工程管道安装和设施安装施工方案一、编制依据1.1 与产权方一起,依据设计图在现场勘探结果,结合本质编制。
1.2 武钢焦化5、6 号焦炉干熄焦配套汽轮发电站、除盐水工程除盐水站工艺部分图号为:40-119L1 ;1.3 武钢焦化5、6 号焦炉干熄焦配套汽轮发电站、除盐水工程除盐水站水泵间及室外水箱地域工艺管道图号:40-119L2 ;1.4 武钢焦化5、6 号焦炉干熄焦配套汽轮发电站、除盐水工程酸碱存储系统工艺图号:40-119L3 ;1.5 武钢焦化 5、6 号焦炉干熄焦配套汽轮发电站、除盐水工程除盐水站中和池、除盐水箱及酸碱计量间地域工艺管道部署图号: 40-119L4 ;1.6 武钢焦化5、6号焦炉干熄焦配套汽轮发电站、除盐水工程除盐水站辅机安装图号:40-119L5;1.7 武钢焦化5、6号焦炉干熄焦配套汽轮发电站、除盐水工程除盐水站 500m3圆形水箱制造图号:40-119L6 ;1.8 武钢焦化5、6号焦炉干熄焦配套汽轮发电站、除盐水工程主厂房通风空调图号:40-119P1 ;1.9 武钢焦化5、6 号焦炉干熄焦配套汽轮发电站、除盐水工程化水车间通风空调图号:40-119P2 ;程循环水泵房通风图号:40-119P3 ;电力建设施工技术规范第5部分管道及系统(DL5190.5-2012 );电力建设施工质量查收及讨论规程第 5 部分管道及系统(DL/T 5210.5-2009 );电力建设施工技术规范第 6 部分水办理及制氢设施和系统();电力建设施工质量查收及讨论规程第 6 部分水办理及制氢设施和系统(DL/T5210.6-2009 );1.15 电力建设施工质量查收及讨论规程第7 部分焊接(DL/T 5210.7-2010 );加强聚丙烯管和管件HG 20539-92 ;输送流体用不锈钢无缝钢管GB/T 14976-2002;输送流体用无缝钢管GB/T 8163-2008 ;衬塑( PP、 PE、 PVC )钢管和管件 HG 20538-921.20 工业金属管道工程施工及查收规范GB50235-97。
Fig. 1Function keys/操作按键基本型56Item Designation"Power" keyLift position " " keyLift position " " keyRotating knob speed / Rotation drive"Timer" key"Int" key 序号 名称电源开关键 (Power)提升按键 " "下降按键 " "旋转马达开关及转速调节旋钮定时按键 (Timer)左右转动间隔时间设定键 (Int)Display/屏幕显示50Fig. 3 DesignationDisplay "Remote"Display "888 rpm"Display ODisplay "TIMER"Display "INT"HB 10 基本/数显型加热锅注意!操作请参考加热锅操作规范中的“调试”部分。
将加热锅放置于旋转马达支架台上并推至最左侧位置 (Fig. 8)注:马达和加热锅之间通过红外连接进行数据交换,接口须清洁并且没有外物遮挡才能确保数据传输正常进行。
玻璃蒸发管逆时针转动锁定装置 (D) 60° 从而打开锁定装置 (Fig. 9)将蒸发管安装到位。
顺时针转动锁定装置(D) 60° 进行锁定 (Fig. 10)。
检查蒸发管轴向锁定。
机械推开装置塑料螺纹装置 (E) 有助于松开蒸发瓶 (Fig. 10)。
握住锁定装置,松开螺纹装置。
松开蒸发瓶连接时,握住蒸发瓶,同时转动螺纹推开装置用手按住升降架顶部并卸下仪器背部的固定螺丝 (A)。
运输锁定装置取下后,升降架将缓慢升降至顶端位置,行 程 140 mm 。
使用电源线,接通电源 (B)。
欧萝芭整体淋浴房使用说明书1. 引言欧萝芭整体淋浴房是一款高品质的淋浴设备,它采用先进的技术和设计,为用户提供舒适、安全和便利的淋浴体验。
本使用说明书将详细介绍欧萝芭整体淋浴房的安装、使用和维护方法,以确保用户正确操作并延长产品寿命。
2. 安装2.1 准备工作在安装之前,请确保您已具备以下准备工作: - 确定所选位置是否合适,并留出足够的空间进行安装和使用。
- 确保水源、电源和排水管道的位置符合要求。
- 检查所需安装工具是否齐全。
2.2 安装步骤请按照以下步骤进行安装: 1. 清理安装区域,确保地面平整、干净。
2. 根据产品尺寸,在地面上标记出正确的位置。
3. 使用电钻将固定螺丝孔打入地面,并插入膨胀螺丝。
4. 将底座固定在地面上,并使用水平仪进行调整,确保底座水平。
5. 根据产品要求,连接水源和排水管道。
6. 将淋浴房主体组件安装在底座上,并使用螺丝固定。
7. 安装调节阀和喷头,确保连接紧固。
8. 检查所有连接是否牢固,并进行最后的调整。
3. 使用方法3.1 打开淋浴房在使用欧萝芭整体淋浴房之前,请确保以下操作: - 关闭冷热水阀门,以免热水或冷水直接喷出。
- 检查排水管道是否通畅。
3.2 调节温度和水流欧萝芭整体淋浴房配备了温度和水流控制器,您可以按照以下步骤进行调节: 1. 打开冷热水阀门,调节至适宜温度。
2. 转动控制器,调整所需的水流强度。
3.3 进入淋浴房当您完成温度和水流的调节后,请按以下步骤进入淋浴房: 1.打开淋浴房门,并确保门关闭完全。
2. 在进入之前,检查地面是否湿滑,以免滑倒。
3.4 使用注意事项 - 在使用淋浴房时,请不要过度用力关闭门,以免损坏门轨道。
- 使用淋浴房时,请注意保持平衡,以避免摔倒。
- 使用结束后,请及时关闭冷热水阀门,以节约能源。
4. 维护与清洁为了保持欧萝芭整体淋浴房的良好状态和延长使用寿命,请按照以下建议进行维护和清洁: - 每次使用后,用软布擦拭淋浴房表面,以去除水渍和污垢。
洗衣房设备安装施工方案及方法1. 引言本文档旨在提供洗衣房设备安装的施工方案与方法,确保设备的顺利安装和正常使用。
在施工过程中,应遵循相关安全标准和操作规程。
2. 施工前准备在施工前,需要进行以下准备工作:2.1 确定设备安装位置根据洗衣房的布局和设备需求,合理确定设备的安装位置。
