当前位置:文档之家› Determination of fault operation dynamical constraints for the design of wind turbine DFIG drives

Determination of fault operation dynamical constraints for the design of wind turbine DFIG drives

Determination of fault operation dynamical constraints for the design of wind turbine DFIG drives
Determination of fault operation dynamical constraints for the design of wind turbine DFIG drives

Static compensator for maintaining voltage stability of wind farm integration to a distribution network Original Research Article

Renewable Energy

control of a grid-connected DFIG-based wind turbine with series grid-side converter during network unbalance Original Research Article

Electric Power Systems Research

The increasing penetration of variable speed wind turbines in the electricity grid will result in a reduction of the number of connected conventional power plants. This will lead to a reduction of inertia in the grid, as the rotational speed of a variable speed turbine and the grid are decoupled by a power electronic converter. A lower system inertia will result in larger and faster frequency deviations after occurrence of abrupt variations in generation and load.

It is possible to implement an additional control loop in the power electronic converter of the turbine, which connects the turbine inertia directly to the grid. It is even possible, by control, to make a ‘virtual inertia’ that is larger than the real inertia. During a frequency drop additional power can be released to the grid with this control. This behaviour will be called inertial response. The additional power is obtained from the kinetic energy that is stored in the rotating mass of the turbine.

In this contribution two different control strategies are investigated and compared with each other. A type of control that is equal to the primary frequency control of large power plants shows the best results, both with respect to the power that is needed to limit the frequency drop and with respect to electrical and mechanical stress of the turbine.

Article Outline

1. Introduction

2. Wind turbine inertia

3. Controller implementation

3.1. Wind turbine control

3.2. Inertial response control implementations

4. Simulation setup

4.1. Introduction

4.2. Synchronous machine model

4.3. Wind and mechanical models

4.4. Modelling and control of electrical subsystem

5. Case study description

6. Results and discussion

7. Conclusion

Acknowledgements

References

Status, plans and technologies for offshore wind turbines in Europe and North America Original Research Article

Renewable Energy

Power converters play a vital role in the integration of wind power into the electrical grid. Variable-speed wind turbine generator systems have a considerable interest of application for grid connection at constant frequency. In this paper, comprehensive simulation studies are carried out with three power converter topologies: matrix, two-level and multilevel. A fractional-order control strategy is studied for the

variable-speed operation of wind turbine generator systems. The studies are in order to compare power converter topologies and control strategies. The studies reveal that the multilevel converter and the proposed fractional-order control strategy enable an improvement in the power quality, in comparison with the other power converters using a classical integer-order control strategy.

Article Outline

Nomenclature

1. Introduction

2. Modeling

2.1. Wind turbine

2.2. Mechanical drive train

2.3. Generator

2.4. Matrix converter

2.5. Two-level converter

2.6. Multilevel converter

2.7. Electric grid

3. Control strategy

3.1. Fractional-order controller

3.2. Converters control

4. Harmonic assessment

5. Simulation results

5.1. Case study 1 — ideal sinusoidal voltage waveforms on the network

5.2. Case study 2 – non-ideal sinusoidal voltage waveforms on the network

6. Conclusions

References

Comparative study of power converter topologies and control strategies for the harmonic performance of variable-speed wind turbine generator systems Original Research Article

Energy

With increasing wind power penetration, transient responses of doubly-fed-induction-generator (DFIG) based wind turbines gain attentive focus. Accurate prediction of transient performance of DFIG under grid faults is required with increasing wind power penetration. Taking into account the main flux saturation and deep-bar effect, this paper concentrates on transient responses and stability of the DFIG system under symmetrical grid faults. Their roles played in the enhancement of system transient stability are clarified. The analyses proposed contribute greatly to proper selection, design and coordination of protection devices and control strategies as well as stability studies.

Article Outline

Nomenclature

1. Introduction

2. DFIG system modeling

2.1. Generator model

2.2. Back-to-back converter model

3. Control schemes

4. Main flux saturation

5. Deep-bar effect

6. Conclusion

Acknowledgements

Appendix A

References

Design of a wind turbine pitch angle controller for power system stabilisation Original Research Article

Renewable Energy

The design of a PID pitch angle controller for a fixed speed active-stall wind turbine, using the root locus method is described in this paper. The purpose of this controller is to enable an active-stall wind turbine to perform power system stabilisation. For the purpose of controller design, the transfer function of the wind turbine is derived from the wind turbine's step response. The performance of this controller is tested by simulation, where the wind turbine model with its pitch angle controller is connected to a power system model. The power system model employed here is a realistic model of the North European power system.

A short circuit fault on a busbar close to the wind turbine generator is simulated, and the dynamic responses of the system with and without the power system stabilisation of the wind turbines are presented. Simulations show that in most operating points the pitch controller can effectively contribute to power system stabilisation.

Article Outline

1. Introduction

2. Power system oscillations and stabilisation

3. Description of the system

3.1. Power system model

3.2. Wind farm model

4. Transfer function of wind turbine

4.1. Nonlinearities in the wind turbine

4.2. Step response of the wind turbine system

4.3. Transfer function from the step response

5. PID controller design

6. Results and discussions

7. Conclusion

References

变压器类产品在系统中的运行状态分析

风机和风电场出现的重复性频率达到kHZ 高频暂态过电压升压设备绝缘性能影响解决方法

重点高校高电压与绝缘技术专业电力系统

良好数值分析

Assessing transient response of DFIG based wind turbines during voltage dips regarding main flux saturation and rotor deep-bar effect Original Research Article Applied Energy

Analysis and estimation of transient stability for a grid-connected wind turbine with induction generator Original Research Article

Renewable Energy

Electricity generation from wind has grown sharply and its growth potential is still significant. However, the decentralized nature of the wind opposes the historically centralized structure of national networks. Unlike conventional sources, wind does not provide reactive power, which is necessary to maintain acceptable voltage conditions on the network. The use of Flexible AC Transmission Systems (FACTS) in distribution network to compensate for vagaries such as production related to wind energies and to control the voltage is an optimal solution.

This paper is aimed at presenting a point of view on the wind power generation control issues. The main idea is to propose the use of a FACTS such as the STATCOM, which is a compensation device that is capable of generating and/or absorbing reactive power and in which the output can be varied to control the specific parameters of an electric power system and improve the quality of the energy provided, i.e., to regulate the desired power flows in a power network and to provide the best voltage profile in the system as well as to minimize the system transmission losses when inserting the wind generator in the electrical network.

