可以进行下道工序。基础筏板基 础。基础垫层强度C15;地下室外墙、顶板、地板为C30抗渗等级S6;钢筋均采用普通热轧钢筋。地下室防水等级为一级,防水钢筋混凝土(抗渗 等级S6)。 4厚SBS改性沥青防水卷材一道,地下室防水保护层选用120标砖MU7.5,砂浆标号M5,外设防水层的设防高度应高出地面0.5m,经检查符合图纸要求及施工规

监理管理表格

质量控制、安全、环保监理表格 1监表、施工组织设计报审表 2监表、施工技术方案报审表 3监表、施工技术、安全、环保交底记录 4监表、监理工作指令 5监表、监理工作指令回复 6监表、暂时停工令 7监表、复工申请单 8监表、复工指令 9监表、中间交工证书 10监表、交桩记录表 11监表、测量技术方案报审表 12监表、水准加密点报验单 13监表、施工放样报验单(开工报告用) 14监表、工程人员履约检查表 15监表、机械设备履约检查表 16监表、工程试验设备履约检查表 17监表、工程理处罚通知书 18监表、工程质量事故处理报告单 19-A监表、建筑材料报验单 19-B监表、工程材料/构配件/设备报审单 20、桩基检测方案申报表 21、桩基检测计划申报表 22监表、交(竣)工申请书 23监表、工程交工证书 24监表、缺陷责任期证书 25监表、旁站记录 26-A监表、监理巡视记录 27监表、标段开工申请单 28监表、工程报验单 29监表、工程质量认可单 30监表、工地会议记录 31监表、会议纪要 32监表、监理规划(实施细则)审批表 增施检表5、承包人现场核验记录表 增监表5、监理现场核验记录表 33监表、结构物水泥砼(砂浆)配料通知单(E202) 34监表、击实试验成果申请批复单 35监表、砼(砂浆)配合比申请批复 36监表、水泥砼(砂浆)浇筑申请单(E201) 37监表、水泥稳定土配合比申请报批复单 38监表、级配碎石配合比申请报批复单 39监表、不合格工程材料使用情况跟踪表 40监表、不合格施工部位质量情况跟踪表 41报告、安全生产日志 42报告、环保及水土保持生产日记 43报告、施工日志 44监表、监理日志 45监表、分部/分项工程开工申请单

工程监理质量评估报告

工程监理质量评估报告 Company Document number:WUUT-WUUY-WBBGB-BWYTT-1982GT

B9 ××××调度楼工程 工程质量评估报告 建设单位:××××供电局 设计单位:××建筑设计研究院 承包单位:×××建筑工程公司 监理单位 (章): 总监理工程师:××× 公司技术负责人:××× 日期:××年××月××日 江苏省建设厅监制 项目质量评估报告 一、工程建设概况 1、建设工程概况: ××××公司生产营运调度用房工程,由××供电公司投资,建筑面积约23000平方米,地下一层,主体建筑16F,局部20F,建筑总高度米。本工程为电力销售、电力调度及供电公司管理人员办公用的综合楼。 本工程由×××地质勘探设计院负责岩土、水文地质勘探工作,××建筑设计研究院负责本工程的设计及设计协调工作。并由以下单位进行专项设计:外装饰幕墙由沈阳远大铝业工程有限公司负责设计;内装饰由苏州金螳螂建筑装饰有限公司设计;地下室

人防部分由江苏省第二建筑设计研究院设计;建筑智能由东大智能化系统有限公司及清华同方股份有限公司设计。 2、施工情况: 1)各专业施工时间跨度。本工程自2000年10月18日破土动工,桩基及支护施工时间跨度为2个月,土方施工1个月,基础分部2个半月,主体结构6个月,建筑装饰分部10个月,安装工程施工24个月(包括建筑智能的施工)。室外总图工程施工3个月。 2)参加各方的单位名称、负责人及施工内容列表如下:

二、验收依据、评估范围及工程分项/分部/单位工程划分验收情况 1、验收依据。 1)《建筑工程施工质量验收统一标准》(GB50300-2001)、相关建筑工程施工质量验收规范及其他相关工程建设标准规范。 2)合同文件包括施工承包合同、投标商务标/技术标文件等。 3)设计文件(设计图纸、设计说明、设计变更等)。 4)国家关于建设工程的法律、法规、行政性文件的要求。 5)《建筑工程文件归档整理规范》GB/T50328-2001。 2、本质量评估报告的评估范围。 本质量评估范围为扬州供电公司生产营运调度用房单位工程。以下施工内容确定不在本评估范围内:室外单位工程包括附属建筑、室外环境、电气等;建筑智能的综合布线系统、电视监控系统、门禁系统、车位管理及系统集成;电梯分部(由另外单位监理)。 3、分项、分部工程划分及验收情况。

