Vendor Evaluation Questionnaire-AKFP-20060912[1].

  • 格式:doc
  • 大小:136.50 KB
  • 文档页数:5

4.1 Bank Foshan Branch, Bank of China Renming West Road,Foshan, Guangdong(name) (address) Contact Mr. Yu Jiming +86-757-8280 2043 /+86-757-8281 7010(name) (telephone/fax)(name of entity)ANDRITZ-KENFLO FoshanPump Co., Ltd(title)4.2 Annual Dollar Volume (each of last seven years):1. 1999 USD 1860K2. 2000 USD 3220K3. 2001 USD 3850K4. 2002 USD 5280K5. 2003 USD 9350K6. 2004 USD 13010K7. 2005 USD 19810K4.3 Is Certified Financial or Income Statement available? Yes√No(If yes, please attach latest copy and insert our name on your annual distribution list)4.4 [Not used]4.5 [Not used]4.6 Insurancea) Indicate the amount of wrap-up comprehensive general liability insurance and site “AllRi sk” insurance for which you are presently covered: USD 64Kb) Indicate the amount of automobile insurance for which you are presently covered:USD 2.5Kc) Other Insurance: USD 7K4.7 Has your Company ever cancelled a Contract before completion of the work:Yes No √Have you ever declared bankruptcy or restructured the Company to avoid bankruptcy:Yes No √Do you have any judgements, claims, or lawsuits pending:Yes No √If yes, Provide Details://///5.0 RESOURCES5.1 Provide details as to resources and capacities in engineering, procurement, fabrication andconstruction (as relevant to the Works)Manufacturing and assembling Centrifugal Pumps 3000 units.Manufacturing and assembling Double Suction Pumps 300 units.Manufacturing and assembling agitators 1000 units.5.2 Typical organization chart for equivalent projects.See attachments.5.3 Expected resources required (man-hours):(Note: All pump design& research are be done in ANDRITZ AG/ Austria, the ANDRITZ-KENFLO Foshan Pump Co., Ltd are only for manufacture and sales)5.4 Typical Fabrication Plan for equivalent worksIn House Fabrication:∙Major components – Listing of, $ Value and Size ofVolute casing (Material GG25 or 1.4460)Casing cover (Material GG25 or 1.4460)Impeller (Material: 1.4460)Wear Lining (Material: 1.4460)Bearing housing (Material: 1.4460)Pump shaft (Material: 1.4462 0r 1.4404)∙Fabrication facility – name and locationMachine shop FoshanAssembly shop Foshan∙Details of facility capacity and resourcesA ssembly ShopCapacity: assembling 3000 units centrifugal pumps, 300 units double suction pumps and 1000 units of agitators.Resources: radial drilling machines, redial drilling machines, hydraulic jacks, cantilever cranes, electricity heat boxes, series of special tools for assembly.Machine ShopCapacity: manufacturing the major parts for 3000 units stock pumps 300 units double suction pumps and 100 units of agitators.Resources: Horizontal manual lathes, CNC Horizontal boring milling machines, Radial drilling machines, Vertical universal milling machines, vertical lathes, CNC horiaontal lathes, Grinding machines, CNC Vertical drilling machines, CNC vertical machining centers, Balancing Machines.Purchase/Contracted Components:∙Name of Sub Contractor / ManufacturerAndritz AG∙LocationAustria.∙Details of resources & capacity∙Approximate $ Values5.5 Purchased MaterialsPlease comment on your organization’s ability to procure steel and other bulk items in the current market place.Casting – From foundry of Kenflo Foshan pump co., Ltd, max. 7t/pcsShaft Material: from Europe5.6 Typical Contracting Plan for Saudi Arabia∙Type of ContractDirect Hire $ ValueSub Contract $ ValueList of key subcontractors and details of their resources and capacity $ Value.5.7 SubcontractorsRefer to section 3.46.0 LA BOUR RELA TIONS∙List all trades with whom you have contracts or working agreements; give expiration dates for these as it may relate to the intended subcontract/supply contract in connectionwith the Works.Have no.∙Third Country Nationals Labour - provide details regarding the potential sources of labour and their working contract conditions such as:∙Country of Origin∙Verification of Competency∙Health Verification∙Contracting Conditions∙Travel∙Payment MethodsHave no.7.0 HEA LTH A ND SA FETYDo you have a program? Yes √NoName of Manager responsible: Mr.Zhao Guangzhi2002 2003 2004 ∙Please supply corporate data for the last threeyears.Number of Lost Work Day Cases: 1 1 2Number of Restricted Work Day Cases: 3 2 4Number of Cases with Medical attention only: 1 1 2Number of Fatalitities:2002 2003 2004 Frequency = Number of Lost Time Accidents * x 2000.68% 0.68% 1.36%000Number of Hours Worked during theyearSeverity = Number of Days Lost x 200 000 2.0% 1.36% 2.72%Number of Hours Worked during theyear8.0 ENVIRONMENTA L PROTECTIONDo you have a program? Yes No √If yes, please attach.Name of Manager Responsible Mr.Zhao Guangzhi9.0 SA LES SERVICES∙Provide details of spare parts services program.Supply from ANDRITZ-KENFLO within one month after contract∙Provide information on in Kingdom services during warranty periodWe will send service engineer to site for service.10.0 QUA LITY A SSURA NCE10.1 Indicate quality system implemented:- CSA Z299- AQAP- MIL- ISO √- Other10.2 Provide a status of QA system third party certification.See attachmens.。