当前位置:文档之家› 国际结算的7个流程图

国际结算的7个流程图

国际结算的7个流程图
国际结算的7个流程图

1.议付信用证

2.电汇(P113)、票汇(P135)、信汇(P132)

3.凭即期付款交单程序(P166)

4.凭远期付款交单程序(P167)

5.承兑交单(P165)

第七章 国际结算单据及其审核练习题

第七章国际结算单据及其审核

COMMERCIAL INVOICE To:Invoice No.: Invoice Date: S/C No.: From:To: Letter of Credit No.: SAY TOTAL:

PACKING LIST To:Invoice No.: Invoice Date: S/C No.: From:To: Letter of Credit No.:Date of Shipment: SAY TOTAL:

1. Shipper Insert Name, Address and Phone B/L No. 中远集装箱运输有限公司 COSCO CONTAINER LINES TLX: 33057 COSCO CN FAX: +86(021) 6545 8984 ORIGINAL 2. Consignee Insert Name, Address and Phone Port-to-Port or Combined Transport BILL OF LADING RECEIVED in external apparent good order and condition except as other- Wise noted. The total number of packages or unites stuffed in the container, The description of the goods and the weights shown in this Bill of Lading are Furnished by the Merchants, and which the carrier has no reasonable means Issued the number of Bills of Lading stated below, all of this tenor and date, One of the original Bills of Lading must be surrendered and endorsed or sig- Ned against the delivery of the shipment and whereupon any other original Bills of Lading shall be void. The Merchants agree to be bound by the terms And conditions of this Bill of Lading as if each had personally signed this Bill of Lading. SEE clause 4 on the back of this Bill of Lading (Terms continued on the back Hereof, please read carefully). *Applicable Only When Document Used as a Combined Transport Bill of Lading. 3. Notify Party Insert Name, Address and Phone (It is agreed that no responsibility shall attsch to the Carrier or his agents for failure to notify) 4. Combined Transport * 5. Combined Transport* Pre – carriage by Place of Receipt 6. Ocean Vessel Voy. No. 7. Port of Loading 8. Port of Discharge 9. Combined Transport * Place of Delivery Marks & Nos. Container / Seal No. No. of Containers or Packages Description of Goods (If Dangerous Goods, See Clause 20) Gross Weight Kgs Measurement Description of Contents for Shipper’s Use Only (Not part of This B/L Contract) Subject to Clause 7 Limitation 11. Freight & Charges Revenue Tons Rate Per Prepaid Collect Declared Value Charge Ex. Rate: Prepaid at Payable at Place and date of issue Total Prepaid No. of Original B(s)/L Signed for the Carrier, COSCO CONTAINER LINES T LADEN ON BOARD THE VESSEL DATE BY

工程竣工结算要求及建设工程竣工结算审计流程图)

工程竣工结算造价组成 1、工程中标造价或合同价 2、补充协议造价 3、清单工程量增减调整造价(含设计变更、图纸会审、联系单、会议纪要、施组和方案、隐蔽验收记录等文件涉及工程量变化) 4、工程签证造价 5、材料差价和甲供材(材料价差、甲供材采保费) 6、政策性调整造价(人工费、税金等) 7、其他造价(工程奖励、总包服务费或配合费、延期付款利息、工程专项检测试验费、电子档案费等) 工程结算资料应包括的内容 1.施工合同及附件、与结算相关证明(如优良奖、提前工期奖、文 明施工奖励标准、管理配合服务费等) 2.补充协议(若有) 3.中标(中选)通知书 4.图纸会审纪要(签字盖章手续齐全且清楚) 5.开、竣工报告及工期延期联系单(签字盖章手续齐全且清楚) 6.竣工验收记录(签字盖章手续齐全且清楚)

7.招标文件及招标工程量清单及电子盘、招标答疑纪要、招标补遗 8.投标文件商务标及电子盘 9.投标文件技术标 10.承包人编制的结算书及电子盘(盖承包人公章和造价编制人员资 格章,并由建设单位签字同意送审) 11.岩土工程勘察报告、地基验槽记录(可作为地基换填深度、确定 地下水位、基础加深深度、土方工程量的依据) 12.施工图及电子盘(按《技术制图复制图的折叠方法》GB/10609.3-89 统一折叠成A4幅面297mm×210mm) 13.承包方、发包方、监理方按规定签字认可的竣工图纸(按《技术 制图复制图的折叠方法》GB/10609.3-89统一折叠成A4幅面297mm×210mm),将变更更改于图面(变更较多时,重新绘制竣工图),更改处标注变更依据,盖竣工图章及施工、监理公章,签字齐全 14.经审定的施工组织设计、施工方案或专项施工方案(签字盖章齐 全且清楚) 15.原始地貌标高抄测记录 16.材料、设备认质核价单(需有连续编号,签字盖章齐全且清楚。 或购货凭证、定购合同等有效市场价证明。注意:预算价=材料采购价+运杂费+包装费+供货手续费+采购保管费) 17.设计变更单、技术核定单(需有连续编号,签字盖章手续齐全且 清楚、附件完备)

国际结算业务流程图

进口信用证开立业务流程 1.买卖合同 出进 口口 商 5..发货商 9.付款6.交单 4.通知L/C 10.付款11.放单2.申请开证 出口 3.开立信用证中国 方银银行 行7.寄单索汇︵ ︵开 通8.承兑/付款证 知行 出口议付信用证业务流程