桩基工程监理评估报告样本

桩基工程监理评估 报告

总部经济园3、4、6号楼及地下车库二期 桩 基 评 估 报 告 中国轻工业西安设计工程有限责任公司 二0一七年八月七日 一、工程概况 工程名称:总部经济园3、4、6号楼及地下车库二期建设单位:陕西省沣西置业有限公司 设计单位:中国建筑西北设计研究有限公司 承包单位:陕西建工第六建设集团有限公司 监理单位:中国轻工业西安设计工程有限责任公司 勘察单位:咸阳市建筑设计研究院 工程概况:

4号楼建筑面积为23935.11平方米,地上15层,总高度58米,地下2层(非车库部分)建筑面积2253.20平方米。均采用CFG 桩复合地基,钢筋混凝土框架-剪力墙结构、板式筏基础加柱墩的基础形式。设计使用年限50年,抗震设防类别丙类,结构安全等级二级,抗震设防烈度8度,地基基础设计等级乙级,耐火等级一级。相对标高±0.00相当于绝对标高389.00m(黄海高程)。4号楼于 2月19日开始土方开挖, 6月10日开挖结束,边坡支护及时跟进, 6月13日开始进行CFG工程桩施工, 6月21日打桩完成,共计775根桩(有效桩长8m桩148根,有效桩长6m 桩627根),桩位平面采用等边三角形布置,桩距1500mm,桩径400mm,混凝土强度等级C30,地基承载力特征值360kPa,单桩承载力特征值450kN,极限值900kN。 二、施工情况及对承包商的评价 桩基工程于年 6 月13 日开工,至年 6 月22日结束。 桩基工程由1台桩机施工。于年6 月13日开始试打桩,桩砼经28天后的静载试验,单桩承载力特征值均满足设计要求。年6 月13日开始工程桩施工,到6月22日,共计完成工程桩775根,施工用时10天。按施工合同约定完成了全部桩基施工任务。 整个施工过程中,施工单位能按照“质量第一”的原则,能坚持每道工序均有人把关,施工组织基本合理,质量保证体系基本健全。

基础分部验收监理评估报告

基础分部验收监理评估 报告 文件编码(GHTU-UITID-GGBKT-POIU-WUUI-8968)

大名县石刻博物馆搬迁新建项目 弘敬阁 监理评估报告 编制人: 审批人: 河北中原工程项目管理有限公司 2016年3月22日 大名县石刻博物馆搬迁新建项目弘敬阁 基础分部验收监理评估报告 一、工程建设有关主体单位 建设单位:大名县文化体充旅游局 设计单位:邯郸市怀特建筑设计有限公司 监理单位:河北中原工程项目管理有限公司 施工单位:河北杰诺园林古建筑工程有限公司 二、工程概况 本工程单体占地面积。 本工程建筑占地面积为1640.46㎡,建筑面积为4242.95 ㎡,建筑层数为6层,高度为32.25m。结构安全等级为二级,基础设计等级为丙级,设计使用年限50年,耐火等级一级。抗震设防烈度7度。 质量评估依据 1)图纸及有关联系单;

2)建筑地基基础工程施工质量验收规范(GB50202-2002); 3)建筑工程施工质量验收统一标准(GB50300-2011); 4)工程质量验收有关规范规定; 5)工程建设强制性标准要求; 6)有关法律、法规规定。 三、检验批、分项工程的质量验收情况 该工程的地基与基础分部共分土方工程、砼基础分部;砼基础有模板、钢筋、砼分项,所有资料均齐全、完整,验收合格。 四、工程观感验收情况 现场全面检查基础的外观质量一般,符合设计及验收规范要求。 五、隐蔽工程验收情况 钢筋隐蔽前施工项目通知我监理项目部进行了验收,验收后均形成隐蔽验收记录,经查验,符合设计图纸及有关规范要求。 六、现场质量实测情况 1.基础部分分别共制作标准养护、同条件养护均有砼试块龄期均未达到,待测。轴 线位移、标高、截面尺寸、表面平整度等基本符合质量验收规范。砼试块留置组数、见证取样符合规范要求。 1、基础部分共进行钢筋复试:组; 2、基础钢筋焊接头共23组。 3、基础实体检测回弹报告3份。

静压桩基工程监理质量评估报告

静压管桩基础 质 量 评 估 报 告 编制人: 审核人: 监理有限公司 0年0月0日

-一、前言 1、工程名称: 2、工程地点: 3、建设单位: 4、勘察单位: 5、设计单位: 6、施工单位: 7、监理单位: 二、质量评估依据 1、海口市城市规划设计研究院编制的施工设计图。 2、福建省建专岩土工程有限公司提供的地质勘察报告。 3、《建筑工程施工质量验收统一标准》GB50300-2013。 4、《建筑地基基础工程施工质量验收规范》GB50202-2016。 5、《建筑桩基技术规范》(JGJ94-2008)。 6、《建筑地基处理技术规范》(JGJ79-2012) 7、《建设工程监理规范》(GB50319—2013) 8、核工业华南二九四工程物探公司提供的桩基检测报告。 9、武夷文旅广场-北一区桩基施工记录。 10、武夷文旅广场-北一区桩基竣工平面图。

