山东省安装工程消耗量定额(2013版) 第七册
- 格式:xlsx
- 大小:35.96 KB
- 文档页数:13
1-1-1人工挖普通土10m388.4488.441-1-2人工挖坚土10m3207.24207.241-1-3推土机推普通土20m内10m322.98 3.9619.02 1-1-4推土机推坚土20m内10m326.55 3.9622.59 1-1-5推土机推土100m内增运20m10m313.0813.08 1-1-6装载机装运土方20m内10m320.33 3.9616.37 1-1-7装载机装运200m内增运20m10m3 5.21 5.21 1-1-8铲运机铲运普通土200m内10m338.26 3.960.2234.08 1-1-9铲运机铲运坚土200m内10m349.14 3.960.2244.96 1-1-10铲运机500m内增运100m10m310.8810.88 1-1-11拉铲挖自卸汽车运普通土1km内10m3105.85 5.940.5399.38 1-1-12拉铲挖自卸汽车运坚土1km内10m3126.01 5.940.53119.54 1-1-13反铲挖自卸汽车运普通土1km内10m3102.76 5.940.5396.29 1-1-14反铲挖自卸汽车运坚土1km内10m3120.12 5.940.53113.65 1-1-15自卸汽车增运1km10m316.1116.11 1-1-16机械打孔爆破松石10m3126.2856.1034.8435.34 1-1-17机械打孔爆破坚石10m3234.2890.4255.4388.43 1-1-18挖掘机挖渣自卸汽车运渣1km内10m3210.657.260.53202.86 1-1-19自卸汽车运渣增运1km10m324.5524.55 1-1-20机械夯填土10m354.0938.9415.15 1-1-21光轮压路机回填碾压10m392.9829.040.6863.26 1-1-22振动压路机回填碾压10m390.5329.040.6860.81 1-2-1人工挖普通土深2m内10m3150.48150.481-2-2人工挖普通土深>2m10m3230.34230.341-2-3人工挖坚土深2m内10m3287.10287.101-2-4人工挖坚土深4m内10m3366.96366.961-2-5人工挖坚土深6m内10m3423.06423.061-2-6人工挖坚土深>6m10m3460.68460.681-2-7人工挖淤泥.流砂10m3726.00726.001-2-8人工挖冻土厚0.5m内10m3887.04887.041-2-9爆破后人工挖冻土厚0.5m内10m3304.70260.7044.001-2-10人工挖沟槽普通土深2m内10m3213.01212.520.49 1-2-11人工挖沟槽普通土深>2m10m3289.96289.740.22 1-2-12人工挖沟槽坚土深2m内10m3419.59419.100.49 1-2-13人工挖沟槽坚土深4m内10m3472.12471.900.22 1-2-14人工挖沟槽坚土深6m内10m3534.08533.940.14 1-2-15人工挖沟槽坚土深>6m10m3580.88580.800.08 1-2-16人工挖地坑普通土深2m内10m3237.04235.62 1.42 1-2-17人工挖地坑普通土深>2m10m3316.16315.480.68 1-2-18人工挖地坑坚土深2m内10m3472.66471.24 1.42 1-2-19人工挖地坑坚土深4m内10m3531.98531.300.68 1-2-20人工挖地坑坚土深6m内10m3593.78593.340.44 1-2-21人工挖地坑坚土深>6m10m3640.53640.200.33 1-2-22人工挖桩孔普通土孔深8m内10m3708.15632.2875.871-2-23人工挖桩孔坚土孔深8m内10m31151.671028.28123.391-2-24人工挖桩孔普通土孔深12m内10m3959.48856.68102.801-2-25人工挖桩孔坚土孔深12m内10m31517.581354.98162.601-2-26人工挖桩孔普通土孔深16m内10m31247.031113.42133.611-2-27人工挖桩孔坚土孔深16m内10m31972.921761.54211.381-2-28人工挖桩孔普通土孔深>16m10m31439.221285.02154.201-2-29人工挖桩孔坚土孔深>16m10m32276.742032.80243.941-2-30人工凿松石方10m3473.22473.221-2-31人工凿坚石方10m31063.921063.921-2-32人工凿沟槽松石10m3560.34560.341-2-33人工凿沟槽坚石10m31508.101508.101-2-34人工凿地坑松石10m3777.48777.481-2-35人工凿地坑坚石10m32270.402270.401-2-36人工凿桩孔松石10m32604.202325.18279.021-2-37人工修整爆破后基底松石10m2146.52146.521-2-38人工修整爆破后基底坚石10m2377.52377.521-2-39人工修整爆破后基底槽坑松石10m2177.54177.541-2-40人工修整爆破后基底槽坑坚石10m2420.42420.421-2-41人工修整爆破后边坡松石10m293.7293.721-2-42人工修整爆破后边坡坚石10m2258.72258.721-2-43人工运土方20m内10m3129.36129.361-2-44人工运土方200m内增运20m10m329.0429.041-2-45人工运淤泥流砂20m内10m3290.40290.401-2-46人工运淤泥流砂200m内增运20m10m343.5643.561-2-47人力车运土方50m内10m3104.28104.281-2-48人力车运土方500m内增运50m10m316.5016.501-2-49人力车运淤泥流砂50m内10m3234.30234.301-2-50人力车运淤泥流砂500m内增运50m10m325.0825.081-2-51人工清运石渣20m内10m3306.90306.901-2-52人工清运石渣200m内增运20m10m356.1056.101-2-53人力车清运石渣50m内10m3277.86277.861-2-54人力车清运石渣500m内增运50m10m336.3036.301-2-55人工清运石渣桩孔人工出渣10m3501.18447.4853.701-2-56人工装车土方10m3102.96102.961-2-57人工装车石渣10m3137.94137.941-3-1推土机推普通土20m内10m320.92 3.9616.96 1-3-2推土机推坚土20m内10m325.91 3.9621.95 1-3-3推土机推土100m内增运20m10m311.9711.97 1-3-4装载机装运土方20m内10m321.82 3.9617.86 1-3-5装载机装运200m内增运20m10m3 5.21 5.21 1-3-6铲运机铲运普通土200m内10m341.61 3.960.2237.43 1-3-7铲运机铲运坚土200m内10m353.60 3.960.2249.42 1-3-8铲运机运土500m内增运100m10m310.8810.88 1-3-9挖掘机挖普通土10m326.92 3.9622.96 1-3-10挖掘机挖坚土10m332.84 3.9628.88 1-3-11挖掘机挖淤泥.流砂10m382.6221.1261.50 1-3-12挖掘机挖槽坑普通土10m330.177.9222.25 1-3-13挖掘机挖槽坑坚土10m332.377.9224.45 1-3-14挖掘机挖普通土自卸汽车运1km内10m3123.10 5.940.53116.63 1-3-15挖掘机挖坚土自卸汽车运1km内10m3148.61 5.940.53142.141-3-16挖掘机挖普通土槽坑汽车运1km内10m3119.027.920.53110.57 1-3-17挖掘机挖坚土槽坑汽车运1km内10m3143.607.920.53135.15 1-3-18人工打孔爆破松石10m3214.54179.5235.021-3-19人工打孔爆破坚石10m3446.72395.3451.381-3-20人工打孔爆破槽坑松石10m3570.06484.4485.621-3-21人工打孔爆破槽坑坚石10m31151.761022.34129.421-3-22机械打孔爆破松石10m3149.2965.3438.5345.42 1-3-23机械打孔爆破坚石10m3279.62104.9461.17113.51 1-3-24机械打孔爆破槽坑松石10m3359.75159.7293.77106.26 1-3-25机械打孔爆破槽坑坚石10m3700.41275.88148.98275.55 1-3-26机械打孔爆破桩孔松石10m3815.71515.46185.39114.86 1-3-27机械打孔爆破桩孔坚石10m31899.381106.82383.01409.55 1-3-28控制爆破松石10m3450.75149.16249.8351.76 1-3-29控制爆破坚石10m3765.24215.16399.05151.03 1-3-30控制爆破槽坑松石10m3735.96213.18406.50116.28 1-3-31控制爆破槽坑坚石10m31396.65374.88659.76362.01 1-3-32静力爆破坚石10m34925.511133.882269.091522.54 1-3-33静力爆破槽坑坚石10m35472.481259.282521.211691.99 1-3-34风镐破碎桩孔松石10m34126.652228.82267.461630.37 1-3-35风镐破碎桩孔坚石10m35895.093183.84382.062329.19 1-3-36风镐破碎鼓石10m31744.641003.20741.44 1-3-37液压锤破碎松石10m3313.9640.92273.04 1-3-38液压锤破碎坚石10m3386.4741.58344.89 1-3-39液压锤破碎槽坑松石10m3372.7642.24330.52 