工程安全会议纪要
- 格式:doc
- 大小:17.00 KB
- 文档页数:4
安全施工会议纪要通用版范文(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如心得体会、策划方案、规章制度、合同协议、条据文书、应急预案、职业规划、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as insights, planning plans, rules and regulations, contract agreements, documentary evidence, emergency plans, career planning, teaching materials, complete essays, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!安全施工会议纪要通用版范文安全施工会议纪要通用版范文5篇会议纪要是记载和传达会议情况和议定事项时使用的一种法定公文,是下行文。
工地安全会议纪要范文6篇Model text of site safety meeting minutes编订:JinTai College工地安全会议纪要范文6篇小泰温馨提示:写作是运用语言文字符号以记述的方式反映事物、表达思想感情、传递知识信息、实现交流沟通的创造性脑力劳动过程。
本文档根据写作活动要求展开说明,具有实践指导意义,便于学习和使用,本文下载后内容可随意修改调整修改及打印。
本文简要目录如下:【下载该文档后使用Word打开,按住键盘Ctrl键且鼠标单击目录内容即可跳转到对应篇章】1、篇章1:工地安全会议纪要范文2、篇章2:工地安全会议纪要范文3、篇章3:工地安全会议纪要范文4、篇章4:监理工地会议纪要范文5、篇章5:监理工地会议纪要范文6、篇章6:监理工地会议纪要范文办公会议纪要(也指日常行政工作类会议纪要),主要用于单位开会讨论研究问题,商定决议事项,安排布置工作,为开展工作提供指导和依据。
下面是小泰为你带来的工地安全会议纪要范文,欢迎参阅。
篇章1:工地安全会议纪要范文会议名称港龙财智国际广场二期施工安全教育会议20XX年7月23日中午,由xxx有限公司总经理召集了港龙财智国际广场二期所有幕墙施工人员,进行了长达一个半小时的施工安全教育会议。
会议首先总结了前段时间的施工情况,并指出了目前施工现场存在的问题,下一步施工需注意的安全问题以及相关要求,形成会议纪要如下:1、施工人员不带安全帽的现象时有存在、且正确佩戴安全帽的不多。
针对此类现象,殷总要求施工人员进入工地必须佩戴安全帽,并详细地讲解了安全帽的佩戴要求及规范。
会中殷总还强调了如若再有施工不带安全帽者将对其进行经济处罚。
2、针对吊篮的使用,殷总指出在上吊篮前必须检查配重块是否装好,螺丝是否有松动。
检查完方可使用,吊篮在使用过程中,必须拴好安全绳,以确保施工安全。
3、施工现场各种材料堆放零乱,特别是铝板、幕墙立柱、白铁皮等主要材料,目前施工现场总映象为脏、乱、差且时有材料被偷现象。
工程安全会议纪要工程安全会议纪要一20XX年7月22日,贵阳供电局主网建设管理办公室主持召开了赵斯新建220kV变电站调整光纤通信备用通道的技术方案讨论及建设协调会,贵州电力调度通信局、贵州电力设计研究院、贵阳供电局各相关部门参加了会议。
会议结合工程建设情况及生产运行要求,就赵斯220kV变电站另行调整光纤通信备用通道的技术方案进行了讨论和明确,并对相关问题进行了协调与安排。
纪要如下:1、为进一步提高贵阳电网的供电可靠性,实现赵斯220kV输变电整体工程的尽早投运,通过比较赵斯220kV输变电工程各110kV线路送出工程的建设进度,原设计方案中作为赵斯变光纤通信备用通道建设的赵斯变至长岭变110kV线路光缆工程,经会议各方讨论,调整为优先实施赵斯变至瑞金变110kV线路光缆工程。