三、工程特点 1、1 桩基概况 本工程位于。本工程分为Ⅰ区、Ⅱ区及以外区域,均为预应力混凝土管桩,强度为C80等级管桩,型号为PHC-125-A型,Ⅰ区抗拔桩有效桩长不小于7m,Ⅱ区抗拔桩有效桩长不小于9m,其她区域有效桩长不小于6m。地基基础设计等级为乙级;设计要求单桩竖向抗压承载力特征值为2000KN,单桩竖向抗压极限承载力标准值4000KN,压桩力为4300KN;管桩施工采用静压工艺,施工桩数为为774根,桩尖采用“十”字型钢桩尖。 1、2 土层分布情况 根据设计要求,静压预制管桩应进入全风化石英片岩⑥或砂土状强风化石英片岩⑦或碎块状强风化泥质粉砂岩⑧0、5m以上。 1、3 试桩要求 试桩要求桩底进入⑥或⑦或⑧层土0、5m,单桩竖向承载力极限值不小于4000KN。 试桩的目的就是确定单桩允许承载力,为本工程桩基优化设计提供依据。 四、质量受控状态 1、对生产厂家资质,企业营业执照,安全生产证书进行审查。 2、对进场材料进行严格检查(桩裂缝、垂直度、合格证、复检报告)等。 3、对施工单位放线成果进行复核。

基础验收评估报告监理

基础验收评估报告 监理 1 2020年4月19日

一、工程概况 (一)工程概况 ***工程位于****,该工程有***,建筑面积34797m2,其中地下一层7148.28m2;地上13层,建筑面积27648.72m2,建筑高度58,6米。 本工程采用框架抗震结构,基础为平板式伐型基础,建筑结构安全等级为二级,建筑物合理设计使用年限50年,抗震设防度为8度,建筑耐火等级为一级。 本工程基础、底板垫层为100厚C15混凝土,抗水基础,基础主体结构采用C30混凝土±0.000以下采用M7.5,水泥砂浆、主体墙砌体采用M5.0混合砂浆B06级加气混凝土砌块,±0.000以下砌体采用M5.0水泥砂浆MU10煤矸石砖砌筑。 (二)参加单位 建设单位: 设计单位: 勘察单位: 施工单位: 监理单位: 二、工程建设目标

质量等级:合格 三、评估依据 工程建设监理合同、工程施工承包合同; 经设计审图机构经过的施工图; 经总监审批的施工组织设计; 经审批的监理规划和监理实施细则; 《建筑地基基础工程施工质量验收规范》GB50202- 《电梯工程施工质量验收规范》GB50310- 《混凝土工程施工质量验收规范》GB50204- ; 《钢筋焊接及验收规范》JGJ18- ; 《建筑电气工程施工质量验收规范》GB50303- ; 《建筑给排水工程施工质量验收规范》GB50242- ; 《建筑工程施工质量验收统一标准》GB50300- ; 四、质保资料审核情况 3 2020年4月19日

五、材料进场见证及取样情况: (一)进场材料情况如下: (1)钢材:采用。 (2)水泥:采用牌,等级P.O32.5R、P.O42.5R。 (3)石子、砂:石子采用碎石规格13~40mm,砂采用河砂。 各种进场材料均有出厂合格证,并按规定经监理现场见证取样送检,检测结果符合要求。 (二)、原材料见证取样送检情况: 4 2020年4月19日

公路工程监理使用表格word版本

公路工程监理使用表格

目录 1、总体施工组织设计报审表················································A-10 2、分项(分部、单位)工程开工申请批复单··································A-11 3、施工放样报验单························································A-12 4、原材料报验单··························································A-13 5、分项工程施工主要人员报验单············································A-14 6、进场设备报验单························································A-15 7、施工方案及主要工艺报审表··············································A-16 8、专项安全、文明(环保)施工方案报批单··································A-17 9、检验申请批复单························································A-18 10、工序检查报验单·······················································A-19 11、下承层检验申请批复单·················································A-20 12、混凝土浇筑申请报告单·················································A-21 13、施工单位月工作计划报告单·············································A-22 14、施工单位每周工作计划·················································A-23 15、监理巡视记录························································A-24 16、监理旁站记录·························································A-25 17、监理日志·····························································A-26 18、监理日巡视、旁站、抽捡安排表·········································A-27 19、工地会议记要·························································A-28 20、监理指令·····························································A-29 21、工程暂时停工指令·····················································A-30 22、复工申请·····························································A-31 23、复工指令·····························································A-32 24、施工日志·····························································A-33 25、工程质量(安全)事故处理报告单·······································A-34 26、中间交工证书·························································A-35 27、公路工程(施工段)交工验收证书··································A-36 28、工程缺陷责任期终止证书···············································A-37

