计算机系统验证方案

计算机系统验证方案
计算机系统验证方案

Computerised System Validation

计算机系统验证

Dept.

部门:

Effective Date

1Objective 目的

Test and assessment should be taken for URS, design, purchase,

installation, function, as well as process adaptability of computerized and PLC control system related to GMP in compliance with this SOP so as to

ensure that computerized and PLC are fit for design requirement and stated

This SOP is fit for the validation management of computerized and PLC

control system related to GMP, which apply to material control and

management, laboratory equipment control and communication management,

manufacturing process control, and utilities control.

本SOP适用于电脑,PLC控制系统的管理是否符合GMP,物料控制和管理,实验设备控制

3

4Definitions定义

Computerized or PLC control system: It composed of hardware, system

software, applications, and relevant peripheral devices is a system that

can implement a function and a set of functions.

无论是计算机化还是PLC控制系统:都是由硬件、系统软件、应用、及相关的周边设备

组成的一个系统,可以实现某一功能和一套功能。

Source code: It is source program of computer whose format( program

language) can be read by operator, before computer execution, it should be

translate to machine language whose format can be executed by computer.

5

5.1Organization of Validation team and responsibility

验证机构及责任

Validation team is composed of supplier, QA, Equipment Department, use

department.

验证团队由供应商,QA、工程设备部和使用部门组成。

Implementation department responsibility of system validation

系统验证实施部门的职责

Use department: Responsible for providing written URS, preparing

validation protocol and report, implementing approved IQ and OQ

protocol, completing final report and participating validation

deviation investigation and alteration review.

使用部门:负责提供书面的URS,准备验证方案和报告、实施批准IQ,OQ协议,完成

最终报告偏差并参与调查及变更验证审核。

Equipment Department: Responsible for cooperating with use department

to prepare URS and validation protocol, receiving system, installing

system and implementing IQ, guiding use department on IQ and OQ process

and participating validation deviation investigation and alteration

review.

设备部门:负责准备使用部门的合作协议,并确认你接收系统,安装系统,实施IQ,指

导使用部门关于IQ和OQ的验证过程和参与验证偏差调查和变更回顾。

QA: Responsible for reviewing validation draft and final report,

implementing validation protocol, participating validation deviation

investigation and alteration approval and archiving validation protocol

and report.

QA:负责审查验证,也是最后一项报告草案、实施验证方案,参与调查及变更验证

偏差的批准验证方案和归档,并做好报告。

5.2System classification

5.2.1Before validation, evaluation and classification should be carried out for

system so as to insure that different grade validation should be provided for different type computerized and PLC control system. Classification as follows:

在验证之前,评估和分级应当进行系统分类,以确保不同等级验证需提供不同类型的计算机化的,PLC控制系统,分类如下:

5.2.2

be classified in accordance with developing degree of each module.

一些计算机化的和PLC控制系统复杂程度应当跟各分类模块的开发程度相一致。

be

also 5.3

with fundamental requirement, expectation and performance index of new/changed computerized and PLC control system, which will be use to determine system designing criteria. Content as follow:

URS应该为系统用户和项目专家准备基本要求详细的,预期和新的性能指标、更改计算

机化和PLC控制系统,可以用来决定系统设计标准。内容如下:

System description: what to do about system, how connection and interaction between different module, control methods (e.g. logic control, separation control, interlock control, alarm control, location control, temperature control, pressure control, time control, counting and other multipolar

3

5.3.1.

4output program and detailed explanation, reproduction of software provision and retention condition, system block drawing and configuration list.

软件的文件标准:包括程序编号和修改编号,输出接口程序和详细说明、软件的追加和

保留条件、系统分程序图纸和配置清单。

5.3.1. 5Test requirement: test items and record required to be carried out on system developing process, including module separated test and integrated test.

测试要求:测试项目和记录必须在系统的发展过程中进行,包括模块测试和集成分离测

6

1

system

PID

control element pareto diagram.

系统设计应该由系统配置图、硬件设计和软件设计组成。在供应商准备的系统设计被

用户评估和检验后,可配置的系统图纸设计应该完成,包括系统PID, I/O (输入/输

出)连接图、连接原理帕累托图。

5.3.2. 2Hardware design: include all I/O (input/output) connection template and type, CPU selection, communication template, man-machine Interface controller, screen viewer selection, medium relay, memory, printer, auxiliary power unit, electronic element/wire/cable, other elements etc.

硬件设计:包括所有I/O (输入/输出)连接模板和类型,CPU选型,通信模板、人机界面

/电

3

fit for

:

1

SOP, training plan, post-sale service agreement, equipment inventory, security program, hardware qualification, software qualification, source code, instrument list, instrument calibration procedure, PID, control loop diagram, I/O (input/output) device list and connection diagram, spare parts list, and maintenance procedure.

文件确认应该由用户工艺要求、SOP,培训计划,售后服务协议、设备库存,安全程序、硬件说明,软件说明,源代码、仪器清单、仪器校准程序、PID、控制回路图,I/O(输入/输出设备清单和连接图,备件清单和维护规程。

5.3.3. 2Installation process qualification: qualify that installation is fit for requirement PID and operating manual.