偿付行 9.付8.索 款汇 4.审证并通知 中国银行(通 5.交单出口商知行/议付行)10.入账或结汇 3.开 6.寄 证单 1.签订合同 2.申请开证 开证行7.提示单据进口商 出口托收业务流程 中托3 托收委托书出 口9 付款收国 商行银 行

1. 2. 4. 8. 买发托通 卖货收知 合指承同示兑/付款 进 5.提示付款/承兑代 口 6.付款/承兑收 商7.交付单据行 进口代收业务流程 国1买卖合同国 外内 出进 口 2 发货口商商 3.托收9.付款 5.提示 6.付款/ 7.交付委托单据承兑单据 国 4.寄单中

外代国 托8.通知承兑收银 收/付款行行 汇出国外汇款电汇和信汇业务流程进口商/汇款人1提出申请 中国银行 2发出汇款指示 (SWIFT、电传或信函) 解付行(收款人账户行、中国银行 的代理行或联行) 3汇款解付 出口商/收款人

汇出国外汇款票汇业务流程 进口商/汇款人 1.提出申请 2.开出汇票 (特指票汇) 中国银行 3 交 付 解付行(收款人账户行、中国银行汇 的代理行或联行)票5.汇款解付 4.提示汇票 出口商/收款人

国外汇入汇款电汇和信汇业务流程进口商/汇款人 办理汇出1. 汇款委托 汇出行 3资金 划转 2 发出汇 款指示 中国银行 (汇入行) 4汇款解付 出口商或收款人 国外汇入汇款票汇业务流程

竣工结算报送及审核流程

竣工结算报送及审核流程一、竣工结算流程

二、流程说明 1、工程竣工验收合格后30天内,施工单位向监理单位递交竣工结算申请及完整的结算资料(见结算资料清单)。 2、监理公司接到结算申请及结算资料后10天内,对资料的准确性、完整性、符合性进行审核,如不符合要求,施工单位应在7天内补充及修订不完整不准确的资料。监理公司对上述结算资料出具结算意见。 3、甲方项目部在接到经监理审核的结算申请及结算资料后10天内,对资料的准确性、完整性、符合性进行复核,如不符合要求,施工单位应在7天内补充及修订不完整不准确的资料。项目部对上述结算资料出具结算意见。 4、经项目部审查通过的结算资料视为最终的结算资料,在此之后无论任何单位或部门补充的资料均须按上述流程并报甲方公司领导批准方予受理。 5、成本部在接到项目部转来的结算资料后组织预算工程师进行结算审核。根据工程实际情况在1~3个月内完成。 6、成本部审核完毕在与施工单位进行校对前须同施工单位共同制定校对工作计划,明确校对时间及在每个时间段的应校对的工作内容,双方签字确认。若在校对过程中施工单位预算人员在某个时间段内未前来校对则视为施工单位认可甲方对该时间段内工作内容的审核结果。 7、校对工作完毕后,预算工程师将校对后的结果提交

成本部指定的专业预算工程师进行复核。 8、专业预算工程师在接到校对结果后21天内进行复核,如有不同意见及时与主办工程师进行沟通然后将统一意见后的结算书提交成本部经理审核。 9、成本部经理在7天内对专业预算工程师复核后的结算书进行审核。 10、成本部审核结果报送公司领导审定,经公司审定的结算书一式四份,甲乙双方签字盖章,甲方存三份,乙方存一份。该结算书做为甲方支付工程结算款的唯一依据。如甲方需要另行编制竣工结算证明及建设工程造价结算核准表,乙方必须无条件配合,该竣工结算证明及建设工程造价结算核准表所附之结算书仅作为办理相关证件用,不作为支付工程款的依据。 三、施工单位申报竣工结算需提交的资料清单 1、结算申请表一份,该结算申请表须经监理公司及甲方项目部签署意见,对施工单位报送的竣工结算资料进行审核确认,对施工范围及施工过程中合同执行情况进行详细说明,确认施工范围是否与合同约定相符、在施工过程中施工范围有何变化以及与其他分包单位的施工范围如何界定。 2、工程开工令。 3、施工方案及施工组织设计:必须是原件,且该施工方案及施工组织设计在项目施工前经甲方签字认可并盖公

国际结算业务流程图

国际结算业务流程图 进口信用证开立业务流程 出口议付信用证业务流程 出口托收业务流程 进口代收业务流程 汇出国外汇款:A-电汇和信汇业务流程 B-票汇业务流程 国外汇入汇款:A-电汇和信汇业务流程 B-票汇业务流程 保函业务流程 保理业务流程 进口押汇业务流程 打包放款业务流程 出口押汇业务流程 出口贴现业务流程 福费延业务流程 提货担保业务流程 进口信用证开立业务流程返回 1.买卖合同 出进 口口 商 5..发货商 9.付款6.交单 4.通知L/C 10.付款11.放单2.申请开证 出口 3.开立信用证中国 方银银行 行 7.寄单索汇︵ ︵开 通 8.承兑/付款证 知行

出口议付信用证业务流程返回偿付行 9.付 8.索 款汇 4.审证并通知 5.交单出口商 知行/议付行) 10.入账或结汇 3.开 6.寄 证单 1.签订合同 2.申请开证 开证行 7.提示单据进口商 出口托收业务流程返回 出 3 托收委托书托中 口 9 付款收国 商行银 行 1. 2. 4. 8. 买发托通 卖货收知 合指承 同示兑/付款 进 5.提示付款/承兑代 口 6.付款/承兑收 商 7.交付单据行

