蒸车SQSLD11167
- 格式:pdf
- 大小:144.58 KB
- 文档页数:2
8PARTS MANUAL 8.1LIFT ASSEMBLY8.2LIFT ASSEMBLY PARTS LISTITEM QTY DESCRIPTION PART #1 1 TOWER WELDMENT, POWER SIDE 4-1010WELDMENT 4-11142 2 CARRIAGE3 8 GLIDEBEARING 2-0772NIPPLE 6-0000 4 4 GREASE7 2 PIN, CABLE EQUALIZATION 1-1887PULLEY 1-18988 6 2-POST9 2 HITCH PIN, 1/8” DIA 6-184111 8 LOCKWASHER,1/2”ID 6-0059NUT,1/2”-13UNC 6-0035 14 13 HEXPIN 1-233715 2 SAFETY16 4 SNAP RING ¾” EXT 6-244517 8 FLAT WASHER, 51/64”ID x 1”OD x 1/16”THK. 6-080818 1 SAFETY DOG WELDMENT, POWER SIDE 2-190119 4 SELF TAPPING SCREW, #10 X 3/8” LG. 6-0169SPRING 1-111520 2 SAFETY21 6 SELF TAPPING SCREW, #12 x 1/2”LG. 6-113422 3 SHOULDER BOLT, 3/8”DIA. x 1”LG. 6-0206PULLEY 1-041523 2 SAFETY24 3 SAFETY CABLE PULLEY 1-111625 1 SHOULDER BOLT, 3/8” x 1 1/2” LG. 6-080126 1 THIMBLE,5/32” 6-2074DECAL 6-176727 1 CAPACITY28 1 SERIALPLATE 6-111129 1 TOWER WELDMENT, SLAVE SIDE 4-101130 1 SAFETY DOG, SLAVE SIDE 2-087231 1 SHOULDER BOLT, 3/8”DIA. x 1 1/2”LG. 6-0801BAR 1-1439 32 1 ACTUATORGUARD 6-140433 1 FOAM34 1 CROSSMEMBERWELDMENT 2-1281 35 4 CROSSMEMBER PULLEY PIPE, 1/2"LG. 1-16233/4”ID 6-0738 36 16 FLATWASHER,37 2 CROSSMEMBER PULLEY PIPE, 1 3/4"LG. 1-162638 2 CROSSMEMBER PULLEY SHAFT 2-125139 4 COTTER PIN, 1/8”DIA. x 1 ½”LG. 6-097840 1 SAFETY COVER cw/DECALS, POWER SIDE 0-020441 1 SAFETY COVER cw/DECALS, SLAVE SIDE 0-0203ID 6-0058 43 4 LOCKWASHER,3/8”45 4 HEX BOLT, 5/16”-18UNC x 3/4” LG. 6-0423PIN 2-159446 4 ARM47 8 HEX BOLT 5/16-18 UNC x 1-1/4 LG. 6-2059RESTRAINTGEAR 1-2618 48 4 ARM3/8UNCx3/4”LG. 6-0030BOLT,49 4 HEX50 4 INNER ARM WELDMENT 3-0923ITEM QTY DESCRIPTION PART #ARMWELDMENT 3-0919 51 4 OUTERASSEMBLY 4-1134 52 4 ARMASSEMBLY 1-2634PAD53 4 STACK54 4 HEX BOLT ¼” x ¾” LG. 6-0178PAD 3-0872 55 4 RUBBERWELDMENT 2-1993 56 4 STACKPAD57 4 STACK PAD ADAPTER 3” 1-199358 4 STACK PAD ADAPTER 6” 2-1580ID 6-00561/4”60 6 LOCKWASHER,61 6 ROUND HEAD SCREW, 1/4”-20UNC x 3/8” LG. 6-1353NUT,3/4”-10UNC 6-0737 62 10 HEX3/4”ID 6-0738 63 10 FLATWASHER,64 10 WEDGE ANCHOR, 3/4”-10UNC x 5 1/2”LG. 6-137965 1 PLASTICKNOB 6-113566 1 SAFETY RELEASE HANDLE 1-111367 8 HEX BOLT, 1/2”-13UNC x 1 1/4” LG. 6-0046GROMMET 6-1507 68 3 RUBBERCABLE 1-147369 2 EQUALIZING70 1 SAFETY RELEASE CABLE 1-205871 7 HEX HD. NUT 1/4”NC 6-003272 2 6/32 SCREW (ELECTRICAL BOX) 6-146673 1 MICROSWITCH 6-091674 1 LIMIT SWITCH MTG. BRACKET 2-114375 1 ELECTRICAL UTILITY BOX 6-140376 1 CABLECONNECTOR 6-1133 77 1 ELEC. CABLE 12/3 x 117”LG. 6-1173EXTENSION 1-137978 1 ACTUATOR79 1 HEX HD. BOLT 1/4”NC x 2”LG. 6-074180 2 HEX HD. BOLT 1/4”NC x 1 1/4”LG. 6-002781 1 HEX HD. BOLT 1/4”NC x 1 ½”LG. 6-020582 2 SHOULDER BOLT, 3/8”DIA. x 5/8”LG. 6-006983 2 HEX5/16”-18UNC 6-0294 NUT,BRACKET 1-1378MTG.84 1 ACTUATOR85 2 WIRE ROPE CLIP, 1/16” 6-206086 3 ELECTRICAL CABLE CLIP, 5/8” ID 6-17591/2” 6-0536 87 6 TUBECLAMP,88 16 FLATWASHER, 3/8”ID SAE 6-006289 4 ARM LOCK HANDLE WELDMENT 1-2914SPRING 1-2942 90 4 ARMLOCK91 4 SPRING RETAINER CAP 6-30868.3HYDRAULIC SYSTEM8.4HYDRAULIC SYSTEM PARTS LISTITEM QTY DESCRIPTION PART #PACK 6-2055 1 1 POWERDECAL 6-2094OPERATION”2 1 “LIFTNUT,5/16”-18UNC 6-0294 3 4 HEX5/16”I.D. 6-0674WASHER,4 4 LOCKROD 2-12545 2 PISTON6 2 CYLINDER TUBE 2-1255017 2 MALE NIPPLE, 1/4”NPT 6-20958 2 1/8”NPT TO 1/4” JIC 6-0280CONTROL 6-15109 2 FLOW10 2 PISTON 1-146711 2 PISTON SEAL KIT 0-0337WASHER,5/16”I.D. 6-0295 12 4 FLAT5/16”-18UNCx1”LG. 6-0293 13 4 HEXBOLT,TEE 6-150614 1 BRANCH15 1 HYDRAULIC HOSE (LONG) 1-204016 1 HYDRAULIC HOSE (SHORT) 2-1230KIT 0-0338 17 2 GLANDCAP 6-1884 JIC18 2 1/4”* CYLINDER ASSEMBLY (NOT INCL. FLOW CONTROL) 3-0621018.5POWER PACK: #6-2055 (AB-1381) 208-230V/1PH/60Hz8.6POWER PACK PARTS LIST: #6-2055 (AB-1381) 208-230V/1PH/60HzITEM QTY. DESCRIPTION PART #CHECK6-1087CARTRIDGE1 1 VALVEAUTOHOIST6-2136INSTALLATION2 1 LABELBLADDER&6-1376CAP4 