Module 2_16Way_v2.0
- 格式:ppt
- 大小:598.50 KB
- 文档页数:10
Dashboard/…/motorBench 2.25 ReleasemotorBench 2.25.0 Release NotesCreated by Fernando Garibaldi, last modified by Jason Sachs 2 minutes agoOverview of motorBench® Development SuiteWhat’s NewSystem RequirementsSupported HardwareHigh-voltage hardwareOther hardware required with both low-voltage and high-voltage setupsInstalling motorBench® Development Suite 2.25.0RepairsMotor Control Fixed IssuesChanges since revision 2.15Known IssuesMotor Control IssuesLimitationsSupported DevicesSoftware LimitationsMotor Control LimitationsSupported Motor ParametersCustomer SupportThe Microchip Web SiteAdditional SupportOverview of motorBench® Development SuiteMicrochip motorBench Development Suite is a graphical, interactive development environment designed to help motor control engineers to design and implement motor control systems, from very basic to very sophisticated ones.motorBench® Development Suite allows the user to:configure a motor systemmeasure motor parameterstune the controller gainsgenerate code to spin the motorWhat’s New1. Motor Control Application Framework (MCAF) R5 – see MCAF User's Guide for more information.a. Added support for dsPIC33CK256MP508b. Added Angle-tracking PLL (ATPLL) supportc. Improved Customize page support in motorBench2. Customizea. Allow advanced customization of MCAF code generation3. Measurea. Updated fault handing logic to detect if an invalid load is connected to the inverter before starting motor parameter measurement or Board calibrationb. Improvements to support motors with large values of stator inductancec. Improvements to support motors with large inertia and high cogging torque4. MCC Integrationa. Improved support for MCC-generated peripheral and system initialization code5. Device Supporta. Added support for dsPIC33CK256MP508i. This device is not yet supported by the motor parameter measurement featureSystem RequirementsMPLAB X 5.30 or later.XC16 compiler version:Firmware generated by motorBench® Development Suite has been tested with XC16 1.41.33EP devices: XC16 1.36 or later are expected to work with motorBench®Development Suite but have not been extensively tested.33CK devices: Either of the following is required:XC16 1.50 or laterXC16 1.41 with DFP 1.2.66 or laterMPLAB Code Configurator®(MCC) Plugin Version 3.95.0 or laterPIC24/dsPIC33/PIC32MM library 1.166.0 or laterSupported HardwareThis release of motorBench®Development Suite supports both low-voltage and high-voltage setups.Low-voltage hardware1. dsPICDEM MCLV-2 Development Board [Part Number: DM330021-2]2. dsPIC33EP256MC506 External Op Amp Motor Control PIM [Part Number: MA330031-2] with silicon revision A8 or dsPIC33CK256MP508 External Op Amp Motor Control Pim[Part Number: MA330041-1].3. A three phase PMSM or BLDC motor that is compatible with 24V, such as the Hurst 24V BLDC motor DMA0204024B101 [Part Number: AC300022].4. 24V power supply [Part Number: AC002013] - ensure this connects to AC mains using a 2-prong cable. If you have an AC002013 with a 3-prong cable, please contact Microchip.High-voltage hardware1. dsPICDEM MCHV-2 Development Board [Part Number: DM330023-2] or dsPICDEM MCHV-3 Development Board [Part Number: DM330023-3]AC mains voltages 120VAC 60Hz and 220VAC 50Hz have been tested.2. dsPIC33EP256MC506 External Op Amp Motor Control PIM [Part Number: MA330031-2] with silicon revision A8 or dsPIC33CK256MP508 External Op Amp Motor Control Pim[Part Number: MA330041-1].3. A three phase PMSM or BLDC motor that is compatible with rectified AC mains voltage, such as the Leadshine 400W BLDC motor EL5-M0400-1-24 [Part Number: AC300025].Other hardware required with both low-voltage and high-voltage setups1. A USB-to-logic-level-UART converter from the following list:a. Saelig USB-COM-U or USB-COM-U13b. TRENDnet TU-S9 v2.02. Programming tool - one of the following tools: Real ICE, ICD33. Board calibration load resistors - this is optional, please see motorBench® Development Suite User's Guide document for more detailsInstalling motorBench ® Development Suite 2.25.0To install the MPLAB ® Code Configurator v3.95 Plugin1. In the MPLAB® X IDE, select Plugins from the Tools menu2. Select the Available Plugins tab3. Check the box for the MPLAB® Code Configurator v3, and click on InstallTo install different peripheral library version or motorBench ® Development Suite version when connected to internet1. Create a project with dsPIC33EP256MC506 or dsPIC33CK256MP508, or use the sample project.2. Open MPLAB® Code Configurator3. In the Versions tab under PIC24/dsPIC33/PIC32MM MCUs, find the multiple library versions (loaded version is indicated by the green check mark)4. Right-click on the required version of the library and select Mark for Load5. In the Versions tab under motorBench ® Development Suite find the multiple library versions (loaded version is indicated by the green check mark)6. Right-click on the 2.25.0 version of the library and select Mark for Load7. Click on Load Selected Libraries button to load the marked libraries.To install different peripheral library version or motorBench® Development Suite version when not connected to internet1. In the MPLAB® X IDE, select Options from the Tools menu2. Select Plugins tab3. Click on Install Library4. Add pic24-dspic33-pic32mm_v1.166.mc3lib5. Add motorBench_2.25.0.mc3lib6. Restart MPLAB® X IDERepairsMotor Control Fixed IssuesChanges since revision 2.15The following aspects of motorBench® Development Suite and the Motor Control Application Framework (MCAF) have been updated:MCAF has been updated to R5, includingChanges in R2:Support for DC link compensationSupport for overmodulationSupport for wider range of low-voltage motorsUpdated HAL for future MCHV2 supportUpdated Motor Control LibraryNumerous minor fixesChanges in R3:MCC system module compatibilityMCHV-2 and MCHV-3 supportInverter maximum current now has a 1:1 ratio with the maximum commanded dq-frame current of the drive, operating in FOC (in R2 this incorporated a deratingfactor)Other minor fixesChanges in R4:MCC peripheral supportParameter customizationQuadrature encoder supportAdded new startup method (Weathervane startup)Other minor fixesChanges in R5:Added device support for dsPIC33CK256MP508Added Angle-tracking PLL (ATPLL) sensorless estimatorImproved motorBench Customize page