当前位置:文档之家› MARS6中文操作手册

MARS6中文操作手册

MARS6中文操作手册
MARS6中文操作手册

Exceed简体中文使用手册

景威实业有限公司 台北市长安东路二段230号2F之2 TEL:(02)2771-4138 2740-7226 FAX: (02)27318253 EMAIL: info@https://www.doczj.com/doc/fe2222191.html, Web site:https://www.doczj.com/doc/fe2222191.html, Exceed中文使用手册

目录 EXCEED 安装前注意事项 (2) EXCEED 安装WINDOWS 3.1&DOS版本 (3) WINDOWS NT&WINDOWS 95版本 (6) 安装方式介绍 (6) 单机安装 EXCEED 的使用 (8) 第一次使用简易流程说明 (8) Xconfig (10) Xstart(启动Xclient) (14) Xsession (15) 颜色与字型问题 (16) X client Wizard与Xstart常问问题集 (18) 附注一.支援的Network Transport Software (22)

Exceed 安装事项 A.For Windows 3.1 注1 : (1)网络协议及软件: (TCP / IP , DECNET, IPX / SPX ) 详细列表请见20页 (2)请确定网络卡及网络安装正确, 以TCP / IP 为例: PC / NFS, PC / TCP, Microsoft TCP / IP .....请利用Ping , Telnet来确认 TCP / IP 工作正常。 (3). 若没有任何网络软件,可安装Exceed 提供之TCP / IP (Hummingbird TCP / IP) 。 B. For Window 95 & NT (2) 网络设定: 请确认Microsoft TCP / IP 已安装,并且设定正确, 可利用Ping , Telnet 来测 试 TCP / IP。 (3)PC及Unix Host 的 IP, Hostname, Netmask Gateway, DNS Server.......

给煤机维护使用操作手册(中文)

使用操作手册 给煤机(GM - BSC 22-26) 上海大和衡器有限公司

概述 近年来,由于石油供给状态已经恶化, 作为石油代用品的煤已越来越广泛地发挥其应有的作用。长期以来,上海大和衡器有限公司生产制作的给煤机、定量皮带秤、皮带秤已广泛地应用于电力、钢铁、化工、造纸、化肥工业,等等。 上海大和衡器有限公司生产制作的耐压式给煤机适用于正压式磨煤机和负压式磨煤机,并具有本质防爆特性和节能特性,因此广泛应用于供煤系统,并赢得了较好的评价和信誉。 上海大和衡器有限公司生产制作的耐压式给煤机采用重量传感器检测到煤流的单位长度的瞬时重量信号,同时速度传感器检测到速度脉冲信号。通过控制系统将重量信号与速度信号进行乘积运算,从而求得煤的真实流量(输送量)。控制系统将煤的真实流量和用户设定的输送量(设定量)进行逐次比较,其差值信号反馈给变频器,用于调节输送胶带速度,从而保证煤的真实流量和设定量相一致。

.安全预防 需实行正确操作和定期检修,以保证給煤机安全运行。谨请在完全读完本手册并且了解了给煤机后,操作和保养该设备。完全理解了给煤的结构和安全操作的意义,才能预防人员伤亡事故的发生,才能避免设备的毁损。 从另一方面来说,安全工作就是防止设备故障和正确操作,有效维护,以致设备能发挥它的最高性能。 标志的含意: 在设备运行时,在标志附近范围内较危险,如果没有做到安全操作,可能 引起伤亡事故和设备的毁坏。必须绝对遵守安全操作规范,避免出现危险的情形。 在设备运行时, 在标志附近范围内较危险,必须注意到工作环境的危险性,以避免出现伤亡事故。必须绝对遵守安全操作规范,避免出现危险的情形。 在操作时必须小心谨慎,如果没有预防措施,可能引起现伤亡事故的发生。必须绝对遵守安全操作规范,避免出现危险的情形。 必须正确操作,有效维护,以致设备能发挥它的最高性能。同时需绝对遵 守安全操作规范,避免出现事故苗头。 必须完全了解设备的特性,才能保证设备正常工作和能发挥它的最高性能。 DANGER WARNING CAUTION IMPORTANT REFERENCE