1 BREATHER6 1 MOTOR AC 208-230V. 2HP/1PH/60Hz, BLK 6-24746-2149AUTOHOISTWARNING7 1 LABEL9 1 SPRING 0.480” x 0.063” x 0.42” COMP 6-215121.5”6-2152x10 1 RETURNODHOSE3/8”6-2153NUT11 1 COMPRESSIONTUBE6-2154SLEEVETUBE12 1 COMPRESSION6-2155AUTOHOIST13 1 ENDHEADUNIVERSAL14 1 PUMPASSY 2.5 CC/REV. SHORT SPLINE 6-195815 1 RELIEF ASSEMBLY FIXED 190 BAR 6-131916 1 VALVE CARTRIDGE RELEASE MANUAL 6-088017 1 WIRING ASSEMBLY AC 1PH FENNER 6-2473G8TORX6-1090 18 2 BOLT3.00”5/16”-24x6-07741.260”SAE9T-20/4019 1 COUPLINGSAE9/16”6-2157 20 1 PLUMBINGPLUG21 1 SEAL SHAFT 0.500” x 1.00” x 0.25” 6-215822 1 WASHER 0.338” x 0.625” x 0.060” STEEL 6-21596-21613/8”NPT24 1 PLUMBINGPLUG25 1 PLUMBING MAGNET 6-216227 2 SCREW TAPTITE M6 x 1.0 12MM TORX 6-216428 1 COVER ASSY SUCTION 6-2165ADJ.6-2166INLETHOSECLAMP29 1 PLUMBING1.00”6-1392SHCSx30 1 BOLT5/16”-186-2167STEEL0.250”31 1 NUT ¾”-16 x 1” HEX xTOOTHLOCK 6-2168INT.32 1 WASHER¾”33 1 BRACKET – HANDLE ASSY REL BLACK 6-077634 4 BOLT M6 x 1.0 35MM SOC HD 6-2169HI-COLLARLOCK6-2170 35 4 WASHER¼”37 4 BOLT #12-24 x 0.50’ HEX WSHRHD 6-109138 1 PLUMBING ASSY INLET 17.24 (3) 6-0786CAPASSEMBLY 6-1089VALVE39 1 RELIEF22.50”OSBLK 6-1399 40 1 TANK6.7PLASTICWHITE6-1846LONG8”41 1 CABLETIE6-0875BUNA42 1 O-RING2-348。
Fashion Box2000WAnti-calcNon-stick soleplateGC1438/35Easy and Effective3 ways to make your ironing easierThis comfort steam iron makes your ironing easy and effecive with lots ofcontinious steam and the non-stick soleplate soleplate makes your gliding easier.With comfort iron the ironing job is now made simpler.Easy to remove creasesPower up to 2000 W enabling constant high steam outputContinuous steam up to 25g/min for good crease removalA fine spray evenly moistens the fabricSteam boost up to 100 g for the most stubborn creasesEasy gliding on all fabricsEasy gliding on all ironable garmentsLonger lifetimeCalc clean slider to easily remove scale out of your ironEasy to start ironingHeat resistant box for immediate storage after ironingDrip-stop system keeps your garments spotless while ironingLarge water tank 220ml and convenient water fillingBigger temperature dial for easier temperature adjustmentTriple precision tip for optimal control and visibilityHighlightsPower up to 2000 WPower up to 2000 W enables constant high steam output.Continuous steam up to 25g/minContinuous steam up to 25g/min for good crease removal.SprayThe spray function produces a fine mist that evenly moistens the fabric, making it easier to iron out creases.Non stick soleplateThe soleplate of your Philips iron is coated with a special non-stick layer for easy gliding performance on all ironable garments.Large water tankLess refilling with the extra-large 220 ml water tank so you can iron more clothes in one go.Temperature dialBigger temperature dial for easier temperature adjustmentDrip stop systemDrip Stop system lets you iron delicate fabrics at low temperatures without having to worry about stains from water droplets.Triple precision tipThe tip of this Philips iron is precise in 3 ways:it has a pointed tip, button groove and a sleek design of the nose. Triple Precision tip enables you to reach even into the most tricky areas,e.g. around the buttons or between the pleats.Calc clean sliderThis steam iron can be operated with normal tap water and the calc clean slider makes it easy to remove any built-up scale out of your iron. To maintain the performance of your Philips steam iron, you should use this scale clean function once a month when using normal tap water.Heat resistant storage boxThis heat resistant storage box is designed for storing the hot iron easily and immediately after use.100 g steam boostApplying the steam boost will release a steam shot up to 100 g to remove even the toughest creases.SpecificationsFast crease removal Voltage: 240 V Continuous steam: 25 g/min Power: 2000 WSteam boost: 100 g Easy to useWater tank capacity: 220 mlPrecision steam tipDrip stopStorageStorage solution: Heat resistant boxGreen efficiencyUser manual: 100% recycled paper© 2019 Koninklijke Philips N.V.All Rights reserved.Specifications are subject to change without notice. Trademarks are the property of Koninklijke Philips N.V. or their respective owners.Issue date 2019‑07‑31 Version: 4.1.1。