进口代收业务流程返回 国 1买卖合同国 外内 出进 口 2 发货口 商商 3.托收 9.付款 5.提示 6.付款/ 7.交付 委托单据承兑单据 国 4.寄单中 外代国 托 8.通知承兑收银 收 /付款行行 汇出国外汇款电汇和信汇业务流程返回 进口商/汇款人 1提出申请 中国银行 2发出汇款指示 (SWIFT、电传或信函) 解付行(收款人账户行、中国银行 的代理行或联行) 3汇款解付 出口商/收款人

工程竣工结算审核基本流程

工程竣工结算审核工作基本流程 一、收集与结算相关竣工资料 一般来说,对一个清单计价工程需收集以下资料 1.招标文件、答疑纪要、中标人投标文件,包括投标函、商务标书(含单价分析表)技术表述 2.施工合同及补充协议,标后调整经审批的施工组织设计、施工图(含电子版)、图纸会审记录 3.竣工图(含电子版)、材料核价表、设计变更单、技术核定单、隐蔽记录、验 槽记录、停工报告、监理工程师指令、其他工程签证、索赔单、现场会议纪要或报告、施工方报审的竣工结算编制书、施工方工程量计算书(如为电算提供软件计算电子文件) 4.地勘报告(对挖土的土质类别存在争议的时候有作用)、监理合同(含经济签证 授权内容)、监理报告、专业分包工程分包单位的竣工报告及资料、桩基检测报告中有关桩长的应变检测参考数据、施工单位施工记录、原始票据、现场照片或摄像。 5.其他可以收集的有用资料、咨询单位自身长期积累的计价文件和规定 二、详细阅读、分析和对比竣工结算资料 第一:确定本工程的结算方式,主要看合同约定结算条款(合同约定结算条款非常重要,是决定该项目工作方式的重要依据),如果结算条款约定不清晰的,需要甲乙双方签订补充合同或在结算会议纪要中明确。 第二:判断竣工结算资料的有效性。比如,竣工图必须要由建设单位或经授权的监理单位有权人员签字确认,并加盖施工图章。设计变更单必须是设计单位编制,且有设计人员签名和设计单位印章,并且该项变更经建设单位同意,经监理单位确认发出。隐蔽记录、变更材料核价表、请单外单价审批等工程签证要有建设单位或经授权的监理单位有权人员确认。即,每一类工程字资料必须要有相应的负责人员确认才能生效。 第三:判断竣工结算资料的准确性。比如,竣工图应该如实反映工程实际情况,竣工图的绘制应该根据施工图、设计变更单、技术核定单、隐蔽记录等工程签证汇总绘制。施工方在编制竣工图时有可能有意或无意的扩大工程量,因送审结算是依据施工图编制的,如果将上述有关资料与竣工图做对比,就可能发现差异并轻松做核减。 再如,将隐蔽记录中基础土石比签证与验槽记录、地勘报告有关土石性质及所处深度的数据作对比,也可能发现差异并做核减。 三、勘查现场,掌握工程实际情况。 深入现场可以将竣工资料与现场可以看到的工程做核实,可抽查丈量,与建设、施工、监理方共同举行现场的审前工作会议,向工程实施阶段的各方了解情况,将疑问向各方当面求证,如发现竣工资料不实或不完整,就有可能从定性角度发现审增减点。 四、全面核算工程量、审查结算单价、审查材料单价、审查索赔事项及金额、核算措施费等其他税费。 1.在工程量计算时,要选择适当的方法:如结构部分可以采用广联达计 算,装饰工程可以用科瑞计算。 2.施工单位在投标报价清单中的漏项,其价值包含在其他项目费用中,

国际结算业务流程图精品

【关键字】情况、提出、工程、方式 国际结算业务流程图 进口信用证开立业务流程 出口议付信用证业务流程 出口托收业务流程 进口代收业务流程 汇出国外汇款:A-电汇和信汇业务流程 B-票汇业务流程 国外汇入汇款:A-电汇和信汇业务流程 B-票汇业务流程 保函业务流程 保理业务流程 进口押汇业务流程 打包放款业务流程 出口押汇业务流程 出口贴现业务流程 福费延业务流程 提货担保业务流程 进口信用证开立业务流程返回 1.买卖合同 出进 口口 商 5..发货商 9.付款6.交单 4.通知L/C 10.付款11.放单2.申请开证 出口 3.开立信用证中国 方银银行 行 7.寄单索汇︵ ︵开 通 8.承兑/付款证 知行 出口议付信用证业务流程返回 偿付行 9.付 8.索 款汇 4.审证并通知 中国银行(通 5.交单出口商 知行/议付行)入账或结汇 3.开 6.寄 证单 1.签订合同 2.申请开证

开证行 7.提示单据进口商 出口托收业务流程返回 出 3 托收委托书托中 口 9 付款收国 商行银 行 1. 2. 4. 8. 买发托通 卖货收知 合指承 同示兑/付款 进 5.提示付款/承兑代 口 6.付款/承兑收 商 7.交付单据行 进口代收业务流程返回 国 1买卖合同国 外内 出进 口 2 发货口 商商 3.托收 9.付款 5.提示 6.付款/ 7.交付 委托单据承兑单据 国 4.寄单中 外代国 托 8.通知承兑收银 收 /付款行行 汇出国外汇款电汇和信汇业务流程返回 进口商/汇款人 1提出申请 中国银行 2发出汇款指示 (SWIFT、电传或信函) 解付行(收款人账户行、中国银行 的代理行或联行) 3汇款解付 出口商/收款人 汇出国外汇款票汇业务流程返回 进口商/汇款人 1.提出申请 2.开出汇票 (特指票汇) 中国银行 3 交