supportOther minor fixesSections in this release notes affected:Other RequirementsLimitationsSupported Motor ParametersKnown IssuesPlease note:We do not recommend using the MCP2200 USB to RS232 Demo Board [Part number: MCP2200EV-VCP ] with this release of motorBench® Development Suite.While testing, we have observed more frequent occurrence of a serial communication timeout issue while running motor parameter measurement using this cable.See Known Issues section of this document for more information (MCGUI-1141)Motor parameter measurement is only supported on dsPIC33EP256MC506 device.Issue Key Summary WorkaroundMBPLAN-673Serial port does not get closed programmatically when MCC exits during motor parametermeasurementIf you exit SC during execution, restart MPLAB X.MBPLAN-932Exception during attempted creation of a runtime properties class No workaround needed, this issue doesn't have an impact on thefunctionality.MBPLAN-984Improve error reporting for SC build errors in the event of a code generation failureMBPLAN-1095Switching projects after loading motorBench erroneously allows motorBench code to generate for new projectMBPLAN-1160"Import Motor" and "Export Motor" buttons can be clicked multiple times, opening multiple dialog boxesMotor Control IssuesIssue Key SummaryDB_MC-411Current calibration happens only once (at part reset) rather than upon entry to MCSM_RESET stateDB_MC-560Speed controller exhibits chattering behavior at voltage saturation hysteresis boundary (MCAF)DB_MC-978"Soft start" gate drive in board_service.c has duty cycle that is too smallDB_MC-1092PLL estimator may not converge into rotor reference frame while using the Classic startup method in MCAFDB_MC-1396PLL calculations in code generation do not allow motor.velocity.nominal to be more than 1250Hz electrical (=20kHz/8/2)DB_MC-1415With some motors and 12V operation, increased velocity margin improves startup but creates unstable estimatorDB_MC-1430Quanum MT4012 unstable in closed-loop operation at 4200 RPM speed and aboveDB_MC-1491With Quanum MT4012, MCAF may not detect stallDB_MC-1492Quanum MT4012 Stalls on pressing 'S3'(reverse) at low speeds and on changes to speed command potentiometerDB_MC-1495Anaheim BLY342D-24V-3000, BLY342D-48V-3200 motors creates hardware over-current during stall-detect testingDB_MC-1521Closed loop speed step response overshoot - MCHV2, Leadshine 400DB_MC-1892Some motors with extreme parameters may produce out-of-range error for stall_detect.group.timerCountsVarianceDetect (detected in Monte Carlo analysis)DB_MC-1920Board service isrCount-based timing is not guaranteedDB_MC-1922LED patterns not displayed when in the TEST_DISABLE or TEST_ENABLE statesDB_MC-2122BLWS232D motor startup in QEI mode causes a false detect for stall-detectionDB_MC-2213Deadtime needs to be changed in both MCC and motorBench to affect codeDB_MC-2275Large current rampup times may not start (STARTUP_TORQUE_RAMPUP_RATE = 0)DB_MC-2309QEI tracking loop Kp and Ki produce out-of-range errors for low-speed motorsDB_MC-2323Weathervane transition state should not have active damping enabledDB_MC-2387DC link voltage measurement may have too much phase delay for MCAF DC link compensation to work effectivelyDB_MC-2606MCC-generated code has incorrect IESO/FNOSC config bits for 33CKDB_MC-2671MCAF_CaptureTimestamp calls incorrect timer function for 33CK devicesDB_MC-2785Current sense signal integrity issue with 33CK during overmodulationLimitationsSupported DevicesmotorBench® Development Suite supports these devices:1. dsPIC33EP256MC5062. dsPIC33CK256MP508Software LimitationsmotorBench® Development Suite is tested for serial communication using Windows 7 and Windows 10 platforms. Other platforms may work with standard baud rates, but this operation has not yet been verified.Motor Control LimitationsFollowing are the known limitations for this release of motorBench® Development Suite:1. One mechanical load - constant load. This represents a mechanical load with constant inertia, viscous damping, and friction. The velocity control loop can generally rejectexternal disturbance torques, within the rated current of the motor and board, and within the bandwidth of the velocity control loop. Mechanical loads with time-varying or angle-varying inertia, viscous damping, and friction, such as a blower, compressor, or pump, are currently not supported.2. One motor type - PMSMMCLV-2:The reference motor is the Nidec Hurst motor DMA0204024B101 (MicrochipDirect part number AC300022). Microchip has also validated motorBench® DevelopmentSuite (including motor parameter measurement) with motors with parameters plotted below. Please also read the following section on Supported Motor Parameters. IfmotorBench® Development Suite is unable to spin a motor successfully, please contact Microchip staff for additional assistance.(Note: Mechanical time constant (2/3)×JR/Ke² represents the time constant of velocity acceleration under an open-loop synchronous-frame voltage step, neglecting the effects of inductance, with J, R, and Ke expressed in canonical metric units. R is expressed as line-neutral resistance = half of line-line resistance, and Ke is expressed as V/(rad/s) line-neutral zero-peak = Vrms/KRPM (line-line) × 0.007796968)MCHV-2/MCHV-3:The reference motor is the Leadshine 400W motor EL5-M0400-1-24 (MicrochipDirect part number: AC300025). Microchip has validated motorBench® DevelopmentSuite (including motor parameter measurement) with motors with parameters plotted below. Please also read the following section on Supported MotorParameters. If motorBench® Development Suite is unable to spin a motor successfully, please contact Microchip staff for additional assistance.3. Boarda. dsPICDEM™ MCLV-2 development board. This release of motorBench® Development Suite is compatible with modifications to the board to alter its rated current orvoltage. Contact your local Microchip office to obtain the document "Using MCLV-2 with motorBench® Development Suite to support alternative current and/or voltageratings", which provides guidance for such modifications. Other modifications may not be compatible.b. dsPICDEM™ MCHV-2 and MCHV-3 development boards. This release of motorBench® Development Suite is compatible with unmodified MCHV-2 and MCHV-3development boards.4. Motors should be well-matched to the board and