PCF 中文手册

PCF8574T I 2C 并行口扩展电路 1. 特性 操作电压2.5~6.0V 低备用电流(≤10μA ) I 2C 并行口扩展电路 开漏中断输出 I 2C 总线 实现8位远程I/O 口 与大多数MCU 兼容 口输出锁存,具有大电流驱动能力,可直接驱动LED 通过3个硬件地址引脚可寻址8个器件(PCF8574A 可多达16个) DIP16,SO16或SSOP20形式封装 2. 概述 PCF8574是CMOS 电路。它通过两条双向总线(I 2C )可使大多数MCU 实现远程I/O 口扩展。该 器件包含一个8位准双向口和一个I 2C 总线接口。PCF8574电流消耗很低,且口输出锁存具有大电流驱动能力,可直接驱动LED 。它还带有一条中断接线(INT )可与MCU 的中断逻辑相连。通过INT 发送 中断信号,远端I/O 口不必经过I 2C 总线通信就可通知MCU 是否有数据从端口输入。 这意味着PCF8574可以作为一个单被控器。 PCF8574 和PCF8574A 的唯一区别仅在于器件地址不相同。 3. 订单信息 封装 型号 名称 描述 PCF8574T PCF8574AT SO16 塑料小型表面封装 4. 功能框图 P7 P6P5P4P3P2P1P0V DD V SS SDA SCL A2A1A0INT

管脚配置(SO16) 12345678 1615141312 11109 INT A0A1A2P0P1P2P3SDA V SS SCL P7 P6P5P4 V DD PCF8574 PCF8574A 6. I 2C 总线特性 I 2C 总线用于不同的IC 或模块之间的双线通信。两条线其中之一为串行数据线(SDA ),另一条为串行时钟线(SCL )。当与器件的输出级相连时,这两条线都必须接上拉电阻。数据的传送只有在总线空闲时才能进行。 位传送 在每个时钟脉冲出现时,总线传送一个数据位。在时钟信号高电平期间,SDA 线上的数据位应保持稳定,如果此时改变SDA 线数据则被认为是总线的控制信号(见图1)。 起始和停止信号 当总线空闲时,数据和时钟线保持高电平。SCL 线为高电平时,SDA 线电平由高至低的变化定义为总线的起始信号(S );SCL 线为高电平时,SDA 线电平由低至高的变化定义为总线的停止信号(S )(见图2)。

Oracle P6-Pro用户中文培训手册(P6R151)_TP02_精简版(OS)_v1.0_20160914

PRIMAVERA P6PPM R15.X 用户培训手册 作者:艾伟 版本1.7 2016/9/18 保密材料,请妥善保管

目录 练习01:定义资源库 (1) 练习02:估算作业资源需求计划 (4) 练习03:资源负荷分析与资源平衡 (7) 练习04:估算作业成本费用 (12) 练习05:查看项目和作业费用计划 (13) 练习06:建立项目目标计划 (15) 练习07:反馈实际进展及资源消耗 (17) 练习08:本期进度更新 (20) 练习09:预测和调整进度计划 (22) 练习10:跟踪和分析作业上的实际成本支出 (24) 练习11:定义和使用费用科目来统计汇总项目费用 (26) 练习12:保存本期完成值 (30) 练习13:资源剖析表设置 (33) 练习14:资源直方图设置 (34) 练习15:作业剖析表设置 (35) 保密材料,请妥善保管

练习01:定义资源库 上接TP01练习14中的备份项目。 步骤1:选择菜单“管理员-〉货币(C)”,在货币定义对话框中,直接将第一行基本货币修改为“人民币”。 步骤2:选择菜单“管理员-〉管理类别”,在管理类别窗口中定义材料资源所需要用到的计量单位:“m3 立方米”,“bl 桶”,“m 米”。 步骤3:单击菜单“企业”>“资源(R)”命令,或者工具栏上的“”资源命令,切换到资源窗口中,按下列表格所示,创建这些资源,并填写资源的相关的属性。其中材料资源还需要选择计量单位。

备注:机械的台班在P6当中属于非人工资源,“台班”可以理解成“工日”的概念。 步骤3:单击资源详情表中的“数量及价格”页签,填写每个资源的“最大单位时间用量”和“单价”。 步骤4:单击资源详情表中的“详情”页签,取消每个资源的“自动计算实际值”选项。

wasp6中文操作手册

WASP6中文操作手册 Translator :Longtao zhang, Xi'AN University of Architecture and Technology 英文来源:Water Quality Analysis Simulation Program (WASP) Version 6.0 DRAFT: User’s Manual By Tim A. Wool Robert B. Ambrose1 James L. Martin2 Edward A. Comer3 US Environmental Protection Agency – Region 4 Atlanta, GA 1Environmental Research Laboratory Athens, GA 2USACE – Waterways Experiment Station Vicksburg, MS 3Tetra Tech, Inc. Atlanta, GA