3

clean

alarm

its adjustment, continuous power supply, wide area network connection, local

area network connection, disaster recovery, telephone figure/ analog,

etc.

记录关键设施以及条件, 鉴定的公共设施应该跟说明一致:包括消防报警公告/预防系

统、冷却系统、电力及调整,持续供电、大面积网络连接,本地区域网络连接,灾难恢

复、电话图形/模拟等

(3)Qualify that record system is fit for requirement of man-machine

engineer.

条件和记录系统符合人控机工程师的要求。

All instruments and meters should be calibrated and on expire day of

calibration. Calibration should be fit for definite criteria and

corresponding certification should be provided.

所有仪器仪表应该被校准和标注过期日,校准应该有明确的标准及应提供相应的检查

证件。

I/O (input/output) signal test should be carried out so as to ensure

that single can transmit from control system to device and return.

I/O (输入/输出)信号试验应确保信号可以在控制系统设备间进行传输和反馈。

Data acquisition and transmission and signal memory test

数据采集,传送和信号记忆测试

Other tests

?其他测试

OQ (operation qualification)

out on

1

Test for system security: “worst case”of all logic systems should be tested, e.g. use authority of different persons should be tested so as to identify that operation unauthorized should be forbidden.

测试系统安全:“最坏情况”的系统逻辑应该进行测试,如使用不同权限以便确认未经授权运行是否被禁止。

Various processes control function tests required by system request: “ worst case “ ( e.g. maximum communication load, process of considerable data document, etc.) test for all function of system and decision routines

Test for timer and sequencer: establish time and program of system generating corresponding function according to system operation manual so as to validate efficacy of system timing or ordering program.

定时器和定序器测试: 根据系统的操作手册设置时间和系统产生相应的功能以确认系

统有效时间或程序命令

Test for data disposal and memory

测试数据处理和记忆

(1)Qualify correct data memory, collection and search of system’s own.

在系统关闭之前和之后检查数据采集的情况,确保数据没有损坏或丢失。

(2)Check the function of backup power supply, uninterruptible power supply, power adjuster and power generator.

检查备用电源的供应、不间断电源供应器、电力调节器和电力发电机。

(3)System breakdowns or failures should be made in accordance with system

operation manual so as to ensure that back-up system should be provided.

系统故障和失败的时候,能够根据系统的操作手册提供系统备份。

running

PQ的目的是确认系统运行过程中的有效性和稳定性方面的情况。测试项目应确定跟期

望达到的结果相一致、二次确认也应该执行。

If system is part of production, laboratory or utilities, PQ of system

should be completed conformity with PQ of equipment (utilities).

如果系统是生产,实验室或公共设施系统的一部分,系统的PQ必须根据设备的PQ进行完整性测试。

5.3.5. 1If a manual system is being replaced by computerized and PLC control system, the two should be run in parallel.

当一个人工系统被电脑,PLC控制系统取代时,两者需要平行运行。

2

Tests

some

对设备的连续过程进行监控应当进行,如空气净化体系的指标,例如尘埃粒子、微生

物、温度、湿度、风量、压差、换气频率等,应在一个周期内被监控。

Validation deviation

偏差验证

5.3.6The disposal of system validation deviation can refer to < Validation

Organization and Implementation>.

处置系统偏差验证可参阅<验证组织和实施>。

(1) Written application should be prepared by use department, including

change reason, evidence, and content and implementation protocol.

使用部门应该准备好书面申请,包括变更原因,证据,内容和实施方案。

(2)Professional technologist, the head of relevant department and QA are responsible for assessing, reviewing and approving.

工艺主管,相关部门经理和QA负责评估、审查和批准。

(3) Whether revalidation should be taken or not should be on the basis of impacting range. E.g. validation should be carried out for the parts of

and PLC

after

by

be

into

where necessary, revalidation should also be carried out for relevant systems.

对于变更对其他有关系统的影响,应当进行考核和系统评估,必要时, 相关系统还要进行再验证。

计算机系统验证办法

精心整理Computerised System Validation 计算机系统验证 Dept. 部门: Effective Date 生效日期: 2 This SOP is fit for the validation management of computerized and PLC control system related to GMP, which apply to material control and management, laboratory equipment control and communication management, manufacturing process control, and utilities control. 本SOP适用于电脑,PLC控制系统的管理是否符合GMP,物料控制和管理, 实验设备控制和通信管理、生产过程控制、公用设施的控制的验证。

3 Responsibilities 职责 QA is responsible for drafting, revising, reviewing, training, implementing and supervising this SOP. QA负责起草、修订、审核、培训、实施和监督本SOP。 The quality director is responsible for approving this SOP. 质量副总负责批准本SOP。 Relevant departments are responsible for reviewing and implementing this SOP。 相关部门负责审核和实施本SOP。 4 , 5 5.1 OQ investigation and alteration review. ●使用部门:负责提供书面的URS,准备验证方案和报告、实施批准 IQ,OQ协议,完成最终报告偏差并参与调查及变更验证审核。 ●Equipment Department: Responsible for cooperating with use department to prepare URS and validation protocol, receiving system, installing system and implementing IQ, guiding use department on IQ and OQ process and participating validation deviation investigation and alteration review. ●设备部门:负责准备使用部门的合作协议,并确认你接收系统,安装系统, 实施IQ,指导使用部门关于IQ和OQ的验证过程和参与验证偏差调查