桩基工程验收监理质量评估报告

兆隆·金盾国际A区8#楼 桩基工程质量评估报告 建设单位:郑州兆隆房地产开发有限公司 设计单位:河南东方建筑设计有限公司 勘探单位:河南地矿建设工程(集团)有限公司 监理单位:郑州广源建设监理咨询有限公司 施工单位(章):河南省合立建筑工程有限公司技术负责人: 日期: 2014年月日

桩基工程质量评估报告 一、工程概况 1、工程名称:兆隆·金盾国际A区8#楼 2、工程地点:商丘市归德路与珠江路交叉口西侧 3、建筑面积:29765.29平方米 4、结构层数:混凝土剪力墙结构;地下2层,地上32层 5、参建单位: 建设单位:郑州兆隆房地产开发有限公司 设计单位:河南东方建筑设计有限公司 监理单位:郑州广源建设监理咨询有限公司 施工单位:河南省合立建筑工程有限公司 二、桩基工程情况 1、基础依据河南省地矿建设工程(集团)有限公司2013.01.17提供的兆隆金盾国际商住小区(A区)《岩土工程勘察报告(详勘)》进行设计。采用PHS 桩桩筏基础,桩基础设计等级乙级。 2、本工程±0.000相对高程为50.800米。桩顶标高-7.380(相对高程43.420)。方桩边长a=400mm,桩型号为 PHS-400(220)A-20m,桩身混凝土强度等级为C80。预应力混凝土空心方桩按照中南地区工程建设标准12ZTG208<<预应力混凝土空心方桩>>设计制造,方桩厂家应提供产品详细图纸大样及有关说明(包括方桩力学性能指标),提供产品的有关检验数据及质保证书。本工程桩端持力层为第8层粉土层,进入持力层不应小于800mm。依据当地经验资料,设计单桩承载力特征值为1400kN。为了检验PHS桩的适应性, 3、本工程桩基正式施工之前应按照设计要求进行施工工艺和承载力特性检验性试桩,以便设计依据试桩结果及时调整工程桩设计参数。桩需接长时采

6#基础验收监理单位评估报告

康城瑞河兰乔花园6#住宅楼 基础分部工程 质 量 评 估 报 告 编制人: 审核人(总监理工程师): 编制单位:北京兴电国际工程管理有限公司 日期:2014年 4月 15日

一、工程概况: 1.工程项目概况 在施工过程中,施工单位按照合同规定和设计图纸要求,认真组织施工。目前,基础施工内容已完成。施工单位的自检及监理单位的初验工作已完成,监理单位对施工单位报审的质量控制资料进行审核,认可资料基本齐全完整,施工单位对存在的问题已进行了认真整改。因此监理单位同意施工单位对该基础分部的验收审报,并对基础工程进行了质量评估。 二、评估依据: 1、业主提供的经审查机构审查通过的设计施工图; 2、图纸会审记录、设计修改图纸、设计变更通知; 3、本工程委托监理合同,工程建设施工合同文件。 4、《建设工程监理规范》(GB50319-2013)。 5、《建筑工程施工质量验收统一标准》(GB50300-2001)。 6、《砌体工程施工质量验收规范》(GB50203-2002)。

7、《混凝土结构工程施工质量验收规范》(GB50204-2002)。 8、国家现行的法律、法规及建设工程相关的技术规范规程。 三、基础阶段的监理程序及监理工作: 进入基础结构施工后,监理单位按照《委托监理合同》的要求,依照《监理规划》、《监理实施细则》、《旁站监理计划》等监理工作文件的要求,本着严格监理、热情服务的原则,积极开展基础施工阶段的监理工作。按照“四控制”指导原则,重点作好对工程质量和施工安全方面的控制,尤其始终先抓好事前控制和事中控制的工作。采取巡视和平行检查方式对工程质量进行跟踪监理,并对关键部位和关键工序进行旁站监理,健全了材料报验,工序报验制度,严格执行了不合格材料不准使用,上道工序检验不合格不准进入下道工序施工的规定。定期或不定期主持召开由建设单位、施工单位参加的工地例会和专题例会,根据现场施工的实际情况以及配合政府部门的要求,多次组织进行现场质量、安全、文明施工、施工现场创卫等的检查,并对检查出的问题进行通报,针对现场施工组织管理、施工质量、安全及进度存在的问题提出相应的整改要求和建议,监理对整改情况进行跟踪检查和复检,以督促施工单位对存在的问题进行整改。施工单位对质量监督站和监理单位提出的问题基本上都能进行认真整改并进行了书面回复。整个基础施工过程中,未发生过危及结构安全的重大质量和安全事故。 工序(检验批)质量控制: 从楼层内控制点引测放线、钢筋加工、钢筋焊接及(绑扎)安装,

