一、工程概况

由XX公路工程有限公司承建的地铁3号线XX段建设地点位于市XX区繁华地段。该车站与XX路斜交,沿XX道东西走向。本工程包括的主要内容:XX路站及站后停车场全长309m、XX路站~XX道站盾构区间长706.04双线米。车站主体采用现浇钢筋混凝土箱型结构形式。

二、绿色施工管理

1、组织管理

1.1、项目部在组建之初便建立了健全的绿色施工管理体系,以项目经理为第一责任人,明确了绿色施工管理人员和施工人员。

(1)组长XX为绿色施工第一责任人,负责绿色施工的组织实施及目标实现,并指定绿色施工管理人员和监督人员。保证本项目绿色施工措施、资金投入的实施工作。

(2)XX为绿色施工实施责任人,负责项目部绿色施工计划、目标的宣传发动和组织落实工作。

(3)XX负责施工现场的自查工作,每月检查不得少于两次,对存在的问题及时进行整改。

(4)XX负责施工组织,及各种方案的制定和落实工作。

(5)XX负责物资材料供应计划和协调工作。

(6)绿色施工管理体系

1.2、根据国家及市有关要求制定了相应的绿色施工管理制度与目标,明确了各施工工序绿色施工的岗位职责,责任人签字确认。

1.3、按制度对责任人进行考核,考核记录真实完整,对考核不符合标准的将安排专门的培训,直至考核通过。

2、规划管理

本工程对环境保护、节材、节水、节能、节地与施工用地保护等各方面制定了详细的措施。绿色施工各项措施配有量化指标,指标根据管理目标确定。每一量化指标均设最低警戒值,对量化值相对低的环节采取相应的整改措施,直至符合相关要求为止。

3、实施管理

3.1、绿色施工在实施过程控制中保证记录内容详细完整,对于施工用电和生活用电实施计量管理,按月采集数据,计量管理实施有详细的记录。

3.2、根据施工进度提前做好材料计划,合理安排材料的采购、进场时间和批次,减少库存,材料堆放整齐,一次到位,减少二次搬

运。对施工机具及耗材、耗能情况每周进行统计。

3.3、加大绿色施工的宣传力度,营造绿色施工氛围。定期对项目部全体管理人员及民工组织绿色施工专项培训,提高职工绿色施工意识。

3.4、对参建员工进行四节一环保(节能、节地、节水、节材和环境保护)的教育培训,增强员工绿色施工意识,并制定四节一环保工作计划。

4、评价管理

4.1、由分公司相关人员成立绿色施工评估组,定期对项目进行评估,对工作及管理不到位的部分提出改进意见,将评估情况及改进意见留有记录。

4.2、评估自绿色施工方案制定开始,贯穿施工全过程,在项目竣工后进行综合评估,并建立专门的绿色施工档案。

5、人员安全和健康管理

5.1、制定施工防尘、防毒、防辐射等职业危害的措施,并编制意外伤害应急预案,现场配有应急的药品及物品。

5.2、现场建立了健全的卫生急救、保健防疫制度,在现场设医疗救护室。

5.3、现场设专门的保洁员,每天两次清扫施工现场,保证施工人员工作与生活的环境卫生。

6、扬尘控制

6.1、现场实行围挡全封闭,围挡的建设严格按照地铁公司的统一规定执行,采用砖围墙,外铺铝扣板。围挡大门采用封闭门扇,每

扇门宽3m,严禁敞口施工。

6.2、在建筑物四周设置全封闭密目防尘网,密目网保证整洁、美观、无破损。

6.3、在西端头井现场出口设冲车平台,做到水资源的循环利用。

6.4、在运输易散落、飞扬、流漏物料的车辆时采取措施封闭严密,保证车辆清洁。

6.5、本工程地处市中心闹市区,在施工场地内大门出入口设置长度不少于30m的混凝土路面,裸露地面采用绿化或苫盖方式防尘。

6.6施工现场安排专人采用洒水、覆盖等扬尘控制措施,做到土方作业阶段目测扬尘高度小于 1.5m,不扩散到场区外;结构施工、安装装饰装修阶段,作业区目测扬尘高度小于0.5m。

