施工现场七牌二图
- 格式:doc
- 大小:41.50 KB
- 文档页数:13
施工现场七牌二图
1、管理人员名单及监督电话
2、工程概况
3、进入施工现场须知
4、文明施工规则
5、十项安全生产措施
6、消防保卫制度
7、施工现场平面布置图
8、立面效果图
9、农民工维权须知牌
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the
expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
管理人员名单及监督电话
管理人员姓名各工种负责人姓名
项目经理瓦工
技术负责人钢筋工
施工员木工
技术员架子工
安全员电工
质检员起重工
预算员机械操作工
材料员电焊工
资料员砼工施工单位电话:
建设单位电话:
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline
vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
安全监督部门电话:
工程概况
工程名称: 建设单位: 勘察单位:
施工单位: 监理单位:
质量监督单位: 材料检测单位:
安全监督单位:
层数:
高度: 结构类型:
建筑面积:
开工日期: shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length.