operating voltage. The nominal DC link voltage of the MCLV-2 board is 24V. This voltage can be changed by cutting jumperJ6 and using an appropriate power supply connected to the appropriate terminals of J7. Use of a mismatched motor (for example, a 12V motor used with a 24V DC link voltage) may cause a hardware over-current fault; in this case motor parameter measurement may fail with the message "Fault Code #10: Undefined Fault". Retry with an appropriate DC link voltage.5. Two PIMs and Two devices - dsPIC33EP256MC506 External OpAmp PIM with silicon revision A8 or dsPIC33CK256MP508 External OpAmp PIM. (Please see the HardwareSetup section of the motorBench User's Guide for important modifications to dsPIC33EP256MC506 External OpAmp PIM for use in MCHV-2 and MCHV-3.)6. One algorithm - FOC7. Estimators - PLL, QEI, ATPLL8. Motor parameter measurement:a. Performance criteria adjustment is not presently supported. This includes adjustment of phase margin and PI phase lag at crossover in the current loop; Microchip hasnot completed validation and documentation of these adjustments.9. Autotuning:a. Performance criteria adjustment of the current loop is not presently supported. This includes adjustment of phase margin and PI phase lag at crossover; Microchiphas not completed validation and documentation of these adjustments.b. Use of performance criteria adjustment of the velocity loop is not fully documented or tested. We recommend not adjusting phase margin or PI phase lag unlessnecessary; cases where this is likely to occur are large inertias where αJ = JR/LK m2 > 10, for which an increase of phase margin is appropriate. Phase margin valuesbetween 70 and 85 degrees are recommended in this case, with larger values providing additional stability at the cost of lower velocity bandwidth.10. Axis management not currently implemented - supports only one axis.11. Code generation:a. PWM switching frequency is fixed at 20kHz and does not reflect the value entered under Board parametersb. Integration with external user-supplied code may involve substantial changes. Some guidelines for this are given in the documentation for the Motor ControlApplication Framework. While it is possible to integrate the code generated from motorBench® Development Suite with external code, it is the responsibility of the end user to validate this combination.12. Required compiler settings:a. Optimization-O1 or greater; -O0 and -Os will both compile without errors but do not execute fast enough to complete within the 50 microsecond ADC ISR. Note: at higheroptimization levels, in-circuit debugging using MPLAB X will behave unreliably with respect to breakpoints and single-stepping through C code.The "Omit frame pointer" and "Unroll loops" settings must be enabled.b. Memory model:Large data model (handles using pointers, not direct addressing, to allow for more than 8K of program variables)Small scalar modelc. Additional options:-Wno-volatile-register-var -finlined. Test harness: In order for the test harness to be enabled, the symbols MCAF_TEST_PROFILING and MCAF_TEST_HARNESS should be defined.13. Recommended compiler settings:a. Additional options:-WundefSupported Motor ParametersSince version 2.15, motorBench®Development Suite supports a wide range of motors, subject to the following notes:Ranges of motor parameters (including rated values and computed metrics) must be within the limits noted in either range-limits-mclv2.html or range-limits-mchv2.html.These ranges were tested to ensure that code generation produced firmware constants that were within bounds.Motor parameter measurement does not need to complete successfully but valid motor parameters are required. Some motors may have too low of an inductance or resistance, and may fail motor parameter measurement.Other particular issues that may cause incompatibility with motorBench®Development Suite includeLarge inertia values – in this case, increasing voltage loop phase margin may prevent stability problems. (See "Autotuning" in the Limitations section of this document.) Rotor magnetic saliency – if there are significant differences between Ld and Lq (>10% difference) then some of the MCAF algorithms may not work optimally. Highermismatch between Ld and Lq is typically found in interior-permanent magnet (IPM) motors, and is an intentional feature of the design. See the MCAF User's Guide for more information.Large back-EMF harmonics – a quasi-sinusoidal back-emf is assumedIssues involving individual motor control algorithms, such as PLL estimator, motor startup, or stall detectionHigh cogging torqueMismatch between motor and drive (namely using a motor with current and/or voltage requirements significantly different from that of the hardware) Microchip cannot guarantee that motorBench®Development Suite will work correctly with all motors. If a particular motor does not work properly, please contact the MCU16 Motor Control Team for further guidance.Customer SupportThe Microchip Web SiteMicrochip provides online support via our web site at . This web site is used as a means to make files and information easily available to customers. Accessible by using your favorite Internet browser, the web site contains the following information:Product Support – Data sheets and errata, application notes and sample programs, design resources, user’s guides and hardware support documents, latest software releases and archived softwareGeneral Technical Support – Frequently Asked Questions (FAQs), technical support requests, online discussion groups/forums (), Microchip consultant program member listingBusiness of Microchip – Product selector and ordering guides, latest Microchip press releases, listing of seminars and events, listings of Microchip sales offices, distributors and factory representativesAdditional SupportUsers of Microchip products can receive assistance through several channels:Distributor or RepresentativeLocal Sales OfficeField Application Engineering (FAE)Technical SupportCustomers should contact their distributor, representative or field application engineer (FAE) for support. Local sales offices are also available to help customers. A listing of sales offices and locations is available on our web site.Technical support is available through the web site at: 。