Article Outline

1. Introduction

2. Purpose of the work

3. Power extracted from the wind

4. Voltage stability

4.1. Voltage profile improvements

4.2. Static compensator (STATCOM)

4.3. Principle of operation

4.4. STATCOM power flow modeling

5. Modeling and numerical simulation

5.1. Network without the wind generator

5.2. Integration of the wind generator

5.3. Integration of the STATCOM

6. Conclusion

References

Review of contribution to frequency control through variable speed wind turbine Review Article

Renewable Energy

Increasing levels of wind energy in modern electrical power system is initiating a need for accurate analysis and estimation of transient stability of wind turbine generation systems. This paper investigates the transient behaviors and possible direct methods for transient stability evaluation of a grid-connected wind turbine with squirrel cage induction generator (SCIG). Firstly, by using an equivalent lump mass method, a three-mass wind turbine equivalent model is proposed considering both the blades and the shaft flexibility of the wind turbine drive train system. Combined with the detailed electromagnetic transient models of a SCIG, the transient behaviors of the wind turbine generation system during a three-phase fault are simulated and compared with the traditional models. Secondly, in order to quickly estimate the transient stability limit of the wind turbine generation system, a direct method based on normal form theory is proposed. The transient models of the wind turbine generation system including the flexible drive train model are derived based on the direct transient stability estimation method. A method of critical clearing time (CCT) calculation is developed for the transient stability estimation of the wind turbine generation system. Finally, the CCT at various initial mechanical torques for different dynamical models are calculated and compared with the trial and error method by simulation, when the SCIG stator terminal is subjected to a three-phase short-circuit fault. The results have shown the proposed method and models are correct and valid.

Article Outline

1. Introduction

2. Transient models of wind turbine system

2.1. Mechanical models of wind turbine

2.2. Electromagnetic transient models of SCIG

3. Transient stability analysis of wind turbine system

4. Transient stability estimation

4.1. Stability region boundary theory based on nonlinear dynamic system

4.2. Brief introduction of normal form theory

4.3. Normal form inverse transformation

4.4. Transformation of SCIG model based on normal form method

4.5. Steps of CCT calculation

5. Conclusions

Acknowledgements

References

Comparative study on the performance of control systems for doubly fed induction generator (DFIG) wind turbines operating with power regulation Original Research Article

Energy

The necessity for size decrease in power electronics systems has pushed the operating frequency of these systems into the MHz range. The operation of these systems in the MHz range introduces a number of problems such as excessive coreloss, the skin effect and the proximity effect. In this work, a new high efficiency coreless transformer has been developed using polymer thick film technology, to overcome the coreloss at high frequency. The coils of the transformer are arranged coaxially in two configurations, (1) as a one-layer structure and (2) as two series connected layers in a sandwich structure. The operating principle of this transformer is based on the skin and mutual effect between the coils at high frequency. The copper electroplating process was implemented since an upper limit exists on the thickness of the conductor due to the skin effect under high frequency operation. The well-defined geometry of this thick-film planar transformer renders the parasitic interwinding capacitance and the leakage inductance reproducible. The experimental work performed shows that the polymer thick-film transformer exhibits a low interwinding parasitic capacitance, a high coupling factor of 98% at 9 MHz and shows a maximum efficiency of 98.2% at 10 MHz depending on the load condition.

Article Outline

1. Introduction

2. Experimental procedure

3. Results and discussion

4. Conclusion

References

System stability of large wind power networks: A Danish study case Original Research Article

International Journal of Electrical Power

Transformer products running in the system state analysis

Wind turbine and wind farm appears to kHZ repetition frequency of transient over-voltage step-up high-frequency performance of equipment insulation solutions

Key Universities High Voltage and Insulation Technology professional power system Good numerical analysis

Development of high frequency coreless transformer using thick film polymer technology Original Research Article

Microelectronics Journal

The paper reviews characteristics and the developing state of abroad offshore wind farm briefly, and the key technology related to offshore wind farm. The optimization configuration and assessment of abroad offshore wind farm, and rational distribution assess, offshore wind farm electric transmission technology, system insert with operating, wind farm MES and wind turbine base, etc., are studied to put forward

corresponding implementation and solution. The conditions for research and development, and demonstration of its application are suggested. Through studying key offshore wind farm technology, we can make offshore wind farm system optimization designing techniques reach the most advanced levels internationally, train teams with innovation ability, which are engaged in designing and running wind farm to manage wind-power electricity generation and wind farm design . All of these are of strategic, economic, social and academic value.

Article Outline

1. Introduction of the research and construction of offshore wind farm

2. Key technologies of offshore wind farm [6], [7], [8], [9], [10], [11] and [12]

3. Development of offshore wind farm key technologies

3.1. Optimal configuration and evaluation of offshore wind farm

3.2. Electrical transmission and grid-connection

3.3. Access and stability operation of offshore wind farm

3.4. Research and development of offshore wind farm MES

3.5. Foundations of wind turbines

4. Wind energy generation of Shanghai, and development and basis of offshore wind farm technology

5. Conclusion

References

Predictive control of wind turbines in small power systems at high turbulent wind speeds Original Research Article

Control Engineering Practice

key technology of offshore wind farm and its new development in China Review Article

Renewable and Sustainable Energy Reviews

An integrated control method for a wind farm to reduce frequency deviations in a

small power system Review Article

Applied Energy

13,762articles found for: pub-date > 1995 and tak(((Transformer products) or (running in) or (the system state analysis) or (Wind turbine) or (wind farm) or appears or kHZ) and (repetition or frequency or transient or "over-voltage" or "step-up" or "high-frequency" or performance or equipment or insulation or solutions) and ((Key Universities) or (High Voltage) or Insulation or Technology or professional or (power system) or Good or numerical or analysis))

Inertial response of variable speed wind turbines Original Research Article

Electric Power Systems Research

This paper presents a modelling methodology to analyse the impact of wind farms in surrounding networks. Based on the transient modelling of the asynchronous generator, the multi-machine model of a wind farm composed of N generators is developed. The model incorporates step-up power transformers, distribution lines and surrounding loads up to their connection to the power network.

This model allows the simulation of symmetric and asymmetric short-circuits located in the distribution network and the analysis of transient stability of wind farms. It can be also used to study the islanding operation of wind farms.