6.7、砂、石等散体材料堆放须砌筑50cm实体围墙,工程土、砂石料等易引起扬尘粉尘源须苫盖。

6.8、本工程采用商品混凝土,在施工现场杜绝自拌混凝土。

6.9、在施工过程中产生的废土应集中堆放,工程渣土及时清运。施工备用渣土存放高度不得超过围挡高度(2.5m),并采取洒水、苫盖等措施。

6.10、对建筑垃圾进行分类,并收集到现场封闭式垃圾站,集中运出。

7、噪声控制

7.1、本施工现场强噪声的设备设置在远离居民区的一侧,并采取降低噪声的措施。

7.2、在施工过程中严格遵守限时施工规定,控制噪声排放不超

过国家标准《建筑施工场界噪声限值》的规定。

7.3、对因生产工艺要求或其他特殊需要,在夜间进行超过噪声标准施工的,按规定办理夜间施工证。

7.4、运输材料的车辆进入施工现场,严禁鸣笛,装卸材料应做到轻拿轻放。

8、光污染控制

8.1夜间室外照明灯加设灯罩,透光方向集中在施工范围。

8.2电焊作业采取遮挡措施,避免电焊弧光外泄。

9、水污染控制

9.1、施工现场污水排放应达到天津市地方标准《污水综合排放标准》的要求。

9.2、在施工现场针对不同的污水,设置相应的处理措施。未经处理的废水不得直接排入市政污水管网或河流。

9.3、对于化学品等有害材料、油料的储存地,应有严格的隔水层设计,做好渗漏液收集和处理。

9.4、施工现场按要求设置排水沟及沉淀池,确保现场排水通畅。

10、土壤保护

10.1、沉淀池、泥浆池、化粪池等安排专人定期清理保证不发生堵塞、渗漏、溢出现象。

10.2、有毒有害废弃物由专人负责处理,不能作为建筑垃圾外运。

三、节材与材料资源利用

1、材料存放及使用

1.1、根据施工进度、库存情况等合理安排材料的采购、进场时

间和批次,减少库存。避免因积存材料过多造成施工用地或库存空间紧张现象。

1.2、材料运输工具适宜,装卸方法得当,防止损坏和遗撒。

1.3、优化下料方案,加强施工过程动态控制,合理用料,减少废料产生。

2、周转材料

2.1、现场办公和生活用房采用符合标准的装配式岩棉防火活动板房。

2.2、现场围挡最大限度地利用现有围墙。

2.3、在本工程主体结构施工时梁体浇筑采用竹胶板,柱子浇筑采用定型钢模板。

四、节水与水资源利用

1、循环用水装置

1.1、现场机具、设备、车辆冲洗用水必须设立循环用水装置。本工程车辆循环用水装置见下图:

1.2、施工现场喷洒路面采用储水池中的水源。

2、节水系统与节水器具

2.1、施工现场办公区、生活区的生活用水采用节水系统和节水器具,提高节水器具配置比率。

2.2、加强管理,及时修换损坏的器具,杜绝跑、冒、滴、漏和长流水等浪费现象。

3、用水管理

3.1、施工现场分别对生活用水与工程用水确定用水定额指标,并分别计量管理,计量管理有记录。

3.2、本工程属大型工程,对不同单项工程、不同分包生活区分别计量用水量。在签订不同分包或劳务合同时,将节水定额指标纳入合同条款,进行计量考核。

4、非传统水源的搜集利用

4.1、现场设有雨水收集系统,将雨水排入沉淀池中。

4.2、混凝土养护用水采用符合要求的中水;处于基坑降水阶段的工地,优先采用符合要求的地下水作为养护用水、冲洗用水和部分

生活用水。

4.3、现场机具、设备、车辆冲洗、喷洒路面、绿化浇灌等用水,采用非传统水源,尽量不使用市政自来水。力争施工中非传统水源和循环水的再利用量大于30%。

五、节能与能源利用

1、施工设备机具

1.1、建立施工机械设备管理制度,建立设备用水、用油统计表,完善设备档案。

1.2、及时做好维修保养工作,使机械设备保持低耗、高效的状态。

1.3、合理安排工序,提高各种机械的使用率和满载率,降低各种设备的单位耗能。

1.4、优先选用高效节能、高科技含量的施工机具,严禁使用淘汰的耗能机具。

2、可再生能源利用

生活区洗浴室安装使用太阳能再生能源,量化评价的节材指标。

3、节约用电

1.1、临时用电优先选用节能型灯具,临电线路合理设计、布置、临电设备采用自动控制装置。采用声控、光控等节能照明灯具。照明设计以满足最低照度为原则,照度不应超过最低照度的20%。

1.2、合理配置采暖、空调、风扇数量,规定使用时间,实行分段分时使用,节约用电。

1.3、施工现场分别设定生产、生活、办公和施工设备的用电控

制指标,定期进行计量、核算、对比分析,并有预防与纠正措施。

六、节能与施工用电保护

1、临时用地指标

1.1、临时设施占地面积按用地指标所需的最低面积计算。

1.2、现场平面布置合理、紧凑,废弃地和死角少,临时设施占地面积有效利用率大于90%。

2、临时用地保护

1.1、优化深基坑施工方案,减少土方开挖和回填量,保护周边自然生态环境。

1.2、完工后及时恢复原地形、地貌,减少施工活动对周边环境的影响。

1.3、利用和保护施工用地范围内原有绿色植被。对于施工周期较长的现场,按建筑永久绿化的要求,安排场地新建绿化。

(完整版)地铁施工绿色施工方案

目录 2一、编制目的............................................................................................. 2二、编制依据............................................................................................. 2三、工程概况............................................................................................. 3四、管理机构............................................................................................. 3 五、绿色施工原则..................................................................................... 六、绿色施工目标及目标责任分解 (4) (一)绿色施工目标 (4) (二)绿色施工目标责任分解 (4) 七、绿色施工因素辨识分析 (5) 八、绿色施工措施................................................................................... 19 28九、应急措施...........................................................................................

地铁明挖区间测量方案设计

实用标准文档 目录 一、工程概况 (1) 二、编制依据 (1) 三、测量组织体系和仪器配备 (2) 四、AA南站枢纽工程施工测量 (3) 五、竣工测量 (11) 六、测量安全及管理 (13)

一、工程概况 1、工程简述 本区间采用明挖法施工,基坑总长226m,左线基坑宽6.2m,右线基坑宽5.9m,基坑开挖面去地下一层开发结构基础褥垫层底标高,开挖深度约6m~9m。基坑采用排桩+内支撑的支护形式,基坑安全等级:二级。 二、编制依据 1)AA市市政工程设计研究院交桩资料; 2)依据北京城建设计院有限公司出图资料; 3)业主提供的设计施工图纸; 4)《城市轨道交通工程测量规范》GB50308-2008; 5)《工程测量规范》GB50026-2007; 6)《建筑变形测量规范》JGJ8-2007; 7)《新建铁路工程测量规范》TB10101-99; 8)《城市测量规范》CJJ8-2009; 9)《地铁限界标准》CJJ96-2003; 10)《地下铁道工程施工及验收规范》GB50299-1999; 11)《全球定位系统(GPS)测量规范》GB/T18314-2001;