2.1 Company benefits1 Complete this list of job benefits using the words in the box.Your employment package willinclude:● a (0) good salary●Use of a (1) _____ car●(2) _____ working hours●Excellent opportunities for(3) ______● A full (4) _____ on retirement●Possibility of (5) _____ leave●Five weeks annual (6) ______●One day (7) per month for personal training2 Complete these expressions using take.0 I am taking a trip to Madrid next week. I hope I’ll get some time to see the city.1 Don’t worry. Andrew is an excellent host. He will take _________ of you.2 We have taken _________ a temporary secretary forThree months to help us get through the work.3 I think we should take a ___________. We have beenDiscussing this for two hours now.4 You should take what she says with a _________ of salt.5 The conference will take __________ in New York in October next year.3 Read the passage about job title inflation and choose the best sentence (A-G) to complete each gap (1-6) A That is a lot of chiefs and not very many Indians.B Have you got greater responsibilities?C They make a public statement that this employee is important to the company.D In terms of the job they actually do, the title is meaningless.E After all, the company can’t be made up of only high-flying managers.F The other will be to have an impressive job title. Have you just been promoted to the status of manager? Then ask yourself these questions: has your salary risen significantly? (0) B Have your benefits increased? If not, then you are probably the victim of what is known as ‘job title inflation.’(1)______One in four company employees in London are now managers. (2) ______ it cannot be the case that companies need so many people giving orders and so few people taking them. So we can only conclude that these managers are managers in name only. (3)______So why do companies continue to hand our these titles? The answer is simple. They are a cheap way to recognise an employee’s commitment to the job and to give them an incentive to stay. (4) ______ if you ask an MBA student these days what their ambitions are, one will certainly be to pick up a fat pay cheque some day. (5) ________But companies have to be careful. Too many title promotions can lead to employees feeling suspicious about their value. (6) ______ If the company keeps creating new title (Senior, Deputy, Vice-President, Marketing and so on) their significance soon decreases.The Past4 Look at the underlined verbs in this dialogue. If the verb is in the correct tense, write “correct”. If it is incorrect, write he correct form. Interviewer so, I see from your CV that you are currently with Cadbury’s. How long did you work (0)have you been working there? Candidate I have joined (1)________them in 2004. At first, I worked (2)_________in the sales department but more recently I worked (3)_________in the marketingInnovation department.Interviewer That sounds interesting. What have youdone(4)___________________there exactly?Candidate We have been researching(5)________________________what products weshould sell into our new markets in the Far East. Insome cases we took (6)______________________anexisting product and branded it. In other cases wehave been developing(7)____________________acompletely new product.Interviewer And you lived(8)_________________inAustralia until last January. Is that right?Candidate Yes, we have moved(9)___________backto the UK in February. I have looked(10)_______for a new job since then.5 Write the profile of this company using the facts in the box, Begin like this:Reynard Inc is based in Birmingham in UK. The company...Pronunciation6 Look at this extract from a presentation and mark where you think the natural pauses should go.7 The letter’i’ can be pronounced/ai /as in nice , or/I /as in quick .Sort the words from the box into the correct column in the table. 2.2 Presenting your company 1. Complete the company profile of a French energy company, by choosing the correct word A-D below to fill each gap.3. Put one word in each space to complete this extra from a presentation.4. What comes next? Continue these presentation phrases using the prompts in brackets. 0 Thank you (come/today) for coming today . 1 I’d like to begin by (tel l/something/product) ___________________________________2 At this point I will quote our CEO: (great/product/not enough)___________________________________ 3 Let’s move on (look/sales)___________________________________ 4 This chart (show/turnover/2007)___________________________________ 5 Let’s take a look (profits/last years)___________________________________ 6 That brings me (end/presentation)____________________________________ Memos5 Read the following memo and answer the questions.1 What is the relationship between John Simmons and Graham Pole? 7 Read these two memos and then replace theunderlined phrase with the synonyms below.2.3 Reading Test: Part Five1 Find the extra word in each sentence. Explain why it is wrong.0 The company don’t cannot know what motivates each employee the most.You not need two auxiliary verbs (‘do’ and ‘can’) and ‘company’ is a singular noun so ‘don’t’ is incorrect.1 For most people, it is more better to have an interesting job than a high salary.2 the company encourages a people to go on training courses.3 It is a job with a lot of variety and which with flexible working hours.4 When you join to the company, you become part of the family.5 But it is not only the company’s responsibility. Each employee that has to motivate himself2 Answer the exam question.Writing Test: Part One3 memos in the exam are supposed to be 40-50 words long. Look at the question and the candidate’s answer, which is too long (100 words). Underline the most important information in the memo and cross out any phrases which give unnecessary detail. Then, write a shorter version of the memo.(2)、汇聚光的是凸透镜,发散光的是凹透镜;(3)、看字时放大的是凸透镜,缩小的是凹透镜。