1-3-40液压锤破碎槽坑坚石10m3459.6542.90416.75 1-3-41推土机推石渣20m内10m359.15 5.2853.87 1-3-42推土机推石渣100m内增运20m10m336.9136.91 1-3-43挖掘机挖集石渣10m377.48 5.2872.20 1-3-44挖掘机挖石渣自卸汽车运1km内10m3239.667.260.53231.87 1-3-45装载机装土方10m321.26 3.9617.30 1-3-46装载机装石方10m339.88 5.2834.60 1-3-47挖掘机装土方10m320.33 3.9616.37 1-3-48挖掘机装石方10m340.96 5.2835.68 1-3-49机动翻斗车运土方100m内10m391.4091.40 1-3-50机动翻斗车运土方500m内增运100m10m312.5612.56 1-3-51机动翻斗车运石方100m内10m3277.97277.97 1-3-52机动翻斗车运石方500m内增运100m10m333.2933.29 1-3-53拖拉机运土方1km内10m3183.20183.20 1-3-54拖拉机运土方增运1km10m321.8221.82 1-3-55拖拉机运石方1km内10m3376.86376.86 1-3-56拖拉机运石方增运1km10m344.1044.10 1-3-57自卸汽车运土方1km内10m370.37 1.980.5367.86 1-3-58自卸汽车运土方增运1km10m312.2212.22 1-3-59自卸汽车运石方1km内10m3123.11 1.980.53120.60 1-3-60自卸汽车运石方增运1km10m322.5122.51 1-3-61垂直运输机械运土方10m347.7721.7825.99 1-3-62垂直运输机械运石方10m380.7936.9643.831-3-63运输钻孔桩泥浆5km内(桩体积)10m31487.69424.381063.31 1-3-64运输钻孔桩泥浆增运1km(桩体积)10m381.1881.18 1-4-1人工场地平整10m241.5841.581-4-2机械场地平整10m2 5.670.66 5.01 1-4-3竣工清理10m310.5610.561-4-4基底钎探十眼75.2475.241-4-5人工原土夯实10m210.5610.561-4-6机械原土夯实10m27.47 5.94 1.53 1-4-7原土机械碾压10m2 1.330.660.67 1-4-8填土机械碾压10m3109.7332.340.6876.71 1-4-9人工松填土10m352.1452.141-4-10人工夯填土(地坪)10m3106.28105.600.681-4-11机械夯填土(地坪)10m351.8034.9816.82 1-4-12槽、坑人工夯填土10m3132.68132.000.681-4-13槽、坑机械夯填土10m368.0646.2021.86 1-4-14槽、坑夯填砂10m31156.13172.26981.72 2.15 1-4-15槽、坑夯填石屑10m3706.46172.26532.05 2.15 1-4-16槽、坑夯填石渣10m3687.02224.40459.80 2.82 1-4-17钎探灌砂10眼 2.47 1.45 1.022-1-13:7灰土垫层10m31377.22552.42812.7512.05 2-1-2砂垫层10m31291.09307.56981.38 2.15 2-1-3人工级配砂石垫层10m31506.27529.98969.72 6.57 2-1-4天然级配砂石垫层10m31194.17442.20745.40 6.57 2-1-5干铺碎石垫层10m31361.68443.52911.047.12 2-1-61:3砂浆灌碎石垫层10m31933.24537.901335.8959.45 2-1-7干铺碎砖垫层10m31608.74515.461086.167.12 2-1-81:3砂浆灌碎砖垫层10m32176.39726.001404.3046.09 2-1-9干铺地瓜石垫层10m31353.77524.04822.177.56 2-1-101:3砂浆灌地瓜石垫层10m32079.31713.461304.8561.00 2-1-11干铺毛石垫层10m31456.86564.30884.627.94 2-1-121:3砂浆灌毛石垫层10m32207.89854.041286.9966.86 2-1-13C154现浇无筋砼垫层10m32537.99673.861853.5310.60 2-1-14C154现浇毛石砼垫层10m32381.69638.881732.2110.60 2-2-1夯填灰土10m31369.61535.92821.6412.05 2-2-2人工填砂石机械振动10m3994.62245.52747.60 1.50 2-2-3人工填砂石机械碾压10m31099.24291.72784.8422.68 2-2-4推土机填砂碾压10m3823.12 4.62784.8433.66 2-2-5推土机挤淤碾压10m3850.417.92782.4260.07 2-2-6填铺石屑10m3827.97291.72531.87 4.38 2-2-7填铺碎石10m31354.42436.26911.047.12 2-2-8抛石挤淤10m31052.65396.66653.62 2.37 2-2-9填筑C154现浇毛石砼10m32342.09599.281732.2110.60 2-3-1打砼方桩12m内10m32193.39524.0457.561611.79 2-3-2打砼方桩18m内10m32062.82352.4457.561652.82 2-3-3打砼方桩30m内10m31314.35210.5457.561046.25 2-3-4打砼方桩>30m10m31133.68180.1857.56895.94 2-3-5压砼方桩12m内10m32572.00473.88180.321917.802-3-6压砼方桩18m内10m32686.46499.62180.322006.52 2-3-7压砼方桩30m内10m33126.70413.82180.322532.56 2-3-8压砼方桩>30m10m32658.08349.14180.322128.62 2-3-9打砼管桩16m内10m39178.08669.906157.822350.36 2-3-10打砼管桩24m内10m38737.66571.566157.822008.28 2-3-11打砼管桩32m内10m38579.00538.566157.821882.62 2-3-12打砼管桩>32m10m38553.78531.966157.821864.00 2-3-13打砼板桩1m3内10m33633.69799.9244.962788.81 2-3-14打砼板桩1.5m3内10m33020.44662.6444.962312.84 2-3-15打砼板桩2.5m3内10m32553.46508.8644.961999.64 2-3-16打砼板桩>2.5m310m32248.01446.8244.961756.23 2-3-17C203现浇砼打孔灌砼桩10m内10m36999.292136.422604.162258.71 2-3-18C203现浇砼打孔灌砼桩15m内10m35342.131292.282604.161445.69 2-3-19C203现浇砼打孔灌砼桩>15m10m34961.271096.262604.161260.85 2-3-20C203现浇砼夯扩成孔灌注砼桩身10m37910.992528.462602.712779.82 2-3-21C203现浇砼夯扩成孔灌注桩夯扩砼10m38395.432806.322502.953086.16 2-3-22螺旋钻机钻孔12m内10m32201.08658.68123.801418.60 2-3-23C203现浇砼螺旋钻孔灌注砼桩12m内10m33094.00294.362498.85300.79 2-3-24螺旋钻机钻孔>12m10m31936.68562.98123.801249.90 2-3-25C203现浇砼螺旋钻孔灌注砼桩>12m10m32962.53198.662498.85265.02 2-3-26回旋钻机钻孔φ600内10m35084.141401.18286.303396.66 2-3-27回旋钻机钻孔φ800内10m34438.741248.06281.992908.69 2-3-28回旋钻机钻孔φ1000内10m33953.961135.20274.222544.54 2-3-29回旋钻机钻孔φ1200内10m33375.96846.78256.302272.88 2-3-30回旋钻机钻孔φ>120cm10m33003.07765.60240.591996.88 2-3-31回旋钻机钻孔入岩φ600内10m321310.276072.00266.5514971.72 2-3-32回旋钻机钻孔入岩φ800内10m314866.874183.08266.5510417.24 2-3-33回旋钻机钻孔入岩φ1000内10m312695.113573.90266.558854.66 2-3-34回旋钻机钻孔入岩φ1200内10m39916.242774.64266.556875.05 2-3-35回旋钻机钻孔入岩φ>120cm10m37291.482073.06266.554951.87 2-3-36回旋钻孔灌注砼桩10m33183.93240.902943.032-3-37C252现浇灌注砼桩壁人工挖孔10m33542.151081.742310.03150.38 2-3-38M10 砂浆砌黏土砖桩壁120人工挖孔10m33781.721538.462213.2630.00 2-3-39M10 砂浆砌黏土砖桩壁240人工挖孔10m33771.571538.462198.0635.05 2-3-40C204现浇灌注砼桩芯人工挖孔10m33212.74823.022061.73327.99 2-3-41C204现浇灌注毛石砼桩芯人工挖孔10m32804.99574.861902.14327.99 2-3-42打灰土挤密桩6m内10m33157.99919.381030.391208.22 