2、赵斯变至瑞金变110kV线路光缆工程采用现运行的鸡场变至三桥变24芯ADSS光缆开断π接赵斯变110kV侧新出48芯ADSS光缆的方案,由此赵斯变光纤通信备用通道的路径由原设计的赵斯~长岭~云潭~金阳变调整为赵斯~鸡场~金阳的路径。
鉴于鸡场~金阳光缆被盗现象较为严重,待赵斯~长岭线路光缆工程建成后,原路径光纤容量具备条件时再恢复为原方案。
3、经参会各方讨论,赵斯变光纤通信备用通道路径调整为赵斯~鸡场~金阳的过渡方案,根据目前赵斯变、鸡场变光纤通信设备的配置情况以及鸡场至金阳光缆纤芯的使用情况,技术上可满足赵斯220kV线路光差保护双通道和省网、地区网通信的要求,但赵斯变和鸡场变的地区网通信设备需增加一对光接口板以实现该光通信迂回通道。
4、赵斯变光纤通信备用通道调整涉及的变更内容由贵州电力设计院出具相关说明,由贵阳供电局电网建设管理中心按照工期要求和相关流程立即组织工程实施,施工、调试单位涉及运行的通信通道和通信设备的工作由贵阳供电局信息通讯中心负责管理和配合。
工程安全会议纪要二20XX年5月4日,县政府副县长谭志鹏在县政府三楼会议室主持召开县城七一东路电力线路改造工程施工协调会议,县司法局、经信局、水利局、林业局、规划局、烟草局、电力局、电信公司等单位负责人参加了会议,会议就工程建设问题进行了协调。
工地安全检查会议纪要范文(3篇)工地安全检查会议纪要范文(精选3篇)工地安全检查会议纪要范文篇1会议名称:安全会议会议时间:_年2月5日下午会议地点:项目部主持人:记录:出席人员:会议内容:我项目部的安全管理策划阶段已基本完备:安全组织机构和相关人员职责已确定;相关安全制度已建立健全;各类人员进行了安全培训和教育;危险源辨识、风险评价工作已完成,对重大危险源进行了有效控制管理;危险性较大的工程编制了专项施工方案;编制了各种应急预案并认真进行了演练。
一些内业上及现场管理上的不足已经在各级领导的指导和帮助下得到了整改和落实。
现将近期有关安全生产工作情况详细汇报如下:一、高度重视、把安全隐患消灭在发生之前项目部领导、各部门高度重视,加强组织领导。
以“施工安全重于泰山,人民生命财产高于一切”的责任感,狠抓安全工作的落实。
切实细化安全责任,层层分解职责、明确标准规范,真正做到把安全生产责任督促落实到每个岗位、每个工作环节、每个责任人员。
分管安全的副经理亲自率队对施工现场进行多次检查,查处了多处隐患,切实把安全隐患消灭在发生之前,确保施工安全万无一失。
二、监管到位、将安全落到实处各部门强化管理,加大安全监管力度。
安全部门加强了安全监管,严格执行安全责任管理制度,确定了消防安全监管的主管领导、责任人、专门工作机构和人员,落实消防安全监管队伍,把消防安全生产监管工作职责和任务落到实处。
采取多种方式进行检查、抽查,对工作未落实的部门进行通报,并追究相关责任人的责任。
三、安全自查、发现问题就地整改各工区多次开展了消防安全自查。
自查重点是施工现场,拌和站、油库等重点部位,以及所有办公场所、职工食堂、和宿舍。
防患于未然。
在检查中发现的问题马上进行了整改,直至符合要求。
四、重点投入、主要场站增强配备专人看管针对各工区施工现场及油库和拌和站等重点消防部位加大安全防范投入,充实抢险队伍、增强抢险设备,明确专人负责,建立消防安全及应急长效工作机制。
工程安全会议纪要5篇工程安全会议纪要5篇安全会议鼓励报告安全漏洞:安全会议鼓励员工主动报告安全漏洞和隐患,加强对安全问题的发现和整改。
下面是小编帮大家收集整理的工程安全会议纪要,希望大家喜欢。
工程安全会议纪要篇1一、时间:__年__月__号上午__:__二、地点:工地会议室三、参加人员:__ __ __ __ __ __ __ __ __ __ __ __ __ __四、内容:项目部要求:1、砼工班组:在每层浇筑混凝土(每层钢筋隐蔽验收之后)之前,梁板必须用水一下,振动棒棒手及找平人员必须到位,人员必须充足。
2、木工班组:在每层隐蔽验收前,必须将其工作面的垃圾清理干净,特别是柱内、梁内的锯末清理干净;每层结构梁板底模在拆除之前,必须提前两天通知项目部。