国际结算习题

际结算习题国际结算习题 第一章绪论 一、填空 1、国际结算是处于两个国家的当事人通过(银行)办理的(货币)收支业务。 2、国际结算的方式,基本有三大类:汇款方式、(托收)方式、(信用证)方式。 3、国际结算包括(国际贸易结算)和(国际非贸易结算)两大部分内容。 二、选择题 1、现代国际结算的中心是( D )。 A. 票据 B.买卖双方 C.买方 D.银行 2、以下由( B )带来的结算被归入国际非贸易结算中。 A.国际运输、成套设备输出、国际旅游 B.国际金融服务、侨民的汇款、国际旅游 C.侨民的汇款、国际商品贸易、国际技术贸易 D.有形贸易、无形贸易、国际文化交流 3、最初的国际贸易是用黄金白银为主作为支付货币的,但黄金白银作为现金用于国际结算,存在着明显的缺陷是( D )。 A.清点上的困难B.运送现金中的高风险C.运送货币费用较高D.以上三项4、甲国向乙国提供援助款100万美元,由此引起的国际结算是( D )。 A.国际贸易结算B.非贸易结算C.有形贸易结算D.无形贸易结算 5、国际贸易结算是指由( C )带来的结算。 A.一切国际交易 B.服务贸易 C.有形贸易 D.票据交易 6、下列哪些事项引起的国际结算是非贸易结算(ABD )。 A.我国某著名运动员向悉尼奥运会捐赠10000美元 B.甲国无偿援助乙国美元500000美元 C.非洲某国向美国购买药品若干 D.中国银行上海分行和纽约花旗银行轧清上年往来业务

第二章国际贸易结算票据概述 一、填空 1、汇票的收款人即抬头有三种表示方法,分别是(来人)、(指示性)、(限制性)。其中不能转让的为(限制性)抬头的汇票,无须持票人背书转让的为(来人)抬头的汇票。 2、汇票债务人承担汇票付款的责任次序在承兑前是(1)(出票人)、(2)(第一背书人)、(3)(第二背书人);承兑后是(1)(承兑人)、(2)(出票人)、(3)(第一背书人)。 3、汇票的提示分为两种,分别是(提示承兑)、(提示付款)。 4、支票划线的作用在于(防止支票被冒领票款)。 5、出票人撤销其开出的支票,称(止付),支票因出票人在存款行没有足够的存款以支付票据金额而未得付款,称(拒付)。 6、世界上两大票据法体系,一是(英美)法系,二是(大陆)法系。 7、汇票的(出票)行为是基本汇票行为。 8、出票行为(不)使付款人承担付款义务,付款人只有经(承兑)以后才负付款责任。 9、背书种类以背书目的为标准,可分为(可转让背书)和(非转让背书)。 10、如汇票金额为About Five Thousand Dollars,则此汇票为(无)效汇票。 11、本票与汇票的当事人(不)同,承诺的(不)不同,出票人(不)同,主债务人(不)同,远期(汇)票需承兑,而远期(本)票不需承兑, (本)票只能开一张,(汇)票可开一套。 12、汇票在进入流通前的基本当事人有(出票人)、(付款人)、(收款人)。 二、判断题 1、票据具有流通性,所以凡是票据都可以流通转让,无论其抬头如何表示法。(×) 2、一张汇票出票后付款人总是主债务人。(×) 3、未记载付款日期的汇票为废票。(×) 4、汇票出票以后汇票上的付款人必须承担起付款的责任。(×) 5、承兑是各种票据都有的一种票据行为。(×) 6、参加承兑与承兑没什么异处。(×) 7、参加承兑人是汇票的第一付款人。(×) 8、支票有即期和远期之分。(×) 9、票据的产生是有原因的,而票据的成立是没有原因的。(√)

庞红国际结算课后题答案

第一章国际结算导论 一、 1、支付工具划账冲抵 2、票据单据银行 3、协定贸易结算 4、货物单据化所有权 二、 1错 2错 3对 4错 5错 6对 三、 1A 2C 3A 4C 第二章国际结算中的票据 一、 1、拒付退票 2、2007年4月3日 3、商业本票银行本票 4、银行汇票商业汇票 5、光票跟单汇票 6、非票据义务人义务被保证人 二、 1错 2错 3错 4对 5错 6错 三、 1B 2B 3D 第三章汇款 一、 1、(1)remitter (2)payee (3)remitting bank (4)paying bank 2、(1)outward remittances (2)inward remittances 3、(1)T/T (2)M/T (3)D/D 4、(1)chips (2)fed wire (3)bank’s internal payment by book entries 5、(1)mail advice (2)payment order 6、(1)bank’s cheque (2)bank’s promissory note 7、draft on center 8、(1)goods sold (2)selling on consignment 9、略 二、 1对 2对 3错 4对 5错 6错 三、 1D 2B 3A 4A 5C 6A 第四章托收 一、 1、(1)acceptance (2)payment 2、(1)bills of exchange (2)invoices