考虑到设备的尺寸、通风要求和便捷性,选择适当的位置进行安装。
2.2 解决设备供电问题确定设备的电源需求,并与电力供应部门协调,确保设备能够正常供电。
遵循相关安全规定,确保安全可靠。
3. 施工流程施工过程中应按照以下步骤进行:3.1 安装设备基础支架根据设备的尺寸和重量,选择合适的基础支架。
安装支架时应保证其稳定和牢固,并与地面进行适当的固定。
3.2 连接设备管道根据设备的要求,进行相应的管道连接。
确保管道连接牢固、无泄漏,并满足设备正常工作所需的水、电、气等要求。
3.3 安装设备根据设备的安装说明,按照正确的方法进行设备的安装。
注意检查设备的配件完整性,确保安装过程中不损坏设备。
3.4 连接设备控制系统根据设备的控制系统要求,进行相应的接线和配置。
确保设备能够正常操作和控制,提供便捷的使用体验。
4. 安全与质量控制在施工过程中,应注意以下安全和质量控制要求:- 施工现场应保持整洁有序,工作人员应佩戴合适的个人防护装备。
- 施工过程中应严格按照相关标准和规程操作,避免安全事故和质量问题的发生。
- 安装完成后,进行设备的功能测试和安全检查,确保设备工作正常。
- 完工后进行验收,确保设备安装符合要求,并交付使用方正常使用。
5. 维护与保养设备安装完成后,应建立维护与保养计划,并确保设备的正常维护与保养。
定期检查设备的工作状态,及时处理设备故障和问题,以保证设备的长期稳定运行和使用寿命。
以上为洗衣房设备安装施工方案及方法的简要说明,希望能对相关工作提供参考和指导。
在具体施工过程中,请根据实际情况进行适当调整和补充。
汗蒸房材料
汗蒸房的材料可以根据个人需求和预算不同而有所差异,以下是一些常见的汗蒸房材料:
1. 木材:汗蒸房常用的木材有松木、桦木、赤松木等,木材具有良好的保温性能和舒适感,可以有效地吸湿排汗。
2. 石材:汗蒸房的地面和墙面可以选择石材材料,如大理石、花岗岩等,石材具有耐磨、防潮的特性,同时能够保持房间的湿度。
3. 玻璃:汗蒸房的门和窗通常使用强化玻璃或夹层玻璃,以确保安全性和防止热量损失。
4. 不锈钢:汗蒸房内的桑拿炉和排风系统等设备通常选用不锈钢材料,因为它具有耐高温、防腐蚀的特性。
5. 绝缘材料:在汗蒸房的墙壁、天花板和地板之间使用绝缘材料,如岩棉、玻璃棉等,以防止热量散失和提供更好的保温效果。
6. 湿度调节材料:汗蒸房内可以使用湿度调节材料,如木炭、竹炭等,能够吸附湿气、去除异味,保持房间内的空气清新。
请注意,对于汗蒸房的具体材料选择,建议咨询专业人士或根据供应商的建议进行选择,以确保安全、舒适和持久性。
汗蒸床垫一天要用多少电啊?
汗蒸房一天要用多少电呢?恩宇汗蒸为您算算:
我们以10平米的汗蒸房为例:
说明一:15平米指的是汗蒸房功能间的落地面积。
说明二:汗蒸房配置的标准功率为450瓦/平米
因此,汗蒸房总功率是:15平米X450瓦=6.7千瓦
试问:如果汗蒸房持续工作,每小时的耗电量就是9度电。
每天营业10小时岂不就是67度电?
不是这样的,因为我们的汗蒸房安装有温控系统,温控器可以随时控制电源开关,我们通常把温控器的温度设定在42摄氏度,当温度达到指定温度时,电源开关就会自动断电,如果汗蒸房内温度下降1-2度,温控器会将电源自动打开。
所以,在实际使用过程中,汗蒸房是间歇性用电,而并非全天10小时持续用电。
通过我们实际的经验来看,汗蒸房的用电量与天气状况,蒸房保温情况,电热膜的热转换率,还有就是顾客出入的频率都有很大的关
系,夏天的室内温度本身就有30度,此时只要上升12度即可到达指定温度,用电量自然会很少。
冬天的温度相对较低,室温一般都在10度以下,有暖气的室内在25度左右,这时要加热到42度,所需的时间要长,用电量自然会比较高。
再有,如果蒸房的保温没有做好,或是电热系统的热转换率较低,都会影响到汗蒸房的升温时间和用电量。
那么汗蒸房用电量到底有没有一个大概的标准呢?通过汗蒸房实际使用情况来看,汗蒸房开启后,预热时间要1个小时左右,两个小时以后,汗蒸房进入间歇性工作状态,时间间隔大约为30分钟,加热时间为8分钟,假如我们汗蒸馆每天营业10小时,前期预热时间是1小时,所以在12小时内,它的耗电量约为:1X6.7千瓦+10小时除以2乘以6.7。
油烟净化设备安装实施方案一、前期准备。
在进行油烟净化设备的安装前,首先需要进行前期准备工作。
包括确定安装地点,测量空间尺寸,了解设备安装要求,准备必要的安装工具和材料等。
在确定安装地点时,需要考虑到设备的排烟口位置,以及周围环境是否适合设备的安装和使用。
同时,还需要对安装地点进行检查,确保设备安装的稳固性和安全性。
二、安装设备。
1. 安装前的检查。
在正式进行设备安装之前,需要对设备本身进行检查,确保设备完好无损。
同时,还需要对安装地点进行再次检查,确认无误后方可进行安装。
2. 安装步骤。
(1)固定设备底座,根据设备的尺寸和形状,确定合适的固定方式,将设备底座固定在安装地点。
(2)连接管道,根据设备的排烟口位置和周围环境情况,进行管道连接,确保排烟通畅,不会影响周围环境。
(3)电气连接,将设备的电源线连接到电源插座,确保设备的正常供电。
(4)设备调试,在安装完成后,进行设备的调试工作,确认设备能够正常运行。
三、安装后的检查。
安装设备后,需要进行一系列的检查工作,以确保设备安装的质量和安全性。
1. 设备稳固性检查,检查设备的固定情况,确保设备稳固可靠。
2. 排烟通畅性检查,检查排烟管道是否通畅,确保排烟效果良好。
3. 电气连接检查,检查设备的电气连接是否牢固,确保设备的正常供电。
四、安装后的维护。
设备安装完成后,需要进行定期的维护工作,以确保设备的正常运行和使用寿命。
1. 定期清洁,定期对设备进行清洁,清除油烟和污垢,确保设备的通风通畅。
2. 定期检查,定期对设备进行检查,确保设备各部件的正常运行。
3. 定期保养,定期对设备进行保养,更换易损件,延长设备的使用寿命。
五、安装后的使用。
设备安装完成后,需要对设备进行正确的使用和管理,以确保设备的有效运行和延长设备的使用寿命。
1. 正确使用,使用人员需要按照设备说明书的要求,正确使用设备,避免操作失误造成设备损坏。