2-3-43打灰土挤密桩>6m10m32514.58584.101030.39900.09 2-3-44打砂桩10m内10m33116.001141.80920.001054.20 2-3-45打砂桩15m内10m32633.79799.92920.00913.87 2-3-46打砂桩>15m10m32427.29641.52920.00865.77 2-3-47打碎石桩10m内10m33186.621212.42920.001054.20 2-3-48打碎石桩15m内10m32684.61850.74920.00913.87 2-3-49打碎石桩>15m10m32467.55681.78920.00865.77 2-3-50振冲碎石桩10m32227.91475.20974.96777.75 2-3-51钻孔压浆碎石桩10m34697.481090.982578.891027.61 2-3-52打砂石桩10m内10m33639.261212.421372.641054.202-3-53打砂石桩15m内10m33137.25850.741372.64913.87 2-3-54打砂石桩>15m10m32920.19681.781372.64865.77 2-3-55深层搅拌粉喷水泥桩(水泥10%)10m31486.40332.64671.14482.62 2-3-56深层搅拌浆喷水泥桩(水泥10%)10m31518.73374.22685.22459.29 2-3-57水泥桩水泥掺量每增1%10m360.9060.902-3-58高压旋喷水泥桩成孔10m427.78105.608.68313.50 2-3-59双重管旋喷机高压旋喷水泥桩10m32607.91684.42769.901153.59 2-3-60三重管旋喷机高压旋喷水泥桩10m33495.09760.321102.901631.87 2-3-61预制钢筋砼桩接桩包角钢十根5627.781211.10424.433992.25 2-3-62预制钢筋砼桩接桩包钢板十根8588.141264.563359.933963.65 2-3-63预制钢筋砼桩接桩注硫磺胶泥10m226812.646362.404160.6116289.63 2-3-64预制钢筋砼桩截方桩十根1379.37308.88950.20120.29 2-3-65预制钢筋砼桩截管桩十根526.63250.80275.83 2-3-66预制钢筋砼方桩凿桩头10m33133.722345.64788.08 2-3-67灌注砼桩凿桩头10m31248.31933.90314.41 2-3-68桩头钢筋整理十根56.7656.762-3-69回旋钻机挤扩支盘钻孔D800内10m32038.71252.7823.461762.47 2-3-70回旋钻机挤扩支盘钻孔D>80010m31666.53207.2415.761443.53 2-4-1强夯<100t-m 25夯点 4击100m21302.14357.72944.42 2-4-2强夯<100t-m 25夯点增减1击100m2244.7572.60172.15 2-4-3强夯<100t-m 23夯点 4击100m21198.51329.34869.17 2-4-4强夯<100t-m 23夯点增减1击100m2218.5560.06158.49 2-4-5强夯<100t-m 17夯点 4击100m2886.78244.20642.58 2-4-6强夯<100t-m 17夯点增减1击100m2161.0944.22116.87 2-4-7强夯<100t-m 13夯点 4击100m2677.35186.12491.23 2-4-8强夯<100t-m 13夯点增减1击100m2122.5733.6688.91 2-4-9强夯<100t-m 10夯点 4击100m2521.16143.22377.94 2-4-10强夯<100t-m 10夯点增减1击100m293.8525.7468.11 2-4-11强夯<100t-m 低锤满拍100m21223.59321.42902.17 2-4-12强夯<200t-m 25夯点 4击100m21944.00477.841466.16 2-4-13强夯<200t-m 25夯点增减1击100m2354.8387.12267.71 2-4-14强夯<200t-m 23夯点 4击100m21788.13439.561348.57 2-4-15强夯<200t-m 23夯点增减1击100m2327.3880.52246.86 2-4-16强夯<200t-m 17夯点 4击100m21321.34324.72996.62 2-4-17强夯<200t-m 17夯点增减1击100m2242.0459.40182.64 2-4-18强夯<200t-m 13夯点 4击100m21010.43248.16762.27 2-4-19强夯<200t-m 13夯点增减1击100m2185.4846.20139.28 2-4-20强夯<200t-m 10夯点 4击100m2777.04190.74586.30 2-4-21强夯<200t-m 10夯点增减1击100m2142.5734.98107.59 2-4-22强夯<200t-m 低锤满拍100m21721.80403.261318.54 2-4-23强夯<300t-m 25夯点 4击100m22456.07564.961891.11 2-4-24强夯<300t-m 25夯点增减1击100m2476.28108.24368.04 2-4-25强夯<300t-m 23夯点 4击100m22259.54519.421740.12 2-4-26强夯<300t-m 23夯点增减1击100m2432.7199.66333.05 2-4-27强夯<300t-m 17夯点 4击100m21670.04384.121285.92 2-4-28强夯<300t-m 17夯点增减1击100m2319.0073.26245.74 2-4-29强夯<300t-m 13夯点 4击100m21276.85293.04983.812-4-30强夯<300t-m 13夯点增减1击100m2244.5256.10188.42 2-4-31强夯<300t-m 10夯点 4击100m2982.02225.72756.30 2-4-32强夯<300t-m 10夯点增减1击100m2189.1643.56145.60 2-4-33强夯<300t-m 低锤满拍100m22737.75386.102351.65 2-4-34强夯<400t-m 25夯点 4击100m25365.521076.464289.06 2-4-35强夯<400t-m 25夯点增减1击100m21148.38230.34918.04 2-4-36强夯<400t-m 23夯点 4击100m24935.68990.003945.68 2-4-37强夯<400t-m 23夯点增减1击100m21056.29211.86844.43 2-4-38强夯<400t-m 17夯点 4击100m23453.39693.002760.39 2-4-39强夯<400t-m 17夯点增减1击100m2780.02156.42623.60 2-4-40强夯<400t-m 13夯点 4击100m22789.74559.682230.06 2-4-41强夯<400t-m 13夯点增减1击100m2597.33120.12477.21 2-4-42强夯<400t-m 10夯点 4击100m22146.60430.981715.62 2-4-43强夯<400t-m 10夯点增减1击100m2460.4592.40368.05 2-4-44强夯<400t-m 低锤满拍100m23456.54659.342797.20 2-4-45强夯<500t-m 25夯点 4击100m26736.661216.385520.28 2-4-46强夯<500t-m 25夯点增减1击100m21441.75260.041181.71 2-4-47强夯<500t-m 23夯点 4击100m26195.641118.705076.94 2-4-48强夯<500t-m 23夯点增减1击100m21326.39239.581086.81 2-4-49强夯<500t-m 17夯点 4击100m24331.58783.423548.16 2-4-50强夯<500t-m 17夯点增减1击100m2979.84176.88802.96 2-4-51强夯<500t-m 13夯点 4击100m23502.05632.282869.77 2-4-52强夯<500t-m 13夯点增减1击100m2749.96135.96614.00 2-4-53强夯<500t-m 10夯点 4击100m22694.25487.082207.17 2-4-54强夯<500t-m 10夯点增减1击100m2577.92104.28473.64 2-4-55强夯<500t-m 低锤满拍100m23848.50791.343057.16 2-4-56强夯<600t-m 25夯点 4击100m27446.041374.786071.26 2-4-57强夯<600t-m 25夯点增减1击100m21560.58260.041300.54 2-4-58强夯<600t-m 23夯点 4击100m26703.571118.705584.87 2-4-59强夯<600t-m 23夯点增减1击100m21326.39239.581086.81 2-4-60强夯<600t-m 17夯点 4击100m24335.75783.423552.33 2-4-61强夯<600t-m 17夯点增减1击100m2979.84176.88802.96 2-4-62强夯<600t-m 13夯点 4击100m23502.05632.282869.77 2-4-63强夯<600t-m 13夯点增减1击100m2749.96135.96614.00 2-4-64强夯<600t-m 10夯点 4击100m22694.25487.082207.17 2-4-65强夯<600t-m 10夯点增减1击100m2577.92104.28473.64 2-4-66强夯<600t-m 低锤满拍100m24200.98863.943337.04 2-4-67强夯<100t-m 7夯点 