钢结构工程结算清单表格
- 格式:pdf
- 大小:30.12 KB
- 文档页数:2
钢结构合同工程计价表英文回答:Steel structure contract engineering pricing is acrucial aspect of any construction project. It involves determining the cost of the steel structure based onvarious factors such as materials, labor, equipment, and overhead expenses. The pricing table serves as a guide to estimate the overall cost of the project.In order to accurately price a steel structure contract, several key elements need to be considered. Firstly, thesize and complexity of the structure play a significantrole in determining the cost. Larger and more intricate structures require more materials and labor, resulting in higher pricing.Secondly, the type of steel used in the structure is another important factor. Different types of steel have varying costs, with high-grade steel being more expensivethan lower-grade options. The quality and strength of the steel also affect the pricing.Additionally, the location of the project can impact the pricing. Construction costs can vary based on regional factors such as labor rates, transportation costs, andlocal regulations. For example, constructing a steel structure in a remote area with limited access to resources may result in higher pricing due to increased logistics costs.Furthermore, the timeline of the project can influence the pricing. If there is a tight deadline, the contractor may need to allocate additional resources and manpower to complete the project on time, which can lead to higher costs.Other factors that may be considered in the pricing table include the contractor's experience and reputation, the complexity of the design, and any additional services required such as engineering or design work.To illustrate the pricing process, let's consider an example. Suppose I am a contractor pricing a steelstructure contract for a warehouse. The warehouse is large, spanning 10,000 square feet, and requires high-grade steel to ensure durability. The project is located in a remote area with limited resources and has a tight deadline of three months.Based on these factors, I would estimate the cost of materials, labor, equipment, and overhead expenses. I would consider the current market prices for high-grade steel and factor in the transportation costs to the remote