2. 定期清洁,用户需要定期对设备进行清洁,保持设备的清洁卫生。
盐蒸改善你的酸性体质酸性体质不但是慢性疾病的开始,更具有体重起伏不定的特性。
如果你发现自己的体重非常容易变动,好不容易降下来的体重,一阵子之后又回复原有的水准,甚至更高,这时你可能就是酸性体质的一员。
为了让自己的体重别上上下下变动,最好避免变成酸性体质的原因。
调查发现,癌症病人的体质都是酸性体质。
当然请大家放心,酸性体质的人不一定就会得癌症。
刚出生的婴儿和正常人的体质都是碱性的,只是在成长过程中,环境或生活习惯的影响使我们的身体体液逐渐向酸性转化。
怎样才可以让我们的体液再转回到碱性呢?答案是常去盐蒸房。
常去盐蒸房可以使身体体液从酸性变为碱性。
盐蒸房里有一种功能性的物质叫电气石,实验证明在电气石的作用下,酸性的水会转变为碱性的水。
再就是盐蒸房提供的纳米水也是一种碱性水,双管齐下,你的酸性体质不改变都不行。
盐蒸通过人体血液循环,散布到全身,不但能够改善人体体质,同时对风寒湿、油脂等体内有害的毒素通过汗液的方式排除体外,从而及可以平衡人体酸碱度!人体75%以上都是水分,当人体进入盐蒸房后,在盐蒸房里电气石的作用下人体的水分会从酸性转为碱性,也就使人体的体液从酸性变为碱性了。
当然我们的身体从正常的碱性变为酸性经过了几十年的时间,想让身体从酸性变为碱性可不是蒸几次盐蒸就可以达到的,我们要多给自己一些时间,经常去盐蒸才能达到想要的效果。
所以各位朋友们,请多给自己一些时间,穿上盐蒸服,走进盐蒸房。
未来的你一定会感谢今天注重养生的你。
盐蒸其实就是指待在一个促进排汗的高温环境中。
对女性来说,通过盐蒸可以排除体内毒素,降低黑色素活性,起到清除体臭、润滑肌肤的作用。
而且盐蒸还可以通经活络,调解睡眠,特别适合工作压力大的人群。
Cabin Installation1. Choose the location where you will be installing the tray, mark the location of the traybecause you may need to move it out from the position for better assembling procedure.Check on the drain if it is fastened tight enough to make sure it won’t leak after complete tray installation.2. Also сheck all the hose connections to prevent leakage. Your plumber may want toreplace the drain flex hose to hard PVC pipes which is also possible (instructions are provided in the manual).3. For installation of the drain in the floor please refer to the Legs and frame position(top view) fig 1 (actual position of the drain and frame on the tray).4. Secure the two vertical profiles and the bottom guide rail with ST4.2×30 round head selftapping screws (fig 2);5. Fasten the top guide rail to the vertical profiles with ST4.2×30 round head self tappingscrews.6. Insert the stationary glass panels into the frame of the vertical profiles and the guiderails. Use the stationary glass holders to secure the glass in the frame. Tap in the single side strip to make the connection waterproof (fig 3);7. Place the tray in the required position. You may need to take off the front skirting panelfor easy access. Adjust the legs to level the tray in case the surface is uneven. Fasten the counter nuts on the legs to secure the height (fig 4);8. Move the tray out. Clean the surface of the tray threshold and apply a layer of siliconeon to the edge; put the back panel onto the tray and fix them with M6×20 bolt sets (fig5 & 6);9. Clean the front threshold of the tray and apply a layer of silicone. Put the glassenclosure assembly onto the tray and adjust the position. Use M6×16 bolt sets to connect the vertical profiles and back panel (fig 7);10. This step applies to those units that came with the roof