文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如工作总结、报告大全、合同协议、演讲致辞、规章制度、应急预案、心得体会、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays, such as work summaries, report summaries, contract agreements, speeches, rules and regulations, emergency plans, experiences, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample formats and writing methods, please pay attention!竣工工作总结7篇通过工作总结,可以发现自己工作中的不足和改进的空间,我们可以在工作总结里面回忆自己这段时间以来的工作收获和成长,本店铺今天就为您带来了竣工工作总结7篇,相信一定会对你有所帮助。
完成竣工总结第1篇各位领导、工程师:今天为xxxx工程项目竣工验收,我在此仅代表深圳市xx建筑工程公司对参加会议的各位领导、工程师表示热烈的欢迎。
同时,对各有关单位一直以来对xxxx项目的支持与指导表示衷心的感谢!xxxx项目由深圳市宝安区xxxx发展有限公司开发,深圳市xxx投资有限公司投资兴建,设计单位为深圳市xxx建筑设计有限公司,监理单位为xx建设监理有限公司。
工程位于深圳市龙华镇东环二路与工业路东北角,占地面积为,为1栋七层商住楼,设置二次伸缩缝,分为三个区。
采用天然地基、独立基础,主体结构为框架剪力墙,设计抗震烈度为7度,防火类别为二类,加气砼砌体,外墙涂料面层。
xxxx项目于20xx年10月25日开工,20xx年6月25日通过有关单位的初验,同时,对各位领导、工程师提出的问题已积极整改完毕,工程资料经过质检站的检查并反馈下来的问题也已全部整理完成,资料齐全。
施工过程中,在抓质量管理的同时,我项目部也不放松安全与文明管理,整个施工过程中无发生工伤事故;参加施工人员均服从指挥,听取建设、监理、安监等各部门的意见,树立文明施工队伍。
我们将xxx贵的施工经验,不断完善和努力提高自身的质量及安全管理水平,以业主的利益为重,为追求施工高质量服务作不懈努力。
一、工程概况xxxxx工程位于福田区农科中心,总用地面积55831m2,总建筑面积122087m2,其中xx 建筑面积为,由一层地下室、12~15栋商住楼组成,建筑面积分别为,地下室5889m2,12栋(6~8层),13栋(11~12层),14栋(15层),5栋(12层),均为坡屋面。
本工程结构形式为框支抗震墙,转换层以上为短肢抗震墙结构,基础为预应力高强管桩钢筋砼承台。
抗震等级:框架抗震墙为二级,短肢抗震墙为三级。
抗震设防为七度,建筑物耐火等级为Ⅰ级。
二、主体结构钢筋砼部分本工程主体砼均为商品砼。
采用钢筋转换层xxx主筋为Φ32Ⅲ级钢筋,其余为Ⅱ级钢,φ8以下为Ⅰ级钢。
施工单位工程竣工总结6篇施工单位工程竣工总结6篇总结在一个时期、一个年度、一个阶段对学习和工作生活等情况加以回顾和分析的一种书面材料,它是增长才干的一种好办法,不如立即行动起来写一份总结吧。
我们该怎么写总结呢?下面是小编收集整理的施工单位工程竣工总结,仅供参考,希望能够帮助到大家。
施工单位工程竣工总结1我代表北京蓝天建设有限公司大兴分公司向参加本次竣工会议的领导及各方代表表示诚挚的感谢!并做以下汇报:一、工程概况1、工程项目名称:长子营镇农民抗震节能住房改造工程。
2、开竣工日期:于20xx年8月19日开工,于20xx年10月25日竣工。
3、建设单位:长子营镇政府4、监理单位:北京东方通国际工程监理有限公司5、总包单位:北京蓝天建设有限公司6、作业内容:对长子营镇下33个自然村房屋进行外墙保温及门窗改造;其中外墙保温改造共3808户,合计;门窗改造共2827户,合计。
二、施工主要依据1、施工图纸与建设方有关指令。
2、现行国家有关法律法规以及建筑工程质量验收规范。
3、公司的质量管理体系与项目部的相关质量制度。
4、建筑工程资料管理规程等有关文件。
三、管理方法、项目管理目标情况我公司精心编制了施工实施方案,以工程项目部的模式进行管理。