location. Additionally, I would allocate sufficient resources and manpower to meet the tight deadline.Considering all these factors, I would then create a pricing table that outlines the estimated costs for each component of the project. This table would serve as a reference for both myself and the client, providing transparency and clarity regarding the pricing of the steel structure contract.中文回答:钢结构合同工程计价表是任何建筑项目中至关重要的一部分。
钢筋结算单表格
钢筋结算单表格通常包括以下内容:
1. 项目名称:工程的名称。
2. 施工单位:负责施工的公司或团队。
3. 钢筋种类:如螺纹钢、圆钢等。
4. 钢筋规格:如直径、长度等。
5. 钢筋数量:按照不同规格和种类进行统计的数量。
6. 单位重量:钢筋的单位重量,如千克/米。
7. 总重量:根据钢筋数量和单位重量计算得出的总重量。
8. 单价:钢筋的单价,如元/千克。
9. 总价:根据总重量和单价计算得出的总价。
10. 结算日期:进行结算的日期。
11. 审核人:对结算单进行审核的人员。
12. 备注:如有其他需要说明的事项,可在此栏填写。
以下是一个简单的钢筋结算单表格示例:
以上表格可根据实际情况填写相关内容,供参考。
钢结构决算单一、磅房边大棚车子撞坏了维修1、拆除水槽钢架、水槽、立柱、墙架、墙瓦1500元2、材料直径140镀锌钢管一根:480元100镀锌槽钢两根,285元/根,计570元,50X50镀锌槽钢五根,105元/根计525元3、立柱安装、角钢墙加固、钢材及人工费:1200元4、水槽钢架焊接人工费:150元∕mX6m=900元5、厚不锈钢水槽安装:50元∕mX6m=300元6、墙面钢架制作、安装及安装瓦5mX3.8m=19m2X142元∕πf=2698元二、山上脱水机水槽制作,安装1、蓝瓦拆除:6mX18块=Io8mX8元∕m=864元2、水槽及钢架拆除IoOO元3、水槽及钢架材料:100镀锌槽钢、60镀锌槽钢、50X50镀锌角钢:27mX170π∕m=4590元4、4、钢架制作安装费:27mX150元∕m=4050元5、厚不锈钢水槽材料:27mX180元∕m=4860元6、不锈钢水槽安装费:27mX70元∕m=135O元7、蓝瓦安装及辅材:108mX12元∕m=1296元三、化验室后亮瓦墙:3.5mX1.5m=5.25m2X142元∕rtf=745元四、一号脱水机亮瓦雨棚:(2m+1.6m)÷2X4m=1.8mX4m=7.2mX185元/m=1332元五、一号脱水机天沟清砂:500元六、铅沙大棚墙面亮瓦制作安装:10mX2.7m=27m2X142元∕ιtf=3834元七、磅房窗户玻璃及滑轮:200元八、一号车间平开门1.5mX1.5m=2.25m2X150元∕ιtf=337元九、山上脱水机大棚中间棚加装亮瓦1、亮瓦材料:7mX35块=245mX31元∕m=7595元2、亮瓦辅材及安装费:245mX12元∕m=2940元十、三号脱水机换屋面行条及屋面瓦1、拆除亮瓦:7mX36块=252mX8元∕m=2016元2、拆除彩钢瓦:7mX36块=252mX8元∕m=2016元3、拆除水槽及钢架:1500元4、140镀锌C型钢:7mX22根=154mX72元∕m=11088元5、140C型钢焊接人工费及辅材:4500元6、亮瓦材料:7mX36块=252mX31元∕m=7812元7、亮瓦安装及辅材:252mX12元∕m=3024元8、平台值班室小屋维修材料及人工费:500元十一、山上脱水机加装墙面瓦1、材料:40X80镀锌方管27根X145元/根=3915元50X50镀锌角钢:12根X105元/根=1260元2、镀锌方管及角钢焊接安装费:2800元3、墙面彩钢瓦切割拆除1.5mX85⅜⅛=127.5mX20元∕m=255O元4、亮瓦材料:7mX85块=595mX31元∕m=18445元5、亮瓦安装费及辅材Z595mX25元∕m=14875元十二、二号车间屋面拆除石棉瓦1、100块X15元∕m=15OO元2、亮瓦材料:7mX26块=182mX31元∕m=5642元3、亮瓦安装费及辅材Z182mX25τc∕m=4550元十三、一号脱水机制作安装墙瓦1.13mX5m=65m2X142元∕πf=9230元2、1号脱水机上的水沟清理打胶:600元十四、磅房边墙面瓦1、拆除彩钢瓦及C型钢:300元2、墙面钢架制作安装及安装亮瓦1.5mX2m+2mX7m=17m2X142元∕πf=2414元十五、五号车间屋面石棉瓦维修材料及人工费:600元十六、平开门大门维修:800元十七、山上脱水机大棚边防凤瓦拆除、制作、安装1、防风瓦拆除:6mX21块=1260mX8元∕m=1008元2、钢材拆除:1500元3、原有防凤瓦钢架加固材料及人工费:1500元4、防风瓦钢架制作、安装:3mX32m=96m2X90τE∕m2=8640元5、防风瓦安装及辅材二120