3、(1)clean (2)documentary (3)direct 4、(1)principal (2)remitting bank (3)collecting presenting (4)drawee 5、(1)collection instruction (2)URC522 6、(1)blank (2)special 7、(1)address (2)presentation (3)address 8、(1)payment D/P (2)acceptance D/A (3)tenor draft (4)paid at sight acceptance (5)signed trust receipt (6)promissory notes (7)letter of undertaking 9、(1)collection bills purchase (2)advance against collection (3)accommodation bills for discount (4)trust receipt 10、略 二、1对 2错 3错 4对 5对 6对 7对 8错 9错 10错 第五章信用证 一、 1、有条件 2、代理行 3、背对背信用证 4、信用证的有效期内 5、符合信用证条款规定的单据 6、开证行 7、受益人提交的单据 8、进口商/申请人 9、第一性的 10、偿付行 二、BCACB DBBCB ADAAA DB 三、错对错对对错错对对错 四、(单选)CBCCD ACCDB 五、 1、分析:BANK1的拒付理由成立。因为此份信用证规定的有效期到期地点是在法国的开证行,而不是通知行中国银行江苏分行。在本案中,中国银行江苏分行仅仅是寄单行,甲公司将单据在有效期内交给寄单行并不能满足信用证的要求,对于这种境外到期的信用证,甲公司应该在至少一个邮程(至少5天)前将单据交给寄单行中国银行江苏分行,这样,单据才能在有效期前到达开证行柜台。 2、分析:从理论上说,由于信用证支付方式是银行信用,开征银行承担第一性的付款责任,信用证项下的付款是一种单据买卖,因而,只要受益人提交的单据符合信用证的规定,开证行就应履行付款义务,本案中,尽管我方出运前获悉开证申请人已经倒闭,但因有开证行第一性的付款保证,所以,如果我方根据信用证的规定装运出口,及时制作一整套结汇单据在信用证的有效期内提交相关银行是可以获得支付保证的,但是,从实务的角度来看,信用证尽管是开证行承担第一性的付款责任,但信用证项下的款项最终是来自进口商的支付,在进口商已经倒闭的情况下,开证行势必百般挑剔,即使出口商有绝对把握单据质量无从挑剔,遇到开证行无理挑单,在货物已经出运,可能面临高额滞港费用及其他费用的情况下,进行一项跨国诉讼也是一项吃力的事情,因此出口商在着这种情况下必须

国际结算业务流程图

国际结算业务流程图 信用证 (3) 进口信用证开立业务流程 (3) 产品简介 (4) 产品特点 (4) 业务流程 (4) 出口议付信用证业务流程 (5) 产品简介 (6) 产品特点 (6) 业务流程 (6) 托收/代收 (6) 出口托收业务流程 (7) -----出口跟单托收 (7) 产品简介 (7) 产品特点 (8) 业务流程 (8) -----出口光票托收 (9) 产品简介 (9) 产品特点 (9) 业务流程 (9) 进口代收业务流程 (10) 产品简介 (10) 产品特点 (10) 业务流程 (11) 汇款 (11) 汇出国外汇款电汇和信汇业务流程 (11) 汇出国外汇款票汇业务流程 (12) 产品简介 (12)

产品特点 (13) 业务流程 (13) 国外汇入汇款电汇和信汇业务流程 (13) 国外汇入汇款票汇业务流程 (14) 产品简介 (15) 产品分类及特点 (15) 业务流程 (16) 保函 (16) 保函业务流程 (16) 产品简介 (17) 产品特点 (18) 业务流程 (18) 保理 (19) 保理业务流程 (19) 进口押汇业务流程 (20) 打包放款业务流程 (20) 出口押汇业务流程 (21) 出口贴现业务流程 (21) 福费延业务流程 (22) 提货担保业务流程 (22)

信用证 进口信用证开立业务流程 1. 9.L/C 10.付款11.放单2.申请开证 /付款

产品简介 是我行(开证行)根据开证申请人的要求、向受益人开立的、有一定金额的、在一定期限内凭规定的单据付款的书面保证。信用证根据不同标准,可分为议付、即期付款、迟期付款和承兑信用证;即期与远期信用证;特殊种类信用证包括:假远期信用证、可转让信用证、背对背信用证、循环信用证、对开信用证。 产品特点 (1)信用证是一项不依附于贸易合同的独立文件。 (2)信用证强调单单一致、单证相符,与实际货物情况无关。 (3)在单证相符的前提下,开证行承担第一性的付款责任。 (4)信用证以银行信用替代商业信用,为贸易双方顺利完成交易提供信心和保障,便于各方融通资金。 业务流程 (1)客户填写我行《开立不可撤销信用证申请书》并加盖公章(我行网站https://www.doczj.com/doc/8d37799.html,可下载开证申请书和修改申请书的电子版本)。同时客户须向我行提交以下资料:进口合同、备案表(如需)、进口批文(如需)、代理协议(如需)、交纳保证金。 (2)我行与客户签订《开立信用证合同》(已与我行签订《综合授信额度合同》的客户无需签订《开立信用证合同》)。支行在我行信贷系统登记,打印岀帐通知书。