计算机系统验证方案

页脚 . Computerised System Validation 计算机系统验证 Dept. 部门: Effective Date 生效日期: Confidential Level 等级: □ Top-secret 绝密 □ Confidential □ Cryptical 秘密 Distribution List : 分发清单: QA 部、QC 部、OSP 固体制剂部、Lo.物控部、EN 工程部、TD 技术部、EQ 设备部 1 Objective 目的 Year/年 Month/月 QA 质量保证部 Date/日

Test and assessment should be taken for URS, design, purchase, installation, function, as well as process adaptability of computerized and PLC control system related to GMP in compliance with this SOP so as to ensure that computerized and PLC are fit for design requirement and stated technical criteria and are able to work stably for a long time. 测试、评估采取的URS、设计、采购、安装、功能以及计算机控制和PLC控制系统 符合GMP,以确保计算机和PLC符合设计要求和工艺要求并且能够稳定工作很长时 间。 2 Scope围 This SOP is fit for the validation management of computerized and PLC control system related to GMP, which apply to material control and management, laboratory equipment control and communication management, manufacturing process control, and utilities control. 本SOP适用于电脑,PLC控制系统的管理是否符合GMP,物料控制和管理,实验设备控 制和通信管理、生产过程控制、公用设施的控制的验证。 3 Responsibilities 职责 QA is responsible for drafting, revising, reviewing, training, implementing and supervising this SOP. QA负责起草、修订、审核、培训、实施和监督本SOP。 The quality director is responsible for approving this SOP. 质量副总负责批准本SOP。 Relevant departments are responsible for reviewing and implementing this SOP。 相关部门负责审核和实施本SOP。 4 Definitions定义 Computerized or PLC control system: It composed of hardware, system software, applications, and relevant peripheral devices is a system that can implement a function and a set of functions. 无论是计算机化还是PLC控制系统:都是由硬件、系统软件、应用、及相关的周边设 备组成的一个系统,可以实现某一功能和一套功能。 Source code: It is source program of computer whose format( program language) can be read by operator, before computer execution, it should be translate to machine language whose format can be executed by computer. 源代码:它是计算机的源程序(程序语言),可以在电脑执行前被计算机识别,它应该被翻译成可以被计算机识别的机器语言。 5 Procedures 程序 5.1 5.1.1 5.1.2 Organization of Validation team and responsibility 验证机构及责任 Validation team is composed of supplier, QA, Equipment Department, use department. 验证团队由供应商,QA、工程设备部和使用部门组成。 Implementation department responsibility of system validation 系统验证实施部门的职责 Use department: Responsible for providing written URS, preparing validation protocol and report, implementing approved IQ and OQ protocol, completing final report and participating validation deviation investigation and alteration review.

除菌过滤系统验证方案

除菌过滤系统 验证方案 编制人:编制日期: 审核人:审核日期: 批准人:批准日期: 实施日期:

验证方案目录 1.概述及验证方案说明 (4) 1.1概述 (4) 1.2验证目的 (4) 1.3验证实施条件 (4) 2.预确认 (4) 2.1目的 (5) 2.2项目 (5) 2.3小结 (5) 3.安装确认 (5) 3.1目的 (5) 3.2项目 (5) 3.3小结 (6) 4.性能确认 (6) 4.1目的 (6) 4.2项目 (6) 4.2.1过滤速度、过滤能力、对微粒截留效果、物料平衡、清洗效果的确认 (6) 4.2.2对药液质量影响的确认 (8) 4.3小结 (8) 5.异常情况处理程序 (8) 6.验证周期的确认 (9) 附表 2.1预确认检查记录 (10) 3.1安装确认检查记录 (11) 4.1最佳泵速确认记录 (12) 4.2过滤能力确认记录 (13) 4.3系统损耗量及完整性确认记录 (14)

4.4清洗效果确认记录 (15) 4.5过滤效果确认记录 (16) 4.6过滤对药液质量影响确认记录 (17) 4.7性能确认小结 (18)

1.概述及验证方案说明 1.1概述 ****为非最终灭菌的无菌制剂,除菌过滤是整个工艺流程中保证药液无菌的重要环节。我公司在生产中使用的除菌过滤系统由粗滤系统和精滤系统组成,包括滤芯、滤壳、硅胶管、蠕动泵。滤芯为****厂生产的聚醚砜滤芯,规格为5英寸、通过精度为0.2μm;滤壳为上海先维过滤设备厂生产的316L不锈钢滤筒;硅胶管为美国道康宁公司生产的药用级硅胶管,内径为**英寸(**mm),壁厚为**英寸(**mm);蠕动泵为****有限公司生产的****型工业蠕动泵。 粗滤系统由滤芯(5英寸,0.2μm),滤壳和两根各****m长硅胶管组成;精滤系统由滤芯(5英寸,0.2μm),滤壳和一根****m长、一根****m长硅胶管组成。 1.2验证目的 通过对设备厂家资质、技术文件、设备材质的检查,及对设备各项性能的试验,证明该设备符合生产工艺要求和GMP规定。 1.3验证实施条件 1.3.1验证用仪器设备及试剂 验证用测试仪器设备及试剂 1.3.2相关文件 验证相关文件 2.预确认