项目部林经理:1、工期要求:__#楼必须达到五天一层,其中木工必须在两天内将梁底模板支设到位,卫生清理干净后交与钢筋工进行钢筋绑扎,钢筋工必须在两天内将梁板筋绑扎到位,水电配管交叉施工。
2、工期要求:__#楼木工必须在两天半内将梁底模板支设到位,卫生清理干净后交与钢筋工进行钢筋绑扎,钢筋工必须在两天内将梁板筋绑扎到位,水电配管交叉施工。
3、质量要求:1)前几次砼浇筑后出现柱角烂根、漏筋、孔洞等层层浇筑时出现,望以后能引起重视,人员安排到位,尽量少出现问题。
2)在验每层隐蔽验收前,将梁板柱内垃圾、锯末清理干净。
3)外架离墙距离必须在50㎝之内;在每层隐蔽验收之前,外架必须按要求搭设到位,安全网挂到位。
4)砼签票人员须在大门口,商品砼车在浇筑完毕出大门后,冲车时不往大门口路上掉垃圾后再签,否则拒签。
项目部陈工:1、箍筋必须绑扎到位,位移较大的主筋必须校正到位。
2、老简砼班组的砼找平及振捣问题,人员必须安排到位;前几次砼浇筑出现问题较多,望以后引起重视。
3、木工班组在每层砼浇筑完毕后,不要急于拆除,必须在砼凝结后方可拆除,特别是吊模的地方在拆模时必须小心。
施工现场安全专题会议纪要
会议时间:2023年6月15日
会议主要内容:
1.安全意识提升
–强调施工人员的安全责任意识,要求每位员工时刻保持警惕,注意安全。
2.施工现场管理
–要求加强现场管理,确保施工区域清晰划分,设立明显的安全警示标识。
3.安全设备使用
–提醒施工人员正确使用安全帽、安全绳等防护设备,严禁私自更改或移除安全设备。
4.应急预案
–要求每个施工单位制定完善的应急预案,员工必须熟悉应急预案并进行定期演练。
5.危险源排查
–强调对施工现场的危险源进行定期排查,及时处理并采取措施消除安全隐患。
6.施工人员培训
–指定每月进行安全培训,包括安全操作规范、安全事故案例分析等内容,提升员工安全意识。
7.安全监督
–设立专门的安全监督组,在施工现场24小时巡视,督促施工人员遵守安全规章制度。
会议结论:
本次会议强调施工现场安全工作的重要性,每位施工人员必须时刻保持高度警惕,严格执行安全规章制度,确保施工现场人员和设备的安全。
各施工单位要密切配合,共同营造安全、和谐的工作环境,为完成工程建设目标提供坚实保障。
工程安全生产会议纪要范文(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如心得体会、总结报告、工作计划、演讲致辞、合同协议、条据书信、党团资料、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!In addition, this shop provides you with various types of classic sample essays, such as experience, summary report, work plan, speech, contract agreement, letter of agreement, party group information, teaching materials, essay encyclopedia, other sample essays, etc. I want to know Please pay attention to the different format and writing styles of sample essays!工程安全生产会议纪要范文工程安全生产会议纪要范文精选11篇现在你是否工程安全生产会议纪要范文精选此一筹莫展呢?以下是本店铺收集整理的工程安全生产会议纪要范文精选,欢迎大家的借鉴与参考,希望对大家有所帮助。
建设工程项目安全生产例会会议纪要建设工程项目安全生产例会会议纪要会议时间:20**年12月19日9:30时会议地点:北一总监办会议室参加人员:高速集团建设事业部,业主项目部,业主代表,第一总监办,第一合同段,第二合同段,第三合同段。
