当前位置:文档之家› Design Considerations ” IBM Systems Journal, Vol.3, No.2, p.144-164.

Design Considerations ” IBM Systems Journal, Vol.3, No.2, p.144-164.

Design Considerations ” IBM Systems Journal, Vol.3, No.2, p.144-164.
Design Considerations ” IBM Systems Journal, Vol.3, No.2, p.144-164.

References

(Afghahi, and Svensson 1990) Afghahi, M. and Svensson, C. (1990) A unified single-phase clocking scheme for VLSI systems. IEEE Journal of Solid-State Circuits, vol.25, (no.1), Febryary, p.225-33.

(Amdahl 1964) Amdahl G. M, (1964) “The Structure of System /360, Part III: Processing Unit Design Considerations” IBM Systems Journal, Vol.3, No.2, p.144-164.

(Anderson et al, 2001) C. J. Anderson, J. Petrovick, J. M. Keaty, J. Warnock, G. Nusbaum, J. M.

Tendler, C. Carter, S. Chu, J. Clabes, J. DiLullo, P. Dudley, P. Harvey, B. Krauter, J.

LeBlanc, P.-F. Lu, B. McCredie, G. Plum, P. Restle, S. Runyon, M. Scheuermann, S.

Schmidt, J. Wagoner, R. Weiss, S. Weitzel, and B. Zoric, “Physical Design of a Fourth-Generation POWER GHz Microprocessor,” IEEE International Solid-State Circuits Conference, Digest of Technical Papers, February 2001, pp. 232–233.

(Anderson et al. 1967) Anderson D.W, Sparacio F.J, and Tomasulo R.M, (1967) “The IBM System/360 Model 91: Machine Philosophy and Instruction Handling”, IBM Journal of Research and Development, Vol.11, No.1, p.8-24.

(Baeg and Rogers 1999) S. Baeg and W.A. Rogers, “A cost-effective design for testability: clock line control and test generation using selective clocking,” IEEE Trans. on CAD of ICs and Systems, vol. 18, no. 6, pp. 850-861, June 1999.

(Bailey and Benschneider 1998) Bailey DW, Benschneider BJ (1998) “Clocking design and analysis for a 600-MHz Alpha microprocessor”, Solid-State Circuits, IEEE Journal of , Vol.33, No.11 , November 1998.

(Benschneider et al. 1995) Benschneider BJ et al (1995) “A 300-MHz 64-b Quad-Issue CMOS RISC Microprocessor”, IEEE Journal of Solid-State Circuits, Vol. 30, No 11. November 1995.

(Bhagwan and Rogers 1997) Bhagwan R, Rogers A (1997) A 1-GHz dual-loop microprocessor PLL with instant frequency shifting. In: ISSCC Digest of Technical Papers, pp 336-337. (Bowhill et al. 1995) Bowhill W. J. et al. (1995) "A 300 MHz 64b quad-issue CMOS RISC microprocessor," IEEE International Solid-State Circuits Conference, vol. XXXVIII, pp. 182 - 183, February 1995.

(Burd et al. 2000) T. Burd, T. Pering, and R.W. Brodersen, “A dynamic voltage scaled microprocessor system”, in Proc. ISSCC 2000, pp. 294-295.

(Chandrakasan et al. 2001) Chandrakasan A, Bowhill BJ, Fox F (2001) “Design of High-Performance Microprocessor Circuits”, IEEE Press, Piscataway, New Jersey, 2001. (Charnas et al. 1995) Charnas A et al (1995) A 64b Microprocessor with Multimedia Support. In: ISSCC Digest of Technical Papers, pp 178-179.

(Cray 1984) Cray Research (1984) S Series Mainframe Reference Manual HR 0029, Minnesota, Cray Research.

(Dobberpuhl 1997) Dobberpuhl, D.W. (1997) “Circuits and technology for Digital's StrongARM and ALPHA microprocessors”,Proceedings of the Seventeenth Conference on Advanced Research in VLSI, Ann Arbor, Michigan, September 15-16. p.2-11.

(Dobberpuhl et al. 1992) Dobberpuhl D. W. et al. (1992) "A 200-MHz 64-b dual-issue CMOS microprocessor," IEEE Journal of Solid-State Circuits, vol. 27, pp. 1555 - 1567, November 1992.

(Earl 1965) Earl J, (1965) “Latched Cary-Save Adder”, IBM Techical Disclosure Bulletin, Vol.7, No.10, March, p.909-910.

(Eichelberger 1983) E. B. Eichelberger, “Latch Design Using “Level Sensitive Scan Design””, Proceedings of COMPCON, San Francisco, 1983.

(Eichelberger and Williams 1977) E. B. Eichelberger, T. W. Williams, “A Logic Design Structure for LSI Testing”, Proceedings of 14th Design Automation Conference, June 1977. (Fishburn 1990) Fishburn JP (1990) Clock Skew Optimization, IEEE Transactions on Computers C-39:945-951.

(Flynn 1966) Flynn M.J, (1966) “Very High-Speed Computing System”, Proceedings of IEEE, Vol.54, No.12, December, p.1901-1909.

(Flynn and Amdahl 1965) Flynn MJ, Amdahl GM (1965) “Engineering Aspects of Large High Speed Computer Design”, Proceedings of the Symposium on Microelectonics and Large Systems, Spartan Press, Washington D.C. 1965.

(Friedman 1995) Friedman E. (1995) Clock Distribution Networks in VLSI Circuits and Systems.

New York: IEEE Press, 1995.

(Furber et al. 2001) Furber SB, Efthymiou A, Garside JD, Lloyd DW, Lewis MJG, Temple S (2001) “Power management in the Amulet microprocessors”, IEEE Design & Test of Computers , Volume: 18 Issue: 2 , March-April 2001.

(Gago1993) A. Gago, R. Escano, J. A. Hidalgo, “Reduced implementation of D-type DET flip-flops”,IEEE Journal of Solid-State Circuits, vol.28, (no.3), p.400-402, March 1993. (Gardner 1979) Gardner F (1979) Phase Lock Techniques. John Wiley and Sons, New York, 1979.

(Geannopoulos and Dai 1998) Geannopoulos G, Dai X (1998) “An Adaptive Digital Deskewing Circuit for Clock Distribution Networks,” ISSCC Dig. Tech. Papers, pp 400-401, Feb. 1998. (Gerosa et al. 1994) G. Gerosa, S. Gary, C. Dietz, P. Dac, K. Hoover, J. Alvarez, et al., “A 2.2 W,

80 MHz Superscalar RISC Microprocessor,” IEEE Journal of Solid-State Circuits, vol. 29,

No. 12, December 1994.

(Gieseke et al. 1991) Gieseke B. A. et al. (1991) "Push-pull Cascode Logic," United States Patent 5,023,480, June 1991.

(Gieseke et al. 1997) Gieseke B. A. et al. (1997) "A 600MHz superscalar RISC microprocessor with out-of-order execution," IEEE International Solid-State Circuits Conference, vol. XL, pp. 176 - 177, February 1997.

(Goncalves and DeMan 1983) N.F. Goncalves, H.J. DeMan, “NORA: A Racefree Dynamic CMOS Technique for Pipelined Logic Structures”, IEEE Journal of Solid-State Circuits, Vol.

SC-18, No 3, June 1983.

(Gowan et al. 1998) M.K. Gowan, L.L. Biro, and D.B. Jackson, “Power considerations in the design of the alpha 21264 microprocessor,” in Proc. DAC 1998, pp. 726-731.

(Greenhill et al (1997) Greenhill D et al (1997) A 330MHz 4-Way Superscalar Microprocessor.

In: ISSCC Digest of Technical Papers, pp 166-167.

(Gronowski et al. 1988) Gronowski, P.E, W. J. Bowhill, W.J, Preston, R.P, Gowan, M.K, and Allmon, R.L, (1998) "High-performance microprocessor design," IEEE Journal of Solid-State Circuits, vol. 33, pp. 676 - 686, May 1998.

(Hajimiri 1988) Hajimiri A (1998) Jitter and Phase Noise in Electrical Oscillators, Ph.D. thesis, Stanford University, November 1998.

(Halin and Flynn 1972) Halin TG and Flynn M.J, (1972) “Pipelining of Arithmetic Functions”, IEEE Transactions on Computers, Vol C-21, No. 8, August, p.880-886.

(Hamada et al. 1999) M. Hamada, T. Terazawa, T. Higashi, S. Kitabayashi, S. Mita, Y.

Watanabe, M. Ashino, H. Hara, and T. Kuroda, "Flip-flop selection technique for power-delay trade-off," IEEE International Solid-State Circuits Conference, vol. XLII, pp. 270 - 271, February 1999.

(Harris and Horowitz 1997) Harris D, Horowitz M (1997) Skew-Tolerant Domino Circuits. IEEE Journal of Solid-State Circuits 32:1702-1711.

(Harris et al. 1996) Harris D, Huang SC, Nadir J, Chu C-H, Stinson JC, Ilkbahar A (1996) Opportunistic time-borrowing domino logic. U.S. Patent 5 517 136.