WASP6是 USEPA 的一个改进了的Windows版本水质分析模拟程序(WASP) 。建模者对WASP6的开发完成有助于WASP的应用。 WASP6 包括一个前处理器, 一个快速数据处理器和一个图形处理器,这使得其必先前的WASP运行更快而且更便捷地以数字与图像评估模拟结果。在WASP6中, 模型的运行能被比早先的USEPA DOS操作系统界面快十倍。当然,WASP6采用与DOS版本相同的算法解决水质问题。 WASP6 包含1) 一个用户友好的windows界面, 2)一个前处理器,用于协助modelers 把数据处理成WASP识别应用格式, 3) 高速WASP eutrophication 和有机化合物模型处理器, 和4) 一个图解post processor ,对WASP结果WASP并与实际测定数据对比。由于可以采用模块设计,WASP6 可轻易地用于开发其他动力学模型。当前, 我们计划开发一个改进的eutrophication 模型,包含以下变量: 2 个另外的藻类, 盐分, 充分的热平衡, coliforms, 二级BOD, 底泥digenesis 模型。 2 感谢 美国EPA 感谢ASci Corporation做出的慷慨捐赠,并将WASP Windows界面公布给EPA 和公共领域表示感激。他们认识到这个模型的应用会营造美好环境以及他们不谋私利的态度值得称赞。 此外, 作者们感谢EPA Region 4 Jim?Greenfield先生,对在WASP6开发和改进的支持和鼓励,。作者会想表达对Mohammed ?Lahlomo 先生的谢意,感谢他的支持和努力把WASP6 公布给公共领域。

Juniper_SA_中文操作手册

Juniper SSL VPN 中文操作手册

目录 一、初始化设置 (2) 1.1、通过Console连接SSL VPN (2) 1.2、填写初始化信息 (3) 1.3、使用浏览器连接SSL VPN (4) 二、SSL VPN基本设置 (5) 2.1、网络接口设置 (5) 2.2、设置SSL VPN的License (6) 2.3、添加用户认证服务器 (7) 2.4、添加认证用户 (11) 2.5、添加SSL VPN的认证域 (13) 三、角色映射和功能模块 (14) 3.1、添加角色 (14) 3.2、角色映射 (16) 3.3、功能模块 (18) 四、使用SSL VPN的三个功能模块 (19) 4.1、使用Core功能模块 (20) 4.2、使用SAM功能模块 (25) 4.3、使用Network Connect模块 (26) 五、资源访问控制 (29) 5.1、Core和SAM的资源访问控制 (30) 5.2、SAM和NC的资源访问控制 (31) 六、设备管理 (32) 6.1、系统概览 (32) 6.2、日志系统 (32) 6.3、系统升级 (34) 6.4、设备排除 (35) 一、初始化设置 1.1、通过Console连接SSL VPN SSL VPN的初始化是通过设备的Console端口完成的,Console的设置如下:9600,8,N,1。 在管理员的计算机上使用任意终端软件,包括HyperTerminal,Crt,SecureCrt等等都行。把设备的Console线连接至SSL VPN的Console端口,

开启电源开关,通过终端软件就能观察到设备启动自检的过程。 1.2、填写初始化信息 当系统自检到如下信息时: Welcome to the initial configuration of your server! NOTE: Press 'y' if this is a stand-alone server or the first machine in a clustered configuration. If this is going to be a member of an already running cluster press n to reboot. When you see the 'Hit TAB for clustering options' message press TAB and follow the directions. Would you like to proceed (y/n)?: y(选择Y) Note that continuing signifies that you accept the terms of the Neoteris license agreement. Type "r" to read the license agreement (the text is also available at any time from the License tab in the Administrator Console). Do you agree to the terms of the license agreement (y/n/r)?:y(选择Y) 初始化网络信息: Please provide ethernet configuration information IP address: 192.168.0.190 Network mask: 255.255.255.0 Default gateway: 192.168.0.254 (填入用户需要的IP地址,掩码和网关等信息。 注意:所有网络信息都会设置到SSL VPN的Internal Interface上) Link speed [Auto]: 0) Auto 1) 1000 Mb/s, Full Duplex 2) 1000 Mb/s, Half Duplex 3) 100 Mb/s, Full Duplex 4) 100 Mb/s, Half Duplex 5) 10 Mb/s, Full Duplex 6) 10 Mb/s, Half Duplex Select 0-6: 0(选择用户需要的速率) Please provide DNS nameserver information: Primary DNS server: 202.106.0.20 Secondary (optional): 202.99.8.1(填入用户需要的DNS地址,可以是内部的DNS服务器的IP地址) DNS domain(s): https://www.doczj.com/doc/fe2222191.html,(填入用户需要的域名,无特别限制) Please provide Microsoft WINS server information: WINS server (optional):