建筑工程监理质量评估报告

××工程 工程质量评估报告 单位技术负责人:××× 总监理工程师: ××× ×××建设监理公司 ×年×月×日 ××监理有限公司(监理单位)受××(建设单位)的委托,对××工程实施工程施工阶段监理,并于2004 年×月×日派驻项目监理部开始对××工程进行施工阶段质量控制。通过建设单位、设计单位、承包单位、监理单位的共同努力,于2004 年×月×日××工程达到竣工条件,经施工单位申请,我项目监理部于×月×日牵头组织了由 建设单位、设计单位、施工单位组成的验收小组,对该工程进行了竣工预验收。我项目 监理部将该工程的质量评估报告出具如下: 一、工程基本情况 本工程参建各方: 建设单位:××××××××××× 勘察单位:×××××××××××

设计单位:××××××××××× 施工单位:××××××××××× 监理单位:××××××××××× (一)工程概况 工程名称: ××× 工程地点: ××× 结构类型: ××× 层数: ××× 建筑面积: ××× 基础埋深: ××× 总高度: ××× 计划开工日期: ××× 计划竣工日期: ××× 说明:本工程为框架×层,层高均为×m,建筑面积为××㎡。依据××有限公司(设计单位)提供的《××工程地质勘察报告》编号×××,××(设计单位)基础设计,采用柱基、条基基础,上部结构形式为框架形式,抗震设防烈度×度,建筑安全耐火等级为×级。

(二)承包单位基本情况 承包单位:××××××××××× 承包范围:土建、建筑电气、给排水 现场项目经理部全面负责××工程的施工任务,各管理人员配备基本齐全,资格符合要求,各施工专业人员持证上岗,符合要求,人员配备也基本满足施工要求。各类施工机械设计规格、型号、数量满足要求,工程原材料、构配件、设备能按使用计划落实到位,施工过程中组织有序,与项目监理部的配合也比较好。 (三)主要采取的施工方法 1.现浇混凝土全部采用商品混凝土,基础、现浇梁板混凝土采用泵输送混凝土。 2.框架柱、梁、板、楼梯均采用竹胶板模板。 3.钢筋接头、框架柱均采用电渣压力焊形式。 4.其他分部工程及各工序为常规施工做法。 (四)工程监理情况 1.抓好事前控制,严把开工关。 在整个监理过程中,我们坚持以事前控制和主动控制为主,依据合同和设计文件编制了监理规划,制订了具体的监理工作程序,明确了工作内容、行为主体、验收标准及工作要求。 本工程开工前,依据监理规范要求,我们审查了施工单位的资质,现场质量管理、技

地基与基础工程质量监理评估报告

工程质量监理评估报告 (地基与基础) 工程名称: 建设单位: 设计单位: 施工单位: 监理单位: 编制: 年月日

一、工程概况 1、*****工程为钢筋混凝土框架结构,本工程位于*****,建筑面积为12600㎡,占地面积为1178.89㎡,一至四层均为办公楼,三级抗震6度设防,外墙砌体采用蒸砂加气砼砌块,内墙采用蒸加加气砼砌块,地基及基础工程实际完成日期为2007年4月16日,标准层高为4.2M。 2、本工程依据********勘察分院提供的《******规划岩土工程勘察报告》,持力层为粉质粘土层;地基承载力为200Kpa。 3、基础采用独立基础,抗震等级为三级,抗震设防为6度,建筑长70.40M,宽28.70M,建筑总高度31.6M。 三、评估依据