(Hashimoto et al. 1998) M. Hashimoto, H. Onodera, and K. Tamaru,“A power optimization method considering glitch reduction by gate sizing,” in ISPLED Dig. Tech. Papers, Aug.

1998, pp. 221-226.

(Heald R et al. (2000) A Third Generation SPARC V9 Microprocessor. IEEE Journal of Solid-State Circuits 35:1526-1538.

(Heald R et al. (2000a) Implementation of a 3rd Generation SPARC V9 64b Microprocessor. In: ISSCC Digest of Technical Papers, pp 412-413.

(Heald R et al. (2000b) A Third Generation SPARC V9 Microprocessor. IEEE Journal of Solid-State Circuits, 35:1526-1538.

(Heo and Asanovic 2001) S. Heo and K. Asanovic, "Load-Sensitive Flip-Flop Characterization,"

IEEE Workshop on VLSI, pp. 87-92, April 2001, Orlando, Florida, USA.

(Hofstee P et al. (2000) A 1-GHz Single-Issue 64b PowerPC Processor. In: ISSCC Digest of Technical Papers, pp 92-93.

(Warnock et al 2002) J.D. Warnock et al, “The Circuit and Physical Dedign of the POWER4 Microprocessor”, IBM Journal of Research and Development, Vol.46, No.1, January, 2002. (Jain et al. 2001) Jain A. et al. (2001) "A 1.2 GHz Alpha microprocessor with 44.8 GB/s chip pin bandwidth," IEEE International Solid-State Circuits Conference, pp. 240 –241, February 2001.

(Kawaguchi and Sakurai 1998) H. Kawaguchi and T. Sakurai, “A reduced clock-swing Flip-Flop (RCSFF) for 63% power reduction” IEEE J. Solid-State Circuits, vol. 33, no. 5, pp. 807-811, May 1998.

(Kim et al. 1994) Kim B, Weigandt T, Gray P (1994) "PLL/DLL System Noise Analysis for Low Jitter Clock Synthesizer Design," Proceedings of the 1994 International Symposium on Circuits and Systems, Vol. 4, 1994, pp. 31-38.

(Kitahara et al. 1998) T. Kitahara et al., “A clock-gating method for low-power LSI design,” in Proc. ASC-DAC’98, pp. 307-312.

(Klass et al. 1998) Klass F, (1998) “Semi-Dynamic and Dynamic Flip-Flops with Embedded Logic,” Symposium on VLSI Circuits, Digest of Technical Papers, pp. 108-109, June 1998. (Klass et al. 1999) Klass F et al, (1999) “A New Family of Semidynamic and Dynamic Flip-Flops with Embedded Logic for High-Performance Processors”, IEEE Journal of Solid-State Circuits, vol. 34, no. 5, pp. 712-716, May 1999.

(Kogge 1981) Kogge P (1981) “The Architecture of Pipelined Computers”, McGraw-Hill Book Company, 1981.

(Kojima et al. 1995) H. Kojima, S. Tanaka, and K. Sasaki, “Half-swing clocking scheme for 75% power savings in clocking circuitry,” IEEE J. Solid-State Circuits, vol. 30, no. 4, pp. 432-435, April 1995.

(Kong et al. 2000) B.-S. Kong, S.-S. Kim, and Y.-H. Jun, “Conditional Capture Flip-Flop for Statistical Power Reduction,” in ISSCC Dig. Tech. Papers, Feb. 2000, pp. 290-291.

(Kozu et al. 1966) Kozu, S, et al.(1996) “A 100 MHz, 0.4 W RISC processor with 200 MHz multiply adder, using pulse-register technique”, Digest of Technical Papers, 1996 IEEE International Solid-State Circuits Conference, San Francisco, 8-10 February. p.140-141. (Kurd NA et al. (2001) “Multi-GHz Clocking Scheme for Inel? Pentium? 4 Microprocessor,”

ISSCC Dig. Tech. Papers, pp. 404-405, Feb. 2001.

(Lauterbach G et al. (2000) UltraSPARC-III: a 3rd Generation 64b SPARC Microprocessor. In: ISSCC Digest of Technical Papers, pp 410-411.

(Lev LA et al. (1995) A 64b Microprocessor with Multimedia Support. IEEE Journal of Solid-State Circuits, 30:1227-1238.

(Lim et al. 2000) Lim K, Park C, Kim D, Kim B (2000) "A low-noise phase-locked loop design by loop bandwidth optimization," IEEE Journal of Solid-State Circuits, vol. 35, pp. 807 - 815, June 2000.

(Lin I, Ludwig JA, Eng K (1992) Analyzing cycle stealing on synchronous circuits with level-sensitive latches. In: Proc. ACM/IEEE Design Automation Conference, pp 393–398. (Llopis1996) R. P. Llopis, M. Sachdev,“Low power, testable dual edge triggered flip-flops”, Proc. of International Symposium on Low Power Electronics and Design, p.341-345, 1996. (LSSD 1985) LSSD Rules and Applications, Manual 3531, Release 59.0, IBM Corporation, March 29, 1985.

(Madden and Bowhill 1990) Madden W. C. and Bowhill W. J. (1990) "High input impedance, strobed sense-amplifier," United States Patent4,910,713, March 1990.

(Markovic et al. 2001) D. Markovic, B. Nikolic, and R.W. Brodersen, “Analysis and design of low-energy Flip-Flops”, in ISPLED Dig. Tech. Papers, Aug. 2001, pp. 52-55.

(Matsui et al. 1994) M. Matsui, H. Hara, Y. Uetani, L. Kim, T. Nagamatsu, Y. Watanabe, A.

Chiba, K. Matsuda, and T. Sakurai, "A 200 MHz 13 mm22-D DCT macrocell using sense-amplifying pipeline flip-flop scheme," IEEE Journal of Solid-State Circuits, vol. 29, pp. 1482 - 1490, December 1994.

(Montanaro et al. 1996) J. Montanaro, R. T. Witek, K. Anne, A. J. Black, E. M. Cooper, D.

Dobberpuhl, P. M. Donahue, J. Eno, A. Farell, G. Hoeppner, D. Kruckemyer, T. H. Lee, P.

Lin, L. Madden, D. Murray, M. Pearce, S. Santhanam, K. J. Snyder, R. Stephany, and S. C.

Thierauf, "A 160MHz 32b 0.5W CMOS RISC microprocessor," IEEE International Solid-State Circuits Conference, vol. XXXIX, pp. 214 - 215, February 1996.

(Montanaro, J.; Witek, R.T.; Anne, K.; Black, A.J.; Cooper, E.M.; Dobberpuhl, D.W.; Donahue, P.M.; Eno, J.; Hoeppner, G.W.; Kruckemyer, D.; Lee, T.H.; Lin, P.C.M.; Madden, L.;

Murray, D.; Pearce, M.H.; Santhanam, S.; Snyder, K.J.; Stephany, R.; Thierauf, S.C. (1997)

A 16O-MHz, 32-b, 0.5-W CMOS RISC microprocessor. Digital Technical Journal, Vol.9,

No.1, Digital Equipment Corp, p.49-62.

(Nedovic and Oklobdzija 2000) Nedovic N, Oklobdzija V.G, (2000) Dynamic flip-flop with improved power. Proceedings of the IEEE International Conference on Computer Design: VLSI in Computers and Processors. ICCD 2000, Austin, Texas, September 17-20. p.323-326. (Nedovic and Oklobdzija 2001) Nikola Nedovic, Marko Aleksic and Vojin G. Oklobdzija, “Timing Characterization of Dual-Edge Triggered Flip-Flops”, Proceedings of the International Conference on Computer Design, ICCD 2001, Austin, Texas, September 23-26, 2001.

(Nedovic et al. 2002) N. Nedovic, V. G. Oklobdzija, W. W. Walker, M. Aleksic, "A Low Power Symmetrically Pulsed Dual Edge-Triggered Flip-Flop," IEEE European Solid-State Circuits Conference, September 2002.

(Nedovic, N, Oklobdzija, V.G. (2000b) “Hybrid latch Flip-Flop with improved power efficiency”, Proceedings of the 13th Symposium on Integrated Circuits and Systems Design, Manaus, Brazil, September 18-24. p.211-15.

(Nikolic and Oklobdzija 1999) B. Nikolic and V.G. Oklobdzija, "Design and optimization of sense amplifier-based flip-flops," Proceedings of the 25th European Solid-State Circuits Conference, ESSCIRC'99, Duisburg, Germany, September 21-23, 1999, pp. 410-413. (Nikolic et al. 1999) B. Nikolic, V. Stojanovic, V.G.Oklobdzija, W. Jia, M. Leung “Sense Amplifier-Based Flip-Flop,” in ISSCC Dig. Tech. Papers, Feb. 1999, pp. 282-283. (Nogawa 1998) M. Nogawa and Y. Ohtomo, “A Data-Transition Look-Ahead DFF Circuit for Statistical Reduction in Power Consumption,” IEEE J. Solid-State Circuits, vol. 33, pp. 702-706, May 1998.