SSG6000中文手册

第一章配件 SSG6000機器所需備件 : 一、電源線 * 1條 二、測試線 * 1組 三、24PIN 接頭訊號線 * 1條 四、15PIN 雙接頭訊號線 *1條 五、25PIN 雙接頭訊號線 *1條 六、操作手冊一份. 安裝程序: 1.拔掉所有電源接頭。 2.打開測試機之上蓋,檢查內部板子、接頭、零件是否鬆脫。 3.依操作手冊、24PIN接頭之連接線與機械之SOLENOIDS,與遮斷開關。 4.連接測試線與機械的測試片(請注意焊接表面要圓滑)。 5.以電表量測AC電源供應之電源規格是否正常。 如使用穩壓器,應對照其錶頭顯示值是否與電表所量測值是否吻合,並確實選 購電子式且品質優良之穩壓器。 機械所使用之電源與測試機所使用電源應分開獨立,若使用穩壓器,也應該分 別使用不同之穩壓器。 SSG6000手冊----2008/4月修版P1

6.打開機械電源,並檢查機械所有機件是否正常。尤其檢查測試片之磨損程度, 以及各SOLENOID上下動作是否順暢?機台是否有漏電情形? 若有請排除之。 7.插妥24PIN接頭,測試線與測試機後面板連接。 8.請接上測試機的電源線,並按開機程序開機。 9.使用測試夾與標準材料,測試測試機所有功能是否正常。 10.測試測試機與機械配合時的各項功能。 並檢試驅動之SOLENOID是否正確,動作是否確實? 11.調整機械與測試機同步測試時間。依其測試速度規格內,而調妥機械 之馬達帶動速度。依好壞相間放置材料在鏈條上,以測試兩者之配合 是否正確。 12.開始連線測試材料並QC材料是否準確。 13.關機時,請先關掉機機械電源。 14.上生產線開始生產。 SSG6000手冊----2008/4月修版P2

P6应用使用手册

ORACLE Primavera P6 应用培训 上海聚米信息科技有限公司 2013-3-19

目录 目录 ORACLE Primavera P6 (1) 应用培训 (1) 第一部分时间进度计划管理 (1) 练习1:P6管理参数设置 (1) 练习2:创建项目 (6) 练习4:创建工作分解结构 (9) 练习5:增加作业并估算工期 (11) 练习6:建立作业之间的逻辑关系 (13) 练习7:进度计算 (16) 练习8:分配限制条件,优化进度 (16) 练习9:建立项目目标计划 (19) 练习10:反馈实际进度 (21) 练习11:预测和调整进度计划 (24) 练习12:导出、导入进度计划 (26) 第二篇数据图表格式设置 (33) 练习1:表格的数据栏位设置 (33) 练习2:表格的数据分组方式和排序设置 (33) 练习3:表格的数据过滤器设置 (34) 练习4:横道图设置 (35) 练习5:时间标尺设置 (36) 练习6:打印预览及打印页面格式设置 (37) 练习7:保存视图 (38) 练习8:导出excel (38) 练习9:复制到项目管理信息系统 (42)

第一部分时间进度计划管理 练习1:P6管理参数设置 步骤1:启动Project Management(PM)程序,输入用户名和密码,用户名为姓名,密码为空,点击“确定”按钮后登录。 步骤2:登陆P6:

步骤3:将登陆后界面的英文设置成“中文” 步骤4:拉开窗体左边隐藏的“按钮”框

步骤6:将窗口右边按钮展开 选择菜单“显示(V)”->“工具条(T)”,将“工具条”菜单中所有选项打上钩。 步骤7:设置当前用户参数 选择菜单“编辑(E)”->“用户设置(Z)…”,并按照下图所示设置当前用户的各个参数。

P6 操作手册

2014 P6操作手册 P6 操作手册及职责说明 作者:汪楠步勇 日期:2014/05/15

目录 一、基本操作 (2) 1.安装软件客户端 (2) 2.用户登录 (2) 3.语言设置 (3) 4.基本设置 (3) 5.设置当前用户参数 (4) 二、职位权限操作指南 (7) 1.质量、安全、技术经理 (7) 2.商务采购 (9) 3.计划经理 (10) 4.成本经理 (11) 5.项目负责人 (11) 6.项目总工 (11) 7.管理层 (12) 三、编码说明 (13) 1.项目分类码编码说明 (13) 2.作业分类码编码说明 (13) 3.资源分类码编码说明 (13) 四、相关名词解释 (14)

一、基本操作 1.安装软件客户端 参见《02-P6客户端安装说明》,沙特分公司由燕军贵负责所有客户端的安装和调试。 2.用户登录 --运行“Project Management”程序; --输入用户名:“登录名”;参见《P6客户端人员清单》 --输入口令:“你的密码”(首次输入密码为空,请务必在基本设置步骤添加口令);--选择数据库(PMDB或MTPMDB均可); --点击“确定”按钮登录PM组件。 菜单栏 导航栏 工具栏 命令目录