4击100m2522.51138.60383.91 2-4-68强夯<100t-m 7夯点增减1击100m265.9615.8450.12 2-4-69强夯<100t-m 4夯点 4击100m2408.40108.24300.16 2-4-70强夯<100t-m 4夯点增减1击100m244.1810.5633.62 2-4-71强夯<100t-m 低锤满拍100m21361.91321.421040.49 2-4-72强夯<200t-m 7夯点 4击100m2767.82184.80583.02 2-4-73强夯<200t-m 7夯点增减1击100m296.6721.1275.55 2-4-74强夯<200t-m 4夯点 4击100m2625.82150.48475.34 2-4-75强夯<200t-m 4夯点增减1击100m267.3514.5252.83 2-4-76强夯<200t-m 低锤满拍100m21896.54403.261493.282-4-77强夯<300t-m 7夯点 4击100m2917.03208.56708.47 2-4-78强夯<300t-m 7夯点增减1击100m2126.0325.74100.29 2-4-79强夯<300t-m 4夯点 4击100m2720.16163.68556.48 2-4-80强夯<300t-m 4夯点增减1击100m286.5117.8268.69 2-4-81强夯<300t-m 低锤满拍100m23024.31386.102638.21 2-4-82强夯<400t-m 7夯点 4击100m21681.85339.241342.61 2-4-83强夯<400t-m 7夯点增减1击100m2301.6754.78246.89 2-4-84强夯<400t-m 4夯点 4击100m21197.26241.56955.70 2-4-85强夯<400t-m 4夯点增减1击100m2200.9136.30164.61 2-4-86强夯<400t-m 低锤满拍100m23743.09659.343083.75 2-4-87强夯<500t-m 7夯点 4击100m22071.11373.561697.55 2-4-88强夯<500t-m 7夯点增减1击100m2374.1662.04312.12 2-4-89强夯<500t-m 4夯点 4击100m21488.09267.961220.13 2-4-90强夯<500t-m 4夯点增减1击100m2250.0541.05209.00 2-4-91强夯<500t-m 低锤满拍100m24116.21791.343324.87 2-4-92强夯<600t-m 7夯点 4击100m22277.71410.521867.19 2-4-93强夯<600t-m 7夯点增减1击100m2413.1769.96343.21 2-4-94强夯<600t-m 4夯点 4击100m21652.00297.661354.34 2-4-95强夯<600t-m 4夯点增减1击100m2276.4546.20230.25 2-4-96强夯<600t-m 低锤满拍100m24492.60863.943628.66 2-5-1木撑木挡土疏板防护10m2185.94109.5676.382-5-2钢撑木挡土疏板防护10m2149.8183.8265.992-5-3木撑木挡土密板防护10m2235.50141.2494.262-5-4钢撑木挡土密板防护10m2189.23107.5881.652-5-5木撑钢挡土疏板防护10m2184.97110.8874.092-5-6钢撑钢挡土疏板防护10m2145.5584.4861.072-5-7木撑钢挡土密板防护10m2223.99141.2482.752-5-8钢撑钢挡土密板防护10m2178.50108.9069.602-5-9袋土围堰10m31948.621145.76749.6053.26 2-5-10打钢工具桩6m内 t923.52218.4637.62667.44 2-5-11打钢工具桩10m内 t642.61150.4837.62454.51 2-5-12打钢工具桩15m内 t471.46106.2637.62327.58 2-5-13打钢工具桩>15m t375.9784.4837.62253.87 2-5-14拔钢工具桩6m内 t414.92161.04 3.71250.17 2-5-15拔钢工具桩10m内 t289.08110.88 3.71174.49 2-5-16拔钢工具桩15m内 t235.6491.08 3.71140.85 2-5-17拔钢工具桩>15m t228.8088.44 3.71136.65 2-5-18安拆导向夹具10m108.2827.7226.5054.06 2-5-19土层砂浆土钉(钻孔灌浆)10m245.58148.5041.9655.12 2-5-20岩石砂浆土钉(钻孔灌浆)10m359.21157.7418.26183.21 2-5-21锚杆机钻孔灌浆10m1671.02396.00654.94620.08 2-5-22锚杆机入岩增加10m2902.841584.00498.75820.09 2-5-23C251现浇砼土层喷射砼护坡 初喷5010m2270.3697.68131.3641.32 2-5-24C251现浇砼岩层喷射砼护坡 初喷5010m2352.93166.98141.2744.68 2-5-25C251现浇砼喷射砼护坡每增减10mm10m252.1017.8226.278.01 2-6-1抽水机基底排水 降水深1m内10m2715.7213.2030.92671.60 2-6-2抽水机基底排水 降水深2m内10m21241.3719.8075.911145.662-6-3抽水机基底排水 降水深3m内10m21565.9233.00123.061409.86 2-6-4砖砌集水井排水h2-4m内 座2193.561491.60617.9184.05 2-6-5钢筋笼集水井排水h2-4m内 座2028.381166.88804.9156.59 2-6-6砼无砂管φ55cm集水深井10m4342.261256.641212.691872.93 2-6-7钢筋笼集水深井10m3433.421360.92386.281686.22 2-6-8钢管集水深井10m2908.061065.90146.381695.78 2-6-9潜水泵抽水机集水井排水台日423.42 2.64420.78 2-6-10单机清水泵抽水机集水井排水台日609.56 2.64606.92 2-6-11泥浆泵抽水机集水井排水台日1094.14 2.641091.50 2-6-12轻型井点7m降水井管安拆十根2481.831033.56372.411075.86 2-6-13轻型井点7m降水设备使用套天1331.72198.0085.881047.84 2-6-14喷射井点10m降水井管安拆十根7760.863036.001287.323437.54 2-6-15喷射井点10m降水设备使用套天2734.79396.0062.182276.61 2-6-16喷射井点15m降水井管安拆十根12538.564984.981850.925702.66 2-6-17喷射井点15m降水设备使用套天2813.05396.00140.442276.61 2-6-18喷射井点20m降水井管安拆十根16354.456433.022411.597509.84 2-6-19喷射井点20m降水设备使用套天2866.17396.00193.562276.61 2-6-20喷射井点30m降水井管安拆十根21455.098348.343522.409584.35 2-6-21喷射井点30m降水设备使用套天3078.82396.00406.212276.61 2-6-22大口径φ600井点15m降水井管安拆十根45198.9514166.906185.2824846.77 2-6-23大口径φ600井点15m降水设备使用套天2727.80396.0055.192276.61 2-6-24水平井点25m降水井管安拆十根81769.0128535.105826.1247407.79 2-6-25水平井点25m降水设备使用套天1886.56396.0042.911447.65 2-6-26电渗井点阳极降水制安及拆除十根11990.061565.529097.761326.78 2-6-27电渗井点阳极降水设备使用套天1505.92396.00581.26528.66 2-6-28射流泵井点降水制安及拆除眼组126.4973.2629.8923.34 2-6-29射流泵井点降水井点抽水组天770.22267.30502.92 3-1-1M5.0砂浆砖基础10m32768.95803.881932.2332.84 3-1-2M5.0混浆矩形砖柱周长1.2m内10m33811.191752.962030.9527.28 3-1-3M5.0混浆矩形砖柱周长1.8m内10m33685.441636.142018.9130.39 3-1-4M5.0混浆矩形砖柱周长>1.8m10m33370.641324.622014.2931.73 3-1-5M5.0混浆异形砖柱10m34287.071654.622595.6036.85 3-1-6M2.5混浆单面清水砖墙 11510m33404.311372.802004.3527.16 3-1-7M2.5混浆单面清水砖墙 18010m33379.421355.641994.0529.73 3-1-8M2.5混浆单面清水砖墙 24010m33175.731191.301953.1531.28 3-1-9M2.5混浆单面清水砖墙 36510m33146.091125.301987.6133.18 3-1-10M2.5混浆单面清水砖墙 ≥49010m33099.251081.741983.4434.07 3-1-11M2.5混浆混水砖墙 5310m33808.091752.962038.7616.37 3-1-12M2.5混浆混水砖墙 11510m33348.871317.362004.3527.16 3-1-13M2.5混浆混水砖墙 18010m33262.981240.141993.2329.61 3-1-14M2.5混浆混水砖墙 24010m32999.511015.081953.1531.28 3-1-15M2.5混浆混水砖墙 