kit:Clean the top surface of the built enclosure assembly and apply a layer of silicone. Put the roof on the fixed shower enclosure and using M6×20 bolt sets connect it to the back panel; (fig 8);If your unit came without roof kit, please, make sure there is a block nut secured on the top valve on the back of the wall.11. Your unit can be shipped to you with the wheel assembles installed on the doors. If not,please refer to diagram (fig 9) how to install it. Attach the top and bottom wheels to the glass doors. The wheel that goes on the top has an adjustable screw and nut to adjust the door level. Note that the lock nut of upper wheel should face up. The bottom wheel has a press button to fix the wheel on the bottom guide rail; that button should face up (fig 9);12. Secure the handles to the doors. Slide the top door wheels into the top guide rail andpush the bottom wheels in the bottom guide rail by pressing down the button. Attach the magnetic strips to the glass doors. Use the Phillips screwdriver #2 (do not use power screwdriver) to adjust the upper wheels, make sure they move smoothly and the doors close tight. Then attach the anti-water strips (fig 10);13. Seal with silicone on all the connections between the vertical profiles and the backpanel, bottom rail and tray, tray and back panel. Let it dry for 24 hours before moving the cabin;14. Connect the flexible hose to the hand shower. Secure this item in place on the backpanel. Secure the top shower head on the roof. Make sure all the water connections are water tight;15. Connect hot water to the red mark water inlet and cold water to the blue mark waterinlet (fig 11). Connect the drain flexible pipe (1 ½” outlet) to the drain opening in the floor;16. Do not move the cabin into the place until you check all the components for anyleakage or problems; open each valve to see how it works, check thermostatic valvefor hot and cold water. You may need to tight some connections (during storage and transportation connections may get loose). If you do not see any leakage, then you can move it to the permanent position, attach the front skirting panel and finish your project.One of the ways on how to change flex hose to hard PVC pipes:Disconnect the flex hose from the shower drain unit. Fasten the 1 ½” hard PVC pipe to the drain. Using the trap adaptor with washer and plastic nut fasten the PVC pipe to the adaptor from 1 ½” to 2”.Fig 1 Legs and frame position (top view)Bath Authority™ LLC / DreamLine™Shower Enclosure, Jetted/Steam Shower and Shower ColumnsLimited WarrantyCONSUMER RESPONSIBILITIESYour