3.语言设置 “工具”—“语言设置” 4.基本设置 选择菜单“显示(V)”->“工具栏(T)”,将“工具条”菜单中所有选项打上钩。

5.设置当前用户参数 选择菜单“编辑(E)”->“用户设置(Z)…”,并按照下图所示设置当前用户的各个参数。 (1)参数“时间单位(U)”的设置如图所示: (2)参数“日期(D)”的设置如下图所示:

操作手册参考资料-中英文

操作手册参考资料 一、安全规范 一般的安全规则 1. 认识你的机器 为了你的个人安全, 仔细阅读本手册。熟知机器的应用与限制,以及与机器相关的潜在性危险。 2.保持工作区域干净. 杂乱的区域以及工作台会引起意外。 3.勿在危险的环境使用 勿在潮湿或下雨的地点使用,或将其暴露在雨中。保持工作区域良好的照明。4.非专业人员勿靠近 所有参观者在工作区域内必须保持安全的距离。 5.勿强行操作机器 让机器以其设计之速度下安全的执行工作。 6.使用正确的工具勿强行使机器或附加装置执行工作 7.穿著适当的衣服 避免佩带可能被移动部分卷入的宽松衣物、手套、项链、手镯或首饰。建议穿著防滑鞋。戴上包住长头发之发帽。 8.勿在工作状态保养机器 机器应进行适当之保养,如润滑、调整 10.维修、更换配件之前,或是组装和重新组装马达时,必须从电源处切断机器的电源. 11.使用建议之配件,查阅手册上建议之配件。 12.不要让机器在无人看管下运转。 本机器自身安全规则(此项由贵厂根据自己机器特点编写)

(英文版) 1.1 SAFETY RULES 1.1.1.GENERAL SAFETY RULES thoroughly and understand completely all instructions, rules, etc. contained in this manual. Failure to comply can result in accidents involving fire, electric shock, or serious personal injury. Keep owners manual and review frequently for continuous safe operation. 1.KNOW YOUR MACHINE. For your own safety, read the owner’s manual carefully. Learn its application and limitations as well as specific potential hazards pertinent to this machine. 2.KEEP WORK AREA CLEAN. Disorder area and working table will cause accident. 3.DO NOT USE IN DANGEROUS ENVIRONMENTS. Do not use power tools in damp or wet locations, or expose them to rain. Keeps work area well illuminated. 4.KEEP NON-PROFESSIONAL PEOPLE A WAY. All visitors should be kept at a safe distance from work area. 5.DO NOT FORCE THE MACHINE. It will do the job better and be safer at the rate for which it was designed. https://www.doczj.com/doc/fe2222191.html,E THE RIGHT TOOLS. Do not force the machine or attachments to do a job for which they were not designed. 7.WEAR PROPER APPAREL. A void loose clothing, gloves ,neckties, rings, bracelets, or jewelry, which could be caught in moving parts. Non-slip footwear is recommended. Wear protective hair covering to contain long hair. 8.DON’T MAINTENANCE THE MACHINE IN RUNNING STA TES The machine should be maintained such as lubrication, proper adjustment. 9. BEFORE MAINTENANCE, ACCESSORY CHANGING OR ASSEMBLING AND REASSEMBLE MOTOR, BE SURE TO CUT OFF THE POWER FROM THE POWER RESOURCE. https://www.doczj.com/doc/fe2222191.html,E RECOMMENDED ACCESSORIES. Consult the o wner’s manual for recommended accessories. 11.NEVER LEA VE MACHINE RUNNING UNA TTACHED. 1.1.2 ADDITIONAL SAFETY RULES FOR COLD FORMING MACHINE

CISCO中文配置手册

CISCO路由器配置手册 第一章路由器配置基础 一、基本设置方式 一、基本设置方式 一般来说,可以用5种方式来设置路由器: 1.Console口接终端或运行终端仿真软件的微机; 2.AUX口接MODEM,通过电话线与远方的终端或运行终端仿真软件的微机相连;3.通过Ethernet上的TFTP服务器; 4.通过Ethernet上的TELNET程序; 5.通过Ethernet上的SNMP网管工作站。 但路由器的第一次设置必须通过第一种方式进行,此时终端的硬件设置如下: 波特率:9600 数据位:8 停止位:1 奇偶校验: 无 二、命令状态 二、命令状态 1.router>