LSES AutoclavesVacuum & Non-Vacuum Autoclaves SES 113, 113B, 225B and Little Sister SHS800THERE ARE STILLSOME THINGS IN LIFE YOU CAN TRULY RELY ONLike the Eschmann range of Infection Control products. In terms of quality and reliability Eschmann products are acknowledged as second to none,the very best in medical engineering technology for over 100 years – yourassurance for complete confidence.Through a well-establishedrelationship of trust with dentists,general practitioners and healthcare professionals, we have maintained an unrivalled record of development and innovation, resulting in a world class and constantly expanding product range. The SES autoclave range incorporates the very latest technology, allowing you to meet all current and future guidelines.So, when it comes to decontamination,if you want market-leading performance and total peace of mind, time after time,there’s only one choice – Eschmann.ENJOY COMPLETE CONFIDENCEvacuum andnon-vacuumSIMPLE RECORD KEEPING The Cycle Logger allows the automatic download of cycle data from your SES113, 113B and 225B autoclaves. The data can then be quickly and easily transferred to your computer for future reference.Simple 3 step processInstall cycle logger E RECORD KEEPINGSIMPLE REC Logger allows the automatic The Cycle Logge of cycle data from your SES113, download of cyc 225B autoclaves. The data can 113B and 225Btechnicalinformation113 AND 113B TECHNICAL INFORMATIONSES 113B - B Type Vacuum Unit(Cat No. 87-123-70)• Overall Dimensions - l/w/h520 x 580 x 430mm• Chamber Dimensions - d/l200 x 345mm• Tray capacity - 6 examination trays(180 x 140mm)• Weight - 39kg• Electrical Connection - 230v, 13ampSES 113 - N Type Unit (Cat No. 87-113-70)• Overall Dimensions - l/w/h - 520 x 580 x 430mm• Chamber Dimensions - d/l - 200 x 345mm• Tray capacity - 6 examination trays (180 x 140mm)• Weight - 37.5kg• Electrical Connection - 230v, 13amp225B TECHNICAL INFORMATIONSES 225B - B Type Vacuum Unit (Cat No. 87-133-70)• Overall Dimensions - l/w/h580 x 580 x 430mm• Chamber Dimensions - d/l257 x 451mm• Weight - 46kg• Tray capacity - 15 examination trays(180 x 140mm)• Electrical Connection - 230v, 13ampN Type Cycle times• Without drying - 12 minutes• With drying - 30 minutesB Type Cycle times• Without drying - 22 minutes• With drying - 45 minutesCycle times• B type cycle without drying - 22 minutes• B type cycle with drying - 45 minutes• N type cycle without drying - 12 minutes• N type cycle with drying - 30 minutes SES113 autoclaves come with a tray carrier, pouch rack, 1 standard and 1 examination tray as standard.SES225 autoclaves come with a tray carrier, pouch rack, 1 standard and 1 examination tray as standard.non-vacuumautoclavesSES 2000 TECHNICAL INFORMATIONSES 2000 Long (Cat No. 87-028-53)16 litre chamber capacity Overall Dimensions - l/w/h460 x 650 x 360mm Chamber Dimensions - d/l 200 x 500mmWeight - 35kgTray capacity - 2 x SES 2000 Stainless Steeltrays (or 6 examination trays)Electrical - 230v, 13amp220/240v option availableCycle time at 134° - 13 minutes, no drying Drying time 17 minutes 2 litre capacity reservoirAutoclaves SES 2000 Long autoclaves come with a tray carrier and two special SES 2000 long stainless steel trays.Pressure safety valve, pressure door lock, electrical door lock, door safety catch,door interlock switch, chamber pressure indicator, overheat protection withhandpiece Autoclavessteriliserinstruments, making them ready for immediate use. Alternativelythey can be packed and stored for up to 21 days (Ref: HTM 01-05).SHS800 is ideally suited to the re-sterilising of instruments thatHandpieces SolidsSterilisation time 3.5 minutes 3.5 minutesSterilisation temp.134º C134º CTotal cycle time*9 minutes7 minutesOverseas enquiries please call:+44 (0) 1903 753 322 or******************.uk。