Article Outline

1. Introduction

2. Electromagnetic transient modelling of the wind generator

2.1. Mechanical model

3. Description of the wind farm

3.1. Wind data for the simulations

4. Integration of the surrounding electrical network in a compact matrix form

4.1. Modelling objectives and state-variables

4.2. Development of the network model

4.2.1. Compensation capacitors

4.2.2. Subterranean lines

4.2.3. Distribution network

4.2.4. Common busbar connection transformer

4.2.

5. State equations

4.3. Additional remarks

5. Aggregation of wind generators

5.1. Electrical model

5.2. Mechanical model

6. Simulator implementation

7. Alternative multi-machine model for validation purposes

8. Start-up of the wind farm

8.1. Validation of simulation results

9. Islanding operation

9.1. Comparison of simulation results with steady-state ones

10. Conclusion

Acknowledgements

References

wind farm electromagnetic transient modelling for grid integration studies Original Research Article

Energy Conversion and Management

This paper presents a novel, easy to use, engineering method for determining the transient electromotive force (EMF) induced in low-voltage (LV) cables, connecting the wind turbine with a near-by transformer, in the event of direct lightning strike into the top of the wind turbine tower. Proposed method is based on the application of the travelling wave analysis onto the system consisted of wind turbine tower, earthing system of wind turbine, earthing system of near-by transformer station and LV cables connecting the

wind turbine with associated transformer. Hence, this design gives rise to a complex, mutually connected, earthing system. Direct lightning strike to the wind turbine initiates a travelling wave process in the system consisted of lightning channel, wind turbine tower and earthing system of the wind turbine. Due to the transient nature of the observed phenomenon, current and voltage states at the earthing system as well as in the associated low-voltage cables are formed through the propagation and reflection of the accompanying travelling waves. Transient EMF induced in LV cables could endanger cable main insulation and insulation of the associated transformer LV winding. Developed theory is subsequently applied on the concrete wind turbine example.

Article Outline

1. Introduction

2. Mathematical model

3. Wind turbine example

4. Conclusion

References

Transient EMF induced in LV cables due to wind turbine direct lightning strike Original Research Article

Electric Power Systems Research

简单的四则运算计算器程序

简单的四则运算计算器程序

注:1、报告内的项目或内容设置,可根据实际情况加以调整和补充。 2、教师批改学生实验报告时间应在学生提交实验报告时间后10日内。

附件:程序源代码 // sizheyunsuan.cpp : Defines the entry point for the console application. #include #include const int MAX=100; class Operand{ private: double operS; public: Operand(){} Operand(double opers){ operS=opers; } void set(double opers){ operS=opers; } double get() { return operS;} }; class Operator{ private: char operF; int priority; public: Operator(){} Operator(char operf) { operF=operf; switch(operf) { case'(':priority=-1;break; case'+':priority=0;break; case'-':priority=0;break; case'*':priority=1;break; case'/':priority=1;break; case')':priority=2;break; } } void set(char operf){ operF=operf; } char get(){ return operF;} int getpriority(){ return priority; } };

(完整版)施工降水施工方案

兰坪县金顶镇文兴农贸市场建设项目《降水工程》专项施工方案 编制人:黄正勇 审核人:罗国强 审批人:张克林 云南瑞石建筑工程有限公司 2019年3月17日

目录 一、工程概况 (1) 二、工程地质 (4) 三、施工工艺 (4) 四、机械设备 (8) 五、质量控制 (8) 六、安全生产、文明施工措施 (8)

一、工程概况 本工程工程名称为兰坪县金顶镇文兴农贸市场建设项目工程,工程位于兰坪县金顶镇文兴社区环城小区。 一、土建概况 (一)兰坪县金顶镇文兴农贸市场建设项目--1栋综合楼工程: 1、建筑面积:403.99m2; 2、地上共2层,无地下室建筑总高7.05米; 3、建筑物室内地面标高±0.000=2288.440; 4、结构形式:砖混结构; 5、基础形式采用柱下条形基础。 兰坪县金顶镇文兴农贸市场建设项目--1栋综合楼工程建筑结构安全及设计使用年限: 1. 建筑结构安全等级:一级; 2. 结构设计使用年限: 50年; 3. 建筑抗震设防类别:乙类设防; 4. 地基基础设计等级:乙级; 5 .结构抗震等级:砖混一级,结构抗震构造措施:按7度一级。建筑场地类别:Ⅱ类。 (二)兰坪县金顶镇文兴农贸市场建设项目--2栋综合楼工程: 1、建筑面积:358.23m2; 2、地上共2层,无地下室建筑总高7.05米; 3、建筑物室内地面标高±0.000=2289.000; 4、结构形式:砖混结构; 5、基础形式采用柱下条形基础。 兰坪县金顶镇文兴农贸市场建设项目--2栋综合楼工程建筑结构安全及设计使用年限: 1. 建筑结构安全等级:一级; 2. 结构设计使用年限: 50年; 3. 建筑抗震设防类别:乙类设防; 4. 地基基础设计等级:乙级;

计算器使用说明书

计算器使用说明书目录 取下和装上计算器保护壳 (1) 安全注意事项 (2) 使用注意事项 (3) 双行显示屏 (7) 使用前的准备 (7) k模式 (7) k输入限度 (8) k输入时的错误订正 (9) k重现功能 (9) k错误指示器 (9) k多语句 (10) k指数显示格式 (10) k小数点及分隔符 (11) k计算器的初始化 (11) 基本计算 (12) k算术运算 (12) k分数计算 (12) k百分比计算 (14) k度分秒计算 (15) kMODEIX, SCI, RND (15) 记忆器计算 (16) k答案记忆器 (16) k连续计算 (17) k独立记忆器 (17) k变量 (18) 科学函数计算 (18) k三角函数/反三角函数 (18) Ch。6 k双曲线函数/反双曲线函数 (19) k常用及自然对数/反对数 (19) k平方根﹑立方根﹑根﹑平方﹑立方﹑倒数﹑阶乘﹑ 随机数﹑圆周率(π)及排列/组合 (20) k角度单位转换 (21) k坐标变换(Pol(x, y)﹐Rec(r, θ)) (21) k工程符号计算 (22) 方程式计算 (22) k二次及三次方程式 (22) k联立方程式 (25) 统计计算 (27)