在安全管理和文明施工方面大力推行标准化管理,实行定期检查和定量评分,结合经济奖罚制度,实现文明施工和无事故安全生产的目标。
质量是企业的生命,我们项目部对该工程项目确定的质量目标为:合格率100%,争取一次验收成功。
为实现这一目标,在质量计划中,项目部将特殊过程和关键工序作为重点进行控制,重点防范关键工序质量问题的产生;坚持以预防为主的原则,制订消除质量通病计划,将消除质量通病工作放在重要的地位;对主体分部工程和装饰分部工程制订出更高的质量标准(内控标准),大幅提高分项工程质量和建筑观感得分。
并对文件资料、产品标识和可追溯性、检验和试验、不合格品控制、贮存和防护、培训等要素的实施制订了详尽和易操作性的方案。
施工单位工程竣工总结一、项目概述我司承接的项目位于某县城新区,项目总建筑面积为X平方米,由X栋楼组成,包括X种不同的用途。
本项目起始时间为XXXX年XX月,预计竣工时间为XXXX年XX月,历时XX 个月,总造价为X万元。
二、进度总结经过全体项目管理团队的不懈努力,本项目已经全部竣工,顺利通过了相关验收并交付业主。
整个施工过程中,我们严格按照施工计划进行,紧密协作,克服了种种困难,圆满完成了各项任务。
具体来说,我们按照计划有序地完成了地面平整、地下管道、桩基、混凝土结构、钢结构、内装修等工程,各项进度均得到了控制和保障。
此外,我们根据项目需求,配合业主进行了多次施工调整,确保施工质量和工期。
总体上看,进度和质量都符合了项目要求。
三、质量总结在本项目中,我们一直致力于提高质量,严格按照设计和相关规范要求进行施工。
首先,我们在钢结构方面采用了先进的焊接工艺,保证了安全性和耐久性。
其次,在混凝土结构方面,我们采用现代化浇筑技术和严格的质量把关,确保每一块混凝土都符合设计标准,达到了预期强度。
此外,我们对重要结构和材料进行了现场检测和抽样,确保施工质量。
同时,我们高度重视安全生产,在施工现场设立了安全警戒区,并制定了详细的安全措施和管理制度,保证了施工过程的安全。
总体而言,我们的质量管控得到了有效实施,达到了预期目标。
四、经验总结在本次工程竣工过程中,我们积累了丰富的经验,总结如下:1.计划和进度控制非常重要,要提前预判问题和难点,加强沟通,确保进度和质量。
2.施工队伍是施工过程的核心,要注重人员培训和管理,提升员工技能和责任意识。
3.施工技术和质量管控是保证项目顺利进行和施工质量的关键措施,要在施工前制定好管控措施,并加强施工现场管理实施。
4.安全生产是重中之重,要密切关注安全隐患,加强现场安全警戒和培训。
五、结语本次施工过程虽然经历了不少的波折,但是,我们凭借着良好的管理团队和施工队伍,认真履行职责,克服困难,达到了预期目标,并得到了来自业主和监理的高度评价。
施工单位工程验收总结阿康物流园区市政道路工程竣工验收会议施工单位发言稿尊敬的各位领导、各位参建单位的代表、各位来宾!大家好!值此阿康物流园区市政道路工程竣工验收会议胜利召开之际,能够与各位同仁再次相聚一堂,共同参加阿康物流园区市政道路工程、验收专题的学习、总结会议,我本人感到万分的荣幸和自豪!在此,我谨代表鄂尔多斯市东方路桥集团对我单位所承建的第九标段、第四标段的市政道路工程的施工情况作如下简要总结汇报。
我项目部针对由我单位承建的第九标段、第四标段的市政道路工程的内容及特点,首先在工程进度方面制定了快进场、早开工、保证重点,突破难点、以管道施工为先导,以路基路面施工为重点的工期控制总原则。
以合同工期为目标,对各分部分项工程的工期计划进行了详细的划分,将各项施工任务有效的落实在每一个施工班组及每一位施工人员的每旬、每周、甚至每天的工作计划上。
同时我项目部的全体员工在施工全过程中时刻发扬“敢想敢干、争创一流”的东方企业精神,以要做就做最好,勇当行业邻头羊的气概投入到每一项工作当中。
正是通过我项目部的每一员工,每一位民工的几百个日日夜夜勤奋工作,不懈奋斗,最终圆满的、超前的完成了合同工期的目标任务。
其次我项目部在工程质量管理方面确定了精心施工,确保优良,争创精品的质量方针;制定了各项工程验收一次性合格率____%的质量目标;同时根据质量方针、质量目标建立了质量控制的组织管理体系,质量保证体系;采取事前控制、事中控制、事后控制的三阶段质量保证措施进行施工全过程的质量控制;实行各分项分部工程三级技术交底的质量保证技术措施,确保我项目部参与建设的每一位员工,每一位工人对所负责的工序的施工技术、质量要求都能熟稔于心。