(Nogawa and Ohtomo 1998) M. Nogawa and Y. Ohtomo, “A data-transition look-ahead DFF circuit for statistical reduction in power consumption,” IEEE J. Solid-State Circuits, vol. 33, no. 5, pp. 702-706, May 1998.

(Oklobdzija 1999) Oklobdzija V.G, (1999) “High-Performance System Design: Circuits and Logic”, Book, IEEE Press, July.

(Partovi 2000) H. Partovi in Design of High-Performance Microprocessor Circuits, ed. A.

Chandrakasan, W. Bowhill, F. Fox, IEEE, 2000

(Partovi et al. 1996) Partovi, H. et al, (1996) “Flow-through latch and edge-triggered flip-flop hybrid elements”, 1996 IEEE International Solid-State Circuits Conference. Digest of Technical Papers, ISSCC, San Francisco, February 8-10.

(Razavi 1996) Razavi B (ed.) (1996) Monolithic Phase-Locked Loops and Clock Recovery Circuits – Theory and Design, IEEE, New York, 1996.

(Rusu and Tam 2000) Rusu S, Tam S (2000) "Clock generation and distribution for the first IA-

64 microprocessor," IEEE International Solid-State Circuits Conference, vol. XLIII, pp. 176 -

177, February 2000.

(Saint-Laurent et al. 2002) M. Saint-Laurent et al. (2002) Optimal Sequencing Energy Allocation for CMOS Integrated Systems. In: Proceedings of International Symposium on Quality Electronic Design, pp 94-99.

(Sakallah et al. 1992) Sakallah KA, Mudge TN, Olukotun OA (1992) Analysis and design of latch-controlled synchronous digital circuits. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems 11:322-33.

(Schutz and Wallace1998) Schutz J, Wallace R (1998) “A 450MHz IA32 P6 Family Microprocessor,” ISSCC Dig. Tech. Papers, pp. 236-237, Feb. 1998.

(Sidiropoulos and Horowitz 1997) Sidiropoulos S, Horowitz MA (1997) "A semidigital dual delay-locked loop," IEEE Journal of Solid-State Circuits, vol. 32, pp. 1683 - 1692, November 1997.

(Sidiropoulos et al. 2000) Sidiropoulos S, Liu D, Kim J, Wei G, Horowitz M (2000) "Adaptive Bandwidth DLLs and PLLs using Regulated Supply CMOS Buffers," IEEE Symposium on VLSI Ciruits, pages 124-127, June 2000.

(Siewiorek et al. 1982) Siewiorek D. P, Bell G. C, Newell A., “Computer Structures: Principles and Examples”, McGraw-Hill 1982.

(Sigal et al.1997) Sigal, L., Warnock, J.D, Curran, B.W., Chan, Y.H., Camporese, P.J., Mayo, M.D., Huott, W.V., Knebel, D.R., Chuang, C.T., Eckhard, J.P., Wu, P.T., “Circuits Design Techniques for the High Performance CMOS IBM S/390 Parallel Enterprise Server G4 Microprocessor”, IBM Journal of Research and Development, Vol.41, No.4-5, IBM, July-September, 1997.

(Silberman et al. 1998) Silberman, J.; Aoki, N.; Boerstler, D.; Burns, J.L.; Sang Dhong; Essbaum,

A.; Ghoshal, U.; Heidel, D.; Hofstee, P.; Kyung Tek Lee; Meltzer, D.; Hung Ngo; Nowka,

K.; Posluszny, S.; Takahashi, O.; Vo, I.; Zoric, B. “A 1.0-GHz Single-Issue 64-bit PowerPC Integer Processor”, IEEE Journal of Solid-State Circuits, vol.33, No.11, IEEE, Nov. 1998. (Stojanovic and Oklobdzija 2001) V. Stojanovic, V. G. Oklobdzija, FLIP-FLOP, US Patent No.

6,232,810, May 15, 2001.

(Stolte 1979) L. A. Stolte, N. C. Berglund, “Design for Testability for the IBM System/38”, Digest of Papers 1979 IEEE Test Conference, Cherry Hill, New Jersey, October 1979. (Strollo1999) A. G. M. Strollo, E. Napoli, C. Cimino, “Low power double edge-triggered flip-flop using one latch”, Electronics Letters, vol.35, (no.3), IEE, p.187-188, Feb. 1999. (Sutherland and Sproull 1991) I.E. Sutherland and R.F. Sproull "Logical Effort: Designing for Speed on the Back of an Envelope," Advanced Research in VLSI, ARVLSI'91, Santa Cruz 1991.

(Sutherland et al.1999) I. Sutherland, B. Sproull and D. Harris, Logical Effort: Designing Fast CMOS Circuits, Morgan Kaufmann, January 1999. – web enhancements from https://www.doczj.com/doc/e95040961.html, or ftp://https://www.doczj.com/doc/e95040961.html,/Logical_Effort/CAT_Tool

(Suzuki 1973) Y. Suzuki, K. Odagawa, and T. Abe, “Clocked CMOS calculator circuitry,” IEEE J. Solid-State Circuits, vol. SC-8, pp. 462-469, Dec. 1973.

(Svensson 1998) C. Svensson and J. Yuan, “Latches and Flip-flops for Low Power Systems,” in Low Power CMOS Design, A. Chandrakasan and R. Brodersen, Eds. Piscataway, NJ: IEEE Press, 1998, pp. 233-238.

(Texas Instruments 1984) Texas Instruments (1984) “The TTL Data Book for Design Engineers”, Dallas, Texas, Texas Instruments.

(Tschanz et al. 2001) Tschanz James, Siva Narendra, Zhanping Chen, Shekhar Borkar, Manoj Sachdev, Vivek De, “Comparative Delay and Energy of Single Edge-Triggered & Dual Edge-Triggered Pulsed Flip-Flops for High-Performance Microprocessors, Proceedings of the 2001 International Symposium on Low Power Electronics and Design, Huntington Beach, California, August 6-7, 2001.

(Unger and Tan 1986) Unger SH, Tan C (1986) “Clocking Schemes for High-Speed Digital Systems”, IEEE Transactions on Computers, Vol. C-35, No 10, October 1986.

(Von Kaenl et al. 1998) Von Kaenl V, Aebischer D, Van Dongen R, Piguet C (1998) "A 600MHz CMOS PLL microprocessor clock generator with a 1.2GHz VCO," IEEE International Solid-State Circuits Conference, vol. XLI, pp. 396 - 397, February 1998.

(Wagner 1988) Wagner K (1988) “Clock System Design”, IEEE Design & Test of Computers, October 1988.

(Williams and Angel 1973) M.J.Y. Williams, J.B. Angel, “Enhancing Testability of Large Scale Integrated Circuits via Test Points and Additional Logic”, IEEE Transactions on Computers, Vol. C-22, January 1973.

(Williams and Eichelberger 1977) Williams, T.W., Eichelberger, E.B., “Random patterns within

a structured sequential logic design”, 1977 Semiconductor Test Symposium, Cherry Hill, NY,

USA, 25-27 Oct. 1977.

(Wolf 1995) S. Wolf, Silicon Processing for the VLSI Era, Volume 3 – The Submicron MOSFET, Sunset Beach, CA: Lattice Press, 1995.

(Woods et al. 1997) Woods JV, Day P, Furber SB, Garside JD, Paver NC, Temple S (1997) “AMULET1: An Asynchronous ARM Microprocessor”, IEEE Transactions on Computers Vo. 46 No. 4 pp. 385-398, April 1997.

(Xanthopoulos et al. 2001) Xanthopoulos T, Bailey DW, Gangwar AK, Gowan MK, Jain AK, Prewitt BK (2001) "The design and analysis of the clock distribution network for a 1.2 GHz Alpha microprocessor," IEEE International Solid-State Circuits Conference, pp. 402–403, February 2001.

(Yano 90) K. Yano et al., “A 3.8 ns CMOS 16x16-b Multiplier Using Complementary Pass-Transistor Logic,” IEEE J. Solid-State Circuits, vol. 25, pp. 388-385, Apr. 1990.

(Young et al. 1992) Young IA, Greason JK, Wong KL (1992) "A PLL clock generator with 5 to

10 MHz of lock range for microprocessors," IEEE Journal of Solid-State Circuits, vol. 27, pp.

1599 - 1607, November 1992.

(Young et al. 1997) Young IA et al.“A 0.35m CMOS 3-880MHz PLL N/2 Clock Multiplier and Distribution Network with Low Jitter for Microprocessors,” ISSCC Dig. Tech. Papers, pp 330-331, Feb. 1997.

(Yuan and Svensson 1989) Yuan, J and Svensson, C, “High-Speed CMOS Circuit Technique”, Journal of Solid-State Circuits, Vol.24, No.1, February 1989.

(Zyuban and Kogge 1999) V. Zyuban and P. Kogge, "Application of STD to latch-power estimation,"IEEE Transactions on Very Large Scale Integration (VLSI) Systems, vol. 7, no.

1, pp. 111-115, March 1999.