标准偏差 (27) 回归计算 (29) 技术数据 (33) k当遇到问题时 (33) k错误讯息 (33) k运算的顺序 (35) k堆栈 (36) k输入范围 (37) 电源(仅限MODEx。95MS) (39) 规格(仅限MODEx。95MS) (40) 取下和装上计算器保护壳 ?在开始之前 (1) 如图所示握住保护壳并将机体从保护壳抽出。 ?结束后 (2) 如图所示握住保护壳并将机体从保护壳抽出。 ?机体上键盘的一端必须先推入保护壳。切勿将显示屏的一端先推入保护壳。 使用注意事项 ?在首次使用本计算器前务请按5 键。 ?即使操作正常﹐MODEx。115MS/MODEx。570MS/MODEx。991MS 型计算器也必须至少每3 年更换一次电池。而MODEx。95MS/MODEx。100MS型计算器则须每2 年更换一次电池。电量耗尽的电池会泄漏液体﹐使计算器造成损坏及出现故障。因此切勿将电量耗尽的电池留放在计算器内。 ?本机所附带的电池在出厂后的搬运﹑保管过程中会有轻微的电源消耗。因此﹐其寿命可能会比正常的电池寿命要短。 ?如果电池的电力过低﹐记忆器的内容将会发生错误或完全消失。因此﹐对于所有重要的数据﹐请务必另作记录。 ?避免在温度极端的环境中使用及保管计算器。低温会使显示画面的反应变得缓慢迟钝或完全无法显示﹐同时亦会缩短电池的使用寿命。此外﹐应避免让计算器受到太阳的直接照射﹐亦不要将其放置在诸如窗边﹐取暖器的附近等任何会产生高温的地方。高温会使本机机壳褪色或变形及会损坏内部电路。 ?避免在湿度高及多灰尘的地方使用及存放本机。注意切勿将计算器放置在容易触水受潮的地方或高湿度及多灰尘的环境中。因如此会损坏本机的内部电路。 双行显示屏

高都1井施工方案dy

高都 1 井等 3 个井站泡沫排水采气工 艺 大修工程 施工组织设计 编制人: 审核人: 批准人: 江苏省工业设备安装集团有限公司

年月日 目录 第一章编制依据. (1) 1.1 遵循的规范和标准 (1) 1.2 编制原则 (1) 第二章工程概况. (1) 2.1 工程名称 (1) 2.2 工程地点 (2) 2.3 建设工期 (2) 2.4 工程概要 (2) 第三章施工部署. (6) 3.1 施工准备 (7) 3.2 施工机具、设备进场计划 (7) 3.3 施工部署 (7) 3.4 临时物资中转场的布置 (8) 3.5 施工组织机构 (8) 3.6 施工人员及设备材料配备表 (9) 第四章主要施工技术方案. (9) 4.1 土建部分 (9) 4.2 管道敷设及特殊地段处理 (11) 第五章质量保证措施. (13) 5.1 质量方案 (13) 5.2 质量目标和质量管理 (14) 5.3 质量控制机构 (14) 5.4 质量责任 (15) 5.5 质量控制要素 (17) 5.6 质量检测及控制程序 (23) 5.7 质量监督与检查 (24) 第六章HSE 管理措施 (25)

6.1HSE 管理体系与组织机构 (25) 6.2 岗位HSE职责 (26) 第七章其它保障措施. (29) 7.1 配合作业 (29) 7.2 设备、材料接、保、检、运措施 (29) 7.3 施工场地治安保卫管理计划 (30) 7.4 施工环保措施计划 (31) 7.5 成品保护和工程保修工作的管理措施和承诺 (32) 7.6 与发包人、监理及设计人的配合 (33) 第八章工程竣工资料及工程总结. (34) 8.1 竣工资料 (34) 8.2 工程总结 (34) 附表一:拟投入的主要施工机械设备表. (35) 附表二:拟配备本工程的试验和检测仪器设备表. (36) 附表三:劳动力计划表. (37) 附表四:计划开、竣工日期和施工进度网络图. (38)

Java带计算过程的计算器课程设计报告

保存计算过程的计算器 Java程序设计课程设计报告保存计算过程的计算器 目录 1 概述.............................................. 错误!未定义书签。 1.1 课程设计目的............................... 错误!未定义书签。 1.2 课程设计内容............................... 错误!未定义书签。 2 系统需求分析.......................................... 错误!未定义书签。 2.1 系统目标................................... 错误!未定义书签。 2.2 主体功能................................... 错误!未定义书签。 2.3 开发环境................................... 错误!未定义书签。 3 系统概要设计.......................................... 错误!未定义书签。 3.1 系统的功能模块划分......................... 错误!未定义书签。 3.2 系统流程图................................. 错误!未定义书签。4系统详细设计........................................... 错误!未定义书签。 5 测试.................................................. 错误!未定义书签。 5.1 测试方案................................... 错误!未定义书签。 5.2 测试结果................................... 错误!未定义书签。 6 小结.................................................. 错误!未定义书签。参考文献................................................ 错误!未定义书签。附录................................................ 错误!未定义书签。 附录1 源程序清单...................................... 错误!未定义书签。

轻型井点降水施工方案

井点降水专项施工方案 工程名称_如皋市红星市场扩建改造及商住楼工程 编制______________ 审核______________ 批准______________ 日期______________浙江广丰建设有限公司

目录 一、工程概况 (3) 二、施工准备 (3) 三、施工工艺 (4) 四、注意事项 (5) 五、轻型井点降水系统拆除 (6) 六、质量验收标准 (6) 七、环境安全措施 (6)