DEWE2Modular Data Acquisition SystemsemurtsnIdetacideDstnemurtsnIsdne-tnorFgninoitSeries Modules1H i g h s p e e d d a t a i n t e r f a ce2Data Acquisition ModuleSystem ArchitectureUser exchangeable TRION™ modulesSignal conditioning Flexible connectorpanelFiltering A/D conversionHigh speed data transfer and synchronizationDEWE2 System Architecture3Housing and Storage Controlling and AnalysisWide range of housingsDEWE2-A series All-in-one DEWE2-M series Mainframes DEWE2-F series Front-endsOne software for allFull hardware controlPowerful online or offline data processingAttractive online displays Fast data analysisPost processing and/or export to many file formats Simple reportsDEWE2 System Architecture4All-in-one instrumentsMainframesFront-endsMost compact, includes powerful i7 computer, brilliant display and keyboard, touchpad.Most convenient for all mobile applications like inspect-ing facilities, rotating machines, test stands, power generators, electrical machines, buildings, vehicles, aircrafts, trains, and anything else.Like the A-series but without display; keyboard and point-ing device are included loose.Very popular for applications where the instrument is installed in a poorly visible place for the user (e.g. in a car the instrument is often installed in the leg area of the passenger seat but the driver needs to see the screen) or laboratory applications and test rigs.F-series units don´t have a built-in computer but supply measurement data over a robust high-speed PCI Express bus. Multiple units can be daisy-chained.One popular application is to use F-series devices with a laptop computer for mobile applications.The second use of F-series devices is to expand A or M series instruments.A-seriesM-seriesF-seriesDEWE2 DefinitionsUse isolated inputs and differential inputs at the same timeInput connectors to match your sensorsAll TRION™ modules have a factory-exchangeable connector panelCustomized connector panels can be offered to match your sensors56ADC-clockB o a r d V o l t a g e [V ]7Fully battery poweredan internal buffer battery Need more battery time?Concerned about vibrations?Respectful of system restore?8SYNC it all!DEWE2 SynchronizationSynchronization of multiple DEWE2 systems via Sync-cableSync via TRION™ modulesTo use TRION-BASE or TRION-TIMING modules for synchronization of multiple units is the most convenient and easiest way.To create high channel count systems or for distributed measurements DEWE2 instruments sup-port multiple synchronization options. A special feature is the perfectly hardware synchronized video acquisition since also for data analysis the slogan ”a picture is worth a thousand words” istrue.Sync up to 1000 meters (IRIG DC, cable length delay compensation)Sync up to 100 meters via TRION-SYNC-BUSSync up to 100 meters via TRION-SYNC-BUSTwo DEWE2-A4 with option DW2-SYNCDEWE2-M13swith TRION-TIMING module DEWE2-M7swith TRION-BASE moduleDEWE2-A13with TRION-TIMING moduleDEWE2-A4with TRION-BASE moduleDEWE2-M7swith TRION-TIMING moduleExample:Two instruments synchronized via TRION-BASE modules (multiple units possible)Example: Three instruments synchronized via TRION-TIMING modules (multiple units possible)Sync via chassis optionsThese options do not block a module slot but need to be factory installed at time of initial order.Two instruments synchronized via DW2-SYNC option.WLANFactory installation only9VIDEO-SYNCHardware synchronized video of up to 200 frames per second(camera clocked by DEWE2 instrument):accurate per sample, no delaySoftware synchronized low-cost video (USB or PAL/NTSC cameras):optimized low latency, known delay of USB camera can be compensatedHigh speed video up to 500 000 frames per second:online sync for Photron cameras, post-sync for any high-speed .avi file.DEWE2 Synchronization Gigabit ethernet interface (up to 100 m cable length)SYNCDEWE2-A4 with optionTRION-BASE moduleDEWE-CAM-GIGE-120IRIGTwo instruments synchronizedto absolute IRIG timeGPSTwo instrumentssynchronized via GPSSynchronization to GPS or IRIG time-codeThere are 2 ways how to synchronize DEWE2 instruments very accurately to absolute time. Both, GPS time and IRIG time, enable execution of synchronized distributed measurements over unlimited distances. Each instrument (or array of instruments) must be connected to the time-code via a TRION-TIMING module. 10DEWE2A ll-In-OneInstrumentsDEWE2 All-in-One InstrumentsDW2-UPS-150-DCThe hot-swappablebatteries guaranteecontinuous operation with-out an external power source.A-seriesDEWE2-A7DEWE2-A4 withRemovable Solid State Disk DEWE2-A13S Y N CP C IeP C I eDEWE-818DEWE2-F18DEWE2-F18DEWE2-F4sPCIe connection up to 7 metersPCIe connection up to 7 metersTRION-SYNC-busDEWE2-F7s with optionDW2-LINK-PCIE-2-S11DEWE2 Front-endsDEWE2 F ront-endsF-series12DEWE2 M ainframesM-seriesDC PowerRS-232DEWE2-M7sDW2-UPS-150-DCThe hot-swappable batteries guarantee continuousoperation without external power sourceDEWE2-M13DEWE2 Mainframes13DEWE2-M13-MK19“ mounting kit for the DEWE2-M13 series, 4U MOB-DISP-12-A Very rugged external displayDEWE2 Mainframes14DEWE2-A4 / M4DEWE2-A4 / M44 slots for TRION™ series modules Isolated wide range DC power supplyOptional internal buffer battery for ~10 minutes Fully battery-powered by stackable battery pack Removable solid state diskPowerful Intel ®Core™ i7 processorChannel ExpansionPCIe connection up to 7 metersTRION-SYNC-busDEWE2-F7s with option DW2-LINK-PCIE-2-SDEWE2-F7s with option DW2-LINK-PCIE-2-SDEWE2-A4 with two channel expansion chassis DEWE2-F7s15BAT-CHARGER-1BAT-CHARGER-4MOB-DISP-12 External displayDE-POWERBOX-12 DC Power distribution box FLEXRAY-INT-1 option DW2-LINK-PCIE-1-S optionSSD-32-64/128/256 Flash disk upgrade16DEWE2-A7 / A137 / 13 slots for TRION™ series modules Powerful Intel ® Core™ i7 processor Brilliant 17'' full-HD displayOptional fully battery poweredPCIe connection up to 7 meters PCIe connection up to 7 meters TRION-SYNC-busTRION-SYNC-busDEWE2-F7s with TRION-TIMING moduleDEWE2-F13s with option DW2-LINK-PCIE-2-SDEWE2-A7 with option DW2-LINK-PCIE-1-SDEWE2-A7 / A1317Shipping/carrying case for the DEWE2-A7 or DEWE2-A13 mainframe. Common-carrier rated, internal custom foam cut-out, high impact construction. Hasps for attaching padlocks, pull-out handle and wheels for easy transport External power supply, input voltage 10 to 36 V DC (max.), output 24 V DC 300 W Lithium-Ion battery, 14.4 V, 95 Wh, max. 8 ADesktop battery charger for 1 battery, incl. external AC adaptor Desktop battery charger for 4 batteries, incl. external AC adaptorBAT-CHARGER-1BAT-CHARGER-4DW2-A13-CC Shipping/carrying caseDEWE-DCDC-24-300-ISO Carrying bagDEWE2-A13DW2-SYNC optionDEWE2-A13 with DW2-A13-PS-BAT optionPCIe connection up to 7 meters (250 MB/s)TRION-SYNC-bus18DEWE2-M4s / M7s / M13sDEWE2-M4s / M7s / M13s4/7/13 slots for TRION™ series modules All connections at the