海尔集团基于知识创新理论的人力资源管理模式(1)

海尔集团基于知识创新理论的人力资源管理模式 在知识经济时代,知识成为企业发展的关键要素和内在动力。现代企业以知识创新来推动企业的发展和价值创造。知识创新的主体是个人,企业需要对富有创造性的个体提供支持。因此企业应采用适合创新的人力资源管理方式,充分调动员工创新积极性,提高企业整体的知识创新能力,提高企业竞争力。 一、企业知识创新 企业知识是与企业生存和发展密切相关的组织知识体系,主要包括管理知识、市场知识和技术知识等。它蕴藏在企业内部的管理体制之中,体现在企业日常的管理流程、生产过程、对外提供的服务和产品,以及企业员工的思想和工作中,同时也体现在企业文化和价值观等方面。企业知识的含义包括三个方面:一是企业知识是企业的生产性知识,企业是为顾客提供服务和产品的组织,因此生产是企业最主要的职能,生产性知识构成了企业的重要资源;二是企业作为一个有机整体,能够像人一样拥有知识,具有学习能力。企业拥有的知识,是以企业中员工的个人知识为基础的,又有别与个人知识的总和;三是企业成员共享的知识,企业知识不会因为某个技术人员的离职而减少。企业知识使企业能够有效地吸纳和利用外部知识,并通过这种知识和能力不断地推动企业创新和发展。 企业知识创新是获取经济和社会利益或创造新知识的过程,出现在企业的生产、管理、营销等企业运营全过程之中。企业知识创新就是运用其知识资源,在相关领域发展出新的思维和解决方案,并转化为新技术、新服务、新产品、新流程等,增强企业创新能力,提高企业核心竞争力。 人力资源管理中的知识创新知识经济时代,知识是企业发展的最主要资源。一个企业能否通过知识创新来获取企业的竞争优势,将决定这个企业能否发展壮

项目经理岗位职责标准版本

文件编号:RHD-QB-K3561 (管理制度范本系列) 编辑:XXXXXX 查核:XXXXXX 时间:XXXXXX 项目经理岗位职责标准 版本

项目经理岗位职责标准版本 操作指导:该管理制度文件为日常单位或公司为保证的工作、生产能够安全稳定地有效运转而制定的,并由相关人员在办理业务或操作时必须遵循的程序或步骤。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 一、项目经理是最高管理者在工程项目上的全权委托代理人,向最高管理者负责,独立承担项目的决策、质量、进度、安全责任。 二、负责项目经理部全面工作,按施工组织设计,精心施工,实现工程利润、成本、工期、质量指标,实行岗位目标考核制,奖优罚劣,褒勤贬惰,提倡敬业精神。 三、接受公司领导,会同各职能部门对工程材料、设备进行计划、采购、供应、使用和管理,控制工程成本,均衡材料占用资金比例,贯彻材料管理制度,提交材料消耗报告。

四、宏观管理劳务,合理地安排、组织施工,协调技术管理部门,实行全面质量管理,落实质量终身责任制,推行“科学管理,质量为先;遵纪守法,关爱环境;以人为本,安全生产;诚信守诺,追求卓越”的方针。推行“向顾客提供一流的产品及服务,对污染环境、危胁职工身体健康与安全的危险源进行有效的控制。以达到国家相关法律、法规的要求”的目标,使工程质量达到优良。 五、坚决贯彻落实国家有关安全工作的规定,建立安全组织机构,制定安全制度,落实安全措施,组织安全施工,监督检查安全工作执行落实情况。奖罚安全管理工作的优劣者。实现安全无事故。六、管理协调各工种,各施工单位的交叉施工,处理好与指挥部、监理处的关系,保持与管理部门的联系,树立企业形象,实行栋号经营核算,实行文明施工。

关于项目经理岗位职责

关于项目经理岗位职责 下面是为你整理的一些关于项目经理的岗位职责,希望对你有 帮助。项目经理岗位职责(租赁) 1.负责项目的市场开拓。 2.完成下达的租赁业务规模及利润指标。 3.在项目立项、信息收集、项目评估、论证到合同签订的全过程中,负责公司内部及外部程序的推进和管理。 4.负责签约项目租赁期结束前的具体执行、管理和监控,包括对承租人、租赁项目及租赁物件跟进等信息的收集反馈,时刻关注项 目所处行业或区域的动态信息并及时报告。 5.负责在租赁期间对承租人不间断地协调管控,确保到期租金按期足额收回。 6.负责发展、维护和协调各种业务合作关系,确保项目的积极拓展和正常运行。 7.与其他部门就项目的运行积极协调与合作,包括项目调研安排、资金安排、商务运作、信息收集和信用调査安排及出险后期处理等 方面工作。 宽带应用开发项目经理岗位职责 1.负责跟踪研究业界各种宽带互联网应用的业务模式。 2.负责各种宽带互联网应用的产品发展规划。 3.负责宽带互联网应用产品的规范、设计和开发。 4.负责基于各种宽带视频终端开发适合市场需求的宽带内容和应用。 5.负责组织业内宽带视频终端厂家的定制化生产。

6.负责定制化生产的各种宽带视频终端的市场推广。 高级项目经理岗位职责(机械机器设备) 1.协助公司技术发展战略规划、技术团队建设、产品规划、设计和开发总体管理,以及公司项目流程体系和质量体系的建立与监督执行等。 2.指导、审核项目总体技术方案,组织制定和实施重大技术决策和技术方案。 3.检查、监督、指导、考核项目工作,为项目提供技术支持。 4.收集和分析产品市场信息,为公司产品立项、设计提供意见方案。 5.跟踪项目,及时发现项目风险并正确处理。 公司运营管理项目经理岗位职责 1.部门职责、岗位职责及描述、运营管理流程的制定、完善和执行监督。 2.公司MBOS管理体系的完善和执行,包括KPI指标、PPO(个人绩效目标)、SDA(技能开发活动)项目的执行跟踪;市场部担任市场部经理助理。 3.公司业务信息系统、LotiKsNotes办公系统及网站的日常运营维护。

海尔集团的人力资源管理

海尔集团的人力资源管理 一、以人为本——海尔的创新用人机制 1、海尔的用人理念 企业管理一般主要管四样:管人、管财、管物、管信息。后三者都由人去管理与操作,人就是行为的主体,可以说,人的管理就是企业管理的核心。因此,现代的企业总就是把人力资源开发放在相当重要的位置,每个企业都有自己的一套用人理念,海尔当然也不例外。 在海尔领导瞧来,企业不缺人才,人人都就是人才,关键就是将每一个人所具备的优秀品质与潜能充分发挥出来。海尔集团总裁张瑞敏认为,企业领导的主要任务不就是去发现人才,而就是去建立一个可以出人才的机制,并维持这个机制健康持久的运行。这种人才机制应该给每个人相同的竞争机会。为此,海尔人“变相马为赛马”,在全体员工高度认同的情况下,不断提升、完善这一竞争机制 海尔的赛马机制具体而言,包含3条原则:一就是公平竞争,任人唯贤;二就是职适其能,人尽其才;三就是合理流动,动态管理。海尔人力资源开发与管理的要义就是,充分发挥每个人的潜能,让每个人每天都能感到来自企业内部与市场的争压力,又能够将压力转换成竞争的动力,这就就是企业持续发展的秘诀.即开展公平、公正、公开竞争。市场竞争说到底就是人才的竞争。有什么样的人才.就有什么样的事业,谁拥有的高素质人才多,谁就可以在竞争中取胜。 2、三工并存、动态转换 海尔集团实行“三工并存、动态转换”制度。三工,即在全员合同制基础上把员工的身份分为优秀员工、合格员工、试用员工(临时工)她们分别享受不同的三工待遇(包括工龄补贴、工种补贴、分房加分等),并且根据工作业绩与贡献大小进行动态转换。 3、升迁机制——海豚式升迁 “海豚式升迁”,就是海尔人力资源管理的一大特色。有的经理职位已经很高了,但就是她如果缺乏某方面的经验,也要派她下基层;有的管理者各方面经验都有了,但综合协调能力较低,也要派她到相关部门去锻炼。 二、海尔员工的培训策略 海尔集团从一开始至今一直贯穿“以人为本”提高人员素质的培训思路,建立了一个能够充分激发员工活力的人才培训机制,最大限度地激发每个人的活力,充分开发利用人力资源,从而使企业保持了高速稳定的发展势头。 1、海尔的价值观念培训 海尔培训工作的原则就是“干什么学什么,缺什么补什么,急用先学,立竿见影”。在此前提下首先就是价值观的培训,“什么就是对的,什么就是错的,什么该干,什么不该干”,这就是每个员工在工作中必须首先声明的内容,这就就是企业文化的内容。对于企业文化的培