轻型井点降水施工方案 一.工程概况: 如皋市红星市场扩建改造及商住楼开发工程位于如皋市如城镇红星村,中山西路北侧,总建筑面积43146平方米,其中住宅15860平方米,农贸市场5139平方米,超级市场8498平方米,商务酒店1156平方米。 该工程包括一幢9层综合楼和4幢住宅楼(两幢6层商住楼和两幢5层住宅楼)。 综合楼平面总尺寸为95.5mX75.4m,主体结构高度38.1m,机房高度41.1m。其中主楼地上9层。一二层商铺,超级市场层高5米及6米,三层及三层以上商务酒店层高3.5米;八层层高3.9米,九层层高4.9米。 商住楼包括1#、2#、3#、4#、四个单体。1#楼平面尺寸为43.6mX10.9m,高18.38m,屋面最高19.95m。地上一层车库+五层住宅+阁楼,其中底层车库层高2.19m,住宅部分层高为2.8m。2#楼平面尺寸为51.46mX14.8m,高19.79m,屋面最高21.36m。地上一层商铺+五层住宅+阁楼,其中底层商铺层高3.6m,住宅部分层高为2.8m。3#楼平面尺寸为65.4mX10.9m,高18.38m,屋面最高19.95m。地上一层车库+五层住宅+阁楼,其中底层车库层高2.19m,住宅部分层高为2.8m。4#楼平面尺寸为55.3mX14.8m,高19.78m,屋面最高21.36m。地上一层商铺+五层住宅+阁楼,其中底层商铺层高3.6m,住宅部分层高为2.8m。 本工程场地基本平整,+0.000为黄海高程5.65米,本基坑开挖在3.05米左右,根据本工程的勘测报告显示,初见水位标高为2.57—3.11M,稳定水位标高为2.67—3.21M 为确保施工安全,达到经济、安全的目的,本工程采用轻型井点降水施工。 二.施工准备 (一)施工机具 1.管:φ45,壁厚为3.0mm的无缝钢管或镀锌管,长5.0m左右,一端用厚为4.0mm的钢板焊死,在此端1m长范围内,在管壁上钻φ15mm的小圆孔,孔距为25mm,外包两层滤网,滤网采用编织布,外部再包一层网眼较大的尼龙丝网,每隔50~60mm用10号铅丝绑扎一道,滤管另一端与井点管进行连接。 2.井点管:φ45,壁厚为 3.0mm的无缝钢管或镀锌管。 3.连接管:透明管或胶皮管,与井点管和总管连接,采用8号铅丝绑扎,应扎紧以防漏气。 5.抽水设备:根据设计配备离心泵、真空泵或射流泵,以及机组配件和水箱。 6.移动机具:自制移动式井架(采用旧设备振冲机架)、牵引力为6t的绞车。 7.水枪:φ50×5无缝钢管,下端焊接一个φ16的枪头喷嘴,上端弯成大约直角,且伸出 冲击管外,与高压胶管连接。 8.蛇形高压胶管:压力应达到1.50MPa以上。 9.高压水泵:100TSW-7高压离心泵,配备一个压力表,作下井管之用。 (二)材料 粗砂与豆石,不得采用中砂,严禁使用细砂,以防堵塞滤管网眼。

vmware部署实施手册

vmware部署实施手册 目录............................................................................................................................................. ESXI 1.ESXi 4 安装............................................................................................................................. . 系统安装以及设置.............................................................................................................. 2.vShpere Client安装................................................................................................................ . vSphere Client 安装........................................................................................................ .虚拟机管理............................................................................................................................ 3.平台管理 . 平台查看以及功能..................................................................................................................................... . 新建虚拟机.编辑虚拟机设置..................................................................................................................... . VMware Tool 安装...................................................................................................................................... . 虚拟机克隆................................................................................................................................................. .虚拟机模板制作......................................................................................................................................... . 从虚拟机模板部署新的虚拟机................................................................................................................. . 虚拟机迁移................................................................................................................................................. 域控 装条件 在运行中输入“Dcpromo”进行安装 用户帐号的添加和管理 文件重定向策略 NAS存储 登录NAS系统 网络设置 安全 服务 共享 备份 现况 ESXI安装 4 安装 通过 DVD 引导文本安装模式简介 . 系统安装以及设置 接下来将ESXi 安装光盘放在光驱并开启服务器。服务器从光盘启动后将出现如下 界面,选择下图中的“ESXi Installer”进入安装过程。

实用计算器程序

目录 1.基本功能描述 (1) 2.设计思路 (1) 3.软件设计 (10) 3.1设计步骤 (10) 3.2界面设计 (10) 3.3关键功能实现 (12) 4.结论与心得 (14) 5.思考题 (15) 6.附录 (17) 6.1调试报告 (17) 6.2测试结果 (18) 6.3关键代码 (21)

实用计算器程序 1.基本功能描述 (1)可以计算基本的运算:加法、减法、乘法、除法。 (2)可以进行任意加减乘除混合运算。 (3)可以进行带任意括号的任意混合运算。 (4)可以进行单目科学运算:1/x、+/-、sqrt、x^2、e^2等。 (5)可以对显示进行退格或清除操作。 (6)可以对计算结果自动进行存储,并在用户需要的时候查看,并且可在其基础上进行再运算操作。 (7)界面为科学型和普通型,可在两界面间通过按钮转换。 2.设计思路 计算器属于桌面小程序,适合使用基于对话框的MFC应用程序设计实现。首先要思考的问题是:我的程序需要实现什么样的功能?需要哪些控件?需要哪些变量?需要哪些响应? 我们知道基于对话框的MFC应用程序的执行过程是:初始化、显示对话框,然后就开始跑消息循环列表,当我们在消息循环列表中获取到一个消息后,由相应的消息响应函数执行相应的操作。根据这个流程我们制定出计算器程序的程序框架主流程图,如下页图1所示。 根据程序主流程图可以看出,我们需要一些能响应用户操作的响应函数来实现我们的计算器相应按键的功能。

图1 程序主流程图 说明:所以流程图由深圳市亿图软件有限公司的流程图绘制软件(试用版)绘制,转 存PDF后导出为图片加入到word中的,所以可能会打印效果不好,但确实为本人绘制。

高空作业施工方案

高空作业施工方案 沈阳华生建设工程有限公司 黎明生活坊项目 2012年4月1日

目录 第一章编制依据 (1) 第二章工程概况 (1) 第三章高空作业的函意 (1) 第四章建筑工程高空作业坠落事故多发的原因 (1) 第五章高空作业施工方案 (3) 一、领导重视、落实责任 (3) 二、严把技术措施关 (3) 第六章高空坠落事故预防 (10) 一、控制人的因素 (10) 二、控制手的因素 (10) 三、控制操作方法因素 (11) 四、控制组织管理因素 (11) 五、控制环境因素 (11) 第七章高空作业安全防护设施验收 (11)