·产品识别有限保修兹保证本品自初始安装之日起二(2)年内、自出厂之日起30个月内,无材料与/或制造缺陷。
任何部件或组件如在质保期内经证实出现材料与/或制造缺陷,可无偿予以更换或维修(由 Prince Castle 公司的决定)目录产品识别 ---------------------- 1 品铄厨具设备(上海)有限公司889号5幢 电话:021-6040-1728 邮编:产品按钮2和下箭头按钮产品按钮3将设备从纸板箱中取出,检查是否有损伤。
如果设备存在损伤,请按 如下方式进行处理:•设备送达后24小时内,通知承运人 •保留纸板箱及包装材料备检•与当地经销商联系,或者直接与品铄销售部联系,确定更换设备事宜,联系电话 021-6040-1728。
• 将设备放置于牢固、平整的台面上。
在设备两侧各放置一个收纳盘。
• 取下包装材料,用清洁液清洁蛋环、顶盖、蛋环支架、加热板表面及接水盒之后用清水洗净自 然风干。
注意:该设备工作时环境温度不可高于43℃(110℉)所有的电路连接应遵守当地的电气法规和任何其它适用的规定。
设备附带IEC 309 16A 插头,必须接入合格、合规的插座中。
为了防止触电事件,此配备必须用等电位连接导体与设备紧密连接。
设备配有接地端子并标有以下符号标记,用于连接导体。
本设备为商用设备,须由经过培训的专业人士操作。
未经培训或人体、感官、精神控制能力有缺陷者不得操作表示指导正确操作设备的重要信息。
不遵守规定可不按额定电压供电可能会损坏设备,并使保修失效表示指导操作设备的重要信息。
不遵守规定可能导3. 将鸡蛋按顺序打开到蛋环中,用专用夹子将蛋黄夹碎。
注意:鸡蛋应至少提前30分钟从冰箱取出。
过冰的蛋可能导致烹饪不熟。
打蛋的顺序如下图所示。
sEC6-RDCE盖上顶盖,加温水到顶盖的水槽内,直至加注意:水量多少会影响蒸蛋品质,请加满水。
5. 按下产品按键(1、2、3、中任意一个)始倒计时。
Parts Manual Gas Floor Type Convection SteamerSeries: SteamCraft Model 24CGA10CLEVELAND RANGE 24CGA10SEQUENCE OF OPERATIONSMechanical Timer1.To turn the unit on, depress the red on/off rocker switch.•115 VAC is sent to the red indicator light.•115 VAC is sent to normally open drain valve closing it.•115 VAC is sent to H and N of the water level board•115 VAC is sent to the timed/manual switches.•115 VAC is sent to the heat standby timer which will energize the R5 relay 20 seconds every 6 minutes to maintain heat while unit is idle2.With the water level board energized and no water in the generator•After a 5 second delay 115 VAC is sent from the FILL terminal to the fill solenoid.•The fill solenoid opens and the generator fills through the drain valve.•The water fills to the low probe shorting it to ground•115 VAC is sent from the HEAT terminal to the 24 VAC heat circuit transformer.•3.When the timed/manual switch is in the timed position and time is on the timer for the topcabinet only•115 VAC is sent from the timer to the coil of the R6 relay.•The R6 relay energizes•R6B contacts close sending 115 VAC to the timer motor.•R6A contacts close sending 115 VAC through the door switch (optional) to the steam solenoid, condensate solenoid and R1 relay.•R1 is energized closing the R1 contacts.•24 VAC is sent from the 24VAC transformer to the normally open contacts of R2.•24 VAC is sent from the 24VAC transformer to the R4 coil.•R4 is energized and the R4 contacts are closed.•24 VAC is sent to one side of the ignition module.•24 VAC is sent to the R3 relay coil•R3 is energized and the R3 contacts are closed.•115 VAC is sent through the now closed R4 contacts to the normally open steam relief valve closing it.•115 VAC is sent to the fan motor.•The fan motor is energized and the air prover switch closes.•24 VAC is sent through the normally closed highlimit and the now closed air prover switch to the other side of the ignition module.4.With 24 VAC to both sides of the ignition module.•Spark is sent to the igniter.•24VAC is sent to the pilot coil on the gas valve and gas is sent to the pilot.•When flame is generated and 1.0 micro amps DC is detected, 24 VAC is sent to the main coil of the gas valve igniting the main burner on low flame.•Steam is energized and sent to the cooking compartment.