frontIsolated wide range DC power supplyOptional internal buffer battery for ~10 minutes Powerful Intel ® Core™ i7 processorChannel ExpansionDEWE2-F13s with option DW2-LINK-PCIE-2-SDEWE2-M7s with option DW2-LINK-PCIE-1-SMOB-DISP-12 External display19BAT-CHARGER-1BAT-CHARGER-4DE-POWERBOX-12 DC Power distribution box DEWE2-M7s with option DW2-LINK-PCIE-1-S 4U 5UM13s installed into a 19” cabinet5 u required (4 u = system + 1 u = cooling)PCIe connection up to 7 metersTRION-SYNC-busDEWE2-F18 with option DW2-LINK-PCIE-2-SDEWE2-M13 with TRION-TIMING module and LINK-HOST-PCIE card20DEWE2-M1313 slots for TRION™ series modules Free PCI slots insideOne internal hard disk and 2 bays for removable disks 19” rack-mountable or benchtop useDEWE2-M13Channel Expansion21DEWE2-M13 with 2x option DW2-M13-BAY35-SATADEWE2-M13 and DEWE-TFT19-RM Rack-mounting 19“ display5 u required(4 u = system + 1 u = cooling)DEWE2-M13 with typical PCI slot configuration4U 5UPCIe connection up to 7 meters (250 MB/s)TRION-SYNC-bus 22DEWE2-F4s / F7s / F13sDEWE2-F4s / F7s / F13s4 or 7 slots for TRION™ series modulesPCI Express data link120 MB/s data transfer rateDEWE2-F13s withDW2-LINK-PCIE-2-S optionDEWE2-F7s withDW2-LINK-PCIE-2-S optionDEWE2-F4s withTRION-TIMING module Channel ExpansionBAT-CHARGER-1BAT-CHARGER-4DW2-UPS-150-DC,130 W UPS with 2 slots for batteries 23t i o n i n g F r o n t -e n d s I n s t r u m e n t s D LINK-HOST-PCIE DEWE2-F7s with optionDW2-PS-DC-150DEWE2-F13s with option DW2-LINK-PCIE-2-S DEWE2-F13s with optionDW2-PS-AC-REDDEWE-UPS-300-DC300 W UPS with 4 slots for batteriesDEWE2-F13s with optionDW2-F13x-MK24DEWE2-F1818 slots for TRION™ series modules PCI Express data link 120 MB/s data transfer rate19" rack-mountable or benchtop useDEWE2-F18Channel ExpansionSeries Modules Series Modules Overview25Series Modules26Series Modules27T R I O N -2402-d A C C -8-S M BT R I O N -2402-d A C C -6-B N C28Differential multi-function input moduleSampling: 24 bit; 204.8 kS/s per channelInput types:Voltage measurement from ±30 mV to ±70 V DC (46.7 V RMS AC)IEPEResistanceCurrent (using external shunt)Additional feature:AUX socketTRION-2402-dACCSeries Modules1)For safety reasons maximum allowed voltage: 70 V DC (46.7 V RMS AC)2930Differential universal input moduleSampling: 24 bit; 204.8 kS/s per channelInput types: Voltage up to ±10 VStrain gauge, bridge sensor, piezoresistive bridge IEPERTD; Pt100 to Pt2000Resistance, potentiometerTRION-2402-dSTG T R I O N -2402-d S T G -8-R JT R I O N -2402-d S T G -8-DT R I O N -2402-d S T G -6-L E M OSeries ModulesTRION-CBL-RJBN-01-00Isolated wide range voltage moduleSampling: 24 bit; 204.8 kS/s per channelInput types: Voltage ±300 mV to ±1000(2) VDCCurrentIsolation: 4 kVTRION-2402-VTRION-242-V-4-BTRION-242-V-8-BDAQ-SHUNT1(not compatible with TRION-x-V-4 modules)DAQ-SHUNT4DAQ-SHUNT5Shunts for TRION™ voltage input modulesCounter, DIO and synchronization moduleCounter channels: 2 SuperCounters™ Digital I/O: 8 DIO and 8 DISynchronization: IRIG code B, DC I/O and Sync I/OAdditional features:1 AUX socket (by default set to camera trigger)TRION-BASET R I O N -B A S ETiming and synchronization moduleTiming:Isolated IRIG input and output Synchronization: 2 TRION-SYNC-BUS interfaces Additional features:8x DIO, 1x counter, 1x AUXTRION-TIMINGT R I O N -T I M I N GIsolated SuperCounter™ moduleSampling 80 MHz time base204.8 kS/s per channelInput types Event, waveform timing and sensor modeProgrammable threshold and AC/DC coupling for ideal signal adaptionTRION-CNT T R I O N -C N T -6-L E MOCables for TRION-CNT modulesMating connectorIsolated digital input moduleNumber of channels: 48 isolated digital inputs (TRION-DIO-4800) Sampling:204.8 kS/s per channelTRION-DIO-4800T R I O N -D I O -4800TRION-CB24-B Options for TRION-DIO modulesTRION-CB24-SCIsolated high speed CAN interfaceInput types High speed, (low speed and single wire with optional converter)Listen only and programmable terminationDirect interface to CPAD2 module seriesTRION-CAN T R I O N -C A N -4-DT R I O N -C A N -2-DCables for TRION-CAN modulesADAP-CAN-LS-HS ADAP-LIN-CANOptionsARINC 429 module with up to 30 interfacesMIL-STD-1553 modules with up to 4 dual redundant channelsMixed modules with 8 ARINC and up to 5 dual redundant MIL-STD-1553 channelsT R I O N -A 429TRION-A429 / M1553 / MA4Model overviewAnalog output module2 channel TRION™ analog output module, based on NI PXI-6251voltage range max. ±10 V 16 bit resolutionUpdate rate max. 2.8 MS/sT R I O N -1628-A O -2TRION-1628-AO-2DEWETRONGmbH•Parkring4•A-8074Graz-Grambach•Tel(0043)31630700•Fax(0043)316307090•*****************。
Module2 课时小作业Ⅰ.语音知识1.standardA.|′stəndaːd|B.|′stændəd|C.|stændaːd| D.|′staːndəd|2.compareA.|kəm′pɛə| B.|kəm′peə|C.|kʌm′pɛə| D.|kʌm′peə|3.switchA.|′swik| B.|′swa itʃ|C.|′swiːtʃ| D.|′switʃ|4.volunteerA.|′ vɔlən′tiə| B.|vʌlən′tiə|C.|vʌluːn′t iə| D.|vɔlən′tiː|5.combinationA.|kɔm′bi′ neiʃn| B.|′kɔmbi′ neiʃn|C.|′ kɔmbi′neiʃn| D.|′ kɔmbinei′ʃn|Ⅱ.情景对话—Hello.I’m calling about the apartment you advertised.—Yes.__1__—I’m interest ed in a one-bedroom apartment.Do you have any available? —__2__When do you need it?—Sometime around next week.What can you tell me about this apartment? —__3__The monthly rent is $650,with a $300 security deposit.—__4__May I come over tomorrow to take a look?—Sure.What time would you like to come?—__5__—Good.May I have your name,please?—My name is Blanca.—Blanca.I’ll see you tomorrow.A.No,I have another oneB.Well,it’s a onebedroom apartment.C.It’s kind of youD.How about 10 a.m.?E.Yes.I have one.F.What kinds of apartments do you prefer?G.Sounds good.Ⅲ.单项填空1.—I want a room for ten people to have a get-together.—Luckily there is one________.A.available B.qualifiedC.standard D.impressive2.The trade union intended to call on the workers to go on strike________the government’s limitation on exports.A.in memory of B.in honour ofC.in response to D.in need of3.The agent was about to sign his name to the document_____________,to our surprise,a stranger broke in to prevent him.A.while B.whenC.as D.until4.The air is badly polluted because some factories don’t__________the rules to protect the environment.A.appreciate B.regardC.honour D.respect5.Much notice has been________the problems with the home-staying children in China.A.paid to B.kept onC.taken of D.made up6.I took it for________that he would try to help me out of the difficulty,but he didn’t at all.A.sure B.certainC.granted D.possible7.