36510m33007.71986.701987.6133.40 3-1-16M2.5混浆混水砖墙 49010m32993.35976.141983.1434.07 3-1-17弧形砖墙另加工料10m3129.8199.0030.813-1-18M5.0混浆贴砌砖墙 5310m2233.85106.26125.25 2.34 3-1-19M5.0混浆贴砌砖墙 11510m2411.54158.40248.58 4.56 3-1-20M5.0混浆贴砌砖墙 24010m2769.84264.00496.829.023-1-21M5.0混浆空花砖墙 11510m2299.39135.96161.54 1.89 3-1-22M5.0混浆空花砖墙 24010m2625.59284.46337.12 4.01 3-1-23M5.0混浆砖平璇10m34279.121788.602458.6831.84 3-1-24M5.0混浆砖拱璇10m35185.932547.602603.4834.85 3-1-25M5.0混浆砖过梁10m33750.201387.322324.4738.41 3-1-26M5.0混浆半砖栏板10m2405.92168.96233.84 3.12 3-1-27M5.0砂浆砖台阶10m32940.64907.502000.3032.84 3-1-28M5.0混浆砖地沟10m32951.09921.361998.0031.73 3-1-29M5.0混浆零星砖砌体10m33440.801518.001893.4129.39 3-2-1M5.0砂浆乱毛石基础10m32053.38779.461219.2654.66 3-2-2M5.0混浆乱毛石墙10m32558.111255.321248.1354.66 3-2-3M5.0混浆乱毛石挡土墙10m32170.03867.241248.1354.66 3-2-4M5.0混浆乱毛石护坡10m32332.35934.561337.7860.01 3-2-5干砌乱毛石护坡10m31546.06607.20938.863-2-6M5.0混浆整毛石墙毛石背里45010m21251.91640.86586.4524.60 3-2-7M5.0混浆整毛石墙毛石背里±1010m225.5312.5412.430.56 3-2-8M5.0混浆整毛石墙砖背里45010m21401.97591.36792.1318.48 3-2-9M5.0混浆整毛石墙砖背里±1010m230.5610.5619.670.33 3-2-10整砌毛石表面处理10m2388.18327.3660.823-2-11石表面倒扁光(斜面10cm内)10m116.82116.823-2-12M5.0混浆方整石柱10m36432.231992.544420.6519.04 3-2-13M5.0混浆方整石墙10m35490.561052.044418.9319.59 3-2-14M5.0混浆方整石墙毛石背里45010m21934.43572.221345.2916.92 3-2-15M5.0混浆方整石墙毛石背里±1010m225.5812.5412.480.56 3-2-16M5.0混浆方整石墙砖背里45010m22075.19521.401538.2015.59 3-2-17M5.0混浆方整石墙砖背里±1010m230.5610.5619.670.33 3-2-18M10 混浆方整石平璇10m37021.081914.665086.3820.04 3-2-19M10 混浆方整石拱璇10m37382.022314.625046.8020.60 3-2-20M5.0混浆零星方整石砌体10m37402.002740.984636.4224.60 3-2-21M5.0混浆整砌毛石墙10m32923.061380.721487.6854.66 3-2-22M5.0混浆整砌毛石挡土墙10m32380.37953.701372.0154.66 3-3-1M5.0混浆烧结粉煤灰轻质砖墙11510m33276.481329.241920.0827.16 3-3-2M5.0混浆烧结粉煤灰轻质砖墙18010m33238.321296.241912.4729.61 3-3-3M5.0混浆烧结粉煤灰轻质砖墙24010m32969.161061.281876.6031.28 3-3-4M5.0混浆烧结粉煤灰轻质砖墙36510m32976.451031.581911.4733.40 3-3-5M5.0混浆黏土多孔砖墙11510m32979.32930.602027.7920.93 3-3-6M5.0混浆黏土多孔砖墙18010m32930.91838.862065.6626.39 3-3-7M5.0混浆黏土多孔砖墙24010m32842.75783.422033.0626.27 3-3-8M5.0混浆黏土多孔砖墙36510m32863.84706.202129.5828.06 3-3-9M5.0混浆煤矸石多孔砖墙9010m33929.53976.802930.5822.15 3-3-10M5.0混浆煤矸石多孔砖墙19010m32483.07825.001635.9222.15 3-3-11M5.0混浆煤矸石多孔砖墙24010m33177.33810.482339.2427.61 3-3-12M5.0混浆煤矸石多孔砖墙29010m32807.88737.882043.2826.72 3-3-13M5.0混浆承重型黏土空心砖墙11510m33347.25976.802351.9718.48 3-3-14M5.0混浆承重型黏土空心砖墙18010m32514.97881.101615.2818.59 3-3-15M5.0混浆承重型黏土空心砖墙24010m33176.41822.362329.5624.49 3-3-16M5.0混浆承重型黏土空心砖墙36510m33090.71742.502322.0526.163-3-17M5.0混浆非承重黏土空心砖墙11510m32965.791015.741930.2319.82 3-3-18M5.0混浆非承重黏土空心砖墙24010m32643.31845.461777.3720.48 3-3-19M5.0混浆零星空心砖砌体10m33393.131294.922069.0429.17 3-3-20M5.0混浆煤矸石空心砖墙11510m32702.821025.641656.0321.15 3-3-21M5.0混浆煤矸石空心砖墙18010m32677.16939.841714.8322.49 3-3-22M5.0混浆煤矸石空心砖墙24010m32545.20853.381665.8825.94 3-3-23M5.0混浆煤矸石空心砖墙36510m32476.74780.781668.2427.72 3-3-24M5.0混浆加气砼砌块墙12010m32376.85741.181626.549.13 3-3-25M5.0混浆加气砼砌块墙18010m32331.71682.441640.149.13 3-3-26M5.0混浆加气砼砌块墙24010m32304.65595.981699.549.13 3-3-27M5.0混浆泡沫砼砌块墙9010m32088.31735.241332.4720.60 3-3-28M5.0混浆泡沫砼砌块墙19010m31987.38669.241307.6710.47 3-3-29M5.0混浆泡沫砼砌块墙29010m31877.63594.661269.1713.80 3-3-30M5.0混浆泡沫砼砌块墙39010m31866.12535.921316.4013.80 3-3-31M7.5混浆硅酸钙砌块墙12010m32574.47892.321671.1311.02 3-3-32M7.5混浆硅酸钙砌块墙18010m32645.42836.881797.5211.02 3-3-33M7.5混浆硅酸钙砌块墙24010m32240.63753.061476.5511.02 3-3-34M7.5混浆硅酸钙砌块墙36510m32174.85681.121480.9312.80 3-3-35石膏砌空心块墙11010m37308.55584.106724.453-3-36石膏砌空心块墙18010m37275.48524.706750.783-3-37石膏砌夹心块墙8010m37362.16646.806715.363-3-38石膏砌夹心块墙10010m37350.60628.986721.623-3-39M7.5混浆粉煤灰加气砼砌块墙20010m31457.94588.06856.7413.14 3-3-40M7.5混浆煤矸石砌块墙28010m31932.99604.561314.1814.25 3-3-41M7.5混浆硅酸盐砌块墙24010m33126.09691.022423.8311.24 3-3-42M7.5混浆膨胀珍珠岩砌块墙11010m313484.74656.0412820.688.02 3-3-43M7.5混浆砼空心砌块墙9010m33741.02774.182952.5914.25 3-3-44M7.5混浆砼空心砌块墙19010m32345.74679.801654.1411.80 3-3-45M7.5混浆砼空心砌块墙29010m32328.98597.961715.4315.59 3-3-46M7.5混浆砼空心砌块墙39010m32219.83550.441654.5814.81 3-3-47M7.5混浆轻骨料砼空心砌块墙9010m32213.99737.221462.5214.25 3-3-48M7.5混浆轻骨料砼空心砌块墙19010m32028.27647.461369.0111.80 3-3-49M7.5混浆轻骨料砼空心砌块墙29010m32253.40569.581668.2315.59 3-3-50M7.5混浆轻骨料砼空心砌块墙39010m31915.96524.701376.4514.81 3-3-51M5.0混浆砌空心砌块烟风道24010m35997.542250.603740.71 6.23 3-3-52M5.0混浆砌变压式排烟道半周80010m1024.23487.08536.950.20 3-3-53M5.0混浆砌变压式排烟道半周120010m1788.35636.901151.170.28 3-3-54M5.0混浆砌变压式排烟道半周150010m2444.17759.001684.830.34 3-3-55M10 砂浆钢筋砼漏空花格70内10m2625.3090.42534.570.31 3-3-56M10 砂浆钢筋砼漏空花格100内10m2776.92130.02646.440.46 3-3-57M10 砂浆钢筋砼漏空花格200内10m21045.74260.04784.790.91 3-3-58预制水磨石隔断板.