(3月月报)MISAMIS-NEPC(GJ)-DOC-MPR-A00-2015-(3)
- 格式:doc
- 大小:13.89 MB
- 文档页数:42
MISAMIS 3X135MW POWER PLANT PROJECTMONTHLY PROGRESS REPORT No.010 Document No.: MISAMIS-NEPC(GJ)-DOC-MPR-A00-2015-001Date: January 15, 2015 to February 15, 2015Employer: FDC MISAMIS POWER CORPORATIONEPC Contractor:The First Northeast Electric Power EngineeringCorporation of China Energy Engineering GroupFebruary 2015Table of Contents1PROJECT SUMMARY (1)1.1Executive Summary (1)1.2EPC Progress (1)1.3Monthly Highlight (1)2ENGINEERING (1)2.1Status of Documents submitted (1)2.2Major Activities this month (1)2.3Major Activities planned next month (2)2.4The approval status of drawing (2)2.5Engineering Progress (23)3PROCUREMENT, DELIVERY AND TRANSPORTATION (23)3.1Major Activities This Month (23)3.2Major Activities planned Next Month (24)3.3Device Supervisory and Inspection Information (24)3.4Procurement Progress (24)3.5Transportation Report (24)4CONSTRUCTION/ERECTION/COMMISSIONING (24)4.1Major Activities This Month (24)4.2Major Activities Planned Next Month (25)4.3Area of Concern/Critical Activities (26)4.4Construction Progress (26)4.5Health Safety & Environment Report (26)5ATTACHMENTS (11)01-Progress S-Curve for Overall Progress-010 (11)02-Progress S-Curve for Engineering-010 (11)03- Progress S-Curve for Procurement-010 (11)04- Progress S-Curve for Construction/Erection-010 (11)05- Engineering Progress Check List-010 (11)06- Procurement Progress Check List-010 (11)07- Construction Progress Check List-010 (11)1 PROJECT SUMMARY1.1 Executive SummaryProject Leading Specification1) Project Name:FDC MISAMIS Power Corporation 3x135MW Coal Fired PowerStation2) EPC Contractor: The First Northeast Electric Power Engineering Corporation ofChina Energy Engineering Group3) Contract Award Date:30 September,20134) Units Capacity: 3×135MW1.2 EPC ProgressTable EPC Progress as of February 15,2015Note: The weighing of ten percent of engineering, twenty percent of procurement and seventy percent of construction.As for the S-Curve for overall progress, please refer to ATT-01.1.3 Monthly HighlightNothing to record2 ENGINEERING2.1 Status of Documents submittedPlease refer to the following pages.2.2 Major Activities this month(1)Preparation for Design & SpecificationU p to January, 106 books on technical specification have been finished such as : turbine,boiler, electricity I, electricity II, coal handling, ash handling, water supply, chemical water treatment, HVAC discipline and so on covering 88% of the total books. The remaining 14 books will be submitted in the coming months.(2)Detailed Design DrawingUp to February 11, 2015, 387 volumes of drawings have be submitted for approval covering 71.67 %of the total.2.3 Major Activities planned next month(1) 0 books of technical specification will be prepared in February. .(2) 28 volumes of drawings will be submitted for approval in February covering 5% of thetotal.2.4 The approval status of drawing1)General Layout2)Architecture and Structure3)Hydraulic Structure4)Mechanical5)Electric6)Water Supply7)Ash Disposal8)Coal Handling9)Power Transmission10)I & C11)Chemical Water12)HVAC2.5 Engineering ProgressAs for Progress S-Curve for Engineering and the Engineering Progress Check List,please refer to ATT-02& ATT-053 PROCUREMENT, DELIVERY AND TRANSPORTATION3.1 Major Activities This Month1) Boiler purchasement contract on Unit 3 was signed on 2Jan, 2014.2) ALSTOM contract has been signed on October 23, 2013, ST main material will bearrived to the plant recently.3) By the end of last month, 106 auxiliary equipment has been signed the procurementcontract (eg: primary air fan, secondary air fan, induced draft fan, ESP, etc.).3.2 Major Activities planned Next MonthWe will continue to produce the sixth auxiliary equipment.3.3 Device Supervisory and Inspection InformationNothing to record.3.4 Procurement ProgressAs for Progress S-Curve for Procurement and the procurement progress calculationsheet, please refer to ATT-03 & ATT-063.5 Transportation Report1)This month shipment listTransport the Air preheater for Unit 3#,water-cooled cyclone for Unit 1#,water wall forUnit 2#,Final superheater, Economizer and Reheater for Unit 2#,TG house steelstructure for Unit1# 2# at Feb. 11th.ETA:Feb 16th.Plan to transport the water-cooled cyclone for Unit 2#,steel scuttle2#,TG house steelstructure for Unit1# 2#,boiler steel structure 4-5 layer for 3# ETD Feb.18th ,ETA: Feb24th.2)Next month shipment schedulePlan to transport the lPrimary Air Fan, Secondary Air Fan, Induced Draft Fan, HighPressure Fluidized Fan, Slag Cooler, Coal Feeder, Boiler drum, Deaerator and TGhouse steel structure for Unit 3#3)OtherNothing to record4 CONSTRUCTION/ERECTION/COMMISSIONING4.1 Major Activities This Month1)工程桩预制(完成100%)。