路由器处于用户命令状态,这时用户可以看路由器的连接状态,访问其它网络和主机,但不能看到和更改路由器的设置内容。 2.router# 在router>提示符下键入enable,路由器进入特权命令状态router#,这时不但可以执行所有的用户命令,还可以看到和更改路由器的设置内容。 3.router(config)# 在router#提示符下键入configure terminal,出现提示符router(config)#,此时路由器处于全局设置状态,这时可以设置路由器的全局参数。 4.router(config-if)#; router(config-line)#; router(config-router)#;… 路由器处于局部设置状态,这时可以设置路由器某个局部的参数。 5.> 路由器处于RXBOOT状态,在开机后60秒内按ctrl-break可进入此状态,这时路由器不能完成正常的功能,只能进行软件升级和手工引导。 6.设置对话状态 这是一台新路由器开机时自动进入的状态,在特权命令状态使用SETUP命令也可进入此状态,这时可通过对话方式对路由器进行设置。 三、设置对话过程 1.显示提示信息 2.全局参数的设置 3.接口参数的设置 4.显示结果 利用设置对话过程可以避免手工输入命令的烦琐,但它还不能完全代替手工设置,一些特殊的设置还必须通过手工输入的方式完成。 进入设置对话过程后,路由器首先会显示一些提示信息: --- System Configuration Dialog --- At any point you may enter a question mark '?' for help. Use ctrl-c to abort configuration dialog at any prompt. Default settings are in square brackets '[]'.

ABB中文维护手册

TZID-C 智能定位器 安装及操作说明书 Page 1 of 9

气路连接 ?使用与定位器气源端口处标识的标准接口连接气源 ?连接定位器的输出与气动执行器的气缸 电气连接 根据下列接线端子图以及设计要求进行相应的配线(一般只需+11,-12,+31,-32) +11 -12 控制信号输入端子(DC4---20mA,负载电阻Max.410欧姆) +31 -32 位置返馈输出端子(DC4---20Ma,DCS+24V供电) +41 -42 全关信号输出端子(光电耦合器输出) +51 -52 全开信号输出端子(光电耦合器输出) +81 -82 开关信号输入端子(光电耦合器输入) +83 -84 报警信号输出端子(光电耦合器输出) +41 -42 低位信号输出端子(干簧管接点输出,5---11VDC, <8 mA) +51 -52 高位信号输出端子(干簧管接点输出,5---11VDC, <8 mA) 调试步骤 1.接通气源,检查减压阀后压力是否符合执行器的铭牌参数要求(定位器的最大供气 压力为7BAR,但实际供气压力必须参考执行器所容许的最大气源压力)。 2.接通4---20mA输入信号。(定位器的工作电源取自输入信号,由DCS二线制供 电,不能将DC24V直接加至定位器,否则有可能损坏定位器电路)。 3.检查位置返馈杆的安装角度(如定位器与执行器整体供货,则已经由执行器供货 商安装调试完毕,只需作检查确认,该步并非必须): ?按住MODE键。 ?并同时点击?或?键,直到操作模式代码1.3显示出来。 ?松开 MODE键。 ?使用?或?键操作,使执行器分别运行到两个终端位置,记录两终端角度 ?两个角度应符合下列推荐角度范围(最小角位移20度,无需严格对称)直行程应用范围在 -28o--- +28o 之内。 角行程应用范围在 -57o--- +57o 之内。 全行程角度应不小于25o 4.切换至参数配置菜单 ?同时按住?和?键 ?点击ENTER键 ?等待3秒钟,计数器从3计数到0 ?松开?和?键 程序自动进入P1.0配置菜单。 5.使用?和?键选择定位器安装形式为直行程或角行程。

p6基本操作手册

第一部分设置规划篇 1 练习一、设置管理参数 1 练习二、建立企业编码体系 5 第二部分进度计划编制篇10 练习四编制总控制计划10 练习五编制标段控制计划15 练习六编制详细施工计划20 第三部分资源、费用管理篇25 练习七管理资源25 练习八自上而下费用管理31 练习九自下而上费用管理33 练习十项目费用分析34 第一部分设置规划篇 练习一、设置管理参数 1、管理员登录 运行"Project Management"程序,输入用户名:"admin",输入口令:"admin",点击"OK"按钮登录 PM组件。 选择菜单"显示(V)"->"工具条(T)",将"工具条"菜单中所有选项打上钩。

2.修改管理设置 选择菜单"管理员(A)"->"管理设置(P)…",按下图设置管理参数中的"单价类型"的"用户定义标题"。 3.定义管理类别 选择菜单"管理员(A)"->"管理类别(C)…",按下图添加管理类别的"计量单位"项。

