AC-155LP SPACE HEATER2 Operator’s ManualPageSafety (4)Controls (9)Preparation (10)Installation (12)Operation (12)Troubleshooting (14)Service (16)Storage (17)Specifications (18)Wire Diagram (19)Warranty (20)Notes (21)All information, illustrations and specifications in this manual are based on the latest information available at the time of publication. The right is reserved to make changes at anytime without notice.Operator’s Manual 34 Operator’s ManualOperator’s Manual56Operator’s ManualOperator’s Manual78Operator’s ManualINSPECT SPACE HEATERBe sure all covers, guards and shields are tight and in place.Locate all operating controls and safety labels.Inspect power cord for damage before using. There is a hazard of electrical shock from crushing, cutting or heat damage.Remove all packing items applied to space heater for shipment. Remove all items from carton. Check items for any shipping damage. If space heater is damaged, promptly inform dealer where you bought space heater.SERVICE SPACE HEATER SAFELYBefore servicing the space heater, disconnect all equipment and battery (if equipped) and allow unit to cool down.Service space heater in a clean dry flat area.Operator’s Manual 9A -- Hot Air Outlet (Front)B -- Upper ShellC -- HandleD -- Fan GuardE -- Power CordF -- Thermostat KnobG -- Hose / Regulator Assembly H -- Inlet Connector I -- On / Off Switch J -- Lower Shell10 Operator’s ManualOperationOPERATION5. Plug extension cord into a 120 volt/60 hertz, 3-hole, grounded outlet.6. Open propane supply valve on Propane / L.P. tank(s) slowly.Note:If not opened slowly, excess-flow check valve on Propane / L.P. tank will stop gas flow. You may hear a click from the excess-flow check valve closing. If this happens, reset the excess-flow check valve by closing propane supply valve and open again slowly.7. Turn thermostat control knob fully counterclockwise to the "cooler" position. Turn ON/OFF switch to the ON position. Turn thermostat control knob slowly clockwise until electric motor and fan begin to run. Heater will start in approximately 3 seconds. Adjust thermostat control knob to warmer or cooler setting as needed.Note: If heater does not start after 3 seconds, the ignition control will automatically attempt to start heater one time. If heater fails to start on this attempt, the safety control will "lock out" and no further automatic restarts will be attempted. This could occur if air remains in fuel line. If heater fails to start on this attempt, turn ON/OFF switch to OFF position. Wait ten seconds for safety control to reset, then turn ON/OFF switch back to ON position and try to start heater again.8. Thermostat Operation Only: During normal thermostat operation, heater will cycle off when air temperature rises to thermostat setting. When air temperature drops sufficiently below thermostat setting, the electric motor and fan will begin to run. After 15 to 60 seconds, heater burner should automatically ignite and provide heat to maintain temperature