第一章编制依据 1、《建筑工程预防高处坠落事故若干规定》(建质[2003]82号) 2、《建筑施工安全检查标准》(JGJ 59—99) 3、《建筑施工高处作业安全技术规范》(JGJ 80—91) 4、《钢管扣件式脚手架安全技术规范》(JGJ 130—2001) 5、施工组织设计 6、施工图纸 第二章工程概况 属于框剪结构;地上16层;地下1层,标准层层高:2.9m。 施工单位:沈阳华生建设工程有限公司 工程名称:黎明生活坊 地理位置:大东区和睦南一路 建设单位:辽宁宝兴房地产开发有限公司 主要功能及用途:住宅 第三章高空作业的涵义 一、所谓高处作业是指人在一定位置为基准的高处作业。国家标准规定:凡在坠落高度基准面2米以上(含2米)有可能坠落的高处进行作业,都称为高处作业。根据这规定,在建筑施工过程中涉及到高处作业的范围,是相当广泛的。 二、为便于操作过程中做好安全防范工作,有效地防止人与物从高处坠落的事故,根据建筑行业的特点,在建筑安装工程施工中,对建筑物和构筑物结构范围以内的各种形式的洞口、临边作业、悬空与攀登作业,操作平台与立体交叉作业,以及在结构主体以外的场地和通道旁的各类洞、坑、沟、槽等工程的施工作业,只要符合上述条件的场地作为高处作业,并加以防护。

vmware vsphere 6.7虚拟化配置手册

Vmware虚拟化完整配置VSPHERE 6.7虚拟化搭建及配置 kenny

目录 一、安装环境介绍 (3) 二、安装与配置vmware vsphere 6.7 (4) 1、安装vsphere 6.7 (4) 2、配置密码 (4) 3、配置DNS、主机名和IP地址 (5) 三、配置Starwind V8 (7) 四、安装vcenter server 6.7 (10) 1、安装vcenter server(自带嵌入式数据库) (10) 2、配置外部数据库SQL SERVER 2008 (15) 3、使用外部数据库安装Vcenter server (19) 五、创建数据中心和群集HA (24) 1、新建数据中心 (24) 2、创建群集HA (24) 六、添加ESXI主机和配置存储、网络 (26) 1、添加ESXI主机到群集中 (26) 2、配置存储 (28) 3、添加网络 (30) 七、创建虚拟机 (32) 1、上传镜像至共享存储 (32) 2、新建虚拟机 (33) 3、将虚拟机克隆为模板 (37) 4、通过模板部署新虚拟机 (39) 八、物理机迁移至ESXI(P2V) (44) 1、迁移windows物理机 (44) 2、迁移Linux物理机 (49) 九、vmotion迁移测试 (51) 十、HA高可用测试 (53) 十一、VMware vSphere FT双机热备 (54) 十二、vSphere Data Protection配置部署 (57)

1、部署VDP模板 (57) 2、配置VDP (62) 3、创建备份作业 (68) 十三、附录 (72)

高速公路集水井施工方案

高速公路集水井施 工方案

高速公路集水井施工方案 一、工程概况 本项目为阜新到朝阳高速公路建设项目,路面共分8个合同段,本标段为第3合同段。设计桩号范围为K324+500~ K362+139.052,本合同有断链一处,K356+151.624=K356+000,链长151.624米,路线全长37790.676米。本标段有互通立交一处,为北票立交;服务区一处,为北票服务区。路面从下到上的结构层为:15cm(12cm)砂砾垫层+21cm(16cm)水泥稳定砂砾掺碎石底基层+21cm(16cm)水泥稳定碎石基层+7cm LAC-25I粗粒式沥青混凝土下面层+6 cm LAC-20I中粒式沥青混凝土中面层+4cm SMA-13L 沥青玛蹄脂碎石表面层。合同工期为:14.5个月。 基层施工已经完毕,已经具备集水井施工的条件;为不影响面层的施工;特申请集水井分项工程开工。 二、施工准备情况 全线水准点和导线点复测审批工作已完成,满足施工测量的需要;集水井施工涉及的C15﹑C30混凝土等配合比工作已完成,具备施工的前提条件。 三、施工流程与施工工艺 (一)施工流程 1﹑大集水井施工流程 施工放样→开挖沟槽→铺筑砂砾垫层→C15垫层混凝土浇注→支模→井身浇注→拆模→养护→盖板安装

2、小集水井施工流程 施工放样→预制→开挖沟槽→C15垫层混凝土浇注→小集水井安装→盖板安装 (二)施工工艺 1、大集水井施工 (1)、测量放线 在施工前根据已放出的中线确定大集水井位置,用白灰撒出大集水井的边线。 (2)、开挖沟槽 根据撒出的白灰线,开挖宽71cm、长140cm、垫层底面以下深122cm的沟槽,槽壁要直立。 (3)、铺筑砂砾垫层 在大集水井底部铺筑30cm的砂砾垫层,砂砾要干净无杂物,砂砾垫层要夯实。 (4)、C15垫层混凝土浇注 在砂砾垫层上铺筑10cm的C15混凝土垫层。混凝土要振捣密实。 (5)、支模 模板宜优先选用钢模,模板要涂抹废机油或肥皂水防止粘模,模板支立要有足够的强度和刚度,防止出现涨模等现象;而且模板之间要接缝要严密不漏浆。 (6)、井身浇注

vmwarevsphere6.7虚拟化配置手册

Vmware 虚拟化完整配置VSPHERE 6.7虚拟化搭建及配置 kenny

目录 一、安装环境介绍 (3) 二、安装与配置vmware vsphere 6.7 (4) 1、安装 vsphere 6.7 (4) 2、配置密码 (4) 3、配置 DNS、主机名和 IP 地址 (5) 三、配置 Starwind V8 (6) 四、安装 vcenter server 6.7 (9) 1、安装 vcenter server( 自带嵌入式数据库) (9) 2、配置外部数据库SQL SERVER 2008 (14) 3、使用外部数据库安装Vcenter server (17) 五、创建数据中心和群集HA (21) 1、新建数据中心 (21) 2、创建群集 HA (21) 六、添加 ESXI主机和配置存储、网络 (23) 1、添加 ESXI主机到群集中 (23) 2、配置存储 (24) 3、添加网络 (26) 七、创建虚拟机 (28) 1、上传镜像至共享存储 (28) 2、新建虚拟机 (29) 3、将虚拟机克隆为模板 (33) 4、通过模板部署新虚拟机 (35) 八、物理机迁移至ESXI( P2V) (40) 1、迁移 windows 物理机 (40) 2、迁移 Linux 物理机 (45) 九、 vmotion 迁移测试 (47) 十、 HA 高可用测试 (49) 十一、 VMware vSphere FT 双机热备 (50) 十二、 vSphere Data Protection 配置部署 (52) 1、部署 VDP模板 (52)