正是通过上述贯穿项目施工全过程的各项组织管理措施,我项目部才最终确保了工程项目各项质量目标的圆满实现。
在此,特别说明的是由我项目部承建的第九标段市政道路工程在市建委组织的评选活动中,被评选为优良工程,我项目部的苏海军同志荣获了优秀项目经理的荣誉称号。
第1篇一、前言随着我国经济的快速发展,基础设施建设已成为推动经济增长的重要动力。
本次工程自开工以来,在各级领导的关心和支持下,经过全体施工人员的共同努力,现已圆满完成施工任务,达到竣工验收条件。
现将工程竣工施工完成情况进行总结,以便为今后的工程建设提供借鉴。
二、工程概况1. 工程名称:XX道路工程2. 工程地点:XX市XX区3. 工程规模:全长XX公里,宽XX米,双向XX车道4. 工程投资:XX亿元5. 施工单位:XX建设集团有限公司6. 设计单位:XX设计研究院三、施工完成情况1. 工程进度:本工程自201X年X月X日开工,至201X年X月X日竣工,历时XX 个月,按计划完成施工任务。
2. 施工质量:严格按照国家有关施工规范和标准进行施工,工程质量符合设计要求。
经检测,路基、路面、桥梁、隧道等主要工程部位质量合格率均达到100%。
3. 安全生产:施工过程中,严格执行安全生产责任制,加强安全管理,确保了安全生产。
全年未发生重大安全事故,安全生产形势稳定。
4. 环境保护:在施工过程中,高度重视环境保护工作,采取有效措施,减少对周边环境的影响。
如:合理规划施工场地,降低扬尘污染;采用低噪声施工设备,减少噪音污染;对施工废弃物进行分类处理,实现资源化利用。
5. 节能减排:在工程设计、施工过程中,充分考虑节能环保要求,采用节能材料和技术,降低能源消耗。
如:道路照明采用节能路灯,桥梁设计采用轻质高强材料等。
6. 服务质量:加强与当地政府、居民的沟通,及时解决施工过程中出现的问题,确保工程顺利进行。
同时,积极开展文明施工,提高施工环境质量。
四、经验与不足1. 经验:(1)加强项目管理,确保工程进度和质量;(2)严格执行安全生产责任制,保障安全生产;(3)注重环境保护,减少对周边环境的影响;(4)加强沟通协调,提高施工效率。
2. 不足:(1)施工过程中,部分施工设备老化,影响施工效率;(2)施工人员技能水平参差不齐,需进一步加强培训;(3)施工过程中,部分地方存在安全隐患,需加强安全管理。
施工单位竣工验收报告简短10篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、总结报告、心得体会、合同协议、条据文书、策划方案、导游词、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, summary reports, insights, contract agreements, documentary evidence, planning plans, tour guides, teaching materials, complete essays, and other sample essays. If you want to learn about different formats and writing methods of sample essays, please stay tuned!施工单位竣工验收报告简短10篇关于施工单位竣工验收报告简短10篇报告是指对某一阶段的工作、学习或思想中的经验或情况加以总结和概括的书面材料,下面给大家分享关于施工单位竣工验收报告简短10篇,欢迎阅读!施工单位竣工验收报告篇1尊敬的各位领导、各位来宾:受重庆市涪陵新大兴集团嘉新房地产开发有限公司委托,我公司对酉阳县质量技术监督局办公楼、住宅楼A1栋、A2栋、BC栋工程进行了施工阶段的监理。
第1篇一、工程概况本工程为XX市XX小区住宅楼工程,位于XX市XX区XX路XX号。
工程总建筑面积约XX万平方米,共XX栋住宅楼,XX个单元,XX户居民。
工程于XX年XX月XX日开工,XX年XX月XX日竣工,历时XX个月。
二、工程目标1. 确保工程质量,达到国家相关标准要求。