1、工程建设监理合同; 2、工程施工合同; 3、工程设计施工图; 4、工程测量规范GB50026-93 5、《建筑工程质量验收统一标准》GB50300-2001 6、《建筑地基及基础工程施工质量验收规范》GB50202-2002 7、《砼结构工程施工及验收规范》GB50204-2002 8、《钢筋焊接及验收规程》JGJ18-2003 9、《实施工程建设强制性标准监督规定》; 10、建筑电气安装工程质量检验评定标准GBJ50303-2002 11、混凝土强度检验评定标准GBJ107-2002 四、质量控制资料核查 1、钢筋出厂合格证和进场试验报告 2 份,符合要求; 2、焊接检验报告、焊剂合格证 1 份,符合要求; 3、水泥出厂合格证和试验报告 1 份,符合要求; 4、砖出厂合格证和试验报告0 份; 5、砼配合比和试验报告 1 份,符合要求; 6、砂浆配合比和砂浆试验报告0份; 7、地基验槽记录 1 份,符合要求; 8、基础验收记录1 份,符合要求; 9、施工组织设计 1 份,符合要求; 10、图纸会审记录 1 份,符合要求; 11、隐蔽验收记录 3 份,符合要求; 12、砼旁站记录 3 份,符合要求; 13、施工日记 1 份,符合要求。 五、工程施工质量情况 本工程根据设计及勘察报告的要求,地基承载力为200Kpa,基础强度等级为C30。本工程质量检测由***********工程质量检测中心承担,钢筋原材料、混凝土试块检测,各项检测全部满足设计要求;持力层均在粉质粘土层,呈黄色;基础砼试件抗压强度代表值为31.7-34.3 Mpa,满足设计强度等级C30的要求。施工过程中,基础防护及防降雨措施均严格按施工组织及相关规定实施,各分项工程施工严密、有部署,均能达到规范要求,专业监理工程师全过程进行监控,并对原材料进行审查签认,对混凝土原材料及施工质量进行严格的控制,并按规定对钢筋、水泥、砂、石、砼等进行取样检测,检测报告均合格。基础砼标号:垫层:C15,基础承台、柱及地梁:C30,基础各分项钢筋安装后,经质监站、设计代表、业主代表核验同意验收。

公路工程全套资料表格

第一篇 监管表

(监管表)目录 1、工程开工令(A—001) 2、项目开工申请报告(A—002) 3、总体施工组织设计报审表(A—003) 4、分项工程开工申请批复单(A—004) 5、分项工程施工组织设计报审表(A—005) 6、施工放样报验单(A—006) 7、进场设备报验单(A—007) 8、工地会议纪要(A—008) 9、分包申请报告单(A—009) 10、承包人每周工作计划(A—010) 11、承包单位(人)报告(A—011) 12、监理工程师报告(A—012) 13、监理日报(A—013) 14、通知(监理通用)(A—014) 15、监理工程师指令(A—015)16、工程质量事故处理报告单(A—016) 17、工程质量事故处理意见通知单(A—017) 18、工程暂时停工指令(A—018) 19、复工申请(A—019) 20、复工指令(A—020) 21、变更设计报告单(A—021) 22、工程变更令(A—022) 23、工程延期申请报告(A—025) 24、工程延期申请批复单(A—026) 25、检验申请批复单(A—027) 26、中间交工申请报告(A—028) 27、中间交工证书(A—029) 28、分项工程质量检验记录表(A—030) 29、分项工程质量检验评定表(A—031) 30、分部工程质量检验评定表(A—032) 31、单位工程质量检验评定表(A—033) 32、标段工程质量检验评定表(A—034) 33、建设项目质量检验评定表(A—035) 34、工程交工申请报告(A—036) 35、工程交工证书(A—037) 36、工程缺陷责任期终止证书(A—038)

建筑工程监理质量评估报告

XX工程 工程质量评估报告 单位技术负责人: XXX 总监理工程师: XXX XXX建设监理公司 XX监理有限公司(监理单位)受XX(建设单位)的委托,对XX工程实施工程 施工阶段监理,并于2004年X月X日派驻项目监理部开始对XX工程进行施工阶段质量控制。通过建设单位、设计单位、承包单位、监理单位的共同努力,于2004年X月 X日XX工程达到竣工条件,经施工单位申请,我项目监理部于X月X日牵头组织了 建设单位、设计单位、施工单位组成的验收小组,对该工程进行了竣工预验收。我项 监理部将该工程的质量评估报告出具如下: 、工程基本情况本工程参建各方:建设单位:XXXXXXXXXXX 勘察单位:XXXXXXXXXXX

设计单位: X X X X X X X X X X X 施工单位: 监理单位: (一)工程概况 工程名称: 工程地点: 结构类型: 层数:XX 建筑面积: 基础埋深: 总咼度:X XX 计划开工日期:XXX 计划竣工日期:XXX 说明:本工程为框架X层,层高均为X m,建筑面积为XXrf。依据XX有限公司(设 计单位)提供的《XX工程地质勘察报告》编号XXX,XX(设计单位)基础设计,采用柱基、条基基础,上部结构形式为框架形式,抗震设防烈度X度,建筑安全耐火等级为 X级。

二)承包单位基本情况 承包单位:XXXXXXXXXXX 承包范围:土建、建筑电气、给排水 现场项目经理部全面负责XX工程的施工任务,各管理人员配备基本齐全,资格符合要求,各施工专业人员持证上岗,符合要求,人员配备也基本满足施工要求。各类施工机械设计规格、型号、数量满足要求,工程原材料、构配件、设备能按使用计划落实到位,施工过程中组织有序,与项目监理部的配合也比较好。 三)主要采取的施工方法 1.现浇混凝土全部采用商品混凝土,基础、现浇梁板混凝土采用泵输送混凝土。 2.框架柱、梁、板、楼梯均采用竹胶板模板。 3.钢筋接头、框架柱均采用电渣压力焊形式。 4.其他分部工程及各工序为常规施工做法。 四)工程监理情况 1.抓好事前控制,严把开工关。 在整个监理过程中,我们坚持以事前控制和主动控制为主,依据合同和设计文件编制了监理规划,制订了具体的监理工作程序,明确了工作内容、行为主体、验收标准及工作要求。 本工程开工前,依据监理规范要求,我们审查了施工单位的资质,现场质量管理、技