三、测量组织体系和仪器配备 为确保地铁建筑物空间位置及几何尺寸的准确性,将误差控制在规定范围之内,保证施工测量的精度。本项目将派具有地下工程测量经验的专业测量工程师和经专业培训持测绘证的测量人员组成测量部。建立内部二级复核制度。C 段明挖区间分包设测量组。专业分包测量组由项目经理部测量组统一管理。根据工程项目施工进度需要统一将测量人员逐次报审监理单位,并建立本标段测量人员和测量仪器配备台账实施动态监管。 本标段测量监控体系组织见下图: 3.1测量监控部组成人员 姓 名 职称 职 务 工作年备注 AAA 中级 测量部负责人 15 项目 项目经理部 项目总工程师 测量部 C 段明挖区间测量组

青岛地铁施工方案

青岛地铁测量施工方案 目录 第一章.工程概况 第二章.测量作业任务和内容 第三章.作业依据 第四章.施工测量技术方案 第五章.测量人员组织 第六章.使用仪器设备 第七章.测量精度质量保证措施

第一章、工程概况 本标段主要工程内容有清江路站、清江路站~双山站区间,1站1区间。清江路站位于清江路与哈尔滨路交汇附近,是3号线的中间站,车站主体位于哈尔滨路下方,车站为地下二层10米岛式暗挖车站,地下一层为站厅层,站厅由中部的公共区及两端的设备管理用房两部分组成;地下二层为站台层,由设备管理用房区、乘车区及轨道区三部分组成。车站中心里程为K12+395.000,车站规模189.00×20.158m。车站共设3处出入口、2处风亭、1处无障碍出入口、1处消防专用出入口。 区间起讫里程K12+516.350~K13+480.500,区间长964.15米,区间隧道采用矿山法施工,断面形式为马蹄形,复合衬砌暗挖结构,区间沿哈尔滨路转入黑龙江路,穿福州路莱钢立交桥,地面为商业、商务办公、居住和商住用地,沿黑龙江路进入双山站。该区间地面覆土9.3m~22.6m,区间线间距13m~18m。区间在K12+899.765处设施工竖井(兼做活塞风道和联络通道)一座,向清江路站和双山站两个方向左右线四个工作面同时施工;在轨面高程最低处设置排水泵房及横通道,在靠近双山站附近右线设停车线一处,停车线为单洞双线马蹄形断面,长228.435米,其他断面为单洞单线隧道,在靠近清江路站附近设置人防门。

第二章、测量作业任务和内容 测量工作是土建工程的重要组成部分,为工程施工提供准确的定位信息、在本次工程项目中,测量作业的任务主要分为三部分:1∶地面控制测量;2∶地面、地下竖井联系测量;3∶施工放样测量。其主内容: ①地面测量控制网的检测; ②施工平面控制网的加密测量; ③施工高程控制网的加密测量; ④地面至隧道的联系测量,包括竖井定向测量、高程传递测量; ⑤地下施工控制测量、施工放样测量; ⑥隧道贯通测量; ⑦竣工测量(包含线路中线测量、隧道静空断面测量)。 第三章、测量作业依据 1、《城市轨道交通工程测量规范》GB50308-2008 2﹑《工程测量规范》GB 50026-2007

地铁车站主体结构施工方案

目录 一、编制原则 (5) 二、编制依据及编制围 (5) 2.1编制依据 (5) 2.2编制围 (6) 三、工程概况 (6) 3.1建筑概况 (6) 3.2周边环境 (7) 3.3结构概况 (7) 3.4主要工程数量表 (8) 3.5车站设计标准 (9) 3.6车站平面及剖面图 (9) 3.7主要材料及混凝土保护层 (9) 3.7.1 主要材料 (9) 3.7.2 保护层厚度 (10) 四、施工管理组织机构与职责 (10) 4.1工程项目管理组织机构 (10) 4.2岗位职责 (11) 4.2.1 项目领导班子岗位职责 (11) 4.2.2 职能部门岗位职责 (14) 五、施工总体部署 (17) 5.1施工准备 (17) 5.2施工管理目标 (18) 5.2.1 工程质量目标 (18) 5.2.2 工期目标 (18) 5.2.3 安全生产目标 (19) 5.2.4 文明施工与环境保护目标 (19) 5.3机械设备与劳动力投入计划 (19) 5.3.1管理人员配置 (19) 5.3.2作业人员配置 (19) 5.3.3机械设备投入计划 (20) 5.3.4材料使用计划 (20) 5.4施工测量 (21) 5.4.1 平面控制测量 (22)

5.4.2高程控制测量 (22) 5.5主体结构施工单元划分 (22) 5.5.1 施工单元划分原则 (22) 5.5.2车站施工段划分 (23) 5.6主体结构施工工艺流程图 (23) 5.7主体结构施工顺序 (24) 5.7.1 车站纵向分段施工顺序 (25) 5.7.2 车站竖向分层施工 (25) 六、施工现场平面布置与管理 (27) 6.1一期施工 (27) 6.1.1 施工围 (27) 6.1.2 场地平面布置及管理 (27) 6.2三期施工 (28) 6.2.1 施工围 (28) 6.2.2 场地平面布置及管理 (28) 6.3三期施工 (29) 七、分项工程施工工艺 (29) 7.1钢筋工程 (29) 7.1.1技术准备 (29) 7.1.2钢筋的进场验收 (30) 7.1.3钢筋加工 (30) 7.1.4钢筋接头 (33) 7.1.5钢筋的锚固 (36) 7.1.6钢筋安装 (37) 7.1.7钢筋绑扎质量通病控制措施 (43) 7.1.8钢筋安装质量检查控制标准 (44) 7.2模板工程 (45) 7.2.1 模板设计的主要原则 (45) 7.2.2 模板方案 (45) 7.2.3 施工技术准备 (46) 7.2.4 模板支撑与安装 (46) 7.2.5 模板工程质量检验标准 (48) 7.3混凝土工程 (49) 7.3.1底板垫层 (49) 7.3.2 底板砼施工 (50) 7.3.3 侧墙混凝土施工 (50) 7.3.4 板梁混凝土的浇筑 (51)