计算机系统验证方案

Computerised System Validation 计算机系统验证 Dept. 部门: Effective Date 生效日期: Confidential Level 机密等级: □ Top-secret 绝密 □ Confidential 机密 □ Cryptical 秘密 Distribution List : 分发清单: QA 部、QC 部、OSP 固体制剂部、Lo.物控部、EN 工程部、TD 技术部、EQ 设备部 1 Objective 目的 Year/Month/月 QA 质量保证部 Date/日

Test and assessment should be taken for URS, design, purchase, installation, function, as well as process adaptability of computerized and PLC control system related to GMP in compliance with this SOP so as to ensure that computerized and PLC are fit for design requirement and stated technical criteria and are able to work stably for a long time. 测试、评估采取的URS、设计、采购、安装、功能以及计算机控制和PLC控制系统符 合GMP,以确保计算机和PLC符合设计要求和工艺要求并且能够稳定工作很长时间。 2Scope范围 This SOP is fit for the validation management of computerized and PLC control system related to GMP, which apply to material control and management, laboratory equipment control and communication management, manufacturing process control, and utilities control. 本SOP适用于电脑,PLC控制系统的管理是否符合GMP,物料控制和管理,实验设备控制 和通信管理、生产过程控制、公用设施的控制的验证。 3Responsibilities 职责 QA is responsible for drafting, revising, reviewing, training, implementing and supervising this SOP. QA负责起草、修订、审核、培训、实施和监督本SOP。 The quality director is responsible for approving this SOP. 质量副总负责批准本SOP。 Relevant departments are responsible for reviewing and implementing this SOP。 相关部门负责审核和实施本SOP。 4Definitions定义 Computerized or PLC control system: It composed of hardware, system software, applications, and relevant peripheral devices is a system that can implement a function and a set of functions. 无论是计算机化还是PLC控制系统:都是由硬件、系统软件、应用、及相关的周边设备 组成的一个系统,可以实现某一功能和一套功能。 Source code: It is source program of computer whose format( program language) can be read by operator, before computer execution, it should be translate to machine language whose format can be executed by computer. 源代码:它是计算机的源程序(程序语言),可以在电脑执行前被计算机识别,它应该被翻 译成可以被计算机识别的机器语言。 5Procedures 程序 of Validation team and responsibility 验证机构及责任 Validation team is composed of supplier, QA, Equipment Department, use department. 验证团队由供应商,QA、工程设备部和使用部门组成。 Implementation department responsibility of system validation 系统验证实施部门的职责 Use department: Responsible for providing written URS, preparing

GMP认证--计算机化系统验证管理规程

性以及工艺适应性的测试和评估,以证实该计算机控制系统能达到设计要求及规定的技术指标,且能够长期稳定工作。 2.范围:本规程适用于被确定为与GMP相关的计算机控制系统的验证管理,此类计算机控制系统主要用于物料控制及管理、实验室设备控制及信息管理、生产工艺及控制、生产工艺设备控制、公用设施控制。 3.职责 3.1质量保证部:负责验证方案及报告的审核批准,并确保按照验证方案实施,参与验证偏差调查及变更审批,并负责将验证报告归档保存,组织供应商审计。 3.2使用部门:负责制订用户需求和验证方案,参与系统的验收、安装及组织并落实安装确认、运行确认、性能确认,参与验证偏差调查及变更审核,参与供应商审计。 3.3物料部:负责筛选供应商并参与供应商审计。 3.4工程部信息管理岗:参与URS和验证方案的制定,参与验证偏差调查及变更审核,参与供应商审计。 4.内容 4.1定义 4.1.1计算机控制系统:由硬件、系统软件、应用软件以及相关外围设备组成的,可执行某一功能或一组功能的体系。本文计算机控制系统包括PLC控制系统。 4.1.2源代码:以人类可阅读的形式(编程语言)表示的初始的计算机程序,在计算机执行之前,需译成机器可阅读的形式(机器语言)。 4.2验证流程图:见附录。 4.3验证内容 4.3.1验证小组的组成及职责 4.3.1.1验证小组的组成由供应商、质量保证部、设备工程部、IT及使用部门所组成。 4.3.1.2系统验证各实施部门职责

认、性能确认,参与验证偏差调查及变更审核。 质量保证部:负责验证方案及报告的审核批准,并确保按照验证方案实施,参与验证偏差调查及变更审批,并负责将验证报告归档保存,组织供应商审计。 采供贮运部:负责筛选供应商并参与供应商审计。 工程部信息管理岗:参与URS和验证方案的制定,参与验证偏差调查及变更审核,参与供应商审计。 4.3.2计算机软件分类 4.3.2.1 GAMP根据系统的风险性、复杂性和创新性,对计算机系统进行分类,通过对系统进行分类来协助确定验证活动和文件范围,软件分类如下:

除菌过滤系统验证方案

除菌过滤系统验证 方案 1 2020年4月19日

xxxxx制药有限公司GMP文件 2 2020年4月19日

除菌过滤系统验证方案 验证方案目录 1.概述 2.验证目的 3.验证范围 4.验证部门职责 5.采用的文件 5.1《中国药典》xxxx版x部xx页 5.2药品生产质量管理规范(xxxx年修订) 5.3药品生产验证指南(xxxx) 5.4无菌制剂质量风险控制验证 5.5标准操作程序 5.6质量标准 3 2020年4月19日

5.7检验标准操作程序 5.8取样标准工作程序 6. 生产操作过程简述 7. 验证程序 7.1除菌过滤系统验证 7.2灭菌后产品检验 除菌过滤系统验证方案 1.概述 xxxx注射剂是我公司生产近上市品种,也是药典品种,是用于xxx病、xxxxxx、xxxxxxx等的治疗的一种液体制剂。该产品的特点是药效明确,药性稳定、安全。确认除菌过滤0.22μm聚醚砜筒式滤芯,使微生物的截留达到除菌过滤目的,因此在该产品的整体工艺设计上采用微生物残存概率百万分之一(SAL=10-6),并采用105℃、30分钟灭菌方式,使最终产品符合质量要求。 4 2020年4月19日

采用的工艺方案流程如下: 原料药→浓配液→稀配液→除菌过滤→灌装→轧盖→灭菌→成品 附图(一) 为此,验证小组对所用的0.22μm聚醚砜筒式滤芯除菌过滤系统进行了验证,以确保按本工艺流程生产出来的产品品质稳定、安全有效。 2.验证目的 除菌过滤系统在整个工艺流程中的地位是极其重要的,我们经过它来达到药液中除菌的目的。这套系统本身的合理性对产品质量保证也有重要影响。因此,我们经过对该系统作前验证,来建立有科学依据,且有可靠质量保证的过滤除菌系统,以维持全套工艺流程的稳定性。 5 2020年4月19日

计算机化系统验证方案

紫外分光光度计 计算机化系统验证方案万案起早 存档日期:______ 年—月—日

验证目的 ....................................................... 2 验证范围 ...................................................... 2 职责确认 ....................................................... 3 指导文件确认 ................................................... 3 术语缩写 ....................................................... 3 验证实施前提条件 ............................................... 4 人员确认 ....................................................... 4 风险评估 ....................................................... 4 验证时间安排 ................................................... 5 验证内容 ...................................................... 5 偏差处理 .. (11) 风险的接收与评审 ............................................. 11 确认计划 ..................................................... 12 验证谱图编制 ................................................. 12 审核、结论 (12) 验证目的 我司质量检验部现有1台XXX 型紫外分光光度计(),与工作站软件、计算机系统 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1

原料车间过滤系统系统验证方案

1. 目的 通过对该系统作验证,以确保按本工艺流程生产出来的产品质量稳定、安全、均一,以保证生产工艺控制的稳定性。 2. 适用范围 原料药车间脱色粗制岗位、结晶精制岗位所用的物料过滤系统。 3. 责任范围 原料药过滤系统验证小组成员对本方案负责。 4. 概述 我公司精烘包原料车间生产头孢类抗生素无菌原料药,该产品的特点是药效明确,药性稳定、安全、卫生、外观是白色或淡黄色粉末。因此在该产品的整体工艺设计上采用了无菌精精制的生产方式,最终产品采用无菌铝桶包装。我们采用的物料过滤系统工艺方案如下: 反应液1→钛棒过滤器粗滤除碳(1μm)→0.45μm微孔过滤器一级粗滤 →0.22μm微孔过滤器除菌过虑→结晶罐结晶。 反应液2→钛棒过滤器粗滤除碳(1μm)→0.45μm微孔过滤器一级粗滤 →0.22μm微孔过滤器除菌过虑→高位滴加罐→结晶罐结晶。 过滤系统的清洁消毒:用注射用水清洗完毕以后,通入纯蒸汽进行灭菌消毒,要求在纯蒸汽压力≥0.2Mpa条件下,温度121℃30分钟. 5.过虑系统安装确认: 5.1过滤系统组件及设备 过滤系统组件及设备的构成如下:

以上过滤系统组件共有2套。 5.2仪器仪表的校验 过滤系统关键性仪表校验见附件2: 6.过虑系统的运行确认 6.1对本过滤系统工作的验证,在内容上,主要包括以下内容: 验证内容及可接受标准 6.2.1过滤器适应性试验和有效成份的截留验证 6.2.1.1实验对象:以头孢西丁生产成盐反应结晶过程,原料药药物中的活性 成份头孢西丁为验证对象,考察其在过滤前后成份含量的变化。 6.2.1.2可接受标准:见上表“验证内容及可接受标准表”第1项 6.2.1.3检验方法:头孢西丁钠检验操作规程 6.2.1.5验证方法:在头孢西丁钠试生产三批,按头孢西丁钠生产工艺投料生产 时过程取样进行验证 6.2.1.5.1过滤器适应性试验:反应药液经过滤系统过滤完成后,取脱炭滤液与精滤后滤液对比检查其外观,并对过滤器过滤前后进行外观检查,2个系统检查结果见附件3:过滤系统适应性试验结果表 6.2.1.5.2有效成份的截留验证 取脱炭滤液与精滤后滤液对比检查头孢西丁钠含量,实验结果见附表4 6.2.2微生物挑战性实验 验证目的用过滤含有定量指示细菌的培养基,模拟实际过滤工艺的方法来确认