项目经理岗位的职责范本

项目经理岗位的职责范本 感觉不到自己心里有愿望存在就等于没有生命。下面是小编整理的项目经理岗位职责范本,供你参考,希望能对你有所帮助。 【第1篇】项目经理岗位职责范本 1.全面负责工程部的日常运行和管理工作; 2.总结施工、管理经验,编制装饰工程部年度计划,制定各岗位职责,制定各工程施工计划; 3.定期对员工进行专业技能等培训; 4.负责协调与各部门的工作。加强与各部门的沟通与合作,努力完成公司总体目标; 5.监督检查施工管理制度的执行情况,现场检查装饰工程中质量、安全情况,对存在的问题进行协调与解决。督促各装饰工程的施工进度,保证各装饰工程保质保量竣工; 6.负责各装饰工程有关合同的审核。 【第2篇】项目经理岗位职责范本 1、按照相关施工标准、图纸要求和操作规范对室内装修现场进行管理,确保施工质量及进度; 2、随时与客户保持沟通,及时处理工程管理中发生的问题,组织调配相关施工人员,不断提高客户满意度,服务质量做到极致; 3、负责现场现场文明施工、安全施工的落实; 4、服从公司的管理模式进行施工管理; 5、项目实施过程总结,形成施工工艺、技术规范,促使施工标准化。 6、制定体系内部标准应用指引,促进内部体系的完善; 【第3篇】项目经理岗位职责范本 1.负责与设计单位、甲方等相关单位人员进行技术交流与沟通,并根据要求进行深化设计、制作技术方案。 2.负责网络综合布线、安防工程(监控、周界防范、防盗报警、、广播系统、楼宇智控等弱电各子系统图纸深化设计及绘制,现场实施的统筹管理和协调工作。

3.编写施工方案和施工计划,并组织、协调、管理以及跟踪监督项目计划执行过程,保证项目的实施进度和质量,确保项目按时完成。 4.施工工艺的全程监督、指导,施工节点的控制、沟通,施工过程中各项问题的完善解决,材料成本的控制等。 5.负责项目的竣工验收和移交工作;组织相关技术文件的编制、收集、整理工作,及时编制施工技术总结等。 6.整体负责项目施工的质量、技术管理工作;审核施工方案、图纸,参与深化设计;做好资料审核、报验;控制施工进度,做好工作结算。 7.负责组织审核设计文件,及时解决施工过程中的各项问题,具备应变能力。编制实施性施工组织设计,指导、检查技术人员日常工作,负责向施工负责人进行技术交底。 【第4篇】项目经理岗位职责范本 一、做好工程开工的准备工作,初步审定图纸、施工方案,提出技术措施和现场施工方案。 二、编制工程总进度计划表和月进度计划表及各施工班组的月进度计划表。 三、认真审核工程所需材料,并对进场材料的质量要严格把关。 四、对施工现场监督管理,遇到重大质量、安全问题时及时会同有关部门进行解决。 五、向专业所管辖的班组下达施工任务书、材料限额领料单和施工技术交底。 六、督促施工材料、设备按时进场,并处于合格状态,确保工程顺利进行。 七、负责对图纸变更、增补工程进行现场签证和记录。 八、协助技术负责人进行图纸会审及技术交底。 【第5篇】项目经理岗位职责范本 1、协调并整合公司资源,参与项目的立项、申报、审批、验收等各环节工作,并负责申报项目的报送跟踪,直至项目完成; 2、收集项目申报、批复文件等相关数据,并进行文字汇总、编写申报材料; 3、查找、搜集公司各类产品的项目申报信息及相关部门的沟通与协调; 4、及时了解行业动态及政府政策,并搜集有价值的行业信息及政策信息; 5、根据项目政策条件,对公司项目提出建议。

建筑项目经理岗位工作标准

建筑项目经理岗位工作 标准 集团企业公司编码:(LL3698-KKI1269-TM2483-LUI12689-ITT289-

建筑项目经理岗位工作标准1、编制目的 本工作标准规定项目部项目经理工作职责、内容,应保存的资料和应熟悉的法律、法规和制度。 2、工作职责 (1)受公司总经理委托,对项目施工的全过程负管理责任。 (2)认真贯彻执行国家、地方政府、上级有关法律、法规、方针、政策和企业规章制度,自觉维护企业和职工的利益,确保承包合同规定的各项经济技术指标的全面完成。 (3)根据项目承包合同,制定实施项目的详细计划,优化组建项目班子,健全各级岗位人员职责,制定各项经济技术指标。 (4)依据局《管理手册》、《管理程序》要求,健全项目QEHS管理体系。

(5)主持编制项目质量、安全保证计划,施工组织设计,制定推广应用“四新”技术计划和创科技示范工程目标。 (6)负责组织项目部对环境因素和危险源进行识别和控制。 (7)科学组织、管理进入现场的人、财、物,协调好项目内外关系,进行有效的总分包管理。 (8)严格财经制度,控制各项费用开支,确保降低成本的实现。 (9)组织工程分阶段质量检查、验收和评定及工程竣工交验工作。 (10)对工程的质量、安全负第一责任。确保质量目标实现,监督安全措施的实施,搞好现场文明施工,树立企业形象。 (11)负责项目竣工结算、资金回收和工程总结工作。 3、工作内容 (1)贯彻落实国家、地方政府法律、法规、方针、政策和企业规章制度,教育员工遵纪守法。

(2)健全项目组织机构,完善项目岗位人员职责,建立项目质量、安全保证体系。 (3)主持制定项目质量、职业健康安全、环境、工期、成本、文明施工、CI形象等目标计划,编制切实可行的施工方案、质量、安全保证计划。 (4)参与合同评审,主持项目合同交底,负责对项目上使用的材料、设备、料具、劳务层、分承包方进行评审、签约(需委托),科学管理,合理组织,确保满足项目生产需要。 (5)负责组织工程分阶段的质量检查、评定和竣工交验工作。 (6)组织识别项目部的环境因素和危险源,并评价出其中重大环境因素和重大危险源,负责制定相应的措施和方案并对其进行有效控制。 (7)建立项目领导安全值班制,定期对项目进行职业健康安全、质量、环境、文明施工检查,保证项目职业健康安全、质量、环境、文明施工符合要求,树立企业良好的Cl形象。 (8)定期进行项目成本经济活动分析,严格控制各项费用开支,督促有关部门及时办理经济签证手续,收集索赔证据,实现降低成本目标。

项目经理部主要岗位职责

项目经理部主要岗位职责 1、项目经理职责 1)向公司总经理负责,负责本项目各项管理工作,是项目总负责人,接受公司和公司各职能部门的监督和领导。 2)贯彻公司的质量、环境、职业健康安全方针和目标。并制订项目的质量、环境、职业健康安全方针和目标。 3)对工程的质量、环境、职业健康安全负全面责任,明确项目经理部有关人员的质量、环境、职业健康安全责任,并督促其履行职责。 4)负责组织实施公司的质量、环境、职业健康安全体系文件,负责组织制定,并实施项目质量、环境、职业健康安全管理措施,负责组织分部、分项工程质量检验评定。 5)履行公司质量、环境、职业健康安全体系程序文件规定的各项职责。

1)贯彻项目质量、环境、职业健康安全方针和目标,协助项目经理建立项目质量、环境和职业健康安全管理体系,并保持有效运行和持续改进。 2)负责本工程的施工技术管理、质量管理、变更洽商管理、工程资料管理及科技推广应用管理,是施工技术、质量、方案、设计管理的主要责任人。 3)组织编制施工组织设计、项目质量计划、项目环境、职业健康安全保证计划,负责组织编制特殊过程和专题施工方案及作业指导书。 4)组织项目有关人员参与工程的设计交底及图纸会审并负责组织整改。 5)负责检查、督促工程测量及项目原材料的送检、试验工作及技术复核工作。 6)负责施工过程中的质量、技术问题处理。 7)负责组织工程施工中一般不合格品的评审、处置、制定纠正和预防措施,并实施跟踪检查。负责组织对项目统计技术工作进行管理和控制。 8)负责组织科技成果推广应用以及施工技术总结。 9)负责审批项目土建工程师技术交底,并对所做的技术交底进行检查、监督执行。 10)组织分部工程质量检验评定。

海尔集团人力资源规划说课讲解

人力资源规划书 学院: 专业: 学号: 指导教师: 班级: 姓名:

目录 一公司简介 (2) 二部门设置 (4) 三人才招聘 (5) ㈠招聘要求 (5) ㈡招聘策略 (5) ㈢工资待遇 (5) 四员工福利 (6) 五风险预测 (7) 六绩效考评政策 (7) 七培训政策 (7) 八人力资源预算 (8)