最新地铁车站施工测量方案

地铁车站施工测量方 案

目录 一、工程概况 0 二、测量依据 (1) 三、编制目的 (1) 1.施工测量组织 (2) 2、施工测量流程 (2) 3.施工测量要求 (3) 4.平面控制测量 (3) 5.高程控制测量 (3) 6.接口的测量 (4) 7.施工放线测量 (4) 四、测量仪器设备清单 (5) 五、测量人员组织结构 (5) 六、测量方法 (6) 七、测量计划 (8) 八、测量质量保证措施 (8) 一、工程概况 A.***路车站

车站结构形式为地下四层内框架箱型结构岛式车站。车站长度为135.6m,车站主体标准段宽度20.9m,车站有效站台中心线里程为YDK26+002.00,有效车站中心线底板底埋深为 26.960m,该处结构高度为24.560m,覆土厚度2.40m。 车站共设置4个出入口和两组风亭,分别设置于站位中心的四个象限,满足出入车站、疏散及过街功能。其中Ⅰ、Ⅱ号出入口设置于站位西南角和东南角,十四街坊西光小区和十四街坊黄河厂小区前,需拆除临街三栋三层住宅和一栋两层住宅。Ⅲ号出入口和2号风亭设置于站位东北角,花卉市场范围内,需拆除一栋一层住宅。Ⅳ号出入口和1号风亭设置于站位西北角,中国兵器集团西安北方光电有限公司临街绿地内。 B.***车站 车站结构形式为地下二层单柱双跨箱形框架结构岛式车站。车站长度为202m,车站主体标准段宽度18.7m,车站有效站台中心线里程为YCK27+662.00,有效车站中心线底板底埋深为16.430m,该处结构高度为13.060m,覆土厚度3.37m。 车站共设置4个出入口和两组风亭,其中Ⅰ号出入口预留,Ⅱ、Ⅲ、Ⅳ号出入口独立出地面,分别设置于其它三个象限内,将进出站客流合理分流,使乘客进出站做到均衡、流畅、便捷,避免相互交叉。设备管理区设1个直通地面紧急疏散口与Ⅳ号出入口设置于站位西北角,出地面部分合设。1号风亭和Ⅰ号预留出入口设置于站位西南角,西蓝长乐坡加油加气站站位侧地块内,并与加油加汽站保持20米以上的距离。2号风亭与Ⅱ号出入口设置于站位东南角,2号风亭结合荣德棕榈湾小区物业,风亭接入棕榈湾1号楼地下室,并从一、二层裙房出风,机械风亭不接入,与裙房外轮廓线保持5米距离,同时与Ⅱ号出入口也保持一定距离,机械风亭进入道路红线内避免扰民,Ⅱ号出入口及2号风亭与荣德棕榈湾小区之间间距均大于5米。Ⅲ号出入口设置于站位东北角。 二、测量依据

地铁施工方案及人员配置

地铁机电安装施工专业施工队劳动力的配置根据施工进度计划优化配置人力、机械、材料、技术等生产要素,并根据施工阶段性要求,保证各生产要素及时进退场,实现施工资源的动态管理,特别是劳动力的动态管理。 为了保证该工程高速、优质地完成,我们将选择具有丰富施工经验的工人,按专业组成专业施工队伍,以充分发挥其专业特长,共组建5个施工队进行该工程的安装,即:通风空调施工队、管道施工队、电气施工队、防腐保温施工队、调试施工队,各系统设备安装纳入相应专业施工队。 各施工队骨干力量保持稳定,一般技术工人以公司为强大后盾,随工程需要实行动态管理,即保证工程高峰期用人需要,又不至于造成现场窝工,从而提高工作效率。 1.施工机械设备一览表 根据总体进度计划的安排,结合各专业工程特点和实际情况,由各专业工程师编制施工机具设备需用计划,在既满足整体施工需要,又保证机械设备利用率的前提下,编制汇总施工机械设备总需用计划。我们将按该计划进行配置,并做好各专业之间的协调工作。 机电安装主要施工机械设备表

2.通风空调系统安装工程 车站通风空调系统由公共区空调系统和设备、管理用房空调系统,区间隧道

通风系统设在车站的事故风道内。 设备及管理用房空调系统(车站小系统)根据地铁设备管理用房的工艺要求和运营管理要求设置通风和防排烟系统,正常运行时为设备正常工作提供必需的运行环境和为运营人员提供舒适的工作环境,事故状态时迅速组织排除烟气。2.1风管主要施工方法及技术要求 1)风管施工主要程序 2)施工准备 (1)人员进场后,组织主要施工技术人员熟悉图纸,解决建筑、结构和电气、暖卫施工图中的管路走向、坐标、标高与通风管道之间跨越交叉出现的问题。 (2)组织施工人员学习有关规范和规程,对施工人员进行技术交底,对风管的制作尺寸,采用的技术标准、咬口及风管的连接方法进行明确。 (3)按照总图对预制加工场地进行布置,根据风管制作的工序合理布置风管加工设备。 (4)风管预制场垫置橡胶板,以减少风管在下料、拼接等过程中的划痕。4)风管及部件的制作 本工程空调风管采用镀锌钢板和玻璃钢风管两种。分别就两种风管的制作方法按工序进行叙述。 (1)镀锌钢板风管的制作 ①风管制作的主要工序:

地铁车站主体结构施工方案

广州市轨道交通十二号线及同步实施工程总承包项目(第八项目部)槎头车辆段工程 槎头车辆段B区盖体结构工程 施工方案 编制单位:(盖单位章) 年月日

目录 目录 (1) 一、编制依据 (3) 二、工程概况 (4) 三、施工总体筹划 (4) 四、施工方案及技术措施 (5) 4.1测量方案 (6) 4.2钢筋工程 (8) 4.3 混凝土工程 (11) 4.4模板工程 (12) 五、质量保证措施 (13) 5.1钢筋质量保措施 (13) 5.2混凝土质量保措施 (15) 5.3质量针对性措施 (16) 六、安全、文明施工保证措施 (18)

一、编制依据 (1)广州市轨道交通十二号线主体结构设计图纸; (2)施工组织设计; (3)中华人民共和国《工程建设标准强制性条文》(城市建设部分)(2000年版) (4)广州市《工程建设地方标准强制性条文》(2000年版) (5)《建筑工程施工质量验收统一标准》(GB50300-2001) (6)市政地下工程施工质量验收规范(DGTJ08-236-2006) (7)广州地基基础设计规范(DBJ08-11-99) (8)《地下工程防水质量验收规范》(GB50208-2002) (9)《地下工程防水技术规范》(GB50108-2001) (10)《钢筋焊接及验收规程》(JGJ18-2003) (11)《钢筋机械接头施工验收规范》 JGJ107-2003 (12)《混凝土结构工程施工质量验收规范》(GB50204-2004) (13)《建筑变形测量规程》(JGJ8-2007) (14)《施工现场安全生产保证体系》(DBJ08-903-2003) (15)《建筑施工安全检查标准》(JGJ59-99) (16)《建筑机械使用安全技术规程》(JGJ33-2001) (17)《施工现场临时用电安全技术规范》(JGJ46-2005) (18)《电气装置安装工程接地装置施工及验收标准》(GB50169-2006)

地铁站主体施工方案

目录 1.编制依据 ·············································································································1 2.编制原则 ·············································································································1 3.工程概况 ·············································································································13.1.设计概况·········································································································1 3.1.1设计概况································································································1 3.1.2结构材料································································································2 3.1.3钢筋保护层·····························································································2 3.1.4结构防水································································································23.2.工程地质与水文地质··························································································2 3.2.1 工程地质 ·······························································································2 3.2.2 水文地质 ·······························································································3 4.资源配置 ·············································································································34.1.劳动力配置······································································································3 4.2.机械设备配置···································································································4 5.主要施工方法及技术措施 ························································································45.1.混凝土垫层施工································································································45.2.钢筋混凝土结构施工··························································································6 5.2.1钢筋工程································································································6 5.2.2模板及支撑系统····················································································11 5.2.3混凝土工程··························································································14 5.2.4预留孔洞及预埋件的施工········································································17 5.2.5楼梯、电梯井、站台板及轨顶风道施工 ·····················································175.3.杂散电流防护钢筋··························································································185.4.结构防水施工 ·····························································································18 5.4.1结构自防水·······················································································18 5.4.2缝的防水 ··························································································18 5.4.3底板防水 ··························································································20 5.4.4 降水井封堵防水···················································································21 5.5.钢支撑拆除···································································································21 6.质量保证措施 ····································································································226.1.质量目标······································································································226.2.质量保证体系································································································226.3.质量保证措施 ·····························································································22 6.3.1技术复核、隐蔽工程验收········································································22 6.3.2 施工阶段“砼浇筑令”制度····································································23 6.3.3技术、质量控制措施··············································································23 7.安全保证措施 ····································································································247.1.安全生产目标 ·····························································································247.2.安全管理制度 ·····························································································24 7.3安全技术措施 ······························································································24 8.文明施工、职业健康安全及环境保护措施································································278.1.文明施工····································································································27

地铁建设工程安全文明及绿色施工方案

地铁建设工程 安全文明及绿色施工方案

目录 第一部分安全施工方案 (6) 一、工程项目安全体系 (6) 1、安全目标 (6) 2、安全机构 (6) 3、施工安全保证体系 (8) 二、工程项目安全管理职责 (11) 1、项目经理的安全职责 (11) 2、项目副经理的安全职责 (12) 3、项目总工程师的安全职责 (14) 4、安全工程师(安全员)(专职) (14) 5、生产班组长的安全职责 (15) 6、主要工种作业人员的安全职责 (16) 三、制度 (21) 1、安全责任制度 (21) 2、安全教育制度 (24) 3、安全检查制度 (26) 4、安全生产技术措施编制和交底 (27)

5、事故处理制度 (30) 四、施工安全防护、技术措施 (31) 1、基坑支护 (31) 2、工程降水 (32) 3、土方开挖工程 (33) 4、模板工程 (35) 5、起重吊装工程 (37) 6、脚手架工程 (41) 五、施工现场起重机及施工机具 (43) 1、一般规定 (43) 2、进场报验 (44) 3、安装拆卸、安装技术要求 (45) 4、作业安全技术要求 (47) 5、施工现场施工机具安全管理要求 (50) 六、用电 (54) 1、配电室 (54) 2、施工用电线路 (55) 3、配电箱 (56)