地基与基础工程监理质量评估报告

地基与基础工程监理质量评估报告 编 审广东达安工程项目中国移动东莞区域 制: 核: 管理有限公司 省级通信枢纽楼工程项目监理部 日期:2010年6月 1工程概况 1.1 工程名称: 中国移动东莞区域省级通信枢纽楼 1.2 建设单位: 中国移动通信集团广东有限公司东莞分公司 1.3 设计单位: 深圳市建筑设计研究总院有限公司 1.4 施工单位: 南昌市第一建筑工程公司 1.5 监理单位: 广东达安工程项目管理有限公司 1.6 勘察单位: 韶关地质工程勘察院 1.7 建筑面积: 2 15148.99 m 1.8 楼层结构: 地下一层/地上七层,建筑高度34.52M,最大跨度8.4M 2评估依据 2.1国家法律、法规和行政规章,主要有: 《中华人民共和国建筑法》《建筑工程质量管理条例》 《中华人民共和国合同法》《工程建设监理规定》 2.2国家现行的强制性技术标准,主要有: 国家标准《建筑安装工程质量检验评定统一标准》(GBJ 300-88) 国家标准《建筑工程质量检验评定标准》(GBJ 301-88) 国家标准《地基与基础工程施工及验收规范》(GBJ 202-83)

国家标准《砌体工程施工及验收规范》(GBJ50203-98 国家标准《混凝土结构工程施工及验收规范》(GB5020令92) 行业标准《钢筋焊接及验收规程》(JGJ18— 96) 2.3工程勘察设计文件 地质勘察资料 施工图纸、设计说明和设计指定的标准图集 设计交底会议纪要、设计变更文件 建设单位提出的工程变更文件 2.4 合同 建设单位与监理单位签订的建设工程监理合同 建设单位与施工单位签订的建筑工程施工合同 3质量保证体系评估 3.1建筑材料、半成品、成品的准用证、质保单、复试报告等各项质量保证资料基本齐全;对于所进场的建筑材料,指定了专人负责,进行了严格管理;并对进场材料及时取样,送检测单位检验合格后方予使用,把关较严格。精品文档 收集整理汇总 3.2本工程采用商品混凝土,试块均在监理见证下随机抽样制作,样本数 符合规定,混凝土养护符合规范规定要求。精品文档收集整理汇总 3.3各分项、分部工程的施工,能严格把关,有自检、互检制度和专职质 量监督员负责各项检查工作;有较完善的质量管理体系。精品文档收集整理汇总 3.4隐蔽工程验收手续基本上与施工进度同步,隐蔽验收资料基本齐全。 4 质量保证资料核查表(基础分部)

工程监理质量评估报告.doc

××调度楼:质量评估报告 B9 ××××调度楼工程 工程质量评估报告 建设单位:××××供电局 设计单位:××建筑设计研究院 承包单位:×××建筑工程公司 监理单位 ( 章) : 总监理工程师:××× 公司技术负责人:××× 日期:××年××月××日 江苏省建设厅监制