一公司简介 海尔集团是世界第四大白色家电制造商,也是中国电子信息百强企业之首。旗下拥有240多家法人单位,在全球30多个国家建立本土化的设计中心、制造基地和贸易公司,全球员工总数超过五万人,重点发展科技、工业、贸易、金融四大支柱产业,2005年,海尔全球营业额实现1039亿元(128亿美元)。 创立于1984年崛起于改革大潮之中的海尔集团,是在引进德国利勃海尔电冰箱生产技术成立的青岛电冰箱总厂基础上发展起来的。在海尔集团首席执行官张瑞敏“名牌战略”思想的引领下,海尔经过十八年的艰苦奋斗和卓越创新,从一个濒临倒闭的集体小厂发展壮大成为在国内外享有较高美誉的跨国企业。 2002年海尔实现全球营业额711亿元,是84年的20000多倍;2002年,海尔跃居中国电子信息百强之首。 18年前,工厂职工不足800人;2002年,海尔不仅职工发展到了3万人,而且拉动就业人数30多万人。 1984年只有一个型号的冰箱产品,目前已拥有包括白色家电、黑色家电、米色家电、家居集成在内的86大门类13000多个规格品种的产品群。在全球,很多家庭都是海尔产品的用户。 用户的忠诚度是与海尔产品的美誉度紧紧联系在一起的,18年间,海尔的无形资产从无到有,2002年海尔品牌价值评估为489亿元,跃居中国第一品牌。 海尔产品依靠高质量和个性化设计赢得了越来越多的消费者。2003年,海尔获准主持制定四项国家标准,标志着海尔已经将企业间竞争由技术水平竞争、专利竞争转向标准上的竞争。在国内市场,海尔冰箱、冷柜、空调、洗衣机四大主导产品均拥有30%左右的市场份额。在海外市场,据全球权威消费市场调查与分析机构EUROMONITOR最新调查结果显示,海尔集团目前在全球白色电器制造商中排名第五,海尔冰箱在全球冰箱品牌市场占有率排序中跃居第一。海尔集团坚持走出国门创名牌,目前,已建立起一个具有国际竞争力的全球设计网络、制造网络、营销与服务网络。现有设计中心18个,工业园10个(其中国外2个,分别位于美国和巴基斯坦;国内8个,其中5个在青岛,合肥、大连、武汉各有一个,海

建筑公司项目经理岗位职责(正式)

编订:__________________ 单位:__________________ 时间:__________________ 建筑公司项目经理岗位职 责(正式) Standardize The Management Mechanism To Make The Personnel In The Organization Operate According To The Established Standards And Reach The Expected Level. Word格式 / 完整 / 可编辑

文件编号:KG-AO-1603-84 建筑公司项目经理岗位职责(正式) 使用备注:本文档可用在日常工作场景,通过对管理机制、管理原则、管理方法以及管理机构进行设置固定的规范,从而使得组织内人员按照既定标准、规范的要求进行操作,使日常工作或活动达到预期的水平。下载后就可自由编辑。 1、在董事长、副总经理的领导下,认真贯彻落实项目的工程计划目标和部门职责范围内的各项管理工作。 2、全面主持工程部的日常管理工作,按计划组织实施项目的工程建设;对项目的工程建设进行全面管理、过程监督;保证按进度、保质量、控成本完成建设任务。 3、在副总经理的指导下,对项目的工程技术和施工情况进行质量控制、成本控制、进度控制及目标管理;负责对公司所开发项目的建设工期、工程质量、施工安全、各方协调、工程成本等进行全面的控制、管理、监督。 4、参加图纸会审、工程施工组织设计及重大施工方案的讨论和审定,审定设计方案、设计图纸和设计

文件,主持技术会议,参与和审定主要材料及设备的选型,审核重大设计和工程施工合同,对项目设计方案和工程建设的重大技术问题进行审核把关,并提出合理的建议。 5、协助公司处理和解决设计、施工、质量、验收等环节出现的技术难题,从技术上提出降低工程造价和成本费用的建议和措施,积极研究和采用新技术、新材料,并在建设过程中严格控制把关,降低建设成本,争取最大的投资效益。 6、严格执行国家、当地的法律、法规、政策和公司规定,根据公司标准工作程序,结合工程所在地的实际,主持制订、修订工程部职责范围、管理制度和有关规定。 7、组织编制月度、季度、年度工作计划和组织实施,并向公司领导及上级主管部门报告计划的实施情况,组织编制年度工作总结。 8、参加对重大质量事故,重大安全事故的调查处理和审查施工单位编制的事故整改方案。

公司项目经理岗位职责

项目经理岗位职责 一、认证贯彻落实国家、省、市的政策法规和企业的各项规章制度,代表公司履行工程承包合同的有关条款,对项目工程管理负全面责任。 二、建立完善项目部组织机构和专项目标管理保证体系,组织制定项目部各项规章制度,明确管理人员职责,充分发挥项目施工人员的积极性。 三、对项目工程施工人员及材料、机具的综合管理负领导责任。及时组织召开生产、质量、安全、成本等会议,协调好各方面关系,组织参加工程例会,接待上级检查。 四、负责项目工程内外承包工作及其主要材料、机具等的价格控制,维护企业和职工的根本利益,定期分析生产情况和各项指标的完成情况。采取针对性的措施,确保项目部各项经济技术目标的全面控制。 五、负责组织编制、实施施工组织设计、质量计划、质量安全保证措施、创建优良工程和安全文明工地的措施。对工程消防、综合治理等工作负领导责任。 六、根据合同工期和公司下达的季、月度施工生产计划、组织编制工程项目的季、月度的施工计划(包括劳力、材料、构配件、机械设备等)与有关部门签订供需、租赁合同,并严格履行。 七、搞好与分供方等有关单位的业务联系,服从上级单位的监督检查,定期向有关领导回报工作。 八、严守财经制度、加强财务、预算管理、正确处理好国家、企业、集体和个人四者之间的利益关系。 九、组织并协助预算员、财务人员与建设单位办理竣工决算及资金回收工作。 十、按合同规定和公司承诺,积极做好工程交付后的回访服务工作。

项目工程师岗位职责 一、认真贯彻执行国家和上级有关部门颁发的技术规程、规范及技术文件。 二、全面负责本项目的技术工作,制定本项目的技术管理办法承担技术领导责任。 三、承担技术经济指标,组织技术准备工作,指定技术节约计划,并组织落实。 四、负责审核施工组织设计、施工方案、技术措施、安全技术措施、质量保证措施、冬雨期施工措施。 五、负责组织图纸会审工作,审核加工订货计划。 六、认真贯彻《质量手册》和程序文件,按照《质量手册》和《程序文件》的要求,搞好项目质量体系运行工作。 七、负责测量、试验、技术培训考核及新技术的推广应用,参加经营管理决策,参与指定施工计划、施工部署。 八、负责组织技术交底,及时解决施工中存在的技术问题。 九、组织单位工程的测量定位、抄平、放线工作。 十、组织隐蔽工程验收、结构验收、分部工程验收、单位工程预验,参与单位工程竣工验收。 十一、检查督促施工技术资料的完成情况。

跨文化经营环境中的人力资源管理组织海尔集团的启示

跨文化经营环境中的人力资源管理--海尔集团的启 示 作者:不详 〖引言〗时代的个性 每个时代都拥有自己的个性。我们如今所处的时代与以往任何一个人类活动的历史时期相比有着更为明显的个性。政治经济气候的风云变幻,科技信息的风起云涌,使得我们这个时代的一切都充满了变数,而这一切变化则暗示着我们这样一个道理:这个时代将不再有“国界”。世界经济全球化,区域经济一体化并不是新生的名词;然而在今天它却包含了更为深刻的意义。我们的时代中,跨越国界的企业将会越来越多;以至于文化的交融与碰撞将会此起彼伏。“跨文化”不再是高层领导会晤时的专有名词,不再属于企业高层洽谈所用的新闻词汇。它已经成为企业生存必须掌握的一种技能,是组织构建中的重要成分。因此,这篇论文将从企业人力资源的不属于管理的角度,直面“跨文化”对于企业核心竞争力的影响并尝试着解答文化冲击所带来的一些问题。全文将以中国海尔集团开拓国际市场时所遇到的风风雨雨作为案例追踪分析。 〖正文〗对于有过程序开发经验的人来说,“Hello,World!”将是他们一生中最难忘的时刻。因为那标志着,他的第一串代码行成功的执行了!而对于处在我们这个时代的企业家来说,这句话同样凝聚着兴奋与激动。它标志着您的企业步入了全球化的崭新领域。然而,对于大多数人来说,迷茫从此开始了。 全球化?还是本地化?

这个命题原本属于战略管理的范畴,然而当今社会的重大演变使得知识经济成为主流,信息经济逐渐衍生。知识的载体在于人,人力的全球化或是本地化将因此显得格外重要。跨国公司在华管理战略上强化协调控制的管理战略主要体现在两方面,一是开始将亚太地区总部移到中国,或者建立中国地区总部。跨国公司在实施人力资源本地化策略同时,强化对关键岗位的控制。南开大学的一项调查显示,跨国公司控制在华企业的重要机制是直接任命总经理进行财务监控和直接任命关键部门的经理。调查表明,绝大多数母公司都认为合资企业总经理的任命权是一个非常重要的控制机制,在由外方任命负责人的部门中,技术部门和财务部门占的比例高达94.2%和92.8%。然而,表面上看来,「本地化」和「全球化」是两个截然相反的过程。但事实上,本地化与全球化互为表里,全球化要能推得愈深,就必须去本地化。没有各具特色的本地化人力、产品和经营理念,哪有全球化的跨国集团?本地化运动可以看作是全球化「大军压境」所产生的一个「特殊」的反应。而全球化其实是全球性的本地化,它在每一个地方每一个跨国公司都形成了难以辨认其所自的组织文化,也因此全球化造成的是一个多元化的企业。与全球化相对应的,本地化也是现代跨国企业应当面对的问题:要在世界各地生存和发展,企业必须实现本地化,尤其是人力资源的本地化成为跨国公司在世界各地抢占的制高点。跨国经营的本质就是劳动力资源、市场资源等各种生产力要素在全球范围内的合理配置,永远处在一种流动性的资源再分配的状态中。绝对的流动性中有相对的稳定性,这个相对的稳定性就是企业经