(2009年江苏锡山模拟)Please leave your phone number______we can get intouch with you in case of emergency.A.so that B.on condition thatC.for fear that D.so long as8.—Do you think our team will beat theirs?—Our team have better players,so I ________our team will win.A.want B.preferC.wish D.expect9.On a________cold win ter morning,his________body was found in a lonely forest.A.frozen;freezing B.freezing;frozenC.frozen;frozen D.freezing;freezing10.After he retired from office,Rogers________painting for a while,but soon lost interest.A.took up B.saved upC.kept up D.drew up11.The headteacher,________with what the student said,nodded with a smile. A.tiring B.tiredC.satisfying D.satisfied12.The shopowner would sell the MP4 for 800 yuan,but my elder brother________only 600 yuan.A.asked B.chargedC.sold D.offered13.Your suggestion sounds fine________,but would it work________?A.in practice;in theory B.in theory;in practiceC.in advance;in theory D.in general;in practice14.We have seen that method________some other conditions and it does work. A.applied to B.applying forC.applies to D.apply for15.(2009年泰安模拟) Only those who have the patience to do simple things perfectly will________the skill to do difficult things easily.A.demand B.acquireC.accomplish D.achieveⅣ.阅读理解A(2010年郑州第一次检测) Willa Cather once said,“When people ask me whether writing has been a hard or easy road,I always answer with the famous saying: The end is nothing;the road is all.That is what I mean when I say writing has been a pleasure.I have never used the computer with the thought that one more task had to be done.”Like most writers,Willa Cather did n ot write books for the money that they brought her,but rather for the pleasure that came in their writing.Her works were,like her,simple and full of the vigor of her days in Nebraska,where she grew from child to young womanhood and where she developed a deep love for the treeless land of the great plain with its wild flowers,wheat fields and rivers.“It’s a rather strange thing about the flat country,” she wrote later.“It takes hold of you or it leaves you perfectly cold.A great many people find it very dull;they like a church tower,an old factory,a waterfall,the country all made to look like a German Christmas card ...But when I come to the open plain,something happens.I’ m home.I breathe differently.”1.Willa Cather wrote because she found writing________.A.simple and livelyB.opened up a road to successC.neither too hard nor too easyD.interesting and enjoyable2.What was the place like where Cather grew up?A.It was cold,plain and without a church.B.It was vast,open and flat.C.It was like a German Christmas card.D.It was a colorful world of wild flowers.3.When she said “It takes hold of you or it leaves you perfectly cold.”,Willa Cather meant that________.A.you either love the place or hate itB.you decide either to stay or to leaveC.some find the place warm;others find it coldD.some find the place peaceful;others find it wild4.What happens when Cather comes to the open plain?A.She breathes differently from others.B.She wants to make the place her home.C.She feels completely comfortable.D.She finds the place similar to her home.B(2010年福建四地六校联考) Every country tends to accept its own way of life as being the normal one and to praise or criticize others,as they are similar to or different from it.And unfortunately,our picture of the people and the way of life of other countries is often a distorted (扭曲的) one.Here is a great argument in favor of foreign travel and learning foreign languages.It is only by traveling in a country and getting to know its inhabitants and their language that one can find out what a coun try and its people are really like.And how different the knowledge one gains this way frequently turns out to be from the second-hand information gathered from other sources! How often we find that the foreigners whom we thought to be such different people from ourselves are not very different at all!Differences between peoples do,of course,exist and,one hopes,will always continue to do so.The world will be a dull place indeed when all the different nationalities behave exactly alike,and some people might say that we are rapidly approaching this state of affairs.With the much greater rapidity (快速) and ease of travel,there might seem to be some truth in this at least as far as Europe is concerned.However this may be,at least the greater ease of travel today has revealed (展示) to more people than ever before that the Englishman or Frenchman or German is not:some different kind of animal from themselves.5.Every country criticizes ways of life in other countries becau se they are_____.A.distorted B.normalC.similar to each other D.different from its own6.One who travels in a foreign country and learns its language will________. A.find out why its people are differentB.argue in favor of this country and the languageC.know the country and its people betterD.like its inhabitants and their language7.The knowledge one gains by traveling in a foreign country is often________. A.from second-hand informationB.gathered from other sources rather than its inhabitantsC.gained from the arguments about the countryD.different from what one had before the travel8.In this passage,th e author wants to say________.A.differences between peoples will gradually disappear because of the ease of travelB.differences between peoples do exist even though different nationalities behave exactly alikeC.differences between peoples will continue to exist and the world will be a dull placeD.differences between peoples will not exist as one hopes参考答案Ⅰ.语音知识1.B 2.B 3.D 4.A 5.CⅡ.情景对话1.F 2.E 3.B 4.G 5.DⅢ.单项填空1.A available可利用的,常跟在修饰词的后面;其他三项“qualified合格的;standard标准的;impressive印象深刻的”作定语常放在修饰词之前,且与题意不符。