窗台板10m2939.02104.28834.743-3-59砖砌屋面烟囱三孔内10m1357.73284.261070.91 2.56 3-3-60砖砌屋面烟囱三孔以上10m2876.31582.322290.43 3.56 3-3-61M5.0混浆加气砼砌块墙20010m32273.31665.281598.909.13 3-3-62M5.0混浆加气砼砌块墙25010m32178.00583.371585.509.13 3-3-63M5.0混浆加气砼砌块墙30010m32136.06545.951580.989.133-3-64M5.0混浆泡沫砼砌块墙20010m31897.63649.771238.739.13 3-3-65M5.0混浆泡沫砼砌块墙25010m31874.71624.361241.229.13 3-3-66M5.0混浆泡沫砼砌块墙30010m31818.76584.691224.949.13 3-3-67M5.0混浆硅酸钙砌块墙20010m32419.24808.761601.359.13 3-3-68M5.0混浆硅酸钙砌块墙25010m32360.37746.391604.859.13 3-3-69M5.0混浆硅酸钙砌块墙30010m32306.29713.791583.379.13 3-3-70M5.0混浆煤矸石多孔砖墙11510m32433.77721.181691.7720.82 3-3-71M5.0混浆煤矸石多孔砖墙14010m32817.78710.422085.2122.15 3-3-72M5.0混浆煤矸石多孔砖墙24010m32995.00628.122339.2727.61 3-3-73M5.0混浆煤矸石多孔砖墙34010m32511.04695.771789.2226.05 3-3-74M5.0混浆煤矸石多孔砖墙36510m32384.25652.871667.9263.46 3-3-75M5.0混浆煤矸石多孔砖墙24010m32419.82697.031695.5127.28 3-4-1GRC多孔板墙6010m22099.6791.082003.70 4.89 3-4-2GRC多孔板墙8010m22170.54100.982064.57 4.99 3-4-3GRC多孔板墙9010m22218.63108.242105.40 4.99 3-4-4GRC多孔板墙10010m22266.76112.202149.46 5.10 3-4-5GRC多孔板墙12010m22320.46122.762192.49 5.21 3-4-6轻集料砼多孔条板墙7510m21596.1889.761502.25 4.17 3-4-7轻集料砼多孔条板墙10010m21705.4797.681603.62 4.17 3-4-8轻集料砼多孔条板墙12010m22032.22107.581920.47 4.17 3-4-9轻陶粒砼实心条板墙6010m2968.50100.98861.25 6.27 3-4-10轻陶粒砼实心条板墙8010m21089.86110.88972.60 6.38 3-4-11石膏空心条板墙6010m2835.9381.84749.31 4.78 3-4-12石膏空心条板墙8010m21010.3887.78917.71 4.89 3-4-13双层石膏空心条板墙10m21610.29191.401415.00 3.89 3-4-14双层石膏空心条板墙填充5010m21791.26207.901579.37 3.99 3-4-15双层石膏空心条板墙填充厚±1010m231.450.6630.793-4-16硅镁多孔板墙9010m21264.7697.681162.09 4.99 3-4-17硅镁多孔板墙10010m21385.28100.981279.31 4.99 3-4-18木纤维增强水泥多孔板墙8010m21529.7091.741432.12 5.84 3-4-19网架水泥板聚苯乙烯泡塑心76(50)10m2943.4986.46854.31 2.72 3-4-20网架水泥板岩棉夹心65(40)10m2890.0975.90811.47 2.72 3-4-21网架水泥板岩棉夹心75(50)10m2930.1885.80841.66 2.72 3-4-22网架水泥板岩棉夹心85(60)10m21052.8695.04955.10 2.72 3-4-23GRC复合外墙板12010m21372.56121.441240.9110.21 3-4-24GRC复合外墙板37010m21842.91161.701671.1010.11 3-4-25彩钢压型板墙10m21150.4161.381029.1059.93 3-4-26双层彩钢压板墙聚氨酯板填6010m22290.56102.962090.5997.01 3-4-27双层彩钢压板墙聚氨酯板填10010m22521.80104.942319.8597.01 3-4-28双层彩钢压板墙聚氨酯板填±2010m2115.060.66114.403-4-29双层彩钢压板墙岩棉板填8010m22191.84104.281990.5597.01 3-4-30双层彩钢压板墙岩棉板填12010m22315.08105.602112.4797.01 3-4-31双层彩钢压板墙聚苯乙烯板填7510m22283.41103.622082.7897.01 3-4-32双层彩钢压板墙聚苯乙烯板填15010m22622.78106.922418.8597.01 3-4-33双层彩钢压板墙聚苯乙烯板±2510m2113.12 1.32111.803-5-1铸铁围墙10m1383.9279.861300.96 3.10 3-5-23:7灰土垫层方整石台阶10m22981.40958.321958.2564.833-5-3地瓜石垫层方整石台阶10m23038.56964.922001.8371.81 3-5-4C15砼垫层方整石台阶10m23074.55961.622046.8566.08 3-5-5砖砌屋面排烟气道口10个3538.681310.762141.9685.96 3-5-6砂浆用砂过筛用工10m3198.00198.004-1-1现浇构件圆钢筋φ4 t6087.241279.084761.7246.44 4-1-2现浇构件圆钢筋φ6.5 t6156.901458.604652.9245.38 4-1-3现浇构件圆钢筋φ8 t5595.55945.124602.9847.45 4-1-4现浇构件圆钢筋φ10 t5316.39693.004580.0043.39 4-1-5现浇构件圆钢筋φ12 t5316.56611.164617.6587.75 4-1-6现浇构件圆钢筋φ14 t5207.82521.404608.7177.71 4-1-7现浇构件圆钢筋φ16 t5138.69460.684602.9675.05 4-1-8现浇构件圆钢筋φ18 t5094.64405.904620.4368.31 4-1-9现浇构件圆钢筋φ20 t5046.94363.004617.6766.27 4-1-10现浇构件圆钢筋φ22 t5004.62329.344615.3159.97 4-1-11现浇构件圆钢筋φ25 t4974.16292.384634.7347.05 4-1-12现浇构件圆钢筋φ28 t4966.21279.844633.4552.92 4-1-13现浇构件螺纹钢筋φ12 t5360.42611.164648.25101.01 4-1-14现浇构件螺纹钢筋φ14 t5208.92521.404598.5189.01 4-1-15现浇构件螺纹钢筋φ16 t5108.79460.684562.1685.95 4-1-16现浇构件螺纹钢筋φ18 t5070.84405.904586.6878.26 4-1-17现浇构件螺纹钢筋φ20 t5018.67363.004579.6376.04 4-1-18现浇构件螺纹钢筋φ22 t4976.06329.344576.6970.03 4-1-19现浇构件螺纹钢筋φ25 t4942.22292.384593.9355.91 4-1-20现浇构件螺纹钢筋φ28 t4949.08279.844607.9561.29 4-1-21现浇构件螺纹钢筋φ30 t4963.26290.404618.1554.71 4-1-22现浇构件螺纹钢筋φ32 t4960.62287.764618.1554.71 4-1-23预制构件圆钢筋φ5内绑扎 t7525.652697.424782.9245.31 4-1-24预制构件圆钢筋φ5内点焊 t7212.802121.244711.45380.11 4-1-25预制构件圆钢筋φ6.5绑扎 t6055.961384.684630.6740.61 4-1-26预制构件圆钢筋φ6.5点焊 t5979.931103.524546.63329.78 4-1-27预制构件圆钢筋φ8绑扎 t5519.56896.284580.7342.55 4-1-28预制构件圆钢筋φ8点焊 t5532.40757.024537.64237.74 4-1-29预制构件圆钢筋φ10绑扎 t5254.57658.024557.7538.80 4-1-30预制构件圆钢筋φ10点焊 t5353.53609.184533.49210.86 4-1-31预制构件圆钢筋φ12绑扎 t5254.38575.524595.5083.36 4-1-32预制构件圆钢筋φ12点焊 t5254.49476.524573.15204.82 4-1-33预制构件圆钢筋φ14绑扎 t5155.73495.664586.5673.51 4-1-34预制构件圆钢筋φ14点焊 t5312.68520.744574.01217.93 4-1-35预制构件圆钢筋φ16绑扎 t5089.74436.924580.8172.01 4-1-36预制构件圆钢筋φ16点焊 t5201.88451.444570.80179.64 