4.定义货币体系 选择菜单"管理员(A)"->"货币(Z)…",按下图将第一个的货币修改为"人民币",添加另一种货币"美元",并将其余的货币种类删除掉。 5.设置当前用户参数 选择菜单"编辑(E)"->"用户设置(Z)…",并按照下图所示设置当前用户的各个参数。 a)参数"时间单位(U)"的设置如下图所示:

b)参数"日期(D)"的设置如下图所示: c)参数"货币(C)"的设置如下图所示: d)参数"开始过滤器(F)"的设置如下图所示:

练习二、建立企业编码体系 1.建立组织分解结构 选择菜单"企业(N)"->"OBS…",按下图建立企业的组织分解结构。 2.建立企业项目结构 选择菜单"企业(N)"->"EPS(E)…",按下图所示点击"显示:EPS",在弹出的菜单中选中"栏位(L)"->"责任人(Z)" 按下图建立"EPS"结构,并为每个"EPS"结点选择一个"责任人"。 注意:EPS结点的责任人只能在对话框底部的 EPS详情表"责任人"编辑框中进行选择,不能直接在表格中选择或者直接填写。 3.定义角色与资源

WASP7使用手册

W a t e r Q u a l i t y A n a l y s i s S i m u l a t i o n P r o g r a m (W A S P) V e r s i o n7.1 Watershed and Water Quality Modeling Technical Support Center US EPA Office of Research Development National Exposure Research Laboratory Ecosystems Research Division Athens, GA

Table of Contents INTRODUCTION (1) USING WASP6 INPUT FILES WITH WASP7 (1) S YSTEM D ETERMINATION (1) B OUNDARY C ONDITION U PDATE (2) USER INTERFACE ENHANCEMENTS (2) G ENERAL L AYOUT (2) Restart File (3) Hydrodynamic Linkage File (4) Internal Kinematic Wave Flow Routing (4) External Hydrodynamic Linkage (6) Hydraulic Geometry (8) Solution Technique (11) S EGMENT I NFORMATION (12) Length (12) Width (12) Slope (12) Segment Roughness (13) T IME S ERIES I MPORT/SQL (13) Sources (15) Defer Import (21) Import (23) Execute Queries (24) WASP N ETWORK T OOL (25) Control File (26)

p6基本操作手册

第一部分设置规划篇1练习一、设置管理参数1练习二、建立企业编码体系5第二部分进度计划编制篇10练习四编制总控制计划10练习五编制标段控制计划15练习六编制详细施工计划20第三部分资源、费用管理篇25练习七管理资源25练习八自上而下费用管理31练习九自下而上费用管理33练习十项目费用分析34 第一部分设置规划篇 练习一、设置管理参数 1、管理员登录 运行"Project Management"程序,输入用户名:"admin",输入口令:"admin",点击"OK"按钮登录 PM组件。 选择菜单"显示(V)"->"工具条(T)",将"工具条"菜单中所有选项打上钩。

2.修改管理设置 选择菜单"管理员(A)"->"管理设置(P)…",按下图设置管理参数中的"单价类型"的"用户定义标题"。 3.定义管理类别 选择菜单"管理员(A)"->"管理类别(C)…",按下图添加管理类别的"计量单位"项。 2

4.定义货币体系 选择菜单"管理员(A)"->"货币(Z)…",按下图将第一个的货币修改为"人民币",添加另一种货币"美元",并将其余的货币种类删除掉。 5.设置当前用户参数 选择菜单"编辑(E)"->"用户设置(Z)…",并按照下图所示设置当前用户的各个参数。 a)参数"时间单位(U)"的设置如下图所示: 3

b)参数"日期(D)"的设置如下图所示: c)参数"货币(C)"的设置如下图所示: d)参数"开始过滤器(F)"的设置如下图所示: 4

练习二、建立企业编码体系 1.建立组织分解结构 选择菜单"企业(N)"->"OBS…",按下图建立企业的组织分解结构。 2.建立企业项目结构 选择菜单"企业(N)"->"EPS(E)…",按下图所示点击"显示:EPS",在弹出的菜单中选中"栏位(L)"->"责任人(Z)" 按下图建立"EPS"结构,并为每个"EPS"结点选择一个"责任人"。 注意:EPS结点的责任人只能在对话框底部的 EPS详情表"责任人"编辑框中进行选择,不能直接在表格中选择或者直接填写。 3.定义角色与资源 5

P6施工单位计划编制操作手册

计划编制(作业)操作练习 1、登录P6 软件。 启动Project Management(PM)程序,输入用户名(admin)和密码(初始密码为空),登录PM。 2、打开项目。 编制三级计划则打开“施工计划”项目; 3、增加作业。 点窗口左边“目录”栏中的“作业”进入作业窗口,打开“进度计划编制”视图。 先选择相应的系统、专业(WBS),点右边命令栏位中的“增加”按钮,即可增加一条新作业。在作业名称、计划开始、计划完成栏位输入作业的基本信息。