项目经理岗位职责工作内容范本

岗位说明书系列 项目经理岗位职责工作内 容 (标准、完整、实用、可修改)

编号:FS-QG-19155项目经理岗位职责工作内容 Project manager job responsibilities 说明:为规划化、统一化进行岗位管理,使岗位管理人员有章可循,提高工作效率与明确责任制,特此编写。 项目经理职位要求 1.对承接的项目所涉及的专业有一个全面的了解 2.有一定的财务知识、法律知识(民法) 3.相关的项目知识,使用项目管理工具和技巧的特殊知识 4.一定的计算机应用能力 5.健康的身体和丰富的实践经验 项目经理岗位职责/工作内容1.组建项目部,确定项目部的组织机构,选择聘用管理人员,根据质量/环境/职业健康安全管理体系要求确定管理人员职责,并定期进行考核、评价和奖惩。 2.负责在本项目内贯彻落实公司质量/环境/职业健康安全方针和总体目标,主持制定项目质量/环境/职业健康安

全目标。 3.负责对施工项目实施全过程、全面管理,组织制定项目部的各项管理制度。 4.严格履行与建设单位签订的合同和与公司签订的“项目管理目标责任书”并进行阶段性目标控制,确保项目目标的实现。 5.负责组织编制项目质量计划、项目管理实施规划或施工组织设计,组织办理工程设计变更、概预算调整、索赔等有关基础工作,配合公司做好验工计价工作。 6.负责对施工项目的人力、材料、机械设备、资金、技术、信息等生产要素进行优化配置和动态管理,积极推广和应用新技术、新工艺、新材料。 7.严格财务制度,建立成本控制体系,加强成本管理,搞好经济分析与核算。 8.积极开展市场调查,主动收集工程建设信息,参与项目追踪、公关、进行区域性市场开发和本项目后续工程的滚动开发工作。 9.强化现场文明施工,及时发现和妥善处理突发性事件。

项目经理岗位职责模板

项目经理岗位职责 模板 1 2020年4月19日

项目经理岗位职责(一): 工程项目经理岗位职责 (一)工作职责 1、组织制定项目总体规划和施工设计,全面负责项目部生产、经营、质量、安全、礼貌、财务等一系列管理工作。 2、负责整个项目各种施工方案以及进度计划、月、周工作安排编制和落实。 4、合理的组织、调度生产要素,实施日常工作中的组织、计划、指挥、协调、控制、鼓励的职责,保证工程质量、安全礼貌、工期和效益的目标得以实现。 5、及时向建设单位催要工程进度款,加快资金周转,做好项目工程的成本核算,盘活资金使用,审核各项费用支出。 6、协调解决处理好与业主、监理、分包商以及行业主管部门的关系,确保工程项目正常进行; 2 2020年4月19日

7、负责施工现场管理,合理使用物料、机械设备和劳动力,控制各工程项目的施工成本; 8、按工程进度的急、慢、先、后制订材料申报表、成品及半成品计划应提前计划、提前订购,以不影响施工连续性为关键。 9、组织做好各阶段工程的竣工验收与结算工作; 10、解决处理施工中出现的各种技术问题,协调解决、裁决技术分歧; 11、按照图纸、合同要求组织施工,确保按期交付竣工,赢得业主的满意; 12、完成领导交办的其它工作任务; (二)考核指标 1、每周例会、每一天工作早会制度执行率100%; 3 2020年4月19日

2、施工进度计划完成率90%以上; 3、工程质量合格率95%以上; 4、工程安全重大事故为零。 5、甲方工程管理罚款额在0。5‰以内。 6、上报报表、工作计划及时准确率100%。 (三)工作职权 1、经授权组建工程项目部,对项目部管理人员的工作有安排、考核、评价和奖惩权; 2、主持项目部的运作管理,有权组织制订施工管理的各项规章制度和措施,对所管辖的工程合同、技术交底、设计方案有参与权、知情权; 3、参与各单项工程的劳务分包业务的联系、审核与审批,对分包单项工程业务有管理、考核权与奖惩权; 4 2020年4月19日

项目经理岗位职责

项目经理岗位职责

项目经理岗位职责 项目经理是企业法人代表在工程项目管理中的委托人,是项目工程质工程实施负总责。 一、认真贯彻执行《建设工程质量管理条例》、《工程建设标准强制性条文》及现行施工规范、规程、验评标准,树立“百年大计、质量第一”的思想,努力提高工程质量,并组织质量大检查。 二、认真贯彻执行国家有关劳动保护法令、安全生产法律法规及本企业的安全生产规章制度,坚持“安全第一、预防为主”的方针和“谁主管谁负责”原则,把安全生产落实到实处,并组织安全生产大检查。 三、建立健全项目经理部组织机构,制定工程控制目标及岗位责任制,完善各类管理制度。主持召开办公会议,检查各部门工作计划的执行。 四、负责对外联络及工作汇报,负责以外文件、资料的签发。 五、负责施工总进度计划,并检查总进度计划的执行。 六、审批各分项分部工程的结算和竣工结算。 七、组织隐蔽工程验收、主体工程验收、竣工验收;主持编写验收总结。 八、妥善处理施工现场周边的社会关系,加强对职工的法制教育。提高职工文明施工的水平,树立企业品牌形象。 九、制定财务计划,加强对工程资金的管理,做到专款专用,保

证工程顺利实施。 项目经理岗位职责 一、认真贯彻执行《建筑法》、《合同法》和国家有关劳动保护法令和制度以及公司的安全生产制度。贯彻“安全第一、预防为主”的方针,搞好安全防范措施,把安全工作落到实处,在各种经济承包中必须包括安全生产,做到讲效益必须讲安全,抓生产首先必须抓安全。 二、全面负责本工程的一切事务,认真熟悉施工图纸、编制施工组织设计方案和施工安全技术措施,建立统一规格的“八牌一图”。会同项目部相关人员精选强有力的施工队伍,编制工程进度计划及人力、物力计划和机具、用具、设备计划,做到文明施工。三、制定适合本工程项目的管理细则、方案及措施,组织职工按期开会学习,合理安排、科学引导、顺利完成本工程的各项施工任务。 四、认真履行《建设工程施工合同》条款,保证施工顺利进行,维护企业的信誉和经济利益。五、根据本工程施工现场情况合理规划布局现场平面图,安排、实施、创立文明工地。要求布局合理、经济。 五、编制本工程总进度计划表和月进度计划表及各施工班组的月进度计划表。 六、和工地相关管理人员一起商订、制定和签订本工地的单项工程

项目经理-岗位职责范本

岗位说明书系列 项目经理-岗位职责(标准、完整、实用、可修改)

编号:FS-QG-22953项目经理-岗位职责 Project manager-job responsibilities 说明:为规划化、统一化进行岗位管理,使岗位管理人员有章可循,提高工作效率与明确责任制,特此编写。 作为管理层工作人员的岗位职责,我们已经对营业经理岗位职责、总经理助理岗位职责等做过初步的了解,1.在主管领导的领导下工作,带领所属员工贯彻执行公司的相关规章制度,严格执行本项目的各项操作程序,确保各岗位的工作标准达到要求。 2.制订培训计划,并组织实施培训,督导部属将培训的内容,落实到各工作岗位,并随时检查培训效果,确保员工了解业主单位约定的工作要求。 3.带头随手捡起地上垃圾并将此做为检验各级清洁人员是否符合标准的基本要求。 4.认真考察所管项目的工作区域、工作难度、工作时段,根据实际情况提出合理的定岗定员建议,经公司批准后并严格执行。

5.根据该项目的实际情况因地制宜,制定本项目的各项管理制度,经批准后组织所属员工学习并执行。 6.设置应急事件科目,并拟订应急事件的处理程序方案,经批准后遵照执行。 7.制定每月、每周、每日工作计划并确保工作计划的完成,检讨计划未完成的原因并找出解决办法,撰写各类文件报告及工作总结。 8.在职权范围内审核批复所属员工的各类假期,检查员工的每日出勤情况,审核所管项目员工的月考勤。 9.对表现优秀的员工和违纪员工在职权范围内实施奖罚或建议奖罚,对领班及以上员工每月做绩效考核。 10.听取主管或领班的工作汇报,并协助解决他们工作中遇到的困难,及时了解他们及其他部属的思想动态、工作情绪,关心部署的生活情况确保人员稳定。 11.定期向公司汇报该项目的工作情况,根据实际运作情况,提出人员的增减建议及需要特别支持时的理由。 12.准确掌握该项目人员的流动规律,提前做好补充人员的招聘申请并上报,以便公司掌握准确信息进行人员招聘,