4-1-37预制构件圆钢筋φ18 t5049.66384.784598.2866.60 4-1-38预制构件圆钢筋φ20 t5006.56346.504595.5264.54 4-1-39预制构件圆钢筋φ22 t4967.08314.824593.1659.10 4-1-40预制构件圆钢筋φ25 t4937.21279.184612.5845.45 4-1-41预制构件圆钢筋φ28 t4930.01267.304611.3051.41 4-1-42预制构件螺纹钢筋φ12 t5363.18640.204625.9597.03 4-1-43预制构件螺纹钢筋φ14 t5203.96533.284582.4488.244-1-44预制构件螺纹钢筋φ16 t5104.93480.484540.2184.24 4-1-45预制构件螺纹钢筋φ18 t5065.51415.144557.6892.69 4-1-46预制构件螺纹钢筋φ20 t5028.37381.484554.9291.97 4-1-47预制构件螺纹钢筋φ22 t4961.97338.584552.5670.83 4-1-48预制构件螺纹钢筋φ25 t4940.18305.584581.5853.02 4-1-49预制构件螺纹钢筋φ28 t4911.98269.944585.9356.11 4-1-50预制构件螺纹钢筋φ30 t4925.43273.244596.0856.11 4-1-51预制构件螺纹钢筋φ32 t4925.43273.244596.0856.11 4-1-52现浇构件箍筋φ6.5 t6546.961846.024652.9248.02 4-1-53现浇构件箍筋φ8 t5856.271185.364602.9867.93 4-1-54现浇构件箍筋φ10 t5455.82820.384580.0055.44 4-1-55现浇构件箍筋φ12 t5247.63647.464552.1947.98 4-1-56预制构件箍筋φ6.5 t6421.551747.684630.6743.20 4-1-57预制构件箍筋φ8 t5763.161121.344580.7361.09 4-1-58预制构件箍筋φ10 t5385.10777.484557.7549.87 4-1-59预制构件箍筋φ12 t5186.27613.144530.0443.09 4-1-60先张法预应力钢筋φ5内 t6423.301228.925111.6882.70 4-1-61先张法预应力钢筋φ12 t6196.46623.045377.83195.59 4-1-62先张法预应力钢筋φ14 t5906.86568.925163.91174.03 4-1-63先张法预应力钢筋φ16 t5697.85517.445021.92158.49 4-1-64先张法预应力钢筋φ18 t5573.29485.104943.83144.36 4-1-65先张法预应力钢筋φ20 t5477.75450.784889.72137.25 4-1-66先张法预应力钢筋φ22 t5312.25334.624848.94128.69 4-1-67后张法预应力钢筋φ16 t10482.291432.208424.88625.21 4-1-68后张法预应力钢筋φ20 t8723.731017.067277.20429.47 4-1-69后张法预应力钢筋φ25 t7918.82766.926843.71308.19 4-1-70后张法预应力钢筋φ28 t7235.02680.466284.61269.95 4-1-71后张法预应力钢筋φ32 t6895.31614.466043.30237.55 4-1-72后张法预应力钢丝束12φξ t30696.444270.2025466.34959.90 4-1-73后张法预应力钢丝束14φξ t27145.083598.9822620.95925.15 4-1-74后张法预应力钢丝束16φξ t24687.253339.6020450.24897.41 4-1-75后张法预应力钢丝束18φξ t22692.793044.5818770.80877.41 4-1-76后张法预应力钢丝束20φξ t21185.592894.1017430.07861.42 4-1-77后张法预应力钢丝束22φξ t19921.702743.6216329.95848.13 4-1-78后张法预应力钢丝束24φξ t18815.442566.7415411.67837.03 4-1-79无粘结预应力钢丝束 t14009.992411.6410969.18629.17 4-1-80有粘结预应力钢丝束 t27125.2811386.9814167.661570.64 4-1-81套筒锥形螺栓钢筋接头φ32内10个381.77132.00227.2922.48 4-1-82套筒锥形螺栓钢筋接头φ45内10个552.47225.06291.5235.89 4-1-83带肋钢筋接头冷挤压连接φ2010个96.1640.9235.8119.43 4-1-84带肋钢筋接头冷挤压连接φ2210个111.4444.2246.8120.41 4-1-85带肋钢筋接头冷挤压连接φ2510个142.8448.8472.1221.88 4-1-86带肋钢筋接头冷挤压连接φ2810个174.1654.7895.8723.51 4-1-87带肋钢筋接头冷挤压连接φ3210个225.7360.06140.3625.31 4-1-88带肋钢筋接头冷挤压连接φ3610个283.1866.66189.4227.10 4-1-89带肋钢筋接头冷挤压连接φ4010个359.7272.60257.5729.55 4-1-90电渣压力焊接头φ1810个53.2726.4011.9314.94。
山东省造价员安装工程消耗量定额解释——电气设备安装工程1. 本册适用于10kV以下工业与民用新建、扩建和整体更新改造工程, 请问10kV以上架空线路及电力电缆工程、电气设备安装工程应如何执行?答: 10kV以上的架空线路、电力电缆工程、电气设备安装等应参照电力部门规定执行。
2. 计取本册脚手架搭拆费时有无操作高度要求?答:本册脚手架搭拆费为包干费, 除定额中已考虑的(如10kV以下架空线路)外均可计取, 无操作高度要求。
3. 册说明中第六条2中的项目如何执行定额?答: 电气设备(如电动机等)配合机械设备进行单体试运转的工作已包括在机械设备安装中;联合试运转工作可按施工方案进行计算。
4. "高层建筑增加费"表下面的注如何理解?答:为高层建筑供电的变电所和供水等动力设备安装工程, 如安装在六层以上时, 作为计取高层建筑增加费的基础;安装在六层以下时, 不作为计取高层建筑增加费的基础。
5.本册说明中未涉及洞库、暗室增加费系数, 可否计取?答: 该系数是对设置于没有自然采光、没有正常通风、没有正常运输行走通道的情况下施工而进行补偿的施工降效费。
本册也可计取。
如在洞库、暗室内施工时, 定额人工、机械消耗量增加15%。
6. 变压器油过滤定额中包括取油样、配合试验, 是否包括油的化验和油样分析?答: 变压器油过滤定额中不包括油的化验和油样分析。
转自学易网7.互感器安装定额不包括抽芯, 如需要抽芯检查, 如何执行?答: 可按施工方案进行计算。
8. 高压成套配电柜中"双母线柜"是否是指"带旁路母线的柜"?答:不是, 带旁路母线柜系单母线柜的派生类型。
9. 请问户表箱(电表箱)、明装配电箱如何套用定额?答: 住宅户内电表箱、明装配电箱及各种配电箱均按半周长套用"成套配电箱"相应项目。
10. 盘柜配线怎样计算?答: 盘柜配线仅适用于盘柜上设备元件的少量现场配线, 不适用于工厂设备的修、配、改工程。
册说明一、第七册《通风空调工程》(以下简称本册定额)适用于通风空调设备及部件制作安装,通风管道制作安装,通风管道部件制作安装工程。
二、本册定额编制的主要技术依据有:1.《工业建筑供暖通风与空气调节设计规范》GB50019-2015;2.《通风与空调工程施工质量验收规范》GB50243-2002;3.《通用安装工程工程量计算规范》GB50856-2013;4.《通风管道技术规程》JGJ141-2004;5.《风机盘管安装》01(03)K403;6.《风阀选用与安装》07K120;7.《金属、非金属风管支吊架》08K132;8.《防空地下室通风设计》FK01~02。
9.《暖通空调设计选用手册》(1999年中国建筑标准设计研究所出版);10.《建设工程劳动定额安装工程》LD/T74.1~4-2008;11.《通用安装工程消耗量定额》TY02-31-2015;12.《山东省安装工程消耗量定额》DXD37-209-2002;三、本册定额通风设备、除尘设备为专供通风工程配套的各种风机及除尘设备。
其他工业用风机(如热力设备用风机)及除尘设备安装执行本定额第一册《机械设备安装工程》、第二册《热力设备安装工程》相应项目。
四、空调水系统管道安装执行本定额第十册《给排水、采暖、燃气工程》相应项目,制冷机房、锅炉房管道执行本定额第八册《工业管道工程》相应项目。
五、通风空调工程所用型钢及普通钢板的除锈、刷漆,除各章节另有说明外,定额中均已包括。
型钢及部件用普通钢板按红丹防锈漆及调和漆各两遍、普通钢板风管按内外红丹防锈漆两遍考虑,如设计要求刷其他漆种时可进行换算。
六、本册定额中未包括的刷油和绝热、防腐蚀项目,执行本定额第十二册《刷油、防腐蚀、绝热工程》相应项目。
七、除各章节另有说明外,风管、部件及通风空调设备定额项目中没有包括的型钢支架,执行第十册《给排水、采暖、燃气工程》相应项目。
支架中所用的减振吊钩、弹簧减振器、橡胶减振垫等材料按实计入材料费。
山东省安装工程消耗量定额解释共性问题1.本定额的使用范围"新建、扩建及改造工程"应如何理解?是否与修缮定额的范围重复?答:本定额所说的改造工程指工业技术改造工程或整体更新改造工程。
所谓整体更新改造,指在已有建筑物或生产装置区内,增加或重新更换完整、独立的功能系统安装工程。
如:消防、给排水、通风空调、照明、热力设备等系统,而不是局部或系统中的一部分。
对于局部和系统中部分安装工程的拆除、安装除另有说明外,应执行修缮定额,两者不重复。
执行修缮定额时,对于修缮定额缺项的安装项目可以使用安装定额。
2.在执行消耗量定额时,如遇有缺项可否使用96综合定额和94安装估价表?答:在执行消耗量定额时,如遇缺项,可以参照96综合定额和94安装估价表相关定额的消耗量进行计价。
