Monthly Issue Summary
- 格式:xls
- 大小:20.50 KB
- 文档页数:4
DatePart NO.SupplierPart Name2013.10.0920.0555.8.006Nanjing DoublestarsCatch Cam
2013.10.1220.1579.8.000Elektra Industrial ChinaRear Wall A-Cool IM only BM2013.10.12.20.1527.8.001Elektra Industrial ChinaCoverGVWMAT052013.10.1420.1579.8.000Elektra Industrial ChinaRear Wall A-Cool IM only BM2013.10.1820.0555.8.006Nanjing DoublestarsCatch Cam2013.10.1920.1448.8.001Elektra Industrial Chinadetection pin GVWMAT052013.10.2115.5925.8.000Yueqing Dongnan ElectronicsMicroswitch
2013.10.2120.1579.8.000Elektra Industrial ChinaRear Wall A-Cool IM only BM2013.10.2120.1600.8.000Elektra Industrial Chinabearing GIKICF2013.10.2320.1549.8.000Nanjing DoublestarsHousing2013.10.2315.5271.8.000Zoppas Industries Hangzhou Ltdheating foil2013.10.2420.1543.8.000Universal DPL WuhuCover GIKICF2013.10.2420.1547.8.000Universal DPL Wuhulink GIKICF2013.10.2420.1582.8.001Universal DPL WuhuHousing2013.10.2420.1550.8.000Nanjing DoublestarsHousing
2013.10.2615.5662.8.001Panda MechatronicsMetal Hopper Carrier A-Cool
2013.10.2815.5925.8.000Yueqing Dongnan ElectronicsMicroswitch2013.10.2820.1549.8.000Nanjing DoublestarsHousing2013.10.2820.1526.8.001Elektra Industrial ChinaHousingGVWMAT052013.10.3020.1552.8.000Nanjing DoublestarsCover
2013.10.3020.0555.8.006Nanjing DoublestarsCatch Cam2013.10.3115.5771.8.001Auger X-CoolSumer d.o.o.QuantityLot NO.ResultTest Decision4000801310090008/9NOKreturn to supplier
572801310120009/8NOKrelease4800801310120001NOKrelease242801310140018NOKrelease10000801310180008NOKrelease400801310190001NOKrelease10000801310210010NOKrelease
1310801310210014/15/16NOKrelease2000801310210018/19NOKrelease4800801310230007/8/13/14/15NOKrelease1000801310230017/18NOKrelease968801310230021NOKrelease714801310230022NOKrelease1008801310230023/24NOKrelease4800801310240007/8/9NOKrelease
180801310260003NOKrelease
10000801310280001NOKrelease880801310280009NOKrelease10584801310280014NOKrelease6000801310300006/7/8/9NOKrelease
9000801310300010/11NOKrelease3456801310310007NOKwaiting for confirmationNoteburr/short shot
Sink MarkburrSink MarkburrDimension out of toleranceForce Out of tolerance
Sink MarkDimension out of tolerancedirtydirtydirtydirtydirty/scratchdirty
dirty/scratch
Force Out of tolerancedirtyemergency opener brokenburr
short shotcorrison /dimension out of toleranceFurther ActionsBurr caused by tool problem,the feedback is we can use temporary--need to double check whenEdi Kick and Ritz Martin In emz chinait is best situation supplier can produce--need to double check when Edi Kick and Ritz Martin in emz chinatool go to modification--will check the effetiveness on 21st NOV,2013it is best situation supplier can produce--need to double check By Edi Kick and Ritz MartinBurr caused by tool problem,the feedback is we can use temporary--need to double check whenEdi Kick and Ritz Martin In emz chinaMr Lang Markus have already changed the drawing ,finish!2 pcs failed in the incoming inspection,but if we mesurethe failure partsagain,it become OK ,need germany support how to handle this issueit is best situation supplier can produce--need to double check By Edi Kick and Ritz MartinSupplier will adjust the injection parameter ,emz will check the nextshipmentno corrective actioninfo had been sent to supplier ,planning to visit this supplier in futurenot a critical issue ,but informed supplier to notice this problemnot a critical issue ,but informed supplier to notice this problemnot a critical issue ,but informed supplier to notice this problemno corrective actionno future with this supplier ,the technical and quality control is toopoor,have finished audit with YUKING,YUKING is better3pcs failed in the incoming inspection,but if we mesurethe failure partsagain,2 pcs become OK ,need germany support how to handle this issueno corrective actionnow supplier use baking before ship to emz (1 hour ,50 degree)no corrective actionBurr caused by tool problem,the feedback is we can use temporary--need to double check whenEdi Kick and Ritz Martin In emz chinawaiting feedback from Anton