银行信贷审批业务的基本流程及关注点

银行信贷审批业务的基本流程及关注点国有银行一般分为总行、省分行、市分行、支行四个层级。股份制银行和城市商业银行因规模所限,不完全按行政区域设置,一般分总行、分行、支行三个层级。每笔信贷业务,都是从基层支行开始做起,然后再对应市分行和省分行的某个主管部门。 具体步骤: 1、建立合作关系。支行与客户之间建立联系,达成业务合作意愿。 【关注点】对借款额度要有准确表述,切忌“越多越好”之类的说法,因为这样既不符合企业的经营实际,也容易使人产生企业资金周转不畅、有可能形成资金断链等错觉。接触中,可以透露对银行提供存款支持等有利事项。 2、支行贷前调查。支行行长或主管行长、信贷业务部门经理、客户经理,一起到企业实地调查,并听取企业领导的经营情况介绍。介绍中,要结合实际,说明当前业务发展态势良好,国家政策、经济环境对本公司的影响不大,或自己如何克服了政策和环境的负面影响。银行还会通过网络进行调查,看企业及企业领导、股东,是否有负面信息,人民银行的征信是否正常,通过法院、工商、土地、房管等部门查询是否涉诉,房地产状态是否真实等。企业应关注此间的网络信息,提前做好准备。万一有负面信息,应提前删除。 最好邀请银行调查人员到生产车间、存储场地,边看边说,银行人员会随机提些问题,企业回答起来比较方便,双方都好接受。企业汇报结束前,一定要把企业的发展规划、发展前景描述清楚,让银行感觉到企业的发展前景向好。 有的行领导不一定和信贷部门一起参加贷前调查,但会单独到企业考察,除非与企业领导非常熟悉,对企业非常了解。

如果调查过关,客户经理会给一张《企业需要准备的资料清单》,或者约定发送企业邮箱。 【关注点】企业规模大小,经营是否正常;工作环境是否整洁,工作秩序是否良好,规章制度是否健全,企业发展前景如何等。主要是感观性、表面化的。如果有荣誉证书、牌匾、专利、政界领导人调研图片,以及企业自身的企业文化建设方面的资料等,应该一并提供。 3、支行上报分行。支行根据贷前调查情况,如果同意合作,会安排客户经理,并撰写报告,向市分行做专题汇报。一般市分行会有贷前沟通会,听取各支行的项目汇报,当场决定是否上会、继续跟进、深入调查、放弃合作。 为了提高成功率,企业应提示支行行长或主管行长在沟通会前,通过适当方式向市分行主管领导和主管部门(公司业务部、机构业务部、国际业务部、中小企业部、房地产金融业务部、风险管理部等)负责人进行汇报沟通,争取支持。 【关注点】密切与支行行长的关系,争取支行行长亲自向上级汇报和协调。上级行非常重视支行一把手的意见。企业应向支行表达愿意一起向上级领导汇报的意愿,争取与市分行有关部门领导和客户经理的直接接触,这样更有利于市分行了解企业。 4、市分行贷前调查。市分行沟通会通过后,由风险部、业务部(公司、机构、中小、房金、国际)组成联合小组,对企业进行贷前调查和评估。一般会有一个风险部的副职牵头。调查内容与支行基本相同。但会更关注一些财务指标,及细节性、实质性问题。比如:库存、现金、应收账款、银行流水等情况。一般小银行对财务账查看的更加仔细,要做到基本一致。万一出现数据与事实不一致情况,要有能够自圆其说的合理解释。

工程竣工结算管理办法及工作流程

工程竣工结算管理办法 (讨论稿) 一、目的 为了加强公司工程建设的管理水平,规范公司工程竣工结算的管理,根据国电集团公司有关工程管理制度,结合蒙能公司工程管理和造价管理的实际情况,通过合理确定工程造价及有效控制工程造价而提高工程竣工结算工作的效益,特制定本办法。 二、范围 本管理办法适用于蒙能公司所属项目公司 三、项目公司计划部是工程竣工结算的组织管理部门。 四、工程竣工结算工作应遵循的原则 1、廉洁奉公原则:工程竣工结算工作中,应始终以公司利益为最高利益,遵守法律法规,恪守职业道德。 2、多级审核原则:工程竣工结算须经过多级审核,各级在审核过程中应认真仔细,有关手续的签字、盖章等务必齐全、有效。 3、准确高效原则:工程竣工结算的各项计算应准确、清晰、合规,具有很高的准确度,体现出较高的专业水平;同时工程竣工结算工作应保持较高的工作效率,做到及时帐清,以适应工程造价分析、工期等多方面的要求。 4、可复查性原则:工程竣工结算工作的全过程应有详细、真实的记录及完善的资料管理制度,量价计算过程、审批记录

等文件、资料应具备完全的可复查性。 五、工程竣工结算书包含内容 工程竣工结算书是由施工方在工程按合同约定条件顺利完成,并通过竣工验收后,编制的工程实际造价文件。工程竣工结算书必须包含合同内造价及变更、签证等内容,并附带所有证明资料。凡是项目公司对外签订施工合同的工程项目,均应编制工程结算报告,并作为重要资料存档。 六、工程竣工结算应具备以下条件 1、工程已按施工承包合同及补充条款确定的工作内容全部竣工,并有合格的竣工质量验收报告及工程质量评定报告。 2、工程已正式移交运营单位并签订保修合同。 3、具备完整的竣工图、图纸会审纪要、工程变更、现场签证以及工程验收资料,且竣工材料已按照档案管理要求完整的移交项目公司档案室。 4、工程量差、重大设计变更、委托洽商〈含审定的价款〉审批材料齐全 七、工程竣工结算的原则 1、工程竣工结算应严格执行合同及补充条款和招投标文件的规定,对于固定价格的价款,结算时一律不得调整。 2、工程量差、设计变更、变更设计及委托洽商等,按照施工承包合同的有关规定执行。 (1)由于设计深度不够等原因,招标文件与施工图阶段造成的工程量差,并需要对其费用进行调整的,原则上按已审