DreamLine™ Shower Products will remain beautiful for many years if you take care of them. Some of the waterproofing plastic strips and other seals will need to be replaced when they show signs of wear, yellowing, or are not watertight. Refer to the parts list of your manual for all seals. Water conditions in various parts of the country will determine any extra cleaning attention you may have to give your new shower enclosure or jetted shower. DreamLine™ does not recommend the use of harsh abrasive cleansers on any of its products. Harsh cleansers will damage the metal or glass finish on your shower enclosure or jetted shower. REQUESTING SERVICEHere’s what you need to do if you require service:1. Contact the dealer who sold and/or installed the product. They should be able to solve any problems you may have.2. If your dealer or contractor cannot solve the problem, they will contact or supply you with the name of the local DreamLine™ Distributor or a DreamLine™ Direct Technical Specialist3. If you are unable to obtain warranty service through either your contractor or DreamLine™ distributor, please write us directly atBath Authority™ LLC / DreamLine™909 Louis DriveWarminster, PA 18974ATTN: Customer Service Department4. Include all pertinent information regarding your claim, including a complete description of the product,model numbers, colors, finishes, and the date the product was installed. Include a description of the problem and a photocopy of your invoice and purchase receipt(s) for the products involved. Also please provide information on the name and contact telephone numbers of the contractor and distributor.Please note that under any circumstances, DreamLine™ products should not be returned to your dealer, distributor or directly to DreamLine™ without a written Return Merchandise Authorization (RMA).LIMITED ONE-YEAR WARRANTYThis warrantee extends only to the original owner/end-user for personal household use only. For commercial uses, additional limitations may apply.DreamLine™ warrants acrylic surface against blistering or cracking and chipping resulting from defect in the acrylic surface material when used under normal condition and service for a period of one (1) year from the purchase date.DreamLine™ warrants mirrors, shower doors, shower massage systems, faucet finishes and fittings to be free from defects in workmanship and materials under normal use and service for a period of one (1) year. DreamLine™ further warrants the structure of the acrylic shell against loss of water through the fiberglass laminate of the acrylic body as