2. 按时完成工程进度,确保工程顺利交付。
3. 严格控制工程造价,降低成本。
4. 加强施工现场管理,确保施工安全。
三、工程实施过程1. 施工准备阶段在施工准备阶段,我们严格按照国家相关法律法规和施工规范要求,对施工现场进行了充分勘察,确定了施工方案,并对施工人员进行技术交底和安全教育。
2. 施工阶段在施工过程中,我们严格按照施工图纸和施工规范进行施工,确保工程质量。
主要施工内容包括:(1)土建工程:主体结构、砌体工程、防水工程、装饰装修工程等。
(2)安装工程:给排水工程、电气工程、暖通工程等。
(3)室外工程:道路、绿化、给排水、照明等。
3. 质量控制阶段在施工过程中,我们始终坚持“质量第一”的原则,对施工质量进行了严格控制。
主要措施如下:(1)加强原材料、构件的质量检验,确保进场材料合格。
(2)加强施工过程控制,严格执行施工规范和操作规程。
(3)加强隐蔽工程验收,确保工程质量。
(4)对关键工序进行跟踪检查,及时发现和解决问题。
四、工程成果1. 工程质量达到国家相关标准要求,通过相关部门的验收。
2. 工程进度按计划完成,提前交付使用。
3. 工程造价控制在预算范围内,降低了成本。
4. 施工现场管理到位,未发生安全事故。
五、经验与教训1. 经验(1)加强组织领导,明确责任分工。
(2)严格执行施工规范和操作规程,确保工程质量。
(3)加强施工现场管理,提高施工效率。
(4)注重人才培养,提高施工队伍素质。
2. 教训(1)在施工过程中,要充分考虑天气、地质等自然因素,合理安排施工进度。
(2)加强与相关部门的沟通协调,确保工程顺利进行。
(3)提高施工人员的环保意识,减少施工对环境的影响。
工程竣工验收工作总结7篇(经典版)编制人:__________________审核人:__________________审批人:__________________编制单位:__________________编制时间:____年____月____日序言下载提示:该文档是本店铺精心编制而成的,希望大家下载后,能够帮助大家解决实际问题。
文档下载后可定制修改,请根据实际需要进行调整和使用,谢谢!并且,本店铺为大家提供各种类型的经典范文,如演讲致辞、汇报材料、自我鉴定、条据文书、合同协议、心得体会、方案大全、教学资料、作文大全、其他范文等等,想了解不同范文格式和写法,敬请关注!Download tips: This document is carefully compiled by this editor. I hope that after you download it, it can help you solve practical problems. The document can be customized and modified after downloading, please adjust and use it according to actual needs, thank you!Moreover, our store provides various types of classic sample essays for everyone, such as speeches, presentation materials, self-evaluation, documentary evidence, contract agreements, reflections, comprehensive plans, teaching materials, essay summaries, and other sample essays. If you want to learn about different sample essay formats and writing methods, please stay tuned!工程竣工验收工作总结7篇态度的端正是我们在写工作总结的时候要注意的一点,工作总结是我们对自己工作的一种自我评估,可以帮助我们发现自己的不足之处,进而改进和提升,以下是本店铺精心为您推荐的工程竣工验收工作总结7篇,供大家参考。
竣工验收施工总结(通用9篇)竣工验收施工总结第1篇各位领导、专家:你们好!XX扩建工程自XX年XX月开工,历经近1年多的建设,在XX开发公司及各级主管部门的领导下,经过各个参建单位精诚配合、团结协助共同使本工程得以顺利竣工。
