施工组织设计总体施工安全技术措施
- 格式:doc
- 大小:14.50 KB
- 文档页数:2
施工组织设计总体施工安全技术措施
(最新版)
编制人:__________________
审核人:__________________
审批人:__________________
编制单位:__________________
编制时间:____年____月____日
序言
下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!
并且,本店铺为大家提供各种类型的安全管理制度,如通用安全、交通运输、矿山安全、石油化工、建筑安全、机械安全、电力安全、其他安全等等制度,想了解不同制度格式和写法,敬请关注!
Download tips: This document is carefully compiled by this editor. I hope that after
you download it, it can help you solve practical problems. The document can be
customized and modified after downloading, please adjust and use it according to actual
needs, thank you!
In addition, this shop provides you with various types of safety management
systems, such as general safety, transportation, mine safety, petrochemical,
construction safety, machinery safety, electrical safety, other safety, etc. systems, I want
to know the format and writing of different systems ,stay tuned!
施工组织设计总体施工安全技术措施
项目经理部编制施工组织设计(施工方案)的同时,根据施工特点、劳动组织和作业环境等具体情况,必须编制有针对性安全技术措施。安全技术措施主要内容:
①施工平面布置图:布置现场的道路,水道、电气线路架设及材料、构配件堆放,临时和附属设施等,做到文明施工,安全生产。
②施工现场坑、井、沟和各种孔洞、易燃易爆场所、变压器周围要设置围栏或盖板和安全标志,夜间要设红灯示警,场地狭小,行人来往和运输频繁地点要设临时交通指挥。
③木工车间、贮存易燃易爆器材仓库及熬沥青场地,要设置防火设施和灭火器材。④脚手架(包括脚手板、踢脚板和斜道等)和安全网的搭设必须符合规定要求,搭设完毕须经工程负责人和安全员检查验收合格后,方可交付使用。
⑤做好"四口"、"五临边"的安全防护设施,在建工程的楼梯口(电梯口)、通道口、预留洞口和物料提升机口必须设围栏和盖板,阳台边、屋面周边、框架楼层周边和跑道、卸料平台两边必须设置安全栏或安全网。
⑥凡垂直交叉作业及工程外侧面的通行道和出入口等,必须搭设防护棚和架外隔离封闭。
⑦根据工程结构选用吊装机械,确定吊装行走路线和构件堆放位置,保证场地畅通安全;如遇有高压电线应考虑停电操作,不能停电时,必须采取隔离防护措施。
⑧根据季节性特点,夏季要防署降温,防气体中毒、防食物中毒。冬季要防滑防冻。雨季和台风要防滑防倒塌,遇有六级以上强风,应停止露天作业。
⑨新结构、新工艺、新材料和新设备使用时必须采取相应的安全措施。