会议内容:20**年12月19日9:30时,XXX工程师在第一总监办会议室主持召开了20**年12月份安全生产例会。
会议按照议程进行,首先各施工单位汇报了前期安全生产工作开展情况和下阶段安全生产工作计划。
接着总监办汇报了前期安全生产监理工作开展情况、下阶段安全生产监理工作计划,并对各施工单位的安全生产工作进行了点评。
最后,参加会议的各业主领导对施工、监理单位的安全生产工作开展情况进行了分析、总结和评价,肯定了成绩,也指出了不足,并明确了下阶段安全生产工作的重点,提出了具体的要求。
现将会议主要内容纪要如下:一、安全人员1、根据合同文件要求,每5000万元合同造价须配备1名专职安全人员。
根据各施工单位的汇报,第二合同段配备到位6名专职安全人员,超过合同要求的4人。
第一、三合同段未说明进场专职安全人员数量,特别是第一合同段安全工程师未常驻现场,要求第一、三合同段必须尽快按合同要求的数量和资质将专职安全人员配备到位。
2、除专职安全人员外,各施工班组还须配备兼职安全员,实行全过程、全环节的跟班安全监督,真正建立横向到边、纵向到底的全覆盖的安全网络。
二、安全保证体系1、各施工单位必须建立安全保证体系,制订安全生产方面的制度、措施、预案等,开展全员安全教育培训,认真检查、督促现场安全生产工作,预防安全事故的发生。
2、安全生产保证体系、安全生产预案、安全专项方案、安全演练方案和安全演练总结需经驻地办审批,并报总监办和业主备案。
这些安全方案或预案必须结合本项目实际情况,具有极强的针对性、适用性和可操作性。
3、安全生产预案要包括施工路段高速公路发生交通堵塞或交通事故的处理预案。
4、要针对本项目极有可能发生的、一旦发生危害和社会影响较大的、救援难度较大的假定安全事故进行安全演练,不得以简单的灭火演练敷衍了事。
工程安全生产会议纪要5篇工程安全生产会议纪要【篇1】2月1号在办公楼五楼会议室组织召开地面建设工程安全专题会议,参加会议应到8人,实到8人。
会议强调地面各施工单位加强安全管理,提高人员安全意识。
特别是临近春节前后各单位都要认真自检工地是否存在安全隐患,人员安全意识是否松散,切实做好工地安全无死角、人员安全检查常态化。
1、具体内容如下:张书记强调安全无小事,关系整个企业和家庭,在地面施工所有单位,必须做好安全防控,加强人员安全思想意识。
要认真做到“四个到位”:1、融入融合到位。
地面各个施工单位,无论是本企业单位还是外聘单位,必须加强安全管理,提高员工安全意识,把企业的安全意识融入、融合到各个施工单位,不能走形式,要认真贯彻落实,逐级传达,与企业相辅相成。
2、排查防控到位。
各个施工单位,无论是施工员还是管理者,都要提高业务水平,加强施工队伍人员业务质量。
加强业务和安全管理,要从思想、从行为、从管理上杜绝:人的不安全行为、机械设备的不安全管理、物的不安全状态、环境的不安全因素及管理的缺陷。
3、管理、管控到位。
各个施工单位要严把关、严要求,从心里认真落实安全责任,提高专业技能,深入现场查漏补缺,做好各项安全监督、监控。
4、加强追责到位。
加强施工单位安全管理,对管理不到位,管理松懈,监督、监管不严的,造成安全隐患。
对负责人要追责,要经济与行政并存处罚,情节严重的给与降职、撤职处分。
绝不留情、绝不手软。
2、李书记在安全会议强调:1、组织施工单位建立长效会议制度,时刻对现场安全进行安全监督、检查。
2、无论工程量大小施工单位必须签订安全协议,缴纳安全抵押金。
3、施工单位必须提供相应的报备材料,施工人员要有劳务合同,体检证明,严格排查带病上岗,无证上岗等情况4、各单位在施工前,要提供企业安全资质,制定相应的安全管理制度和措施,对施工人员要做好安全防护,经常开安全会议,排查不安全状态。
5、工程项目办要切实落实各项安全制度,深入现场随时检查落实情况。
工程安全会议纪要
对于人们来说,安全需要是重中之重。
可以说,安全文化建设代表了广大人民群众的根本利益和最基本需要。
下文是工程安全会议纪要,欢迎阅读!