2、配置 VDP (57) 3、创建备份作业 (63) 十三、附录 (68)

高位井施工方案

高位井施工方案 1、工程概况 略 2、工程测量 定位程序:资料审核→内业核算→外业校测→定位测放→定位自检→定位验线。 2.1测量定位 本工程施工场地小,施工受现场条件影响较大,测量定位较为繁复。测量定位采用先进的高精度红外测距仪、全站仪、经纬仪及水平仪,根据提供的红线界桩点和有关图纸,确定各个轴线控制点,组成轴网控制,并将控制点延伸至施工影响范围以外的区域上,且采取混凝土加固保护措施,定位工作由我公司专职测量师完成。 2.2轴线、标高控制 根据地面层设置的控制网、控制点逐层向下传递。测量设备为经纬仪和钢尺,具体方法为:利用经纬仪通过基坑外的控制点来形成控制轴线,用经纬仪钢尺校对,调整误差,最后细分全部轴线;标高的控制采用钢尺从上层引入标高,基点位置固定,通过出入预留口引至下层,同样应调整钢尺的温度及拉力误差,然后利用水准仪同层抄平。 2.3测量精度的控制及误差范围 测角:采用三测回,测角过程中误差控制在2"以内,总误差5mm以内; 测弧:采用偏角法,测弧度误差控制在2"以内; 测距:采用往返测法,取平均值; 量距:用鉴定过的钢尺进行量测并进行温度修正; 每层轴线之间的偏差控制在在5mm以内,层高垂直偏差在5mm以内。

2.4沉降观测计划 (1)根据本工程结构形式的特点,先按照业主提供的高程基准点,将其引测至施工地块内,设置若干控制点,将其固定在基地内不易被破坏的部位,安排专人进行保护,在埋设点保持稳定后测定控制点的高程,并记录其数据,作为以后工程测量基准点,且由专业测量人员定期对其复测,与外界高程基准点进行校核; (2)根据本工程施工范围广、沉井下沉深度深等特点,在建筑物设置施工期间暂时沉降观测点和永久沉降观测点两种。施工期间暂时沉降观测点采用钢筋直接与主筋电焊连接分别固定于结构底板和侧墙内侧。永久沉降观测点设置采用铜质沉降标记预埋件,预埋于结构侧墙内; (3)沉降观测采用测量精度Ⅱ级水准测量,底板浇捣完毕后测得初读数,以后每施工一层测读一次。即每施工一层应进行一次沉降观测。工程竣工后,第一年测沉4次; (4)沉降观测应做好详细记录,认真整理沉降资料,汇入工程验收技术档案。 3、高位井(兼作顶管工作井)沉井施工 本工程高位井采用矩形沉井,尺寸为24.4m×11.0m×22.1m,井内有纵横隔墙将高位井分为一个进水室和两个出水室及一个应急排放管出水室。进水室与排海泵站的出水箱涵相衔接,两个出水室和一个应急排放管出水室分别与深海排放管和应急排放管相衔接。 3.1施工准备 施工前在沉井施工地点进行钻孔了解场地内详细地质情况,查清和排除地面及地面下3m内的障碍物。 3.2基坑开挖 (1)为了减少沉井下沉时的挖土工作量,沉井砼结构制作前在沉井位置开挖基坑。根据现场的施工条件,基坑开挖尺寸为28.4m×15.0m,即离沉井的外

某井塔工程高大施工方案

内蒙古伊泰广联煤化有限责任公司红庆河煤矿副井井塔及锁口工程 施 工 组 织 设 计 中煤第五建设有限公司 2015年1月

1.编制依据 1.1*******煤矿副井井塔及锁口工程招标文件及有关施工图纸等资料。 编号:YTZB2014-145 1.2 现行国家规范标准: 1.2.1 《工程测量规范》GB50026-2007; 1.2.2 《建筑地基基础工程施工质量验收规范》GB50202-2009; 1.2.3 《砌体工程施工质量验收规范》GB50203-2002; 1.2.4 《混凝土工程施工质量验收规范》GB50204-2002(2011版); 1.2.6 《混凝土泵送技术规程》JGJ10-2011; 1.2.7 《钢筋焊接及验收规程》JGJ18-2003; 1.2.8 《屋面工程施工质量验收规范》GB50207-2012; 1.2.9 《建筑地面工程施工质量验收规范》GB50209-2002; 1.2.10 《建筑装饰装修工程施工质量验收规范》GB50210-2001; 1.2.11 《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002; 1.2.12 《建筑电气工程施工质量验收规范》GB50303-2012; 1.2.13 《建筑工程施工质量验收统一标准》GB50300-2013; 1.2.14 《建筑施工安全检查标准》JGJ59-2011; 1.2.15 《建筑施工高处作业安全技术规范》JGJ80-2011; 1.2.16 《高层建筑混凝土结构技术规程》JGJ3-2010; 1.2.17 《钢筋焊接接头试验方法标准》JGJ/T27-2001; 1.2.18 《火灾自动报警系统施工及验收规范》GB50166-92; 1.2.19 《建筑地基处理技术规范》(GB79-91-2001); 1.2.20 《施工现场临时用电安全技术规范》(JGJ46-2005); 1.2.21 《建筑施工高处作业安全技术规范》(GBJ80-91); 1.2.22 《建筑机械安全技术规范》(GBJ33-2012) ; 1.2.23 《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)、1.2.24 《钢筋机械连接通用技术规程》JGJ107-2010 2.工程概况

vmwarevsphere日常操作手册

虚拟化操作手册2018年1月23日

目录 一、vsphere虚拟化管理 (3) 1) 虚拟化组成及介绍 (3) 2) ESXi (3) 3) 登录vcenter (8) 4) 新建虚拟机 (9) 5) 虚拟机的开启、安装操作系统和关闭 (22) 6) 安装VMTOOLS (26) 7) 更改虚拟机CPU和内存配置 (27) 8) 增加虚拟机硬盘 (31) 9) 虚拟机增加网卡 (37) 10) 新建portgroup (41) 11) 虚拟机在ESXI主机间迁移 (44) 12) 虚拟机在存储LUN间迁移 (47) 13) 克隆虚拟机 (49) 14) 倒换成模板 (52) 15) 模板倒换成虚拟机 (55) 16) 删除虚拟机 (58) 17) 对ESXi的物理主机关机维护操作 (59) 三、P2V转换 (61) 1) 安装Converter Server (61) 2) 登录Converter Server client (63) 3) Linux P2V (63) 4) Windows P2V (69)