•When the mechanical timer times down a buzzer will sound and the timer will open removing 115 VAC from the heat circuit.5.When the timed/manual switch is in the timed position and time is on the timer for thebottom cabinet only•115 VAC is sent from the timer to the coil of the R7 relay.•The R7 relay energizes•R7B contacts close sending 115 VAC to the timer motor.•R7A contacts close sending 115 VAC through the door switch (optional) to the steam solenoid, condensate solenoid and R2 relay.•R2 is energized closing the R2 contacts.•24 VAC is sent from the 24VAC transformer to the normally open contacts of R1.•24 VAC is sent from the 24VAC transformer to the R4 coil.•R4 is energized and the R4 contacts are closed.•24 VAC is sent to one side of the ignition module.•24 VAC is sent to the R3 relay coil.•R3 is energized and the R3 contacts are closed.•115 VAC is sent through the now closed R4 contacts to the normally open steam relief valve closing it.•115 VAC is sent to the fan motor.•The fan motor is energized and the air prover switch closes sending 24 VAC to the other side of the ignition module.6.With 24 VAC to both sides of the ignition module.•Spark is sent to the igniter.•24VAC is sent to the pilot coil on the gas valve and gas is sent to the pilot.•When flame is generated and 1.0 micro amps DC is detected, 24 VAC is sent to the main coil of the gas valve igniting the main burner on low flame.•Steam is energized and sent to the cooking compartment.•When the timer times down, the closed contact will open removing 115 VAC from the heat circuit.•115 VAC will be sent through the now closed contacts to the 3-second timer.•For 3 seconds 115 VAC will be sent to the buzzer and it will buzzzzzz.7.When the timed/manual switch is in the timed position and time is on the timer for bothcabinets•115 VAC is sent from the timer through the door switch (optional) to both steam solenoids, both condensate solenoids and both relays.•Both relays are energized closing the relay contacts.•24 VAC is sent from the 24VAC transformer through the R1 and R2 contacts to the high coil on the gas valve.•24 VAC is sent from the 24VAC transformer to the R4 coil.•R4 is energized and the R4 contacts are closed.•24 VAC is sent to one side of the ignition module.•24 VAC is sent to the R3 relay coil.•R3 is energized and the R3 contacts are closed.•115 VAC is sent through the now closed R4 contacts to the normally open steam relief valve closing it.•115 VAC is sent to the fan motor.•The fan motor is energized and the air prover switch closes sending 24 VAC to the other side of the ignition module.8.With 24 VAC to both sides of the ignition module.•Spark is sent to the igniter.•24VAC is sent to the pilot coil on the gas valve and gas is sent to the pilot.•When flame is generated and 1.0 micro amps DC is detected 24 VAC is sent to the main coil of the gas valve igniting the main burner on high flame (the high coil was energized in step 7).•Steam is energized and sent to the cooking compartments.•When the timers time down the buzzers will sound and each timer will open removing 115 VAC from the heat circuit.9.When the water level reaches the high probe then 115 VAC is removed form the FILLterminal and the fill solenoid is turned off.10.After the water level drops below the high probe for 5 seconds 115 VAC is sent to the FILLterminal again.11.115 VAC is turned of by depressing the red on/off rocker switch.•115 VAC is removed from the timer and heating circuits.•115 VAC is removed from the normally open drain valve allowing the steamer to drain.•115 VAC is sent to the 3-minute timer.•The fill solenoid is energized for 3 minutes flushing the drain.。