setting.STOP SPACE HEATER:1. Tightly close propane supply valve on Propane / L.P. tank(s).2. Wait a few seconds. Heater will burn gas left in supply hoses.3. Turn ON/OFF switch to the OFF position.4. Unplug heater.StorageITEM SPECIFICATIONModel Size AC-155LPOutput Rating (BTU / Hr) 150,000Fuel Propane Vapor OnlyFuel Consumption:(Gal. Per Hr / Liters Per Hr) 1.6 / 6.1(Pounds Per Hr / Kilograms Per Hr) 7.0 / 3.2Supply Pressure to Regulator:Minimum (for input adjustment) 10 PSI / 65.98 kPaMaximum Tank PressureRegulator Outlet Pressure ******************"WC/31.8cm Manifold Pressure 9.8" WC / 24.9 cmHot Air Output (Approx.) 550 CFM / 15.6 cubic meter / minute Motor RPM 3450Motor HP 1/8Electric Input 120V / 60HzAmperage (Normal Run) 2.2Ignition Electronic Direct Spark, D.S.I. Ignitor Gap 0.13 in / 0.15 in (3.3 mm / 3.8 mm) Shipping Weight(Approximate Pounds /Kilograms) 35 / 15.9Space Heater Weight(Approximate Pounds /Kilograms) 27 / 12.2RECORD SERIAL NUMBERWrite you model number, machine serial number anddate of purchase in the spaces provided below. Yourdealer needs this information when ordering parts.Model No. ______________________________________________Machine Serial No. _______________________________________Date of Purchase ________________________________________(To be filled in by purchaser)STATEMENT OF WARRANTYJohn Deere warrants all parts, (except those referred to below), of your new space heater to be free from defects in materials and workmanship during the following periods: For One (1) Year from the date of original purchase.Defective parts not subject to normal wear and tear will be repaired or replaced at our option during the warranty period. In any event, reimbursement is limited to the purchase price paid.EXCLUSIONS1. This warranty does not cover parts damaged due to normal wear, misapplication,misuse, operation at other than recommended. Failure to follow recommended operating and maintenance procedures also voids warranty.2. The use of other than genuine manufacturer repair parts will void warranty.3. Warranty will be void if used in any application other than consumer / homeowner.Parts returned, prepaid to our factory or to an Authorized John Deere Service Center will be inspected and replaced free of charge if found to be defective and subject to warranty. There are no warranties which extend beyond the description of the face hereof. Under no circumstances shall the manufacturer bear any responsibility for loss of use of the unit, loss of time or rental, inconvenience, commercial loss or consequential damages.For Service or Warranty Consideration, contactMi-T-M® Corporation, 8650 Enterprise Drive, Peosta, IA 520681-877-JD-KLEEN / (1-877-535-5336) Fax 563-556-1235Monday - Friday 8:00 a.m. - 5:00 p.m. CST。
双辽风电场Gamesa850风机102月定检单风机号:工作负责人: 定检人员:日期:
1.2温度监察:
操作方法:在发电机温度接线盒内,解下发电机所有测温元件接线。
测出发电机绕组、前轴承、后轴承元件阻值,然后换算出相应的温度,与系统的相应温度进行对比,温度偏差较大的要进行处理。
1.3震动监察
操作方法:设定发电机转速:300转、1200转、用测振仪按照XYZ的方法,对发电机前后进行测量并记录相应转速下的震动值。
对震动较大的要进行分析,是否因为发电机对中或轴承损坏所引发的震动。