(完整版)国际结算重点完整版

国际结算重点完整版 第一章 1.国际结算:指国际间由于政治、经济、文化、外交、军事等方面的交往或联系而发生的以货币表示的债权债务的清偿行为或资金转移行为。 2.国际结算研究内容 a国际结算工具:票据(汇票、本票、支票) b国际结算方式:汇款/托收/信用证银行保函/保付代理/包买票据 c国际结算的单据:发票/保险单/运输单据 d以银行为中心的支付体系: SWIFT:环球银行金融电讯协会 CHIPS:美国清算所同业支付系统 CHAPS:英国交换银行自动收付系统 3.国际结算特点:按照国际惯例进行国际结算;使用可兑换货币进行结算;实行“推定交货”原则;商业银行成为结算和融资的中心 4.国际结算的历史演变:从现金结算发展到票据结算从凭实物结算发展到凭单据结算从买卖双方直接结算发展到通过银行结算,实现了非现金结算 国际结算制度的历史演变:自由的多边国际结算制度管制的双边国际结算制 度多元混合型的结算制度 5.六种常见贸易术语 装运港交货的三种贸易术语 FOB 装运港船上交货 CFR 成本加运费 CIF 成本加保险费、运费 适用于多式联运的三种贸易术语 FCA 货交承运人 CPT 运费付至 CIP 运费、保险费付至 6.环球银行金融电讯协会(SWIFT)它的筹建是伴随着欧洲经济与政治一体化而进行的。SWIFT有如下优点:直接、准确、快速、安全;标准统一,制度严格;严密的、合理的机构设置,采用现代化电脑设备与网络;多样化、大众化的服务 7. 为什么要建立代理行关系?—从商业银行的交易中介职能说起 国际交往密切:任何交往背后都有资金的流动 国际贸易大发展:贸易走到哪里,结算就跟到哪里 不可能在世界任何地方都设立分支机构:政治约束、经济成本约束 业务受到限制:法律约束 代理行关系的建立 资信调查 签订代理协议并互换控制文件 确认控制文件:密押/印鉴样本/费率表 第二章 1.票据:由出票人签发的,约定由自己或者委托他人,于见票时或者确定的日期,向收款人或者持票人无条件支付一定金额,可以流通转让的一种有价证券。 2.票据特征:设权性、无因性、要式性、流通性

工程竣工结算审核流程

工程竣工结算审核流程 工程竣工结算审查是竣工结算阶段的一项重要工作,经审查核实的工程竣工结算是核定建设工程造价的依据,也是建设项目验收后编制竣工决算和核定新增固定资产价值的依据。因此,招标采购部联合财务部共同拟定如下工程竣工结算的审核流程,借此达到严格、合理控制工程造价的要求。 一、单项工程竣工后,施工单位应在提交竣工验收报告的同时向我公司递交竣 工结算报告及完整的结算资料。 招标项目竣工结算资料: 1)工程结算书;2)招标文件、中标通知书;3)施工合同(协议书);4)经批准的施工组织设计;5)开工报告、隐蔽工程验收记录、竣工验收报告;6)竣工图纸、图纸会审记录、设计变更资料、施工现场签证单和有关会议纪要;7)投标报价书或预算书;8)工程量计算书;9)甲供材料用量明细表;10)监理单位的监理过程记录材料;11)其他要求提交的资料。 非招标项目竣工结算资料: 1)工程结算书;2)施工合同(协议书);3)开工报告、隐蔽工程验收记录、竣工验收报告;4)变更资料、施工现场签证单和竣工图纸;5)甲供材料用量明细表(如有);6)其他要求提交的资料。 二、监理单位和工程管理部对竣工资料的真实性、完整性、有效性进行审查, 并签署审查意见。 三、招标采购部对工程竣工结算进行审核。 1.核对合同条款。首先,核对竣工工程内容是否符合合同重要条件要求,工程 是否竣工验收合格,只有按合同要求完成全部工程并验收合格才能列入竣工结算。其次,应按合同约定的结算方法、计价定额、取费标准、主材价格及

优惠条款等,对工程竣工结算进行审核,若发现合同开口或有漏洞,与施工单位认真核对,明确结算要求。 2.检查隐蔽验收记录。所有隐蔽工程均需进行验收,两人以上签证;实行工程 监理的项目应经监理工程师签证确认。审核竣工结算时应该对隐蔽工程施工记录和验收签证,手续完整,工程量与竣工图一致方可列入结算。 3.落实设计变更签证。设计修改变更应由原设计单位出具设计变更通知单和修 改图纸,设计、校审人员签字并加盖公章,并经工程管理部和监理工程师审查同意、签证; 4.按图核实工程数量。竣工结算的工程量应依据竣工图、设计变更和现场签证 等进行核算,并按国家统一规定的工程量计算规则计算工程量。 5.认真核实分项工程结算单价。分项工程结算单价应严格按合同约定的计价原 则和计价方法确定,不得违背。 6.核实各项费用的计取。建筑、安装工程的取费标准应符合合同要求或项目建 设期间与计价定额配套使用的建安工程费用定额及有关规定执行,先审核各项费率、价格指数或换算系数是否正确,价差调整计算是否符合要求,再核实特殊费用的计费程序。 7.防止各种计算误差。工程竣工结算子目多、篇幅大,应认真核算,防止因计 算误差多计或少算。 四、与施工单位核对完成后,移交工程造价咨询单位审核。 五、财务部对工程进行决算审计。