4、施工照明 (58) 5、施工机具用电要求 (59) 第二部分文明施工方案 (61) 第一节文明施工管理体系 (61) 一、文明施工管理目标 (61) 二、文明施工管理机构及职责 (61) 第二节文明施工管理方案 (62) 第三节现场管理措施 (63) 一、开展创建文明工地活动 (63) 二、加强施工宣传教育 (63) 三、注重场容场貌建设 (64) 第四节施工技术管理措施 (65) 一、做到两个“同步”实行三个“结合” (65) 二、完善作业程序管理 (65) 三、做好工地卫生保洁 (66) 四、防止扰民和劳动保护 (67) 第五节监督检查措施 (68) 第三部分绿色环保施工方案 (68)

地铁站施工测量方案设计

一、工程概况 水贝站位于省市布心路上,南侧为罗湖工业区,北侧为中华自行车、天众塑胶,周边建筑物密集,交通繁忙人流、车辆密度大。 本站位于布心路北侧地下,顺布心路东西走向布置,车站中心里程为YDK12+542.500;车站起点桩号YDK12+428.241,终点桩号K12+620.300全长192.059m,标准断段宽17.3m,总建筑面积9189.026㎡,车站主体结构采用两层两跨现浇混凝土结构,采用明挖顺筑法施工。基坑开挖深度约17.5m,车站共设2个通道3个出入口,分别设置于布心路。 二、测量施工方案编制依据 1、《市轨道交通二期3号线工程》招投标文件 2、《城市测量规》CJJ 8-99 3、《工程测量规》GB 50026-93 4、《建筑变形测量规程》JGJ/T8-97 5、《地下铁道、轻轨交通工程测量规》GB 50308-1999 三、施工部署 1、总体施工流程 1)车站主体围护结构施工 根据图纸结合现场条件,先行施工明挖车站的围护结构,在围护结构护坡桩、桩顶连接冠梁全部连续的前提下,进行第一步土方开挖、桩间锚喷及基坑钢支撑施工;第二道钢支撑预加应力后,分层开挖至基坑底;再进行主体结构施工。 2)车站主体明挖施工流程 车站围护结构→接地网施工→地基处理→站台层垫层→站台层底板、0.5米侧墙→拆第四道支撑→拆第三道钢支撑→站台层结构→站台层顶板→拆第二道钢支撑→地下二层结构→地下二层顶板→地下一层结构→顶板→拆第一道钢支撑→结构回填 2、测量组织机构的设置 项目经理部下设测量队,隶属于项目经理部技术质量部。主任工程师一名,技术员

两名,一名测量主管,二名测量工。所有测量人员持证上岗。(如下表) 四、控制测量 1、平面控制测量 1)平面加密控制导线点的布设 利用甲方委托单位所交付的水贝站的3个四等精密导线网点D3015、D3016、D3017A 以及加密导线网SD1、SD2作为车站的首级控制。利用SD1、SD2为起边,在车站周边布设CZD1、CZD2、CZD3三点附和到D3016、D3015。导线点布置见【水贝站平面控制示意

地铁施工方案

第一章工程概况 1.工程概况 1.1 工程简介 哈尔滨地铁1 号线一、二期工程东起哈东站,南到哈南站,全长 17.48 公里,设18座车站,分别为哈尔滨东站站、桦树街站、交通学院站、太平桥站、工程大学站、烟厂站、医大一院站、博物馆站、铁路局站、哈工大站、西大桥站、和兴路站、学府路站、理工大学站、医大二院站、哈达站、哈尔滨南站站。本次投标为哈尔滨地铁一号线第十标段工程大学站。 1.2 工程质量标准 工程质量国家优良等级,并须遵守国家有关建筑安装和装饰工程施工和验收规范,以及其他有关规定。符合设计施工图纸和规范要求。1.3 工程工期 (1)计划工程工期:119 日历天 (2)计划开工日期:2013年2月1日 (3)计划竣工日期:2013年5月30日 1.4 施工范围 1.4.1 本规范适用于哈尔滨地铁1号线一、二期工程车站(除博物馆站)出入口外露雨棚、风亭及消防出入口、残疾人电梯装饰装修工程施工及管理。 1.4.2 工程在施工中使用的原材料、半成品或成品,隐蔽工程以及施工原始资料和记录,均应按本规范要求进行一系列的控制与检查,使工程质

量符合规定的质量标准。在每一章节的各项目中均对施工要求、质量检验 内容和方法等提出了要求。如有未写明之处,应按照国家、建设部和黑龙江省现行有关规范规定且经监理工程师批准后执行。 1.4.3 本标段工程投标人实施永久性工程, 为避免对附近不属于地铁公司的既有建筑物、构筑物等产生影响,应征得该建筑物、构筑物等招标人的同意。 1.4.4 本标段工程实施过程中如涉及到哈尔滨市相关政府主管部门和其它企业、团体,本标段投标人应就其建议的施工方法,征求他们的咨询意见,并在自己的计划中为此留出时间。 1.4.5 投标人应在本合同实施过程中对场地管理负全责,并不得干扰周围居民的正常生活,因场地管理不善引发的一切纠纷由投标人自行解决,招标人不承担责任。 1.4.6 投标人在合同期满一个月内或招标人规定的时间内,应无条件清退所有施工场地。如不及时清退,招标人除向投标人收取租金(租金为人民币10元/M2/天)外,招标人将暂停计价支付、工程结算等工作,本合同投标人应承担由此产生的一切后果,比如造成招标人被第三方索赔的事宜。 1.5 工程承诺 1.5.1 工程总体承诺我们完全响应招标文件关于本工程有关的质量标准、施工工期的要求,完全响应招标文件关于文明施工、环境保护和安全生产的 要 求,全力实现工程质量好、工期短、配合佳和业主满意、用户满意、社会满