Module 2 Unit 2 They have seen the Pyramids.一、单选题1._____ Greens are preparing for the coming Christmas.A. /B. AC. AnD. The2.—Today we have too many ways to chat with others, chat rooms, text messages and so on.—But we seem ________ the art of communicating face to face.A. to missB. gettingC. to loseD. finding3.Our school will ________ a big swimming pool next year.A. touchB. sendC. buildD. delete4.—Li Dong, do you know Zhang Jiqing?—Yes. He donated(捐赠)money to build old people’s homes and schools for so many years. His story ________ me.A. savedB. touchedC. missedD. cared5.—Simon, what’s the ________ of your success?—Well. I often cheer ________ up when I want to give up.A. secret; myselfB. secret; meC. way; myselfD. way; me6.—What do you think of Sanya?—Oh, it's a beautiful city. I _____ there for several times.A. have beenB. have been toC. have gone toD. have gone7.The two boys are twins, but they _____ each other.A. is different fromB. is different ofC. are different fromD. are different of8.—Do you know who is the first woman to fly_____?—Valentina Vladimirovna Tereshkova from Russia.A. in spaceB. in the space B. from space D. at space9.He watched Journey to the West last night. He thought it was one of _____ TV programmes.A. interestingB. more interestingC. most interestingD. the most interesting10.—Are all the boys from __________ in your school?—No, there are only five __________ in our school.A.German; GermansB.German; GermenC.Germany; GermansD.Germany; Germen二、用方框中所给单词的适当形式填空,每词仅用一次。
内容1Trial指南简介2综述微软企业桌面虚拟化2.1什么是MED-V V 2.0 中的新功能2.2MED-V 2.0 组件3试用系统要求4MED-V 2.0 环境设置4.1MEDVADMIN 管理计算机配置4.2安装MED-V WORKSPACE PACKAGER4.3安装MED-V 主机代理5虚拟的电脑图像准备MED-V5.1配置Windows XP Mode虚拟机5.2密封使用Sysprep MED-V 图像5.3合并虚拟硬盘6部署MED-V 工作区6.1创建工作区部署包6.2部署MED-V 工作区6.3测试MED-V 工作区7管理MED-V 工作区7.1重定向URL 管理7.2管理MED-V 工作区设置8MED-V 管理工具包9操作安全最佳做法10附录a:准备Sysprep 映像1Trial指南简介本试验指南旨在帮助您快速设置测试环境中的Microsoft 企业桌面虚拟化(MED-V) 评价。
本指南提供了微软MED-V WORKSPACE PACKAGER和MED-V 主机代理安装Microsoft MED-V 组件所需的步骤的详细信息。
本指南将创建基于Windows XP 的客人(虚拟机),应用程序可以纳入Windows ® 7 主机环境。
本指南包括:MED-V WORKSPACE PACKAGER 和MED-V 主机代理,基于Windows Virtual PC 机的虚拟机准备MED-V、创建和部署MED-V 工作区管理MED-V、故障排除和探索MED-V 管理工具包的安装。
为了尽可能顺利地帮助此流程,我们建议您阅读本指南仔细之前安装Microsoft MED-V 平台。
本指南的观众本指南是为Microsoft Windows 系统管理员编写的。
作为信息技术(IT) 专业,您应该有足够的知识和经验来完成以下任务。
∙操作系统的设置和安装应用程序∙将计算机添加到域∙设置和舒适地工作,Active Directory ® 域名服务和微软域名系统(DNS)∙熟悉Windows Virtual PC产品文档MED-V 综合文档是在MED-V 技术中心,在微软TechNet 上可用/fwlink/?LinkId = 207065.TechNet 文档包括联机帮助入门MED-V、规划和部署、操作和故障排除。
前言本手册介绍了产品的安装、接线、接口定义和操作说明等相关内容。
本手册版权归深圳市正运动技术有限公司所有,在未经本公司书面授权的情况下,任何人不得翻印、翻译和抄袭本手册中的任何内容。
前述行为均将构成对本公司手册版权之侵犯,本司将依法追究其法律责任。
本手册中的信息资料仅供参考。
由于改进设计和功能等原因,正运动公司保留对本资料的最终解释权!内容如有更改,恕不另行通知!调试机器要注意安全!请务必在机器中设计有效的安全保护装置,并在软件中加入出错处理程序,否则所造成的损失,正运动公司没有义务或责任对此负责。
为了保证产品安全、正常、有效的使用,请您务必在安装、使用产品前仔细阅读本产品手册。
更新记录产品型号:EIO1616总线扩展模块文件名版本号版本(更改)说明更新日期更改人用户手册V1.51.增加端子规格及接线参考2.丰富前言版权说明及安全注意2.修改整体布局,丰富手册内容2023/4/4xcx安全声明●本章对正确使用本产品所需关注的安全注意事项进行说明。
在使用本产品之前,请先阅读使用说明并正确理解安全注意事项的相关信息。
●本产品应在符合设计规格要求的环境下使用,否则可能导致设备损坏,或者人员受伤,因未遵守相关规定引发的功能异常或部件损坏等不在产品质量保证范围之内。
●因未遵守本手册的内容、违规操作产品引发的人身安全事故、财产损失等,我司将不承担任何法律责任。
安全等级定义按等级可分为“危险”、“注意”。
如果没有按要求操作,可能会导致中度伤害、轻伤及设备损伤的情况。
请妥善保管本指南以备需要时阅读,并请务必将本手册交给最终用户。
安装危险◆控制器拆卸时,系统使用的外部供应电源全部断开后再进行操作,否则可能造成设备误操作或损坏设备;◆禁止在以下场合使用:有灰尘、油烟、导电性尘埃、腐蚀性气体、可燃性气体的场所;暴露于高温、结露、风雨的场合;有振动、冲击的场合;电击、火灾、误操作也会导致产品损坏和恶化。
注意◆安装时避免金属屑和电线头掉入硬件电路板内;◆安装后保证其硬件电路板上没有异物;◆安装时,应使其与安装架紧密牢固;◆如果控制器安装不当,可能导致误操作、故障及火灾。
外研版九年级英语下册Module 2 学情评估英语九年级·下(WY版)时间:45分钟满分:100分一、单项选择。
(每小题2分, 共20分)1. —Mary, is that boy with glasses ____ new classmate?—Yes. Let's say hello to ____.A. our; heB. us; himC. ours; hisD. our; him2. Larry hopes ____ his English, so he keeps practicing it every day.A. to solveB. solvingC. to improveD. improving3. [易错题]—Is there ____ in today's newspaper?—No, there is ____ special.A. something new; somethingB. something new; nothingC. anything new; somethingD. anything new; nothing4. Wild animals are our friends. We shouldn't kill them ____ food or clothing.A. inB. withC. aboutD. for5. [易错题]We don't have enough nurses to look after the patients. At least ____ nurses are needed.A. other tenB. more tenC. ten moreD. ten another6. I didn't believe I could do it ____ I got to the top of Mount Tai.A. becauseB. untilC. soD. if7. He was ____ from the meeting because of his bad illness.A. absentB. presentC. freeD. different8. —Is your friend Michael still in Australia?—I don't know. I have ____ information about him because we haven't seen each other for ____ years.A. little; a fewB. a little; a fewC. a few; a littleD. few; a little9. Nobody taught her daughter how to use that app. She learned it all by ____.A. sheB. herC. herselfD. hers10. — ____ have you talked with your friends on WeChat?—Since I finished my homework.A. How farB. How oftenC. How soonD. How long二、完形填空。
Unit 2They have seen the Pyramids.课型:读写课◎知识导航请预习下列重点单词、短语和句子,并完成下面的表格及相关训练(标•的为重点单词拓展内容)。
单词和短语重点单词名词1.德国Germany•(adj.)德国的;(n.)德国人;德语German2.法国France•(adj.)法国的;(n.)法语;法国人French3.塔tower4.国王;君王king5.女王;王后queen6.阿拉伯语Arabic•(adj.)阿拉伯的;(n.)阿拉伯人Arab7.方面;态度way•在许多方面in many ways形容词8.古老的;古代的ancient动词9.搬家;改变……的位置move10.派遣去;命令……去send•(过去式/过去分词)sent•(短语)派人去做某事send sb. to do sth.11.相混合;融合mix12.惦念;怀念;想念miss•(n.)错过•(n.)小姐;女士;年轻未婚女子Miss13.数;清点count•(短语)倒数;倒计时count down根据语境或提示,完成填空。
1.Space water is different from that on the earth.2.All the students are sleeping in the dormitory while Miss Sanders is working at the m oment.3.I am going to attend a computer programming competition this weekend.I really look forward to it. 4.Beethoven(贝多芬) was born in Germany(德国) and he was famous all over the world.5.My family was in trouble but my mum told me that we would find some ways to deal with it.6.On New Year's Eve,we usually count down to welcome the new year.7.The Robinsons moved to London last year because of Mr Robinson's new job.8.I haven't seen my mother for half a year. I miss her very much.佳句仿写请在教材中标出下面句子,并用句中黑体词或短语仿写句子。
外研版英语八年级下册Module2课文音频+视频+知识点◆◆◆01Moudle 2 单词ever ['evə] adv. 曾经;从来;在任何时候enter ['entə] v. (使)参加;(使)报名competition [ˌkɒmpəˈtɪʃn] n. 比赛;竞争prize [praɪz] n. 奖品;奖项first prize 一等奖dream [dri:m] n. 梦;梦想;[只用于名词前]梦寐以求的v. (dreamed/dri:md/, dreamed; dreamt/dremt/,dreamt)做梦;梦到;梦想afford [ə'fɔ:d] v. (有财力)买得起,付得起write about 编写;写作make up 编写;创作invite [ɪn'vaɪt] v. 邀请move [mu:v] v. 搬家;改变…的位置send [send] v.(sent/sent/, sent) 派遣去;命令……去Germany [ˈdʒɜ:məni:] n. 德国France [frɑ:ns] n. 法国tower ['taʊə] n. 塔ancient ['eɪnʃənt] adj. 古老的;古代的king [kɪŋ] n. 国王;君王queen [kwi:n] n. 女王;王后Arabic [ˈærəbɪk] n. 阿拉伯语way [weɪ] n. 方面; 态度mix [mɪks] v. 相混合;融合miss [mɪs] v. 惦念;怀念;想念count [kaʊnt] v. 数;清点count down 倒数;倒计时M2U1课文动画M2U2课文动画02电子课本03Moudle 2知识梳理【重点单词学习】1. experience n. 经验(不可数),经历(可数)【例句】She has little experience because she has worked for only one month.He had many interesting experiences while travelling in Africa.[考题链接]Mr. Guo is a teacher of much teaching__________(经验).【用法】用作动词,表示“体验”“经历”等。