MODELS CHS-85 through CHS-399User’s Information ManualCHS HIGH EFFICIENCY FIRE TUBE CONDENSING GAS BOILERThis appliance must be installed and serviced by a qualified in-staller or service technician. This appliance must be serviced and inspected annually when operating in normal residential ap-plications. Other applications (mercial or other more strenuous conditions) may require more frequent service and inspection. As the User of this equipment, you are responsible for ensuring maintenance is performed at the required intervals.It is also the User’s responsibility to ensure Vent and Combus-tion Air-inlet terminations are kept clear of obstructions.User Responsibilities:SAVE THESE INSTRUCTIONS:Installing Contractors, leave these instructions with the customer as it contains important information regarding annual inspection requirements, mainte-nance check lists, and shut down procedures. Affix instructions close or adjacent to the appliance.As the installing technician, it is your responsibility to ensure the installation is performed in accordance with the Installation and Operation Instructions as well as any applicable local or National installation codes. It is also your responsibility to inform the User/Owner of their obligation with respect to the above descrip-tion under “User Responsibilities”. Failure to follow this warning could result in fire, serious injury, or death.Installer Responsibilities:©Slant/Fin Corp. 2012 • 712 • PUBLICATION CHS-UIMCONTACT FOR SERVICE AND ASSISTANCEHeating Contractor:_______________________________________Phone__________________________________________Boiler Model #_______________________ Boiler Serial_________________________ Installation Date________________CHS User Information ManualCHS-85-3992Lighting / Shutting Down the ApplianceRead Before Proceeding - If you do not follow these instructions exactly, a fire or explosion may result causing property damage, serious injury or death.FOR YOUR SAFETY, READ BEFORE OPERATING _A) This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.B) BEFORE OPERATING smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. WHAT TO DO IF YOU SMELL GAS: • Do not try to light any appliance. • Do not touch any electric switch.• Do not use any phone in your building.• Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions. • If you cannot reach your gas supplier, call the fire department.C) Use only your hand to turn the gas “shutoff” valve. Never use tools. If the handle will not turn by hand, don'ttry to repair it, call a qualified service technician. Force or attempted repair may result in a fire or explosion.D) Do not use this appliance if any part has been under water. Immediately call a qualified service technicianto inspect the appliance and to replace any part of the control system and any gas control which has been under water.OPERATING INSTRUCTIONS _1. STOP! Read the safety information above very carefully.2. Set the thermostat to lowest setting. Turn off all electric power to the appliance.3. This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.4. Turn the manual gas valve to the OFF position. Remove front access panel.5. Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow “B” in the safety information above. If you don't smell gas, go to the next step.6. Turn the manual gas valve ON. Wait an additional five (5) minutes smelling for gas.7. Replace the front access panel.8. Set thermostat to highest setting. Turn on all electric power to the appliance. 