项目经理部岗位职责标准

(1)项目经理岗位职责 1.在总经理领导下,认真贯彻执行ISO9002质量管理体系标准。 2.项目经理是公司在该工程项目的代理人,代表公司对工程项目全面负责。 3.遵守国家和地方政府的政策法规,执行公司的规章制度和指令。在该项目中代表公司履行合同执行中的有关技术、工程进度、现场管理、质量检验、结算与支付等方面工作。 4.主持制定项目的施工组织设计、质量计划及总体计划和年、季、月施工进度计划。 5.深入施工现场,处理矛盾,解决问题。不断完善经济制度,搞好经济效益,主持项目盈亏分析。 6.搞好施工现场管理和精神文明建设,关心职工生活,确保安全生产,保障职工人身、财产的安全。依法参与涉及职工利益的重大决策,维护职工利益。 7.做好项目的基础管理工作,保证各类文件、资料、数据等信息准确及时地传递和反馈,及时进行工程结算。 8.完成公司交办的其它工作。

(2)施工负责人岗位职责 1.施工负责人是经理的助手,为项目经理负责,受项目经理委托,组织实施生产计划。 2.统筹项目质量计划编制及落实,开展质量安全教育,保证各项制度的正常进行,协调和处理好各部门之间的关系。 3.负责技术复核并组织对所承担的工程项目检查,进行分项、分部工程检查和评定。 4.参与设计变更深入现场解决问题,及时处理施工中的质量问题和其它难题。 5.组织有关人员参加项目工程的交验工作。负责安全标准化工地的建设,搞好安全生产,对安全生产及文明施工负主要责任。 6.定期组织检查项目的安全、质量、进度、文明施工,搞好评比奖罚工作。 7.主持、安排好生产任务保证施工进度按计划进行。 8.完成领导交办的其它工作。

土建项目经理岗位工作职责范本

岗位说明书系列 土建项目经理岗位工作职 责 (标准、完整、实用、可修改)

编号:FS-QG-14524土建项目经理岗位工作职责 Job responsibilities of civil project manager positions 说明:为规划化、统一化进行岗位管理,使岗位管理人员有章可循,提高工作效率与明确责任制,特此编写。 简介:项目经理(ProjectManager),从职业角度,是指企业建立以项目经理责任制为核心,对项目实行质量、安全、进度、成本管理的责任保证体系和全面提高项目管理水平设立的重要管理岗位。它要负责处理所有事务性质的工作。也可称为“执行制作人”(ExcutiveProducer)。项目经理是为项目的成功策划和执行负总责的人。项目经理是项目团队的领导者,项目经理首要职责是在预算范围内按时优质地领导项目小组完成全部项目工作内容,并使客户满意。为此项目经理必须在一系列的项目计划、组织和控制活动中做好领导工作,从而实现项目目标。 项目经理岗位描述(模板一) 岗位职责: 1、全面负责项目管理,统筹管理项目安全、进度控制、

质量控制、成本控制; 2、协调甲方、监理及社会各级主管部门关系; 3、审定、审查重大技术实施方案,整理施工方案专项特殊技术施工方案; 4、按审批要求组织施工图设计和审查工作。深入设计现场,监控设计质量,使设计优化合理、安全、经济、最大限度地减少投资,降低工程成本。 任职要求: 1、30-45岁,大专以上学历,工民建或建筑管理等相关专业毕业; 2、具有5年以上建筑工程管理经验,具有同等资质施工企业优先; 3、具有突出的沟通、协调能力和一定的管理能力; 4、具备房地产项目施工管理和工程配套管理等相关经验,有现场监督管理协调能力; 5、具备领导才能,关于沟通和统筹管理。项目经理岗位描述(模板二) 岗位职责:

项目经理岗位职责规范

项目经理岗位规范 直属上级:工程部经理直属下级:各工种工人能力要求: 1、组织施工能力。 2、解决施工质量问题能力。 岗位职责: 1.组织现场施工,对施工部分的工程质量负全责。 2. 组织施工现场技术交底。 3. 协调施工现场各工种施工。 4. 维持施工现场秩序。 5.协调客户关系。催缴工程款。 6.立足本岗位工作,提出合理化建议。 工作流程 1.接受工作任务,领取施工文件(施工图纸,预算等)。 2.根据预定工期做出施工进度计划,上报工程部经理。协助工程监理组织现 3.协助工程监理组织现场技术交底: 1) 联系设计师确认确切交底时间。如因客户原因变更交底时间,设计师应及时与监理取得联系,明确变更后的时间,如有延误,设计

师应承担责任。乙方不得主动提出变更交底时间的要求。 2) 勘查施工现场的结构及施工面层等情况。发现轻度质量问题(包括原有防水层)须及时向设计师和客户提出,并提出相应技术处理意见。 3) 对原建筑质量问题严重或可能影响装修施工的,建议业主要求物业管理部门对建筑原有的质量问题采取处理措施,直至符合装修施工条件为止。对此,监理应同客户协商工程延期,并办理延期手续。4)与客户进行沟通、交流(包括互换通讯方法)。向客户说明并介绍公司在施工管理、质检、交款、服务等方面的规定。征询客户意见,了解客户需求;协助客户与物业管理部门办理好开工前的必备手续; 5) 与客户约订好材料进场验收时间或下次见面的时间地点等。 6) 与客户确认水电改造项目及增减项目。 7) 根据图纸、预算,结合施工现场情况,评估设计人员的交底是否详实、准确,相关技术处理是否恰当,对有误之处予以说明,由设计师处理设计变更。 8) 工程监理、设计师、工长、客户共同填写技术交底表,24小时内由监理将交底表交到工程部。 4. 遵照公司有关施工现场文明施工规定,布置施工现场,组织施工。 5. 材料进场验收:填写相应表格,签字。 6.隐蔽工程验收:填写相应表格,签字。 7.工程中期验收:填写相应表格,签字。 8. 竣工验收:填写相应表格,签字。

投资项目经理岗位职责

投资项目经理岗位职责 【篇一:投资经理岗位职责】 职位:投资总监(经理) 岗位职责: 1、负责能源投资项目的开发及项目洽谈; 2、负责项目投资的可行性分析,评价项目投资可行性及风险性;完成项目相关的市场分析、技术分析、财务分析、评估分析、投资方案设计等报告的编写; 3、负责公司投融资; 4、项目投资后管理工作,以及项目退出交易设计、文件、跟踪等基础工作; 5、掌握、跟踪相关法律法规及政策动向,对公司投融资提出前瞻性的意见及决策参考; 6、完成其它工作事项。 任职要求: 1、5年以上能源(电力、新能源、能源科技等)投资分析相关工作经验,参与过能源项目投资者或有过证券业行业分析师工作经历或参与过pe投资的优先; 2、本科以上学历(具备能源类学科、经济学、金融学、管理学、法学等学科背景优先); 4、责任心强,工作认真细致,有良好的自我学习能力及知识更新能力,具有良好的团队协作能力,具有良好的沟通能力,具有较强的学习能力与创新能力; 5、具有较强的英文阅读、写作水平,基本具备英文听、说能力能满足商务交流; 6、能根据工作需求出差。 7、条件略逊者可应聘投资经理。 【篇二:投资部项目经理职位说明书】 投资部项目经理职位说明书 【篇三:项目经理及战略发展部岗位职责】 高级项目经理/项目经理岗位职责 高级项目经理/项目经理岗位职责

1、负责跟踪本行业及与公司业务相关的国内外技术发展趋势,结 合公司现行业务优势,为公司业务的发展方向提出市场开发和技术 研制计划; 2、负责公司资源开发管理、技术开发及转化管理; 3、企业发展规划、系统分析、设计评价与管理; 4、研究、制定、实施发展战略与规划; 5、对投资项目进行可行性研究、咨询与评估; 6、制定科技发展规划,并对新产品、新技术进行规划、开发、论 证与评价; 7、对业务流程进行系统分析、规划、设计与实施; 8、进行管理信息系统规划、设计、评估与实施; 9、根据公司整体战略发展目标,积极引进、开发优质、可控的投资、合作项目; 10、对公司各类投资、合作项目进行项目背景调查,收集整理项目 相关资料,联系项目相关单位和相关技术专家,制定初步的项目可 行性研究报告; 11、 12、 工作;对各类投资、合作项目进行科学、有效的管理与控制;参与公司各类营销活动的策划、组织工作及公共关系数据库的建立 战略发展部经理岗位职责 1、负责公司战略发展部工作; 2、研究、制定、实施发展战略与规划,包括总体战略说明、具体 行动计划和项目、公司资源配置和公司应变计划等; 3、负责收集整理与公司发展有关所需的经济信息资料、政策法规,为决策提供支持; 4、负责进行公司战略环境的分析,包括政治形势、法律环境、经 济环境、社会文化环境以及行业环境的分析等,负责拟订公司的竞 争战略; 5、研究国家的产业结构调整方向及行业动态,选择符合公司发展 方向及产业政策的项目,进行可行性分析并提出分析报告。 6、协助高级管理层制定组织发展战略; 7、协助公司总经理完成与相关部门、合作机构的沟通联络; 8、根据公司整体战略发展目标,积极寻找优质、可控的合作项目,参与公司各类合作项目的论证、总体规划、方案策划、沟通谈判、 协调实施过程,提供专业的意见,供决策参考;

相关主题
文本预览
相关文档 最新文档