地铁主体和附属工程施工方案

目录 第一章总说明 (1) 第二章工程概况 (2) 一、工程概况 (2) 第三章施工总体方案及施工组织安排 (6) 一、车站主体及附属附属结构施工方案概述 (6) 三、车站主体及附属结构施工工艺流程 (7) 四、车站主体及附属结构进度安排 (8) 五、施工设备与劳动力安排 (9) 六、施工组织管理 (10) 第五章结构工程施工方法 (15) 一、单段施工步序 (15) 二、接地网施工 (18) 三、垫层施工方法 (19) 四、底板施工方法 (20) 五、侧墙、端墙施工方法 (20) 六、结构立柱施工方法 (21) 七、楼(顶)板、梁施工方法 (22) 八、抗浮压顶梁 (22) 九、内部结构施工 (23) 第六章结构工程施工技术措施 (24) 一、模板工程施工 (24) 二、预埋件及预留孔施工技术措施 (33)

三、钢筋工程施工技术措施 (34) 四、混凝土施工技术措施 (38) 五、车站结构抗浮措施 (44) 六、车站结构测量措施 (44) 七、顶板回填及路面恢复 (45) 第七章结构工程施工质量保证措施 (47) 一、施工控制 (47) 二、裂缝控制 (49) 三、防渗漏保证措施 (50) 四、对预埋件、预留孔洞的保证措施 (51) 五、结构模板与支架施工质量措施 (52) 六、结构混凝土的质量保证措施 (53) 第八章结构工程施工工期保证措施 (55) 第九章结构工程施工安全保证措施 (58) 一、施工现场规范要求 (58) 二、进入基坑要求 (58) 三、高处作业安全措施 (59) 四、支架和支架工程安全措施 (59) 五、满堂支架搭设安全措施 (60) 六、支架和支架拆除安全措施 (60) 七、模板工程安全措施 (61) 八、加强监控量测,确保安全 (62)

地铁车站施工测量方案

目录 一、工程概况 (1) 二、测量依据 (1) 三、编制目的 (2) 1.施工测量组织 (2) 2、施工测量流程 (2) 3.施工测量要求 (3) 4.平面控制测量 (3) 5.高程控制测量 (4) 6.接口的测量 (4) 7.施工放线测量 (4) 四、测量仪器设备清单 (5) 五、测量人员组织结构 (6) 六、测量方法 (6) 七、测量计划 (8) 八、测量质量保证措施 (8)

一、工程概况 A.***路车站 车站结构形式为地下四层内框架箱型结构岛式车站。车站长度为135.6m,车站主体标准段宽度20.9m,车站有效站台中心线里程为YDK26+002.00,有效车站中心线底板底埋深为26.960m,该处结构高度为24.560m,覆土厚度2.40m。 车站共设置4个出入口和两组风亭,分别设置于站位中心的四个象限,满足出入车站、疏散及过街功能。其中Ⅰ、Ⅱ号出入口设置于站位西南角和东南角,十四街坊西光小区和十四街坊黄河厂小区前,需拆除临街三栋三层住宅和一栋两层住宅。Ⅲ号出入口和2号风亭设置于站位东北角,花卉市场范围内,需拆除一栋一层住宅。Ⅳ号出入口和1号风亭设置于站位西北角,中国兵器集团西安北方光电有限公司临街绿地内。 B.***车站 车站结构形式为地下二层单柱双跨箱形框架结构岛式车站。车站长度为202m,车站主体标准段宽度18.7m,车站有效站台中心线里程为YCK27+662.00,有效车站中心线底板底埋深为16.430m,该处结构高度为13.060m,覆土厚度3.37m。 车站共设置4个出入口和两组风亭,其中Ⅰ号出入口预留,Ⅱ、Ⅲ、Ⅳ号出入口独立出地面,分别设置于其它三个象限内,将进出站客流合理分流,使乘客进出站做到均衡、流畅、便捷,避免相互交叉。设备管理区设1个直通地面紧急疏散口与Ⅳ号出入口设置于站位西北角,出地面部分合设。1号风亭和Ⅰ号预留出入口设置于站位西南角,西蓝长乐坡加油加气站站位侧地块内,并与加油加汽站保持20米以上的距离。2号风亭与Ⅱ号出入口设置于站位东南角,2号风亭结合荣德棕榈湾小区物业,风亭接入棕榈湾1号楼地下室,并从一、二层裙房出风,机械风亭不接入,与裙房外轮廓线保持5米距离,同时与Ⅱ号出入口也保持一定距离,机械风亭进入道路红线内避免扰民,Ⅱ号出入口及2号风亭与荣德棕榈湾小区之间间距均大于5米。Ⅲ号出入口设置于站位东北角。 二、测量依据 1.设计文件GPS点、导线点及水准点; 2.《地下铁道、轻轨交通工程测量规范》GB50308—2008; 3.《城市测量规范》CJJ8—99; 4.《工程测量规范》GB50026—2007;

地铁车站主体结构施工方案培训资料(doc 58页)

地铁车站主体结构施工方案培训资料(doc 58页)

目录 1 编制依据 0 2 工程概况 (1) 2.1工程概况 (1) 2.2地质概况 (1) 2.3车站结构设计概况 (2) 3 施工准备 (4) 3.1施工场地准备 (4) 3.2技术准备 (5) 3.3施工组织 (5) 3.4物资设备计划 (9) 3.5物资材料吊装 (13) 4 工期计划 (14) 4.1施工进度管理 (14) 4.2施工进度计划 (14) 4.3工期保证措施 (14) 5 总体施工方案 (17) 5.1施工方案概述 (17) 5.2施工顺序安排 (18) 5.3车站主体结构施工工艺流程 (19) 6 结构工程施工方法 (20)