3.材料、设备的水平及垂直运输是怎样考虑的?答:水平运输是指安装物自施工现场内施工单位仓库或现场指定堆放地点运至安装地点的水平运输。
各册定额中除另有说明者外:设备水平运输按100m取定;材料、成品、半成品按300m取定。
执行定额时,不论施工现场内的水平运输距离多少,均不作调整。
垂直运输是指安装物自设备安装现场基准面运至安装位置的垂直运输。
垂直运输基准面,室内以室内地平为基准面,室外以安装现场地平面为基准面。
除定额另有说明外,材料、成品、半成品构件等垂直运输按六层(或20米)计,超过部分的垂直运输,在高层建筑增加费中计取;设备垂直运输按10m取定,设备垂直运输如超过10m时,除定额已有明确规定外,可按第一册说明第六条第一款规定计。
4.消耗量定额中没有列出脚手架系数的安装工程,如何计取脚手架搭拆?答:消耗量定额各册或章已规定了计取系数。
个别没有列出且须搭设的脚手架工程费用,可按施工组织设计计算。
5.什么情况下计取洞库、暗室增加费?答:洞库、暗室增加费指在没有自然采光、没有正常通风、没有正常运输行走通道的情况下施工,而进行补偿的施工降效费。
山东省安装工程消耗量定额超高系数的计取方式问题山东省安装工程消耗量定额超高系数的计取方式各册的规定各有不同,下面我们分别来看:第一卷:设备安装超高:除第七章电梯外,每章设备底座安装标高超过地平面正负10m,额定人工和机械消耗乘以调整系数如下:设备底座标高为1520253040506080100(±M),调整系数为1.151.201.251.301.401.501.601.751.90。
注:当安装标高超过100m时,每增加20m,调整系数增加10个百分点,不足20m按20m计算。
本册定额所指的“超高”,是指所安装的设备,其底座的安装标高(不是操作高度)超出地平面正或负10m时,凡所属“超高”安装的设备,其超高增加费按工程所套用的相应定额(不只是超出部分)的人、机之和乘以上述系数。
第二册:本工程超高消耗量(考虑超高因素的定额项目除外):当作业对象离地面高度超过5m时,定额劳动消耗量(含小于5m)乘以以下系数:作业高度≤ 10米≤ 15米≤ 20m>20m系数1.151.251.351.40第四卷:专业炉窑综合考虑超高运行系数,不计算超高消耗;一般(一般)工业炉及钢结构烟囱内衬喷涂工程,对于施工高度在40m以上的工程量,定额人工和机械消耗乘以系数1.30。
第五册:整体设备安装高度,定额是按三个安装高度档次(10米以内、10~20米以内和20米以上)分别设置定额子目,不再计算超高费。
第六卷:定额内施工作业高度综合取正负20m。
当超过20m时,多余部分的工程人工和机械消耗可乘以系数1.30或根据施工方案单独计算。
第七册:超高增加消耗量:定额中操作物高度以距楼地面5m为限,如超出5m时,定额人工(含5m以下)乘以下列系数:操作高度≤10m≤15m≤20m>20m系数1.101.151.201.40第八册:超高增加消耗量:定额中操作物高度以距楼地面3.6m为限,如超出3.6m时,定额人工(含3.6m以下)乘以下列系数:操作高度≤10m≤15m≤20m>20m系数1.101.151.201.40第九册:超高增加消耗量:定额中操作物高度以距楼地面6m为限,如超出6m时,定额人工(含6m以下)乘以下列系数:操作高度≤10m≤15m≤20m>20m系数1.101.151.201.40第十一册:工业工程以设计标高正负零为准,当安装高度超过±6.00m时,定额人工和机械(含6m以下)分别乘以下表系数:安装高度(超出2030405060708080以±6.00m上以上)调整系1.211.321.431.531.631.731.832.00数民用建筑随其主体工程适用的各册定额之相关规定。
册说明一、第七册《通风空调工程》(以下简称本册定额)适用于通风空调设备及部件制作安装,通风管道制作安装,通风管道部件制作安装工程。
二、本册定额编制的主要技术依据有:1.《通风与空调工程施工质量验收规范》GB50243-2002;2.《钢结构设计规范》GB50017-2003;3.《采暖通风与空气调节设计规范》GB50019-2003;4.《通风管道技术规程》JGJ141-2004;5.《建设工程工程量清单计价规范》GB50500-2013;6.《通用安装工程工程量计算规范》GB50856-2013;7.《通用安装工程消耗量定额》TY02-31-2015;8.《建设工程施工机械台班费用编制规则》2015;9.《建设工程施工仪器仪表台班费用编制规则》2015;10.《暖通空调设计选用手册》(1999年中国建筑标准设计研究所出版);11.《风机盘管安装》01(03)K403;12.《风阀选用与安装》07K120;13.《金属、非金属风管支吊架》08K132。
三、本册定额不包括下列内容:1.通风设备、除尘设备为专供通风工程配套的各种风机及除尘设备。
其他工业用风机(如热力设备用风机)及除尘设备安装执行第一册《机械设备安装工程》、第二册《热力设备安装工程》相应项目。
2.空调系统中管道配管执行第十册《给排水、采暖、燃气工程》相应项目,制冷机机房、锅炉房管道配管执行第八册《工业管道工程》相应项目。
3.管道及支架的除锈、油漆,管道的防腐蚀、绝热等内容,执行第十二册《刷油、防腐蚀、绝热工程》相应项目。
(1)薄钢板风管刷油按其工程量执行相应项目,仅外(或内)面刷油定额乘以系数1.20,内外均刷油定额乘以系数1.10(其法兰加固框、吊托支架已包括在此系数内)。
(2)薄钢板部件刷油按其工程量执行金属结构刷油项目,定额乘以系数1.15。
(3)未包括在风管工程量内而单独列项的各种支架(不锈钢吊托支架除外)的刷油按其工程量执行相应项目。
《安装工程估价》一、单选题1.下列关于硬聚氯乙烯管材特点及应用的说法中,错误的是(D)oA、耐腐蚀性强B、可输送酸碱溶剂C、不耐高温D、管材的寿命长2.重量轻、强度高、耐蚀性强和耐低温,可用于输送强酸、强碱的有色金属管材是(D )。
A.铅及铅合金管B.铜及铜合金管C.铝及铝合金管D.钛及钛合金管3.多用于焊接易氧化的有色金属管(如钛管、铝管等)、不锈耐酸钢管和各种材质的高压、高温管道的焊接,这种焊接方法是(B)oA、电弧焊B、氯弧焊C、氫电联焊D、气焊4.建筑安装工程编码中,0310表示的是(D )。
A、工业管道工程B、热力设备安裟工程C、通风空调工程D、给排水、釆暖、燃气工程5.根据《安装工程计算规范》的规定,通风空调工程的编码是(B)oA、0306B、0307C、0308D、03096.厂区、住宅小区的道路路灯安装工程、庭院艺术喷泉等电气设备安装工程,按(A )相应项目执行。
A、电气设备安装工程B、市政工程C、路灯工程D、建筑只能化工程7.消防工程安装髙度超过(B )米时,应在“项目特征"中描述。
A、3.6B、5C、6D、108、刷油、防腐蚀、绝热工程安装高度超过(C )米时,应在“项目特征"中描述。
A、3.6B、5C、6D、109、汇总工程量时,以米为单位的,应保留小数点后(B )位小数。
A、一B、二C、三D、四10、下列关于《安装工程计算规范》与其他计量规范界线划分规定,错误的有(C )。
A.室外给排水、釆暖、燃气管道以市政管道碰头井为界B.厂区、住宅小区的道路路灯安装工程、庭院艺术喷泉等电气设备安装工程按通用安装工程“电气设备安装工程"相应项目执行C.涉及管沟、坑及井类的土方开挖按《市政工程计算规范》D.涉及市政道路、市政庭院等电气安装工程的项目,按市政工程中“路灯工程"的相应项目执行11 .《山东省安装工程消耗量定额》中常用的施工技术措施项目费的计算以该定额专业册中所有章节(除措施项目费)的(A)为基数讨算。
《山东省安装工程消耗量定额》解释
第七册《消防及安全防范设备安装工程》
1、本册第八章系统调试中:"自动报警系统装置调试"与"水灭火系统控制装置调试"定额设置最小点分别为"128点"、"200点",实际施工中可能出现较少的点数,如何套用定额?答:如实际调试点数不足定额最少点数的1/2时,可按下列方法计算:最少点数定额子目的消耗量/最少点数(128或200)×实际调试点数。
2、消防及采暖管道沿建筑物弧形墙敷设,管道需煨制成圆弧形,此工作内容在消耗量定额中是否包括?
答:管道为适应建筑物结构造型而需加工成大弧度弯管的情况,现行安装工程消耗量定额相关管道安装工作内容中,均未包括此项加工工序。
工程发、承包双方可根据工程实际情况(管材规格、煨制半径、加工方法等)协商解决处理。
《山东省安装工程消耗量定额》解释共性问题1、本定额总说明第十二条中已明确"环保、安防、消防、劳保、技术监督等部门的监测、检验费用,发生时按有关部门规定另行计算"。
请问,对于这类强制性检验、验收收费应由谁来承担?答:上述费用是发生于工程上的检验、验收费用,其费用计算标准按相关部门规定计算。
这类费用属于建设单位管理费,应由建设单位承担。
2、在执行消耗量定额时,是否必须执行省统一发布的价目表中各类消耗量单价?答:在执行消耗量定额时,其人、材、机的单价应由工程发、承包双方根据建筑市场情况合同定价;如是投标报价则完全由投标人根据拟建工程实际和自身情况自主确定。
省统一发布的工日、材料、机械台班单价是一个指导价格,为工程计价活动提供参考。
省统一发布的指导价格包括省、各市的指导价。
3、怎样理解材料费中的检验试验费包括的内容?结算时这些费用是否按实际发生计取?答:根据建设部建标[2003]206号文件规定,材料检验试验费是指对建筑材料、构件和建筑安装物进行一般鉴定、检查所发生的费用,属于材料费的组成部分。
所谓"对建筑材料、构件……进行一般鉴定、检查……",即是指按照相关工程施工及验收规范的规定,在安装使用前必须对原材料、成品或半成品以及构件、配件等所进行的抽检、校验或复查(包括试件、试样的机械性能试验和化学成分分析)。
这些检测可以由具备条件的施工单位自己进行,也可以委托具有相应资质的专业检验单位进行。
检验试验费的计算,理论上讲,应将实际需要发生的对某一类别、规格、型号、批次的安装材料检验试验费用,分别计入相应被检验材料的单位材料成本费用(单价)之中。
但是在实际工作中,如果每个工程都按实际发生的检验试验费计算非常困难,且由于工程专业、建设地点、材料产地及品质等诸多影响因素,也不宜制定全省统一费率。
所以报价人应根据拟建工程实际情况,结合以往完成的相同或类似工程的成本核算资料,测算并确定材料检验费用的计取比率,进而完成相应的材料成本报价。