工程安全会议纪要一
20XX年7月22日,贵阳供电局主网建设管理办公室主持召开了赵斯新建220kV变电站调整光纤通信备用通道的技术方案讨论及建设协调会,贵州电力调度通信局、贵州电力设计研究院、贵阳供电局各相关部门参加了会议。
会议结合工程建设情况及生产运行要求,就赵斯220kV变电站另行调整光纤通信备用通道的技术方案进行了讨论和明确,并对相关问题进行了协调与安排。
纪要如下:
1、为进一步提高贵阳电网的供电可靠性,实现赵斯220kV输变电整体工程的尽早投运,通过比较赵斯220kV输变电工程各110kV线路送出工程的建设进度,原设计方案中作为赵斯变光纤通信备用通道建设的赵斯变至长岭变110kV
线路光缆工程,经会议各方讨论,调整为优先实施赵斯变至瑞金变110kV线路光缆工程。
2、赵斯变至瑞金变110kV线路光缆工程采用现运行的鸡场变至三桥变24芯ADSS光缆开断π接赵斯变110kV侧新出48芯ADSS光缆的方案,由此赵斯变光纤通信备用通道的路径由原设计的赵斯~长岭~云潭~金阳变调整为赵斯~鸡场~金阳的路径。
鉴于鸡场~金阳光缆被盗现象较为严重,待赵斯~长岭线路光缆工程建成后,原路径光纤容量具备条件时再恢复为原方案。
3、经参会各方讨论,赵斯变光纤通信备用通道路径调整为赵斯~鸡场~金阳的过渡方案,根据目前赵斯变、鸡场变光纤通信设备的配置情况以及鸡场至金阳光缆纤芯的使用情况,技术上可满足赵斯220kV线路光差保护双通道和省网、地区网通信的要求,但赵斯变和鸡场变的地区网通信设备需增加一对光接口板以实现该光通信迂回通道。
4、赵斯变光纤通信备用通道调整涉及的变更内容由贵州电力设计院出具相关说明,由贵阳供电局电网建设管理中心按照工期要求和相关流程立即组织工程实施,施工、调试单位涉及运行的通信通道和通信设备的工作由贵阳供电局信息通讯中心负责管理和配合。
工程安全会议纪要二
20XX年5月4日,县政府副县长谭志鹏在县政府三楼会议室主持召开县城七一东路电力线路改造工程施工协调会议,县司法局、经信局、水利局、林业局、规划局、烟草局、电力局、电信公司等单位负责人参加了会议,会议就工程建设问题进行了协调。
现将会议协调决定的事项纪要如下:
一、县城七一东路北边人行道上的原有电力杆线,改造时搬迁至七一东路南边人行道上,与现有南边人行道的树木走向基本保持一致。
考虑到北边单位及用户用电负荷需求,原有配电台区位置保留不变。
二、为改变县城七一东路"蜘蛛网"式的电线结构,将跨公路的高低压架空线改为电缆,采用机械顶管后地埋的方式。
三、建设单位开挖路面进行施工作业,须先到城管部门办理有关手续,缴纳一定的工程恢复保证金,待工程完工,经城管执法人员检查确认施工现场已完全恢复后,及时退还保证金。
为保证沿线各相关单位正常办公,停电时间应安排在周末。
四、电力杆线搬迁改造至南边人行道后,为保证导线与树木之间的安全距离,建设单位应与城管部门联系,由城管部门负责统一对沿线树枝进行修剪,做到既不影响环境绿化,又不影响线路安全。