1.4发电机滑环炭刷高度测量值:
接地炭刷高度:( mm) 滑环磨损槽深测量值:( mm)
相间环1高度: 1号刷( mm) 2号刷( mm) 3号刷( mm) 4号刷( mm) 相间环2高度: 5号刷( mm) 6号刷( mm) 7号刷( mm) 8号刷( mm) 相间环3高度: 9号刷( mm) 10号刷( mm) 11号刷( mm) 12号刷( mm)
1.5比例阀调整方法
首先,打开比例阀电路板的盒盖(使用2.5号六方扳手),可以看到如上图中所看到的电路板的大致形状。
(要注意不要损坏了连接电缆)
如果,在作常规流量测试时( test REGULACIÓN ),比例阀的值不再规定的范围内,需要调整A,B电位器的值,A用于正值,B用于负值,顺时针增加,逆时针减少。
一般调整1/4--1/2圈。
如果,在作快速流量测试时(flow test),比例阀的值不再规定的范围内,需要调整c,d电位器的值,C用于正值,D用于负值,顺时针增加,逆时针减少。
一般调整1/4--1/2圈。
调整完之后,要重新测试,进行检查。
犐犆犛91.140.10犘46!"#$%&''()*犌犅/犜39288—2020!"#$%"&'犜犺犲狉犿犪犾狊狋狅狉犪犵犲犱犲狏犻犮犲狑犻狋犺犲犾犲犮狋狉犻犮犪犾犻狀狆狌狋犪狀犱狋犺犲狉犿犪犾狅狌狋狆狌狋2020 11 19()2021 10 01*+'(+,-./012目 次前言Ⅰ…………………………………………………………………………………………………………1 范围1………………………………………………………………………………………………………2 规范性引用文件1…………………………………………………………………………………………3 术语和定义2………………………………………………………………………………………………4 分类与标记4………………………………………………………………………………………………5 一般要求4…………………………………………………………………………………………………6 要求6………………………………………………………………………………………………………7 试验方法7…………………………………………………………………………………………………8 检验规则9…………………………………………………………………………………………………9 标志、包装、运输和贮存10…………………………………………………………………………………附录A(规范性附录) 蓄热型电加热装置的实验室热工性能试验方法12………………………………附录B(资料性附录) 蓄热型电加热装置的现场热工性能试验方法19…………………………………犌犅/犜39288—2020前 言 本标准按照GB/T1.1—2009给出的规则起草。
本标准由中华人民共和国住房和城乡建设部提出。
本标准由全国暖通空调及净化设备标准化技术委员会(SAC/TC143)归口。
附件XX:低压电动机技术规书1总如此1.1额定功率200kW与以上的电动机采用10kV电压供电;额定功率200kW以下电动机采用400V电压供电。
1.2所供电机与其设备需要经过CE认证,产品上带CE标志(CE Marking)。
厂家要按照西门子低压电机来报价。
如果厂家能找到符合CE认证的其他电机厂家,请厂家澄清与西门子低压电机的价格差异,供招标方选择确认。
1.3本技术规书适用于土耳其速马2×255MW燃煤电站项目工程中使用的400V低压电动机与其附件的订货,它包括电机本体与辅助设备的功能设计、结构、性能、安装和试验等方面的技术要求和相关要求。
1.4本技术规书提出的是最低限度的技术要求,并未对一切技术细节作出规定,也未充分引述有关标准和规的条文,投标方应保证提供符合本规书和最新IEC标准的优质产品。
1.5如果投标方没有以书面对本技术规书的条文提出异议,那么招标方可以认为投标方提供的产品应完全符合本规书的要求。
1.6在签订技术协议之后,买方有权提出因规标准和规程发生变化而产生的一些补充要求,具体项目由买、卖双方共同商定。
1.7本技术规书所使用的标准如遇与投标方所执行的标准发生矛盾时,按较高的标准执行。
1.8本工程采用KKS标识系统。
投标方提供的技术资料(包括图纸)和设计标识必须有KKS编码。
具体标识要求由提出,在设计联络会上讨论确定。
1.9投标方或其技术引进方的产品应在一样容量机组工程或相似条件下有良好的供货业绩和运行记录,并超过三年,已证明安全可靠。
1.10投标方对电机的成套系统设备(含辅助系统与设备)负有全责,即包括分包(或采购)的产品。
1.11本工程可以提供的电源为交流10kV,交流400V/230V,直流220V。
交流电源为50Hz,电压波动围为90%~110%。
直流电源电压波动围为85%~120%。
如果投标方所供设备需要其他电压等级的电源,需自配变压器设备。
1.12设计环境条件:最低温度:<0℃(-10℃为记录值);最高温度:+40℃;室外相对湿度:100%;电气设备额定运行设计温度:40℃;安装地点污秽等级IV级,泄露比距为/kV〔最高工作线电压〕。
凝结水系统讲座主凝结水系统指由凝汽器至除氧器之间相关的管道与设备。
主凝结水系统主要作用是加热凝结水,并加凝结从凝结器热井送至除氧器。
作为超临界机组,对锅炉给水的品质很高,因此主凝结水系统还要对凝结水系统进行除盐净化,此外,主凝结水系统还对凝结器热井水位和除氧器水位进行必要的调节,以保证整个系统的安全运行。
一系统的组成主凝结系统包括两台100%容量立式凝结水泵(型号:C720III-4,)、凝结水精处理装置、一台轴封加热器,四台低压加热器,一台凝结水补充水箱和两台凝结水补充水泵。
为保证系统在启动、停机、低负荷和设备故障时运行时安全可靠,系统设置了众多的阀门和阀门组。
主凝结水的流程为:凝结器热井→凝结水泵→凝结水精处理装置→轴封加热器→8号低压加热器→7低压加热器→6低压加热器→5低压加热器→除氧器。
1 凝结水泵及系统凝结水泵用途:凝结水泵在高度真空的条件下将凝汽器的热井中的凝结水抽出,输送接近于凝汽器压力的饱和温度的水。
1台变频运行1台工频备用。
离心泵的工作原理:在泵内充满水的情况下,叶轮旋转使叶轮内的内也跟着旋转,叶轮内的水在离心力的作用下获得能量,叶轮林槽道内的水在离心力的作用下甩向外围流进泵壳,于是在叶轮中心压力降低,这个压力低于进水管压力,水就在这个压力差的作用下由吸水池流入叶轮,这样水泵就可以不断的吸水,不断的供水了。
具有结构简单、不易磨损,运行平稳、噪声小、出水均匀,可以制造各种参数的水泵,效率高等优点,因此离心泵可以广大的应用。
凝结水泵轴封有良好的密封性能,不允许发生漏泄现象。
凝结水泵轴封采用机械密封。
泵能在出口阀关闭的情况下启动,而后开启出口阀门。
泵能承受短时间的反转。
2 凝结水精处理装置为确保锅炉给水品质,防止由于铜管泄漏或其它原因造成凝结水中的含盐量增大。
(大机组特有)。
3 轴封加热器及凝结水最小流量再循环在汽轮机级内,主要是在隔板和主轴的间隙处,以及动叶顶部与汽缸(或隔板套)的间隙处存在漏汽。