××调度楼:质量评估报告 项目质量评估报告 一、工程建设概况 1、建设工程概况: ××××公司生产营运调度用房工程,由××供电公司投资,建筑面积约23000 平方米,地下一层,主体建筑 16F,局部 20F,建筑总高度 97.7 米。本工程为电力销售、电力调度及供电公司管理人员办公用的综合楼。 本工程由×××地质勘探设计院负责岩土、水文地质勘探工作,××建筑设 计研究院负责本工程的设计及设计协调工作。并由以下单位进行专项设计:外装饰幕墙由沈阳远大铝业工程有限公司负责设计;内装饰由苏州金螳螂建筑装饰有限公司设计;地下室人防部分由江苏省第二建筑设计研究院设计;建筑智能由东大智能化系统有限公司及清华同方股份有限公司设计。 2、施工情况: 1)各专业施工时间跨度。本工程自2000 年 10 月 18 日破土动工,桩基及支护施工时间跨度为 2 个月,土方施工 1 个月,基础分部 2 个半月,主体结构 6 个月,建筑装饰分部 10 个月,安装工程施工 24 个月(包括建筑智能的施工)。 室外总图工程施工 3 个月。 2)参加各方的单位名称、负责人及施工内容列表如下: 序备施工单位负责人施工内容 号注 1 扬州市桩基 于金涛 桩基的钻孔灌注桩,支护的井点降水、水公司泥土桩、土方开挖 / 回填。 地基及基础分部:地下防水的地下涂料及 卷材防水、防水混凝土,混凝土基础的各 分项工程及后浇带。主体结构:混凝土结 构的模板 / 钢筋、混凝土;砌体结构的砖 2 扬州市建筑张利祥、砌体、混凝土小型空心砖砌块。装饰装修:地下室细石混凝土面层、墙面抹灰及墙面 工程公司凌亚康水性涂料涂饰,防火门安装; 17F 以上陶 瓷地砖地面,墙面水性涂饰,塑料窗安装 及防火门安装。卷材防水屋面。室外子单 位工程混凝土道路及石材饰面,雨污水系 统及化粪池。 沈阳远大铝 3 业工程有限闫成林、幕墙工程的玻璃幕墙、金属幕墙。钢结构公司(扬建分赵超焊接、安装及涂饰工程。铝板吊顶。 包) 主楼 6-16F 装饰装修:地面地毯、石材、苏州金螳螂木地板面层、陶瓷砖及抗静电地板,暗龙4 建筑装饰有李恒星骨吊顶工程的纸面石膏板 +矿棉板饰面、 限公司铝板吊顶;墙面石材饰面板及乳胶漆涂饰 工程;部分会议室软包;细部处理包括橱

桥梁桩基监理评估报告

廊桥工程 桩基子分部 廊桥工程 XX有限公司

7、 8 9、 桩基础子分部工程质量监理评估报告 我公司受业主委托,对该工程桩基础子分部进行施工阶段的工程监理,该 工程桩基础子分部工程于 XX 年11月6日开始施工,经业主方、监理方、施 工方三方共同努力于2019年1月10日完成颐荷-颐荷廊桥桩基础子,该工程 项目(部位)桩基础子分部目前已具备验收条件,我监理部对该桩基础子分部 工程施工过程中的实际监理情况及工程质量的评价意见如下: 、桩基工程简述 1、工程名称: 2、工程地点: 3、参加单位: 建设单位 设计单位 勘察单位 监理单位 施工单位: 二、监理质量评估依据: 《建筑地基基础工程施工质量验收规范》(GB50202-2002) 《城市桥梁工程施工与质量验收规范》 (CJJ2-2008) 10、本工程有关设计图纸、技术核定单、有关的标准图集及说明等技术文1、 2、 3、 4、 5、 6、 《公路桥涵施工技术规范》(JTJ 041-2011 《建筑工程施工质量检验统一标准》( GB 50300-2001) 《钢筋焊接及验收规范》(JGJ 18-2003 《混凝土结构工程施工质量验收规范》(GB 50204-2002) 《工程测量规范》(GB50026-2007) 《建筑桩基技术规范》(JGJ94-2008) 《建设工程监理规范》(GB50319-2000)

11、监理合同、施工合同、设计委托合同 12、国家和地方政府发布的工程建设标准强制性条文和相关的施工质量验收规范 13、经总监审批的施工组织设计 14、监理规划和监理实施细则 三、主要监理工作内容 1、施工企业现场管理制度执行情况 施工企业现场施工,安全保证体系,质量保证体系健全,特种作业人员持证上岗,在桩基子分部工程施工中,。施工班组在每道工序完成后进行自检,施工完成后在自检合格后报施工单位进行复检,认定工程质量符合设计和规范要求后报验,对存在的问题及时整改。 2、监理桩基工程质量控制要点 1)施工准备阶段 在冲孔灌注桩施工前,监理人员首先对施工单位提供的施工组织设计方案进行了认真的审核,并提出自己的审核意见,同时编制桩基监理实施细则。对进场的钻机、经纬仪及电焊机筝施工机械设备、仪器仪表审核其出厂合格证及检定证书等资料,符合要求,同意在工程中使用,对进场的钢筋、焊条等材料,检查其合格证,同时做好材料见证取样送检,实行材料使用监理审批制度,监理人员在施工用材料进场前,按规范要求现场见证取样并送检。核查商品砼公司的资质,经检查砼原材料质量控制资料齐全,均符合设计及有关规范要求,同意在工程中使用。经检查现场具备开工条件,同意柱基开始施工。 2)施工过程阶段 ①、测量放样控制:根据与业主签订的《监理委托合同》,对施工阶段进行了全过程监理,监理过程中,监理人员首先对施工单位的控制点引测及各柱位放样结果进行认真复核,符合要求。 ②为能更形象具体的体现性的施工情况以及每一根性的其体情况,项目多的监理人员对桩进行了认真汇总,对有异常情况的桩均反时与业主、设计院等单位联系征询意见,使质量达到设计及施工质量验收规范要求。在整个施工过程中牢固树立严格