五、有关部门和单位要积极支持配合施工单位做好相关工作,尤其是城关镇和城关镇东周村委会,要做好矛盾协调工作;施工单位要进一步优化设计方案,主动与管线部门沟通联系,制定科学合理、安全可靠的施工计划,确保该工程按时按质按量完成。
参会人员:XXX
记录:XXX
工程安全会议纪要三
会议时间:
会议地点:
参加人员:
会议主题:工程例会、安全及质量学习
会议主持:
会议内容:
工程简介。
本工程现位于基础施工当中(基础分坑与开挖),结合工程施工特点、自然条件及现阶段施工现状项目部进行了此次会议,会议内容如下:
一、提出了基础施工当中以下安全注意事项:
1、施工现场要进行安全文明施工责任区域化管理,使用安全警戒旗、安全围绳配以红白相间的铝合金轻型立杆划分施工责任区,标示牌、警示牌要在满足安全的要求下,摆放整齐,对有危险性机具、机械要设立特殊警告标识。
2、用电安全,临时用电要管理好,实行一机一闸一保护,严禁私拉乱建,电源必须采取隔离措施,配备符合国家标准的电源箱,绝缘软橡胶电源线采用红白相间的标志杆架设,架设高度符合安全规定要求,力求实用美观,带电设备必须进行可靠接地。
3、电源开关保险丝不得用铜丝、铁丝等材料代替
4、在带电线路下施工时,施工不绝缘器具与测量器具应与带电体保持适当距离,以防止发生触电危险
5、作业区内应注意防火防盗,现场应配备合格的灭火器并放在显眼位置。
6、在掏挖基础内的施工人员必须戴安全帽,地面人员要随时注意井下人员的情况,井上井下人员要随时保持联络。
7、开挖时坑上应设监护人,土方应设专人及时清理,不得堆放在孔口四周2m范围内,应把土堆放在指定的堆放处,机动车辆的通行不得对孔壁的安全造成影响。
8、掏挖内必须设置梯子,不得使用麻绳和尼龙绳吊挂或脚踏井壁凸沿上下。
9、在有旧杆根的地方施工时,应尽量与原有杆根保持适当距离,如无法避开应注意基坑开挖情况,防止塌方引起的倒杆。
10、基础施工焊接时,焊接人员必须持证上岗,焊接时要采取必要保护措施,防止伤人及引起火灾。
二、在质量及进度方面提出了一些注意事项:
1、施工材料运输,施工前尽量在道路可行的情况下把材料运输到现场。
2、施工原材料沙、石含泥量及大小要符合要求。
3、转角塔预偏要符合施工图纸要求。
4、声测管埋设要绑扎牢固,管口要有保护措施,不得堵管。
二、在安全方面提出一些注意事项:
1、进入现场机械做到机容机貌清洁,安全技术状况良好,安全防护装置齐全,机动车辆在施工现场必须限速行驶,在公路上行驶必须严格执行《道路交通安全法》,严禁违章驾驶,严禁无内部准驾证驾驶,严禁酒后驾驶。
2、施工现场应根据施工图纸要求结合实际情况设置排水沟。
三、监理对工程的一些质量、安全及资料方面提出了一些要求:
1、进场材料厂家必须与资质报审的厂家一致。
2、施工作业前,要进行安全技术交底,施工工器具必须检查合格后方可使用,材料提前运送到现场。
3、特种作业人员必须持证上岗,并严格按照要求操作机械。
4、施工现场要按照安全文明要求施工,地网开挖深度及接地施工工艺要符合要求。
5、在施工当中如发现问题应及时上报。
6、现位于春季,雨水较多,基础开挖后要采取适当的保护措施。
7、在施工前要提前通知,检查合格后方可进行下一道工序。
8、资料要做到与现场同步。