9. Ignition sequence is automatic. Combustion will occur after a brief fan purge.10. If ignition does not occur, follow the instructions “To Turn Off Gas To Appliance” and call your service technician or gas supplier.TO TURN OFF GAS TO THE APPLIANCE _1. STOP! Read the safety information above very carefully.2. Turn off all electric power to the appliance.3. Turn the manual gas valve to the OFF position.User InspectionUser inspections do not eliminate the need for an annual inspection by a qualified service technician. Routine visual inspections allow the user to spot potential problems that may affect unit operation or occupant safety.Periodic Inspection Checklist (recommended monthly)☐ 1. Remove the front access cover. Check inside the unit for leakage from plumbing, venting or condensate. ☐ 2. Plumbing - Check outside the unit for leaky joints, water stains, or pooling fluid on the floor.☐ 3. Venting - Inspect all indoor exhaust vent and combustion air-inlet pipes and examine them for cracks ormisaligned joints. Water dripping from unsealed vent pipe connections is an indication that flue gases are escaping. Check vent terminations and make sure they are free of debris and obstructions.☐ 4. Condensate - The condensate trap and drain should have clear fluid in it. Check that the condensate is notbacking up onto the floor or spilling into the bottom of the appliance cabinet.☐ 5. Contact a service technician immediately if there is any sign of leakage, either inside or outside the unit.CHS-85-399User Information Manual CHS3Should overheating occur or the gas supply fail to shut off, close the Manual Gas Shutoff valve to the appliance. Failure to follow instructions could result in explosion causingproperty damage, serious injury or death.Do not use this appliance if any part has been underwater. Immediately contact a qualified service technician to inspect the unit and replace any damaged components. Failure to followinstructions could result in explosion causing property damage, serious injury or death.Service Technician InspectionThis unit must be inspected at the beginning of every heating season by a qualified service technician.Annual Inspection Checklist☐ 1. Lighting is smooth and consistent, and the combustion fan is noise & vibration free. ☐ 2. The condensate drain freely flows, and is cleaned of sediment. ☐ 3. Relief Valve and air vents are not weeping.☐ 4. Low water cut off is tested and flushed (if applicable).☐ 5. Examine all venting for evidence of leaks. Ensure vent screens are cleaned and clear of debris. ☐ 6. Check the burner plate for signs of leaking.☐ 7. The combustion chamber must be inspected and if necessary cleaned (Refer to Annual Maintenance andInspection section in the appliance Installation and Operating Instructions).☐ 8. Listen for water flow noises indicating a drop in appliance water flow rate. The hydronic system may requireflushing to eliminate hard water scale.Crystalline Silica – Carefully read the warnings and handling instructions in the Installation and Operating Instruction for Refractory Ceramic Fibres before commencing any servicework in the combustion chamber.Replace any gaskets or insulation discs that show any signs of damage. Do not re-use. Failure to follow these instructions may result in fire, property damage or death.Allowing the appliance to operate with a dirty combustion chamber will adversely affect its operation and void the warranty. Failure to clean the heat exchanger on a frequency thatmatches the need of the application may result in fire, property damage, or death.SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921•Canada: Slant/Fin LTD/LTEE, Mississauga, Ontario。
