GY06通、排风管道施工记录
- 格式:doc
- 大小:62.50 KB
- 文档页数:2
排水管道通水试验记录编号:05–06 T 001单位工程名称杭政储出(2006)35号地块商品住宅27#楼分部工程名称室内排水系统分项工程名称排水管道及配件安装项目经理朱红林施工执行标准名称及编号建筑给水排水及采暖工程施工质量验收规范GB50242–2002部位1层(共8户)管材材质U–PVC排水管编号管径(mm)持续时间(min) 试验情况主卫排–1 50 20 排水顺畅、无渗漏主卫排–2 75 20 排水顺畅、无渗漏主卫排–3 110 20 排水顺畅、无渗漏次卫排–1 50 20 排水顺畅、无渗漏次卫排–2 75 20 排水顺畅、无渗漏次卫排–3 110 20 排水顺畅、无渗漏厨房排–1 50 20 排水顺畅、无渗漏试验结果:从各排水管落水口处进行放水,排水畅通无堵塞,整个通水试验结果符合设计及规范要求。
验收结论合格分包单位:项目专业质量检查员(签名):项目专业技术负责人(签名):年月日合格施工单位:项目专业质量检查员(签名):项目专业技术负责人(签名):年月日专业监理工程师(签名):(建设单位项目专业技术负责人)年月日排水管道通水试验记录编号:05–06 T 002验收结论合格分包单位:项目专业质量检查员(签名):项目专业技术负责人(签名):年月日合格施工单位:项目专业质量检查员(签名):项目专业技术负责人(签名):年月日专业监理工程师(签名):(建设单位项目专业技术负责人)年月日排水管道通水试验记录编号:05–06 T 003单位工程名称杭政储出(2006)35号地块商品住宅27#楼分部工程名称室内排水系统分项工程名称排水管道及配件安装项目经理朱红林施工执行标准名称及编号建筑给水排水及采暖工程施工质量验收规范GB50242–2002部位1层(共8户)管材材质U–PVC排水管编号管径(mm)持续时间(min) 试验情况主卫排–1 50 20 排水顺畅、无渗漏主卫排–2 75 20 排水顺畅、无渗漏主卫排–3 110 20 排水顺畅、无渗漏次卫排–1 50 20 排水顺畅、无渗漏次卫排–2 75 20 排水顺畅、无渗漏次卫排–3 110 20 排水顺畅、无渗漏厨房排–1 50 20 排水顺畅、无渗漏试验结果:从各排水管落水口处进行放水,排水畅通无堵塞,整个通水试验结果符合设计及规范要求。
安装施工日志山东省建设工程质量监督总站监制安装施工日志鲁TK-005山东省建设工程质量监督总站监制安装施工日志鲁TK -005山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制安装施工日志山东省建设工程质量监督总站监制。
过路管道施工日志范文英文回答:Construction Log for Roadside Pipeline.Date: [Date]Location: [Location]Summary:Today, we made significant progress in the construction of the roadside pipeline. The main tasks accomplished include excavation, installation of pipes, and backfilling.Excavation:We started by excavating the designated area for the pipeline. This involved removing the topsoil and digging a trench of the appropriate depth and width. The excavationwas done carefully to ensure the stability of the surrounding soil.Installation of Pipes:Once the trench was ready, we proceeded with the installation of the pipeline. The pipes were carefully placed in the trench, ensuring proper alignment and connection. We used high-quality pipes that are durable and resistant to corrosion.Backfilling:After the pipes were securely in place, we began backfilling the trench. This involved filling the trench with the excavated soil, compacting it in layers to provide stability and support to the pipeline. We made sure to compact the soil properly to prevent any future settlement.Quality Control:Throughout the construction process, we implementedstrict quality control measures. We conducted regular inspections to ensure that the pipes were properlyinstalled and that the backfilling was done correctly. We also conducted pressure tests to check for any leaks or weaknesses in the pipeline.Safety Measures:Safety was our top priority during the construction. We followed all necessary safety protocols, including wearing personal protective equipment, securing the construction site, and providing proper training to all workers. We also ensured that all equipment used was in good working condition.Conclusion:Overall, today's construction activities for the roadside pipeline were successful. We accomplished the excavation, installation of pipes, and backfilling as planned. We maintained high-quality standards andprioritized the safety of our workers. The constructionprogress is on track, and we are confident in thedurability and reliability of the pipeline.中文回答:过路管道施工日志。
2015年装置停工大检修设备检修质量保证手册呼和浩特石化公司2015年3月3日目录第一章设备检修质量保证程序 (1)一、目的 (1)二、组织机构 (2)三、职责分工 (4)四、质量管理程序流程图 (7)五、质量考核办法 (7)第二章改造项目的设备设计、选型等质量保证 (10)一、设计遵循的原则 (10)二、设计采用的标准 (10)三、设计审查 (10)四、设备的选型、配置、计算 (10)五、设计变更管理 (11)六、图纸管理 (11)七、其它相关管理办法及规定 (11)第三章检修物资质量保证 (12)一、检修物资采购的验收检查 (13)二、检修物资的储存及保养 (14)三、检修物资的库存管理 (14)四、其它相关管理办法及规定 (14)第四章检修过程质量管理 (15)一、施工现场的要求 (15)三、检修过程中的质量检查验收规定 (10)二、检修过程中的相关检验表格 (17)1、检修及改造质量检查、记录通用表格 (17)2、设备检修质量检查、记录表格 (18)3、锅炉检修、改造质量检查记录表格 (19)4、电气设备检查检测表格 (20)5、自控仪表设备检修检测表格 (22)6、无损检测表格 (23)三、乙购设备验收 (23)四、单项工程质量控制 (23)第五章检修设备投用后质量管理 (24)一、启动前的安全检查 (24)二、启动后的质量验证 (24)三、设备投用后的异常原因及可靠度分析 (24)四、检修记录归档 (25)附件:常用表格汇总 ......................................................................................... 26-156第一章设备检修质量保证程序一、目的根据公司2015年炼油装置检修“除隐患,消瓶颈,降能耗,增效益,实现装置本质安全,确保四年一修长周期运行”的总体目标要求。
为了抓好全员、全过程的检修质量控制,实现检修开车一次成功,确保下一个“四年一修”长周期运行质量目标,特制定本质量控制大纲。
(建筑工程管理)通风安装施工日志安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志鲁TK—005山东省建设工程质量监督总站监制安装施工日志。