厂区订单进度情况(16周)Process Status(week 14)

技术准备Tech.prepa ration

材料

material

下料

cutting

组对

fitting

up

焊接

welding

机加工

finish

machinin

g

质检

inspecti

on

油漆包装

painting

and

packing

终检

final

inspecti

on

%%%%%%%%%

1蒙古94steel stack

hopper钢

2013-4-1253,090100%100%95%90%70%30%0%0%0%72%

2蒙古127stack and

platforms

2013-1-448,960100%65%7%5%4%1%1%0%0%12%

3蒙古135Stack钢烟

2013-3-29111,842100%85%60%50%40%0%1%0%0%44% 4蒙古136Ducts风管2013-5-360,975100%100%90%70%60%50%35%9%0%66% 5蒙古139Chute溜槽2013-4-58,604100%100%100%100%100%100%100%2%0%90%

6蒙古146Dedusting

pipes除尘

2013-4-527,774100%100%65%62%60%50%8%0%0%57%

7蒙古150Chute溜槽2013-4-513,382100%100%100%100%98%100%95%1%0%89%

8蒙古163Dedusting

pipes除尘

2013-4-510,314100%100%98%96%94%80%50%1%0%84%

恒远沿江(中允)厂区订单进度情况(16周)

Progress Stauts in River Plant (week 16)

预估订单重

量(kg)net

weight

合计%in

total

备 注

remarks

序号No.HY编号HY

No.

项目名称

desription

制作车间

/班组WS

生产接收

日期

issueed

date

订单交贷日

期delivery

date