序号名称计算公式单位工程量屋顶WKL1(1B)(7.5+7.47+7.41*6+7.73+7.92+4.22)*(0.75-0.12)*2-0.2*m²#NAME?屋顶WKL2(11B)(3.63+3.52+4.78*2+2.6*2)*0.75+(1+7.41+7.4*6+7.82*m²#NAME?屋顶WKL3(10B)(3.34+3.07)*0.75+(0.99+5.3+13.4+16.9+28.2+5.68)m²#NAME?屋顶WKL4(11B)(28.06*2+1.28+1.65+1.26+0.96+39.65*2)*0.63-0.2*0m²#NAME?屋顶WKL5(3B)23.11*0.63*2m²#NAME?屋顶WKL6(3A)(3.73+3.6+3.66+1.74+1.76)*0.75*2m²#NAME?屋顶WKL7(3B)(7.21+14.87)*0.63*2m²#NAME?屋顶WKL8(3B)(7.21+3.6+1.05+7.32*2+7.31*2)*0.63+2.3*0.75m²#NAME?屋顶WKL9(3B)(7.25*2+7.36*2+7.32*2)*0.63m²#NAME?屋顶WKL10(3B)(7.35+7.17+7.36)*0.63*2m²#NAME?屋顶WKL11(3B)(7.36+7.17+7.31)*0.63*2m²#NAME?屋顶WKL12(3B)(7.37+7.11+7.31)*0.63*2m²#NAME?屋顶WKL13(3B)(7.31+7.11+7.31)*0.63*2m²#NAME?屋顶WKL14(3B)(5.64+7.11+7.31)*0.63*2m²#NAME?屋顶WKL15(3B)(4.03+7.06+7.23)*0.63*2m²#NAME?屋顶WKL16(3B)(3.13+7.06+7.26+0.54)*0.63*2m²#NAME?屋顶WL1(2B)(69.36+23.85)*.75+(68.89+21.69)*.63-(.4+.2)*.53*9m²#NAME?屋顶WL2(3A)屋顶WL3(2A)屋顶WL4(2A)9.83*0.65*2+4.3*0.53*2+39.53*0.53*2-0.2*0.53*12-0.m²#NAME?屋顶WL5(1)(3.3+2.2+2.3)*.33+(.8+2.3)*.45m²#NAME?屋顶WL6(2)(7.65+7.52)*.53*2-.2*.53*4-.35*.63*2m²#NAME?屋顶WL7(3A)20.53*.53*2-.2*.53*4-.35*.63*4m²#NAME?总计m²#NAME?工程量计算书
西安电大直属四分校———建筑工程估价课程实训
XXXXXX工程施工图预算工程量计算书 学校名称:西安电大直属四分校 学生姓名: 崔海波
学生学号: 1361101406691 班 级: 13 春西安电大直属四分校———建筑工程估价课程实训工程名称:XXXXXX化工有限公司办公楼-土建、装饰序号定额编号分部分项工程名称单位数量计算公式
11-4-1人工平整场地m2723.0021、(12.44*2+14.4*2+15.44*2+5.84*2+8.56*2)*2=226.72
2、(10.44*14.4-1.2*10.56)*2+13.44*16.44=496.28(一层面积)
小计:1+2=723.002
21-3-9机械挖土m3437.351、原位置挖土:((42+3)*(15+1.65+2.85)-14.4*(6-0.25)*2-(2.85-1.65)*
(10.8-3.3)*2)*(0.65-0.15)=346.95
2、南移4m超挖部分:((13.2+1.65*2)*4+(3.6*4-0.05)*2*4)*0.5=90.4
小计:1+2=437.35
31-2-1人工挖土m3149.191、150厚设计余土:346.95/0.5*0.15=104.085
2、定额规定:(346.95+104.085)*0.05*2=45.1035
3、南移4m超挖部分150厚设计余土:90.4/0.5*0.15=27.12
4、南移4m超挖部分定额规定:(90.4+27.12)*0.05*2=11.752
小计:104.085+45.1035+27.12+11.752=188.0605
41-3-12机械挖湿土m3716.689总:((42+3.2+(0.65+0.925)*0.33)*(15+1.75+2.95+(0.65+0.925)*0.33)-
14.4*5.75*2-(2.95-1.75)*(10.8-3.5)*2)*(0.65+0.925)+0.33*0.33*
1
工
程
量
计
算
书
2
某砖混二层办公楼
建筑面积:
①一层:S1=12.24×8.24=100.858m2
②二层:S2=12.24×8.24=100.858m2
③一层底檐廊:S1=12.24×1.2/2=7.344m2 (走廊、檐廊)
④二层走廊:S2=12.24×1.2/2=7.344m2 (挑廊、走廊)
[注:P59页第4.2.11条:有永久性顶盖无围护结构的应按其结构
底板水平面积的1/2计算。 仅指顶盖〈挑檐〉]
⑤室外楼梯:S=0〈无永久性顶盖的室外楼梯不计算建筑面积。〉
∴ ∑S总建筑面积=100.858×2+7.344×2=216.40m2 3 工程量清单编制
A.1 土方工程
项目编码 项目名称 项目特征 计量单位 工程量
010101001001 平整场地
m2 108.20
(A 1-26)
010101003001
挖沟槽 m3 109.34
V=L·B·H
=[(12+8)×2+(8-1.2)×2]×1.2×(2-0.3) 高
=53.6×1.2×1.7=109.344 m3 B
010103001001 土方回填 m3 95.33
(A1-29)
分析:
⑪室内回填:100mm厚C10砼垫层,20mm 1:2水泥砂浆抹面
h回填高度=0.3-(0.1+0.02)=0.18m
V=S净×h净=(12-0.24×3)×(8-0.24)×0.18=15.756 m3
编号工程项目名称计 算 公 式工程数量单位备注景墙、围墙、水系0.9米矮墙(7/X06)结构根据竣工图挡墙归入入户平台及台阶中
600×350×50黄锈石荔枝面A区541.288*0.35#NAME?㎡F1-131.82+0.87+0.9+1.96+2.33#NAME?F1-140.819+1.9+2.26+1.965+0.9#NAME?C1-130.8+2.34+2.76+2.37+0.9#NAME?C1-120.83+1.73+2.29+1.8+0.9#NAME?F1-150.74+1.61+2.22+1.67+0.9#NAME?F1-162.21+2.06+0.9+0.75+1.93+1.96#NAME?C1-120.83+1.73+2.29+1.8+0.9#NAME?F1-150.74+1.61+2.22+1.67+0.9#NAME?F1-162.21+2.06+0.9+0.75+1.93+1.96#NAME?D1-50.72+1.71+2.2+1.73+0.9#NAME?D1-60.835+1.64+2.295+1.72+0.9#NAME?B区F1-70.79+1.76+2.25+2.09+0.9#NAME?F1-80.87+1.92+2.33+1.99+0.9#NAME?F1-90.81+1.85+2.27+1.89+0.9#NAME?C1-110.518+1.43+1.978+1.93+0.9#NAME?F1-10.74+2.24+2.2+1.93+0.9#NAME?F1-20.8+1.97+2.26+1.92+0.9#NAME?F1-30.829+1.98+2.289+2.08+0.9#NAME?C1-90.91+1.78+2.36+1.83+0.9#NAME?工 程 量 计 算 表
第 1 页 景墙、围墙、水系等
编号工程项目名称计 算 公 式工程数量单位备注工 程 量 计 算 表