计算机系统验证方法与应用

计算机系统验证方法与应用 计算机系统验证问题已经成为目前我国制药行业的自动化与信息化发展的最大阻力,探索如何真正理解GAMP的理论和概念,根据不同的计算机系统的特点和要求,分门别类建立对各类计算机系统进行真正科学、合理的验证模式或标准,已是我国医药工业自动化、信息化工作和药品质量管理工作的一个关键性课题。 一. 现场检查中验证检查的重点 近年来FDA检查官在现场检查中关注的验证工作如下: General Are facility layout drawings including mechanical, electrical and architectural kept up-todatefollowing changes? Is revalidation of facilities performed following reimbursement? Validation for effectiveness of cleaning/sanitation, and validation of removal of residual cleaning/sanitizing agents? Equipment Is there a system for validation and regular revalidation of all equipment, including revalidation after repairs? Cleaning and Maintenance Are calibrations and validation being performed adequately? Automated and Computerized Equipment and Systems Where computerization eliminates calculations, is a written record of the program filed with the validation data? Validation of hardware and software: Is validation performed in-house or on contract? If on contract, are records kept of the qualifications of the contractor? Processes Has each phase of the production process been validated according to an approved validation protocol? Is re-validation done when required, and performed appropriately? Sterilization / Depyrogenation Are systems for filter sterilization validated and conditions still the same as when validation was performed? 二. 制药行业的计算机系统验证究竟为何? 难道计算机系统验证就只是IQ, OQ, 与PQ? 验证必须从制定可执行的验证计划开始(VP),定义可被测试的用户需求(URS),并根据客户自身对风险的评估结果(RA),选择合适的供应商(DS, DQ),进行测试(FAT/SAT),最终确

计算机化系统验证及验证文件示例

计算机化系统验证及验证文件示例 --主讲 王宝艺 下面由我来给大家讲一下附录中的计算机化系统,计算机化系统课程大纲共分为三部分: 大纲内容详见上图 今天上午主要讲计算机化系统的验证,关于计算机化系统,在生产应用中的一些应用,包装设备,剩下两块是关于GMP体系的由王彦忠王老师进行讲。对于计算机化系统,现在有2个热门的话题,关于计算机验证和数据完整性,好多数据管理包括实验室数据和生产数据,检查官一检查作为缺陷提出来。 现在对计算机化附录出来以后,什么是计算机化系统从定义来讲如下: 计算机系统由硬件和软件组成,软件如同我们的思想,硬件如我们人的四肢,缺一不可。好多企业有erp系统也是。为什么要对计算机系统进行验证,一是他影响药品质量,一是影响人的健康。我们要认清并不是所有的系统都需要进行计算机验证,只有关系到药品生产质量的,就要进行验证。 我们要将风险管理的理念引入计算机化系统,ERP或者物料的管理是否存在潜在的风险会影响产品质量,我们如果通过风险管理认为这个系统可能会影响到产品的质量,纳闷就需要验证。如果经过判断,只是作为辅助的工作。 举例wms系统,是否需要验证,分情况,如果库只是作为叉车来用,确定物品位置帮助取放,不需要验证。如果系统嵌入效期的管理,用来判断产品是否过有效期,那么这种情况就需要验证。

对计算机系统验证时还有人员,验证人员对计算机系统培训后,能否按照规程进行操作。后面还讲到系统是单机版还是网络版,如果是网络版,我们要对计算机网络框架进行验证。这个是我们对计算机化系统做了一个总结,到底什么是计算机化系统这个定义可以让人员对计算机化系统进一步了解。 日常我们使用的计算机化系统有哪些,详见上图。有些人会问到,我们在日常使用的EXCEL表格要不要进行验证,如果表格用作计算实验结果,这种情况下就需要进行验证。 现在计算机化系统越来越普及,我们为什么要用到计算机化系统,企业最初的想法不过四点,分别为上图中的内容。但是好多企业上完系统之后,往往感觉到实际得到的效果并不能有效的提高企业自动化程度。如果你在选择这套系统没有好好的验证,可能会导致好多故障,反而会降低效率。有些企业在上ERP时,可能是为提高企业形象,但在选择系统是,对供应商的评估不够,供应商在设计这套系统时,并没有考虑到企业的实际情况,最后导致达不到预期的效果。计算机化系统的利与弊,详见上图。 计算机化系统与人工比呢有很多优点,详见上图。 当然,计算机化系统与人工相比也有缺点,如上图。导致计算机化系统工作的不准确行原因一般是软件设置不合理,边缘数据的处理模糊,压力测试不到位。发生固定的错误人工未能及时发现,将导致更加严重的错误。还有计算机化系统的依赖性比较强,一旦发生问题,将导致所有的产品生产工作停滞。