mX20jE∕m=2400元十八、铅沙货场北面连接拆除1、拆除亮瓦:(7m+2m)÷2X18m=4.5mX18m=81mX8元∕m=648元2、拆除防风瓦6mX6块=36mX8元∕m=288元3、拆除防风瓦钢架及槽钢钢架:1500元十九、304材质不锈钢大门:8mX3m=24m2X500τE∕m2=12000元二十、门卫值班室亮瓦棚顶:3mX2.7m=8.1m2X185τL∕m2=1498π墙:5mX2.5m=12.5m2X142τE∕m2=1775TL二十一、工、抗雪柱安装800元2、抗雪柱拆除600元二十二、东边围墙外亮瓦棚1、清理围墙外塑料袋垃圾及清理树枝毛草等人工费:500元2、16mX6m=96m23、55mX3m=165m24、165m2+96m2=261m2X160π∕m2=41760元二十三、锌沙货场墙面加装亮瓦1、顶瓦加焊行条及加装亮瓦(2m+1.2m)÷2=1.6mX8m=12,8m2X190τc∕m2=2432元2、墙面加焊行条及亮瓦2.6mX20m=52m2X142τE∕m2=7384元3、防尘瓦及彩钢瓦加装亮瓦亮瓦材料:6mX148块=828mX31元∕m=27528元亮瓦辅助材料及安装费888mX20元∕m=17760元二十四、锌沙货场顶加装亮瓦亮瓦材料:6mX28块=168mX31元∕m=5208元亮瓦辅助材料及安装费168X12元∕m=2016元二十五、三号及四号脱水机墙面加装亮瓦1、拆除亮瓦:7mX6块=42mX8元∕m=336元2、亮瓦材料:6mX45块=27OmX31元∕m=8370元3、亮瓦辅助材料及人工费:270mX20元∕m=5400元4、拆除亮瓦安装:42mX8元∕m=336元二十六、二号车间顶瓦拆除及安装模板1、清理顶上矿石:200元2、拆除顶瓦:2.5mX7块+6mX2块=29.5mX8元∕m=236元3、安装模板10块=300元4、亮瓦材料:6mX6块=36mX31元∕m=1116元5、亮瓦辅助材料及安装费:36mX12元∕m=432元二十七、一号车间过道墙面安装亮瓦1、亮瓦材料:6mX24块=144mX31元∕m=4464元2、40x80镀锌方管一根:180元3、亮瓦辅助材料及安装费:144mX20元∕m=2880元二十八、磅房边休息室门头加装亮瓦1、5.3mX0.9m=4.77m2X160π∕m2=763π2、水槽钢架一米及水柱:170元3、水槽钢架焊接:150元4、水槽材料一米:120元5、水槽安装费:50元二十九、铅沙货场拆除角钢爬梯:1200元三十、三号脱水机顶加装防晒黑网:300元三十一、一号球磨机及二号破碎机漏雨维修材料及人工费:300元三十二、三号脱水机拆除亮瓦再安ASA树脂瓦1、拆除亮瓦7mX36块=252mX8元∕m=2016元2、材料ASA树脂瓦(3.5m)7mX36块=252mX75τc∕m=18900元3、辅助材料及安装费:252mX15元∕m=3780元4、换落水管材料IlO落水管3根80元/根240元辅助材料及人工费:300元三十三、空压机房1、拆除墙面瓦6mX3块=18mX8元∕m=144元2、拆除顶瓦4.4mX3块=13.2mX8元∕m=105元3、亮瓦材料:6mX3块=18mX31元∕m=558元4、辅助材料及安装:18mX20元∕m=360元三十四、三号脱水机边上泵上亮瓦棚1、6mX7.2m+3mX1.8m=43.2m2÷5.4m2=48.6m22、185元∕m2X48.6m2=8991元合计金额:346900元税金:346900元X3%=10407元总计金额:346600元+10407元=357307元大写金额:叁拾伍万柒仟叁佰零柒元整。
***钢结构工程
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄
投标报价表
投标报价 (小写):1604037.94元
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄
(大写):壹佰陆拾万零肆仟零叁拾柒元玖角肆分
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄
工程造价
投 标 人: 咨询人:
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄
(单位盖章)(单位资质专用章)
法定代表人法定代表人
或其授权人或其授权人:
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄(签字或盖章)(签字或盖章)
编 制 人:复 核 人:
 ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄
(造价人员签字盖专用章)(造价人员签字盖专用章)编 制 时 间:2019年 6月26日复 核 时 间:2019年 6月26日
总 说 明
表-01
建设项目招标控制价汇总表
其中: (元)
序号单项工程名称建筑面积金额(元)
暂估价
1***钢结构工程1060.231604037.94
2
合计1604037.94
注:本表适用于工程项目招标控制价或投标报价的汇总。
表-02
单位工程费用汇总表
第 1 页 共 1 页工程名称:***钢结构工程
规费、税金项目清单与计价表
第 1 页 共 1 页工程名称:***钢结构工程。