AMain PlantA
1Excavation & Back Filling11.1Excavationtorequiredsideslopesbelowgroundlevelinall
kindsofordinaryandhardsoilssuchasClay,sand,sandy
clay,gravel,softmoorum,hardmoorumetc.for
foundations,pits,trenches,footingetc.includingde-watering,
shoring,struttingasnecessaryandtransportingexcess
excavatedsoiltostackorfillwithinthebasicinitialleadof
500mandunloading,stacking,filling,levellinganddressingto
requiredlevelsandgradesetc.completeasperspecifications
andasdirectedbyEngineerforfollowingdepths.(OnlyPCC
planareaasperdrawingshallbemeasuredforpayment.)The
paymentforthisitemwillbeasanexample:Foradepthof
4.0Mfromgroundleveltherateforthefirst2.0Mdepth
quantitywillbepaidasper(i)andtheremaining2.0Mportion
quantity the rate will be as per (ii) below:-1.1
i) 0.0M - 2.0MCu.M
ii) 2.0M - 4.0MCu.M
iii) 4.0M – 6.0MCu.M
iv) 6.0M – 8.0MCu.M
1.1aExcavationtorequiredsideslopesbelowgroundlevelinall
kindsofWeathered,softandDecomposedRockfor
foundations,pits,trenches,footingetc.(Bymeansof
Excavatingequipment,PickAxe)includingde-watering,
shoring,struttingasnecessaryandtransportingexcess
excavatedsoiltostackorfillwithinthebasicinitialleadof
500mandunloading,stacking,filling,levellinganddressingto
requiredlevelsandgradesetc.completeasperspecifications
andasdirectedbyEngineer-incharge,includingaleadupto
500metres(OnlyPCCplanareaasperdrawingshallbe
measured for payment.)1.1a
i) 0.0M - 2.0MCu.M
ii) 2.0M - 4.0MCu.M
iii) 4.0M – 6.0MCu.M
iv) 6.0M – 8.0MCu.M
1.1bExcavationtorequiredsideslopesbelowgroundlevelinall
kindsofHardRock(Bymeansofcontrolledblastingor
Chiseling,etc.forfoundations,pits,trenches,footingetc.
includingde-watering,shoring,struttingasnecessaryand
transportingexcessexcavatedsoiltostackorfillwithinthe
basicinitialleadof500mandunloading,stacking,filling,
levellinganddressingtorequiredlevelsandgradesetc.
completeasperspecificationsandasdirectedbyEngineer-
incharge,includingaleadupto500metres(OnlyPCCplan
area as per drawing shall be measured for payment.)1.1b
i) 0.0M - 2.0MCu.M
ii) 2.0M - 4.0MCu.M
iii) 4.0M – 6.0MCu.M
iv) 6.0M – 8.0MCu.MItem
No.DescriptionUoM项目编
号1.2Loading,transportingandunloadingtheexcessorrejected
excavatedsoiltodisposalareaortoareasidentifiedby
Engineerforfillbeyondtheinitialleadof500Mincludingre-
excavationfromstacksorheapsstackingorfilling,levelling
anddressingofdumpedmaterialtorequiredlevelsandgrades
all complete as directed by the Engineer for lead of1.2
i) 500m - 1000mCu.M
ii) 1000m - 2000mCu.M
iii) 2000m – 4000mCu.M
1.3Transportingdirectly(withoutstackingwithintheinitiallead)
theexcessorrejectedexcavatedsoiltodisposalareaorto
areasidentifiedbyEngineerforfillbeyondtheinitialleadof
500Mincludingloading,unloading,levellinganddressingfor
lead of1.3
i) 500m - 1000mCu.M
ii) 1000m - 2000mCu.M
iii) 2000m – 4000mCu.M
1.4Backfillingoffoundationpitswithinplinthwithexcavated
earthonly,frompreviouslystockpiledneartheexcavatedarea
orotherwisedisposedareaofwithin500metrestoany
sectionsandordepthafterthecastingoffoundations,etc.in
uniformlayersnotexceeding250mmcompactedthickness
includingwatering,compactionsoastoachieveproctor
densityofnotlessthan95%,transportation,alllabour,
includingre-excavationandloading,unloadingetc.complete
asdirectedbytheEngineer.(OnlyPCCplanareaasper
drawing shall be measured for payment.)Cu.M1.4
1.5Backfillingoffoundationpitswithapprovedqualityexcavated
earthfromborrowareasoutsidetheplantboundaryinlayers
notexceeding250mmofcompactedthicknessincluding
watering,compactionsoastoachieveaproctordensityofnot
lessthan95%includingexcavationinborrowpits,loading,
unloading,transportation,alllabour,equipment,allcharges
includingroyaltyetc.CompleteasdirectedbyEngineer.(Only
PCCplanareaasperdrawingshallbemeasuredfor
payment.)Cu.M1.5
1.6Providingandfillingwithapprovedqualitymooruminareas
aroundfoundationunderfootings,floorsetc.inlayersnot
exceeding150mmofcompactedthicknessincludingwatering,
compaction, etc. complete as directed by the Engineer.Cu.M1.6
1.7Providingandbackfillingwithsandofapprovedqualitytoany
sectionanddepthcarriedoutinuniformlayersofnot
exceeding250mmofcompactedthickness,wellwatered,
rammedandconsolidatedto85%relativedensity,including
costofsand,itstransportation,loading,unloading,equipment,
alllabouretc.completeincludingthetemporaryworksfor
confining the sand, if any required.Cu.M1.7
1.8Providingandlayingofapprovedqualityhardcrushedblack
basaltstonemetalsize40mmaverageintransformeryard
andinotherplaceswhererequiredasperdrawingsforany
thicknessshapeandslope,transportation,includingloading,
unloading,spreading,compacting,alllabour,materialsetc.
complete.Cu.M1.8