完整的计算机系统确认与验证流程样本

完整的《计算机系统确认与验证流程》 文/石头968 ? 1、验证主计划( 用户提供) 计算机化系统的验证主计划能够作为《xxx企业验证主计划》或者《xxx项目验证主计划》的一个章节, 说明计算机化系统的硬件、软件的分类原则、风险管理原则、确认与验证原则、确认与验证的控制策略, 总之, 规定好企业应该怎么开展计算机化系统的确认与验证工作。 当然, 也能够单独制定《计算机化系统的验证主计划》, 不过计算机系统一般作为设备的不可分割的一部分( 管理类计算机系统除外) , 或者作为电气自控设备的一种, 单独对待的必要性, 也有待于商榷, 大家看着办就行了。 ? 2、用户需求说明( URS) ( 用户提供) 需要计算机帮我们做什么? ( 功能清单) 每一个功能的控制方式, 执行过程? ( 工艺流程图) 每一个功能的传感器输入、执行信号输出( 输入输出方式) 操作人员对人机接口的操作要求? ( 人机接口输入输出方式) 系统的安全性要求? ( 权限设置) 安装空间、位置、所处的环境?

硬件、软件的基本配置要求? 测试、验证、培训、质量控制、变更控制、文件记录要求 预算、货期、合约等商务要求 ? 3、功能说明( 供应商提供, 用户审核) 硬件及软件的系统供应商对企业URS的回复说明。 硬件配置方框图与功能说明。 软件流程方框图与功能说明。 ? 4、设计说明( 供应商提供, 用户审核) 供应商对自己系统的设计思路与开发计划 硬件整体框架与系统结构图、配置清单 软件整体框架、模块化系统结构图 IO清单与详细的配置说明、功能说明 ? 5、系统工程设计( 供应商的工作) 包含硬件设计、软件设计 用户能够不参与 ? 6、设计审核( 供应商提供, 用户审核) 设计审核一般由用户技术人员与QA完成, 经过比较URS与FS、 DS的一致性, 检查系统是否满足需求, 针对不能满足的部分, 需要和供应商进行协商, 特

医疗器械计算机软件验证方案模板

医疗器械计算机软件验证方案模板 依据: 《医疗器械生产质量管理规范》 MDD/93/42EEC医疗器械指令 GB/T 19001-2016 IDT ISO9001:2015 《质量管理体系要求》 YY/T 0287-2017 IDT ISO13485:2016 《医疗器械质量管理体系用于法规的要求》 编制: 审核: 批准:

0 修改历史/History

*******有限公司 目录 1. 确认目的 (4) 2. 确认范围 (4) 3. 确认职责 (4) 4. 确认指导文件 (5) 5. 术语缩写 (5) 6. 概述 (5) 7. 确认实施前提条件 (4) 8. 人员确认 (6) 9. 风险评估 (6) 10. 确认时间安排 (11) 11. 确认内容 (11) 12. 偏差处理 (29) 13. 风险的接收与评审 (29) 14. 方案修改记录 (29) 15. 确认计划 (30) 16. 附件 .................................................................................................. 错误!未定义书签。

1.验证目的 检查并确认控制气相、液相色谱仪的计算机系统符合《医疗器械生产质量管理规范》及仪器计算机使用说明书要求,满足使用需求,特根据制定本确认方案,作为对气相、液相色谱仪计算机系统验证系统进行确认的依据。 2.验证范围 本次验证主要对用于我公司由****气相、液相色谱仪软件、台式电脑及打印机所组成的气相、液相色谱仪验证系统的安装、运行以及性能进行确认。 3.确认职责。 3.1确认职责

计算机化系统验证方案设计

紫外分光光度计 计算机化系统验证方案方案起草 方案审核 方案批准 存档日期:年月日 目录

1 验证目的 (2) 2 验证范围 (2) 3 职责确认 (3) 4 指导文件确认 (3) 5 术语缩写 (3) 6 验证实施前提条件 (4) 7 人员确认 (4) 8 风险评估 (4) 9 验证时间安排 (5) 10 验证内容 (5) 11 偏差处理 (11) 12 风险的接收与评审 (11) 13 确认计划 (12) 14 验证谱图编制 (12) 15 审核、结论 (12) 1 验证目的 我司质量检验部现有1台XXX型紫外分光光度计(),与工作站软件、计算机系统

及打印机组成色谱仪计算机化系统。为保证这些系统符合GMP标准,满足使用要求和分析测试需求,保证数据的安全,特制定本验证方案,以进行计算机化系统验证。 2 验证范围 本次验证范围是我部1套紫外分光光度计计算机化系统,如表1所示。 表1 计算机化系统列表 3 职责确认 《药品生产质量管理规范》2010 修订版 《药品生产质量管理规范》2010 修订版附录:《计算机化系统》 《药品生产质量管理规范》2010 修订版附录:《确认与验证》 《Cary 60 UV-Vis Specifications》 5 术语缩写

6.1 相关人员已经过岗位培训且考核合格,见附件1:人员培训及考核确认记录。6.2 相关文件系统已编制完成并经过审批,见附件2:验证确认所需文件审核确认记录。 7 人员确认 验证小组成员和所有参与测试的人员均经过验证方案的培训,见附件3:验证方案培训签到表。 8 风险评估 验证小组人员共同对紫外分光光度计计算机化系统验证进行了风险评估,对存在的质量风险提出了预防和纠正措施建议,具体见下表:

计算机化系统验证方案

.. 紫外分光光度计 计算机化系统验证方案 存档日期:年月日

目录 资料word .. 1 验证目 的 .............................................. .. (2) 2 验证范 围 .............................................. .. (2) 3 职责确 认 .............................................. .. (3) 4 指导文件确认................................................ 3 5 术语缩 写 .............................................. .. (3) 6 验证实施前提条件 (4) 7 人员确

认 .............................................. .. (4) 8 风险评 估 .............................................. .. (4) 9 验证时间安排................................................ 5 10 验证内 容 .............................................. . (5) 11 偏差处 理 .............................................. (11) 12 风险的接收与评 审 (11) 13 确认计 划 .............................................. (12) 14 验证谱图编 制 ............................................. 12

完整GMP新增附录确认与验证和计算机化系统培训试题与答案推荐文档

新兴(铁岭)药业股份有限公司 药事法规与GM踪合知识培训试卷(2015) 部门(岗位): _______ 姓名: ________ 日期:__________ 成绩: 一、填空题(每题2分,此题占试卷内容60分): 1. 企业应当确定需要进行的确认或验证工作,以证明有关操作的(关键要素)能够得到有 效控制。确认和验证的范围和程度应根据(风险评估)的结果确认。确认与验证应当贯穿于 (产品生命周期)的全过程。 2. 所有的确认与验证活动都应当(事先计划)。确认与验证的关键要素都应在(验证总计划) 或同类文件中详细说明。 3?当确认或验证分阶段进行时,只有当(上一阶段)的确认或验证报告得到批准,或者确认 或验证活动(符合预定目标)并经批准后,方可进行下一阶段的确认或验证活动。上一阶段的确认或验证活动中不能满足某项预先设定标准或偏差处理未完成,经评估对下一阶段的确 认或验证活动(无重大影响),企业可对上一阶段的确认或验证活动进行(有条件的批准)。 4. 企业应当对新的或改造的厂房、设施、设备按照预定用途和本规范及相关法律法规要求制定(用户需求),并经审核、批准。 5. 设计确认应当证明设计(符合)用户需求,并有相应的文件。 6. (新的或改造)的厂房、设施、设备需进行安装确认。 7. 安装和运行确认完成并符合要求后,方可进行(性能确认)。在某些情况下,性能确认 可与(运行确认或工艺验证)结合进行。 8. 工艺验证应当证明一个生产工艺按照规定的工艺参数能够持续生产出符合(预定用途和注册要求)的产品。工艺验证应当包括(首次验证)、(影响产品质量的重大变更后的验证)、(必要的再验证)以及在产品生命周期中的(持续工艺确认),以确保工艺始终处于验证状 ^态。 9. 企业应当有书面文件确定产品的(关键质量属性)、(关键工艺参数)、常规生产和工艺 控制中的(关键工艺参数范围),并根据对产品和工艺知识的理解进行更新。 10. 在产品生命周期中,应当进行(持续工艺确认),对商业化生产的产品质量进行监控和趋势分析,以确保(工艺和产品质量)始终处于受控状态。 11. 在(极个别情况)下,允许进行同步验证。如因药物短缺可能增加患者健康风险、因产 品的市场需求量极小而(无法连续)进行验证批次的生产。 12. 运输确认应当对运输涉及的影响因素进行(挑战性测试),且应当明确规定(运输途径),包括(运输方式和路径)。长途运输还应当考虑(季节变化)的因素。除温度外还应 当考虑和评估运输过程中的其他相关因素对产品的影响,如(湿度、震动、操作、运输延误、 数据记录器故障、使用液氮储存、产品对环境因素的敏感性)等。 13. 清洁验证应当根据所涉及的物料,合理地确定(活性物质残留、清洁剂)和(微生物污染)的限度标准。 14. 活性物质残留限度标准应当基于(毒理试验数据)或(毒理学文献资料的评估)建立。如使用清洁剂,其(去除方法及残留量)应当进行确认。可接受标准应当考虑工艺设备链中 (多个设备)潜在的累积效应。 15. 应当在清洁验证过程中对潜在的(微生物污染)进行评价,如需要,还应当评价细菌内毒素污染。应当考虑设备使用后至清洁前的(间隔时间)以及设备清洁后的(保存时限)对清洁验证的影响。 16. 清洁验证方案应当详细描述(取样的位置)、所选取的取样位置的(理由以及可接受标准)。

12除菌过滤系统验证方案

22页第1页共 除菌过滤系统验证方案 人:编制编制日期: 审核日期:审核人: 准批人:批准日期:

实施日期: 22页第2页共 验证方案目录4 ..................................................................1.概述及验证方案说明......4 ...............................................................1.1概述..............................4 ............................................................1.2验证目的...........................4 .........................................................1.3验证实施条件 (4) ………………………………………………2.预确认……………………………… 5 ……………………………………………2.1目的…………………………………… 5 …………………………………………2.2项目……………………………………… 5 …………………………………………………………………………………小结2.3 5 ……………………………………………………………………………3.安装确认 5 ………………………………………………………………………3.1目的………… 5 …………………………………………………………………3.2项目……………… 6 ..................................................................3.3小结 (6) ……………………………………………………4.性能确认………………………… 6 ………………………………………………4.1目的…………………………………