6.1单段施工步序 (20) 6.2接地网施工 (23) 6.3垫层施工方法 (24) 6.4底板施工方法 (25) 6.5侧墙施工方法 (26) 6.6结构立柱施工方法 (27) 6.7顶板、梁施工方法 (28) 6.8盾构洞门环的安装方法 (29) 6.9内部结构施工 (29) 7 结构工程施工技术措施 (30) 7.1模板工程施工 (30) 7.2预埋件及预留孔洞施工技术措施 (32) 7.3钢筋工程施工技术措施 (32) 7.4砼施工技术措施 (34) 7.5车站结构测量措施 (37) 7.6顶板回填及路面恢复 (38) 8质量保证措施 (39) 8.1质量保证体系 (39) 8.2检测试验方法及措施 (41) 8.3施工控制措施 (44) 9安全保证措施 (52) 9.1安全监管机构 (52)

9.2安全保证体系 (53) 9.4具体安全措施 (55) 10环境保护措施 (58) 10.1建立环境保护体系 (58) 10.2主要环境影响的控制保证措施 (59) 11施工应急预案 (61) 11.1应急原则 (61) 11.2应急组织及职责 (61) 11.3应急处理程序 (62) 11.4常见事故的预防及应对措施 (64)

绿色施工方案-案例

资源节约型、环境友好型社会,通过采用先进的技术措施和管理最程度地节约资源,提高能源利用率,建设施工活动对环境造成的不利影响,规范绿色施工管理。 本工程是由陕西华东金城投资发展有限公司秉承国际化的建筑理念投资建设。总建筑面积287886平方米。依托得天独厚的双地铁交通优势,建成后将成为西安城东商业圈的核心,利用室内天梯、天庭、天街以及足够数量的电梯、扶梯等,构建出无比优越的购物环境,将成为世界级商业综合体。本工程由地下室、裙房和1、2、3#主楼三部分组成,地下四层,地上二十三~二十七层,建筑物高度99.6米,其中裙房地下四层,地上六层,局部影院七层;1#和3#主楼地上二十三层,建筑高度98.1米;2#主楼地上二十七层,建筑高度99.6米。地上建筑面积196600平方米,地下96154平方米,建筑基地面积 25000平方米。 总体概况表

一、编制依据 1.《绿色建筑技术导则》 2.《陕西省建筑节能条例》 3. 《绿色施工管理规程》 4.《全国建筑业绿色施工示范工程管理办法》 5. 《绿色施工导则》(建质【2007】223号); 6.《建设工程安全管理条例》(国务院第393号令); 7.《中华人民共和国环境保护法》; 8. 《陕西省建筑业绿色施工工程管理办法(试行)》; 9.《公共建筑节能设计标准》; 10.《民用建筑热工设计规范》; 11.施工招标文件及合同; 12.施工设计图及图纸答疑纪要; 二、绿色施工管理目标

三、绿色施工准备 (一) 绿色认证管理组织机构图 (二)绿色施工人员管理组织结构

(三)职责: 1、施工现场分包单位服从总承包单位的绿色施工管理,并对所承包工程的 绿色施工负责。 2、施工单位建立以项目经理为第一责任人的绿色施工管理体系,制定绿色 施工管理责任制度,定期开展自检、考核和评比工作。 3、项目部在施工组织设计中编制绿色施工技术措施或专项施工方案,确保 绿色施工费用的有效使用。 4、项目部组织绿色施工教育培训,增强施工人员绿色施工意识。 5、项目部定期对施工现场绿色施工实施情况进行检查,做好检查记录。 6、在施工现场的办公区和生活区设置明显的有节水、节能、节约材料等具

地铁施工测量技术方案

第15章施工测量 施工测量是标定和检查施工中线方向、测设坡度和放样建筑物,测量是施工的导向,是确保工程质量的前提和基础。地铁工程施工测量的施测环境和条件复杂,要求的施测精度又相当高,必须精心施测和进行成果整理,工程测量成果必须符合相关规范的要求。 15.1 施工测量技术要求 1、施工测量按招标文件和施工图纸、《城市测量规范》CJJ8、《地下铁道、轻轨交通工程测量规范》GB50308及《工程测量规范》GB50026的有关规定执行。 2、对甲方提供的控制点进行检测,符合精度要求后再进行工程的施工测量。 3、对整个工程场区按施工需要布设精密导线平面控制网(如采用原有控制网作为场区控制网时,要先复核检查,符合精度要求后方能取用)。 4、场区内按施工需要布设高程控制网,并应采用城市二等水准测量的技术要求施测,其路线高程闭合差应在±8L mm(L为线路长度,以km计)之内。 5、北京地铁工程隧道开挖的贯通中误差规定为:横向±50mm、竖向±25mm,极限误差为中误差的2倍,即纵向贯通误差限差为L/5000(L为贯通距离, 以km计)。 北京地铁工程平面与高程贯通误差分配表15-1 15.2 施工测量特点 1、车站包括主体结构、出入口、换乘通道和风道。采用明、暗挖相结合的施工方法,施工工艺复杂,工序转换快,地下施测条件差,测量工作量大。 2、地面导线控制网和高程控制网由地面传递到地下,必须保证精度,且要布设形成检测条件并经常复测控制点。 3、对于车站主体结构,净宽尺寸在建筑限界之外,还应考虑如下的加宽量:50mm综合施工误差+H/150钻孔灌注桩施工误差及水平位移。 4、车站钢管柱的位置,其测设允许误差为±3mm。钢管柱安装过程应检测其垂直度,安装