67Are suitable actions taken in case of

deviations?

PFMEA

Process Control Plan

Is there evidence that all concerns

are tracked back to the PFMEA to

confirm that the failure mode has

been included?

Look for PFMEA change log cross

referenced to PRR log, customer

complaint log, voice of the

process review, warranty data,

etc.

Is there evidence that controls

have been added, or

controls/RPNs revised based on

concerns.

R

当结果偏离基准或规定时,是否采取合适

的措施?

过程纠正措施对策表

当过程偏离规定时是否按要求采取

纠正措施并将采取措施后涉及的项

目纳入PFMEA,如涉及到文件更改

应履行更改手续,其他同上。

Approved Approved, but need

Documentation

Follow-Up Audit Date:

Supplier Representative Signature GM Representative Signature