182M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sSTAR MANUFACTURING INTERNATIONAL, INC.Front Loading Steamer Main Body AssemblyRev. B1/18/13SK2276MODEL: FSF2M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sPARTS LIST August 31, 2009, Rev. EIMPORTANT: WHEN ORDERING, SPECIFY VOLTAGE OR TYPE GAS DESIREDPAGE 1 INCLUDE MODEL AND SERIAL NUMBEROF 1Some items are included for illustrative purposes only and in certain instances may not be available.202M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sSTAR MANUFACTURING INTERNATIONAL, INC.Main Body AssemblyRev. A10/25/11SK2281MODEL FS1 & FS22M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sPARTS LIST October 25, 2011, Rev. EIMPORTANT: WHEN ORDERING, SPECIFY VOLTAGE OR TYPE GAS DESIREDPAGE 1 INCLUDE MODEL AND SERIAL NUMBEROF 1Some items are included for illustrative purposes only and in certain instances may not be available.2M-Z188STAR MANUFACTURING INTERNATIONAL, INC. Control Box AssembliesDirect Connect Water SupplyRev. B 6/21/12SK2277MODEL Fast SteamerManual Controls2M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sSTAR MANUFACTURING INTERNATIONAL, INC.Control Box Assemblies Reservoir Water SupplyRev. A6/21/12SK2385MODEL Fast Steamer2M-PARTS LIST May 29, 2013, Rev. EIMPORTANT: WHEN ORDERING, SPECIFY VOLTAGE OR TYPE GAS DESIRED PAGE INCLUDE MODEL AND SERIAL NUMBER OFSome items are included for illustrative purposes only and in certain instances may not be available.212M -Z 10887 O w n e r s M a nPARTS LIST May 29, 2013, Rev. EIMPORTANT: WHEN ORDERING, SPECIFY VOLTAGE OR TYPE GAS DESIREDPAGE INCLUDE MODEL AND SERIAL NUMBEROFSome items are included for illustrative purposes only and in certain instances may not be available.222M-Z1887OwnersManualFastSteamersSTAR MANUFACTURING INTERNATIONAL, INC. Hinge Bracket AssemblyRev. - 8/28/07SK2315MODEL FS1 & FS22M -Z 10887 O w n e r s M a n u a l F a s t S t e a m e r sPARTS LIST October 25, 2011, Rev. ESome items are included for illustrative purposes only and in certain instances may not be available.。
蒸车的操作流程和使用方法蒸车是什么?蒸车是一种使用蒸汽能源进行运行的交通工具。
它采用蒸汽机作为动力源,通过将水转化为蒸汽来提供动力,并驱动车辆前进。
蒸车被广泛运用于铁路交通领域,是早期工业革命时期的一个重要发明。
蒸车的操作流程蒸车的操作流程可以分为以下几个步骤:1.准备工作–确保蒸车的各个部件正常运行,如发动机、蒸汽发生器等。
–检查车辆的燃料和水资源是否充足,如果不足,则需要补充。
–确保车辆的操控系统正常,如方向盘、油门、刹车等。
2.启动蒸车–打开蒸汽发生器的进气阀门,允许水进入蒸汽发生器。
–使用点火装置点燃蒸汽发生器中的燃料,开始产生蒸汽。
–当蒸汽发生器压力达到一定数值时,打开蒸汽发生器的出气阀门,将蒸汽送入发动机。
3.蒸车行驶–使用方向盘控制车辆的转向,向前或向后。
–使用油门控制车辆的前进速度。
–当需要制动时,使用刹车踏板来减速或停车。
4.定期维护–每次使用蒸车后,要对其进行简单的清洁工作,如擦拭车体、排水等。
–定期检查蒸汽发生器和发动机的工作状态,保持其正常运行。
–检查燃料和水资源的充足性,及时补充。
蒸车的使用方法蒸车的使用方法包括以下几个方面:1.安全注意事项–在操作蒸车前,一定要阅读并理解蒸车的操作手册,熟悉各个操控部件的功能和使用方法。
–在行驶过程中,要时刻注意道路情况,遵守交通规则,确保行车安全。
–使用蒸车时,要注意车辆的燃料和水资源的消耗情况,及时补充,避免资源不足而导致故障。
2.操控技巧–在起步时,逐渐加速,避免急刹车或急转向,保持平稳的行驶状态。
–在转弯时,要提前减速并使用方向盘控制车辆方向,避免过度转动导致失控。
–在长时间行驶过程中,要合理控制车速,减小燃料和水资源的消耗。
3.维护保养–定期对蒸汽发生器和发动机进行维护保养,包括清洗、更换润滑油等。
–定期检查车辆的各个部件是否正常运行,如刹车系统、操控系统等。
–长时间不使用蒸车时,要储存好燃料和水资源,防止资源的浪费和损坏。
蒸汽质量测试套装sq1操作规程蒸汽质量测试套装SQ1操作规程一、概述蒸汽质量测试套装SQ1是用于测量蒸汽质量的设备,操作规程旨在确保设备的正确使用和操作,以获取准确的测试结果。
二、安全注意事项1. 在操作设备之前,确认设备及配件是否完好无损,如有磕碰或损坏请及时更换。
2. 操作人员应穿戴个人防护装备,包括护目镜、手套等。
3. 确保操作环境通风良好,避免设备运行过程中产生的废气积聚。
4. 在设备运行期间禁止携带易燃易爆物品进入操作区域,确保工作场所安全。
5. 严禁对设备进行擅自改装或调整,如有需要请联系相关维修人员。
三、操作步骤1. 准备工作a. 确保蒸汽质量测试套装SQ1的电源已接通,并处于正常工作状态。
b. 准备好相应的蒸汽样品,确保样品完全符合测试要求。
2. 设备设置a. 打开蒸汽质量测试套装SQ1软件界面。
b. 点击设备设置选项,根据测试要求进行相应的设备参数设置。
3. 样品处理a. 将蒸汽样品置于测试样品槽内,确保样品充分接触测试仪器。
b. 点击软件界面的样品处理选项,设定测试时间和温度。
4. 开始测试a. 点击软件界面的开始测试按钮,启动测试过程。
b. 在测试过程中,密切观察设备运行和测试数据的变化,并记录相应的测试结果。
5. 数据分析与记录a. 完成测试后,根据设备软件提供的数据分析功能,对测试结果进行分析。
b. 将测试结果记录在相应的测试报告中,并做好备份。
6. 设备关闭a. 完成测试后,关闭蒸汽质量测试套装SQ1软件界面。
b. 关闭设备的电源,并进行必要的清洁和维护工作。
四、设备维护1. 定期检查并清洁蒸汽质量测试套装SQ1设备及配件,确保设备处于良好的工作状态。
2. 定期校准设备,如有需要请联系专业的维修人员进行校准。
3. 长时间不使用设备时,应储存于干燥、通风良好的地方,避免湿气对设备的腐蚀。
以上为蒸汽质量测试套装SQ1的操作规程,操作人员应严格按照规程操作,并遵守相关安全注意事项。
致:吉林市黑沃土绿色食品有限公司 SQ/SLD-11167项目数量
名称/规格单价(¥)金额(¥)A0115台
不锈钢18层盘架车1950.0029,250.00990L×690W×1700H 每台可放36个盘配:ø5"镀锌支架定向轮2个,ø5"镀锌支架万向轮2个29,250.00元 8,250.00元37,500.00元37,500.00元×8%=3,000.00元40,500.00元肆万零伍佰元正 广州市钢得不锈钢设备有限公司
负责人签名:
日 期:
三、付款方式:
于价格确认,合同签妥,客方先付合同总值之50%定金,余款于设备生产完成后送货前付清。
(发票在乙方收到甲方合同总金额后付出) 四、交货日期:于合同签妥,定金付讫、图纸确认后,30天内完成。
说明:
一、材 料:
上述设备材料选用304材质不锈钢板材制造,车架选用30×30×1.2㎜厚不锈钢方管,车架托条选用1.2㎜厚不锈钢,车架脚轮选用ø5〞镀锌支架万向轮. 二、价 格:
上述设备价格为人民币交货价,包括材料、人工、运输及税项。
税前金额合计:
税项:
总金额:
人民币(大写):
报价单关于蒸车及蒸盘设备
设备金额合计:
运输费:。