在此,请允许我代表公司及监理部向莅临XX扩建工程竣工验收的各位领导、专家表示衷心的感谢!下面将监理工作情况作简要汇报。
一、工程概况二、监理工作概述从XX年XX月,施工单位逐步进场施工至XX年XX月份竣工验收,根据设计及相关规范要求对分部分项工程进行结构验收,符合要求。
我公司对该项目十分重视,项目总监理工程师由我公司xxx担任,并抽调公司精干的专业技术人员组建项目监理部,编制了监理规划,组织各专业监理工程师在详细了解规范、强制行条文、招投标文件,认真熟悉施工图纸,在领悟设计意图的前提下,编制了具有可指导性和可操作性的各专业实施细则,并在监理过程中严格执行。
监理项目部为保障项目实施过程中高标准进行各项质量安全控制,实行了对施工单位的技术交底制度、安全交底制度、见证取样制度、工程验收等一系列监理措施,确保了工程监理工作的顺利开展。
三、工程质量控制1、业主、监理共同组织第一次工地例会,会议上明确了质量目标,并提出了达到该目标在质量控制方面应注意的问题。
2、工程施工前,要求施工单位完善和健全质量保证体系,包括项目经理、技术负责人在内的质检、资料、施工等“五员”必须到位,要求施工单位对每一道工序加强自检职能,经自检合格才能通知监理工程师确认,确保了工程各工序的质量。
3、根据实际情况,编制监理旁站计划,对应该旁站的重点和关键部位如:打桩、混凝土浇筑等进行全过程旁站,并做好相应的记录。
4、编制见证取样计划,严格按照计划执行,本工程检测送XX建设工程检测有限公司的钢筋原材、钢筋焊接、混凝土、砂浆等试件均合格。
5、严格把好材料进场质量关,作为工程质量控制的切入口,对其认真核对产品合格证、质保单、检测报告,并对外观进行检查,按规范抽取适当数量送检,对不符合的立即要求施工单位退场,不得在工程中使用。
联合验收发言稿
尊敬的各位领导、各位专家:
大家上午好!
非常感谢各位参加XXXX工程项目联合验收!借此机会,我代表XXXX有限公司项目部向今天出席联合验收的质监单位、设计单位、地勘单位、建设、监理等单位的领导和专家表示热烈的欢迎,向您们在该工程施工中对我们项目部各项工作的支持、关心和大力帮助表示衷心的感谢!
下面,我代表XXXX有限公司项目部向各位领导简要汇报该工程的基本情况。
一、工程概况
XXXX工程由盐城市鑫恒置业有限公司投资兴建。
工程位于盐城市秦南镇,建筑面积24000㎡,该工程1-6#楼为砖混结构7#楼为框架结构。
该工程由盐城市建筑设计研究院有限公司设计,由盐城市永都监理有限公司监理,XXXX有限公司施工。
工程于2008年4月28日开工建设。
二、质量管理情况
工程所用主要建筑材料、各种构配件及设备均有合格证,按规范要求进行各种检测试验,其检测报告结果均合格。
其中用于承重结构的混凝土试件、砂浆试块进行了见证取样检测,检测数量符合要求。
在施工中,我们按基础、主体、屋面、水电、装饰等分部分项工程分别编制了检验批资料及隐蔽工程验收资料,各类原材料检验资料、检验批记录、分项分部工程资料均完整,各类保证资料齐全。
本工程未发生任何质量事故和其他事故,基础、主体、屋面施工
质量均符合规范及设计要求,有防水要求的屋面、露台无渗漏现象。
三、安全及文明施工管理情况
在施工中,我们按照本公司企业形象标识设立了五牌一图,对施工现场进行了封闭施工,并合理布置施工现场,确保现场文明、整洁。
对脚手架、临时用电、塔吊等危险性较大的部位编制了专项安全方案,由于措施得当、现场管理得力,没有发生一起安全事故。
四、工程档案管理情况
施工过程中,我单位按《建筑工程资料管理规程》,设专人对施工过程的全部资料进行记录、收集和整理,建设、监理单位密切配合。
随着工程的进展,双方共同对资料进行检查、核对和确认。
目前,施工资料齐全,竣工资料也已通过质量监督部门的检查,办理移交。
综上所述,我们已完成了建设工程设计和合同约定的各项内容,各类施工技术管理资料完整,该工程使用的主要建筑材料、建筑构配件进场试验报告完整,有勘察、设计、施工、监理等单位签署的质量合格文件,观感质量符合要求。
工程已达到联合验收条件。
特申请今天进行工程联合验收!
以上汇报如有不妥之处,恳请批评指正!谢谢大家!
XXXX有限公司
2012-11-8。