注:如若填写“计划开始”和“计划完成”栏位,则“原定工期”栏位不必填写,系统会直接算出工期。

4、连接作业的逻辑关系。以下介绍三种方法。 1)利用作业详情表中的逻辑关系栏位来分配后续作业以及紧前作业。 首先要在作业详情表中显示出逻辑关系栏位 分配之后可以在逻辑关系页面中去修改相应的逻辑关系及增减延时。 同样在后续作业栏位中也可以编辑当前作业的后续作业(方式同逻辑关系),在逻辑关系栏位页面中可以显示出当前作业的紧前作业与后续作业,而在后续作业栏位页面中只能对后续作业进行编辑。 2)在横道图中,手动连接作业间的逻辑关系 当鼠标放到横道图内作业与作业之间时令出现下列图标,按住鼠标左键拉到要连接的作

业,即可完成作业的连接。 作业连接完毕后会显示出蓝线 若修改逻辑关系或加载延时则把鼠标放在蓝线上双击鼠标左键 在关系类型中选择相应的逻辑关系,若有延时则输入延时时间(延时可以是正延时或负延时),按确定按钮完成。 这样连接逻辑关系只能一个一个的连接,不能同时连接多道后续作业或者紧前作业。3)通过命令按钮中的紧前作业或者后续作业来连接逻辑关系 在右边命令栏位中点“紧前作业”或“后续作业”按钮,在分配窗口中选择作业,按“分配”按钮加载逻辑关系。

AADvance 培训手册中文版

系统培训手册 操作 系统构建 配置 编程 排除故障 维护AADvance可编程控制器指南 1.5版本 2012年5月

2AADvance System Training Manual, version 1.5

注意 The content of this document is confidential to ICS Triplex and their partners. This document contains proprietary information that is protected by copyright. All rights are reserved. No part of this documentation may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying and recording, for any purpose, without the express written permission of ICS Triplex. 该文件内容对于ICS Triplex和他们的合作方均是机密的。本文档包含有受版权保护的专有信息,公司保留其所有权。没有ICS Triplex明确的书面许可,本文档的任何部分都不允许以任何电子或机械的形式或方式被复制和传播,包括复印和记录。 The information contained in this document is subject to change without notice. The reader should, in all cases, consult ICS Triplex to determine whether any such changes have been made. 本文档所包含信息可以随时更改,不另行通知。读者在任何情况下都应该主动咨询ICS Triplex 以便及时了解文档中的变化。 Microsoft, Windows, Windows 95, Windows NT, Windows 2000, and Windows XP are registered trademarks of Microsoft Corporation. Microsoft, Windows, Windows 95, Windows NT, Windows 2000, 和Windows XP是微软公司的注 册商标。 声明 The illustrations, figures, tables, and layout examples in this manual are intended solely to illustrate the text of this manual. The user of, and those responsible for applying this equipment, must satisfy themselves as to the acceptability of each application and use of this equipment. 本手册中的插图、图表、表格和布局示例的目的仅仅是为了辅助说明手册中的文字。任何用户,包括负责使用相关设备的人员必须训练自己以达到使用这一设备和掌握每一个应用的水平。 This document is based on information available at the time of its publication. While efforts have been made to be accurate, the information contained herein does not purport to cover all details or variations in hardware or software, nor to provide for every possible contingency in connection with installation, operation, or maintenance. Features may be described herein which are present in all hardware or software systems. ICS Triplex assumes no obligation of notice to holders of this document with respect to changes subsequently made. ICS Triplex makes no representation or warranty, expressed, implied, or statutory with respect to, and assumes no responsibility for the accuracy, completeness, sufficiency, or usefulness of the information contained herein. No warranties of merchantability or fitness for purpose shall apply. 本文档在其出版时信息有效。虽然文中信息已尽可能完善和准确,但其中所包含的信息不可能覆盖所有硬件、软件的细节和差异,或者是为每个可能的意外事件都提供有效的安装、操作和维护服务。此处的功能特性是结合所有的硬件和软件系统加以描述的。ICS Triplex公司不承担任何义务通知文件持有方其后所作出的更改。ICS Triplex公司并未以明示、暗示或者对法律尊重的形式作出任何陈述或保证,也不对此处所包含信息的准确性、完整性、充分性、有效性承担任何责任。对适销性和适用性不提供任何担保。 ? ICS Triplex, 2010 Table of Contents3

相关主题
文本预览
相关文档 最新文档