一、vsphere虚拟化管理 1)虚拟化组成及介绍 Vsphere 包括vcenter和ESXI主机组成. 虚拟机运行在ESXI主机上。 ESXI系统安装在物理服务器上。 Venter是虚拟化的管理平台,它安装在一台虚拟机上。 2)ESXi 连接服务器,或者从HP服务器的iLo管理界面中,登录ESXi界面。 如果不是hp服务器可以用管理界面进行管理。或者直接到机房的物理服务器前进行如下操作

按F2,登录。

常用的操作就两块,网络和troubleshooting。 其中troubleshooting中的restart management agents选项,用在vcenter无法管理ESXi主机时。

JAVA保存计算过程的计算器课程设计报告

JAVA保存计算过程的计算器课程设计 报告 1 2020年4月19日

保存计算过程的java计算器 目录 1 概述................................................................................. 错误!未定义书签。 1.1 课程设计目的 ............................................... 错误!未定义书签。 1.2 课程设计内容 ............................................... 错误!未定义书签。 2 系统需求分析 .................................................................... 错误!未定义书签。 2.1 系统目标 ....................................................... 错误!未定义书签。 2.2 主体功能 ....................................................... 错误!未定义书签。 2.3 开发环境 ....................................................... 错误!未定义书签。 3 系统概要设计 .................................................................... 错误!未定义书签。 3.1 系统的功能模块划分.................................... 错误!未定义书签。 3.2 系统流程图 ................................................... 错误!未定义书签。4系统详细设计 .................................................................... 错误!未定义书签。 5 测试 .................................................................................... 错误!未定义书签。 5.1 测试方案 ....................................................... 错误!未定义书签。 5.2 测试结果 ....................................................... 错误!未定义书签。 6 小结 .................................................................................... 错误!未定义书签。参考文献 ............................................................................... 错误!未定义书签。附录.................................................................................... 错误!未定义书签。

高空作业施工方案

莲塘一中保集半岛学校工程高空作业 专 项 施 工 方 案 编制人: 审核人: 批准人: 江西建工笫四建筑有限责任公司 2015年3月8日

目录 1.工程概况 (1) 2.编制依据 (1) 3.安全施工措施 (1) 4.物料提升机安装和拆除作业 (5) 5.外脚手架搭设和拆除作业 (5) 6.模板工程作业 (6) 7.高处作业 (6) 8. 钢筋绑扎时的高空作业 (6) 9.混凝土浇筑时高空作业 (6) 10.悬空进行门窗作业 (7) 11.悬挑式钢平台作业 (7) 12. 组织机构及责任人 (8)

高空作业安全施工方案 一、工程概况: 工程名称:莲塘一中保集半岛学校 建设单位:南昌申标房地产发展有限公司 设计单位:江西省建筑设计研究总院 施工单位:江西建工第四建筑有限责任公司 监理单位:上海金品建设工程监理有限责任公司 莲塘一中保集半岛学校工程包含小学部综合教学楼和实验综合楼、初中部实验综合楼、行政办公楼、风雨操场、食堂、设备用房和看台工程等,位于莲塘一中保集半岛学校地块,芳草路以北,诚义路以西。小学部教学楼、初中部综合教学楼为框架结构/4层;行政楼为框架结构/5层;风雨操场、食堂、设备用房为框架/二层,风雨操场屋面为网架结构;总建筑面积约21371平米。 二、编制依据: 1、建筑施工安全检查标准 JGJ59-1999 2、建筑施工高处作业安全技术规范 JGJ80-91 3、龙门架及井架物料提升机安全技术规范 JGJ88-92 4、建筑施工扣件钢管脚手架安全技术规范 JGJ130-2001 5、建筑工程安全生产管理条例 6、中华人民共和国安全生产法 三、安全施工措施: (一)、安全管理措施:为了在该工程施工预防作业人员高空坠落

vmware vsphere 6.7虚拟化完整祥细配置手册

Vmware服务器虚拟化完整配置 VSPHERE 6.7虚拟化搭建及配置 Simon

目录 一、安装环境介绍 (3) 二、安装与配置vmware vsphere 6.7 (4) 1、安装vsphere 6.7 (4) 2、配置密码 (4) 3、配置DNS、主机名和IP地址 (5) 三、配置Starwind V8虚拟存储 (6) 四、使用windows 2012R2创建ISCSI存储 (9) 1、添加角色和功能 (9) 2、配置ISCSI链接 (10) 五、安装vcenter server 6.7 for windows (17) 1、安装vcenter server(自带嵌入式数据库) (17) 2、配置外部数据库SQL SERVER 2008 (22) 3、使用外部数据库安装Vcenter server (25) 六、安装Vcenter Server 6.7 for linux (29) 1、安装Linux版本的Vcenter (29) 七、创建数据中心和群集HA (42) 1、新建数据中心 (42) 2、创建群集HA (42) 八、添加ESXI主机和配置存储、网络 (44) 1、添加ESXI主机到群集中 (44) 2、配置存储 (45) 3、添加网络 (47) 九、创建虚拟机 (49) 1、上传镜像至共享存储 (49) 2、新建虚拟机 (49) 3、将虚拟机克隆为模板 (53) 4、通过模板部署新虚拟机 (55) 十、物理机迁移至ESXI(P2V) (60) 1、迁移windows物理机 (60) 2、迁移Linux物理机 (65)

3、使用Acronis BR迁移linux物理机 (66) 十一、vmotion迁移测试 (81) 十二、HA高可用测试 (83) 十三、VMware vSphere FT双机热备 (84) 十四、vSphere Data Protection配置部署 (86) 1、部署VDP模板 (86) 2、配置VDP (90) 3、创建备份作业 (96) 十五、部署vRealize Operations Manager (101) 1、部署ova模版 (101) 2、配置vRealize Operations Manager (104) 十六、部署VMware-vRealize-Log-Insight (110) 1、部署OVF模版 (110) 十七、附录 (117)

相关主题
文本预览
相关文档 最新文档