a result of defect in materials and workmanship for a period of five (5) years from the purchase date.DreamLine™ will, at its election, repair, replace, or make appropriate credit adjustment where DreamLine™ optional inspection discloses any such defects occurring in normal usage within the warrantee periods. Please note that DreamLine™ is not responsible for any installation or removal costs.Improper modification of any enclosure, jetted shower or shower column components may void the warrantee - so please install the product as directed in the manual. This warrantee does not cover any claim arising from abuse, misuse, negligence, accident, improper installation or operations on the part of the purchaser. This warrantee is void if the DreamLine™ product is subject to alterations, or if repairs are attempted by anyone other than an authorized agent of DreamLine™. This warrantee does not extend to any plumbing or components installed by dealers, installers or by any party other then DreamLine™.Implied warranties, including that of merchantability or fitness for a particular purpose, are expressly limited in duration to the duration of this warranty. DreamLine™ disclaims any liability for special, incidental, or consequential damages.Some states do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of special, incidental, or consequential damages, so these limitations and exclusions may not apply to you. This warranty gives you specific legal rights. You may also have other rights which vary from state to state. This limited warranty provides specific legal rights as they apply within the USA, and other rights may be available, but may vary from country to country.This is our exclusive written warranty for DreamLine™ Shower Enclosure, Jetted/Steam Shower and Shower Column purchases made after May 2004. DreamLine™ reserves the right to modify this warranty at any time, and the consumer understands that such modification will not alter the warranty conditions applicable at the time of the sale of the product.10。
盐蒸房安装保养与维护流程
盐蒸房内部盐能够吸收空气中的水分,盐分子吸入体内能净化肺部,消毒、杀菌、驱寒等疗效。
同时经加热的盐对人体有极大的益处,可以促进人体血液循环,加热后的盐具有一种天然的负离子散播功能,:所以把盐砖铺设在汗蒸房里面做成的盐房在汗蒸房使用的过程中,通过汗蒸房的加热系统加热,让汗蒸房里面的盐砖散播一种天然的负离子,人坐在盐房里面可以起到很好的减轻过敏、哮喘、湿疹、高血压、溃疡等症状,同时还有助于减压等功效疗效。
盐蒸房安装保养与维护流程
1. 盐蒸房内必须配备一个受培训的人员进行保养,和汗蒸讲解;
2. 盐蒸房内严禁吸烟,严禁使用明火;
3. 盐蒸房每天早晚请开门交换空气;
4. 擦拭盐蒸房时请勿使用气味比较大的去污剂;
5. 盐蒸房地面温度高请勿超过48度,一般控制在度就可以;
6.盐蒸房内温度是自动控制,温度设置在42°-48°之间,以温度表为准,使用温控器来调整,室内高温度请勿超过55°,超过55°服务人员需立即切断电源。
7. 每天早上必须使用紫外线消毒灯对汗蒸房进行消毒处理一遍;
8. 盐蒸房需在开店营业前的120分钟内进行预加热;
9. 盐蒸房内湿度请勿超过80%,切不可洒水冲洗,如有意外情况请立即切断电源,疏散顾客,然后查明原因后再解决。