当前位置:文档之家› ARTEB-车灯模具设计标准-

ARTEB-车灯模具设计标准-

REVISIONS

Revis?o caderno de encargos Standard book revision Data: 27/05/2004 número: 01 Date: 23/12/2005 number: 02

INTRODUCTION TO THE STANDARD BOOK FOR INJECTION MOULDS 1- The critical analysis will be performed by the supplier with suggestions from ARTEB engineering, but with total responsibility of the supplier based in the product drawing with RR (repeatibility and reprodutibility)

Obs.: ARTEB engineering can be asked to offer any kind of consulting during the mould construction (eg.: kind of steel, material input, extraction, etc.) however the supplier is responsible for the mould performance and process.

2- The supplier must include in the final project, the drawing of the hot chamber with its map respecting the pattern mentioned in the standard book which has been delivered with the pre project for quotation.

3- The mould only will be released for the 1st try out at ARTEB, after the visit of ARTEB engineering, which will verify: refrigeration test in process temperature; cavity finishing aspect (as product drawing); mould identification plate as ARTEB standard, plate with refrigeration map as ARTEB standard, plate with hot chamber map as ARTEB standard, connections of the refrigeration system as ARTEB standard, connections of the hydraulic male system as ARTEB standards, electrical installation (hot chamber, heating system by resistance, end of course micro) as ARTEB standard; tappings and micros fixation;

dimensions manifold or refrigeration couplings Staubli as ARTEB standards, mould fundamental dimensions as book, centering ring dimensions, as ARTEB standards, groove or fixation flap dimensions as ARTEB standards, type of coupling for extraction as ARTEB standards, kind of lubricant applied on the mobile areas (extraction, slides, male part of the moulds, etc) as ARTEB, type of protective anti-corrosion for the cavities as ARTEB standards, performance of the mechanical parts of the mould.

4- For each try out at Arteb, the supplier should send a tollmaker for following it besides making little adjustments when necessary.

5- The approval for the mould payment after 2.000 cycles, taking into consideration the rate of rejected parts after the process stabilization

Obs.: a- Such rate can vary from 1,5 to 2% (depending on the department) for the thermoplastics and 1,5% for the thermofix (BMC)

b- The injection of 2.000 cycles for approval will be counted only after the try out report by all the involved departments at Arteb (Tooling room, manufacturing, product engineering, process engineering and quality)

6- The mould guarantee (functional, material, cycling) will be of 500.000 cycles Obs.: The supplier should guarantee the cycling timing indicated in the project 7- The final approval will be made only in a lot produced at Arteb.

Obs. 1 – All the above mentioned information is valid for internal and external suppliers

Obs. 2 – The books will be subject to revisions (in the quotations and moulds projects it is very

important to verify if the revisions of the standard book cover are identical to the ones

in the book)

OPTICAL

UNIT STANDARD

AND PATTERNS (PC lens moulding)

REFRIGERATION

MANIFOLD

SYSTEM STANDARD : NMP - 231

HOT MAP PLATE

Standard: NMP -201

HOT CHAMBER MAP PLATE.

(Plástic/optic unit /bezel).

The plate must be fixed on the tooling side ,turned to the injection machine operator.

Hot chamber plug

sample

Standard: NMP -201

Resistência Termopar

CENTRAL

EXTRACTION

CLAMP SAMPLE

Standard: NMP00102

TECNO-ENGATE \ BLOCO óPTICO

PLASTIC PATERNS

AND STANDARD (Housings,lens,others)

REFRIGERATOR SISTEM CONECTIONS

Male(tooling) Female(injetion machine)

In case of multiple entrance and exit , to pul a manifold to distribute water ( entrance and exit with pattern connection )

OBS: The fool must be delivesed with all bridges ready and hoses adequated to process temperature

BEZEL PATTERNS

AND STANDARDS (Bezel and reflector in PC,PBT and PEI)

HOSE FOR PEI INJECTION EXAMPLE

(ULTEM/GE – BEZEL)

In case of multiple entrance and exit , to use maniofold for water distribution Female(tooling) Male(injection machine)

To use the sistem above for all tooling injected at Bezel sector.

Only entrances and main exits,bridges can use the same connection used on the plastc sector

PATERNS AND STANDARDS COMMUON TO ONE OR MORE SECTORS.

HIDRAULIC CONNECTIONS

Male start for hidraulic connections-Example.

IN

OUT

Hidraulics connections start must obey the a bove configuration (entrance-male/exit-female) It must be lacated on the operator opposite side .

COURSE END MICRO FIXATION AND

PLUG

(All departaments)