竣工工程结算管理规定及流程

竣工工程结算管理规定

竣工工程结算管理规定 一、目的和依据 (一)目的: 1.及时掌握全公司已竣工工程项目结算状态 2.了解掌握重点工程项目结算状态 3.加强对重大工程项目结算工作的监督和指导 (二)依据 1.中国化学工程股份公司有关工程结算和清理的相关文件 2.台塑经验:管理制度化、制度表格化、表格电子化。 3.公司经营工作的特点:工程产品不一致,地域广、产值和项目逐年增加、工程结算人员紧张。 二、定义 (一)竣工工程 竣工工程是指完成合同中工作范围内的全部工作内容,且工程质量达到了合同规定的标准,并满足下列条件之一的,视为竣工工程。 1.工程完成一个月,交工资料已交给发包方(如发包方不安排接收资料,视为资料合格)。 2.业主事实上已接收了工程项目,即业主已进行下一道工序,如使用、联动试车、试生产、生产等。 3.与发包方或业主办理了工程竣工移交证书(中间交接)。 4.发包方或业主签发了《工程竣工验收证明书》。 (二)竣工工程结算 竣工工程结算的概念应理解为:工程项目竣工后,在一定的时间内完成对发包方(对外结算,也叫收入结算)和分包方(内部结算,也叫支出结算)的结算。其结算结果能够使财务部门对工程项目进行全面(最终的)核算。 三、竣工工程结算工作程序

工程结算工作流程图

四、竣工工程结算管理规定 (一)工程项目竣工后,各单位、项目部应在两周内要认真研究和填写《竣工工程结算计划表》(见附件 1 ),并报公司经营部。具体要求如下: 1.工程竣工后,三天之内由工程项目所在的单位负责人或项目经理组织,与工程项目结算相关的经营、财务、施工、技术、质量、安全、生活后勤等部门人员参加,召开工程项目结算准备会议。会议的主要内容是:第一,认真再复习一次合同,梳理一下该工程项目的整个进行过程。第二,布置与工程项目结算有关的“素材”收集、完善、整理工作。第三,布置工程项目的成本预测工作。第四,明确结算工作的组织形式、分工、职责。此次会议,做为工程项目结算工作的首次会议,要有会议纪要。 2.在工程项目竣工后,两周内由工程项目所在的单位负责人或项目经理组织,召开工程项目结算研讨会。会议的主要内容是:第一,分析工程项目的成本组成情况,并预测工程项目的总成本。第二,分析工程项目结算“素材”,确定工程项目的结算目标值(预计结算值)、理想结算值。第三,确定结算资料的编制方式与方法,结合预计成本的情况,基本明确各专业、子项的结算资料值。第四,制定工程项目结算工作的工作计划。第五,制定工程项目结算工作的步骤、方法。会议要形成会议记要,同时填写《竣工工程结算计划表》(见附件1),于工程竣工后的十五天内报公司经营部。 3.公司经营部收到其《竣工工程结算计划表》(见附件1)后,对照合同,登记、审查、存档。并依据工程项目的特点(如:产值、回收资金情况、外欠款数额,业主企业性),将其进行初步归类。并转呈相关领导和部门(财务部、工程部等)。 4.对重大的工程项目,由经营部组织公司相关部门、并请公司相关领导参加,对该工程项目的结算计划进行专题审查。并将审查和指导意见及时传达到结算单位。 (二)工程项目竣工后,三个月内仍然未能完成工程结算的,工程项目所属单位应在满三个月后的一周内编制《竣工工程结算状态

银行贷款基本流程图

银行贷款基本流程 银行的贷款流程是比较复杂的,许多企业、特别是中小企业由于对银行贷款业务流程不熟悉,对银行要求提交的材料不清楚,降低了融资效率,甚至导致融资失败。下面我就银行贷款的一般流程加以介绍,并对每个环节中容易出错的地方加以说明,希望对中小企业融资有所帮助。 一、企业办理银行贷款一般流程: 二、企业在银行开立账户 1、确定开户网点: 1)就近、便利原则。 企业需要经常到银行柜面去办理业务,所以企业开户的银行中最好有一家是交通方便的;目前大部分银行都提供在线、银行等离行服务,选择电子银行技术发达的银行也很有必要。这样会减少企业财务人员的大量业务办理时间,而且也减少路途风险。 注意: 不是你看到的最近的银行网点就可以开户。小型商业银行所有机构都可以办理一般的对公账户开户,大型国有银行的储蓄所是不办理对公业务的,还有一些特殊账户是支行办理不了的,需要到分行营业部才可办理,所以开户时需要事先咨询银行。 2)服务良好原则。 虽然银行的服务标准原则上是统一的,但不同银行、同一银行的不同机构的服务质量也可能是不一致的。要考虑银行业务办理效率,有些银行客户多、业务多、窗口少,办理业务需要排很长时间队;不同银行的业务特长不一,对中小企业重视程度不一;这些都需要事先考察一下。 注意:有些银行个人业务很强,但对公业务不一定强,有些银行大客户很多、对中小企业重视程度可能就不够,所以如果你的企业处在业务快速成长期,对银行的服务要 求较高、考虑融资的话就需要花一些时间寻找银行。很容易试,去上门了解一下银行对公业务,看银行工作人员的能力和服务效率就知道了。 3)贷款统一原则。 银行贷款是属地管理。贷款主体和开户主体必须是一家法人单位,贷款行和开户行必须是一家分支机构。

相关主题
文本预览
相关文档 最新文档