1General

1.1 GREEN BUILDING REQUIREMENTS

In order to fulfill the requirements of Green Building standards and initiatives, the systems shall support integration with a standard integration platform, advanced controllability, and sophisticated monitoring, measurement, verification and versatile reporting. The most important prerequisite for achieving Green Building status is the efficient functional integration of building systems. The systems shall function smoothly together according to modes of the building or the space, prevailing conditions and needs/preferences of the users. The integrated operations shall be fully automatic, triggered by one input, having appropriate impact to all systems in the building.

System integration shall enable significantly lower energy consumption, real-time control and monitoring, and dynamic graphics according to needs. System integration shall create better environmental air quality, radically improved energy performance and increased water efficiency, according to requirements of LEED and other Green Building standard and initiatives.

System integration shall also allow for efficient system maintenance and full-scale service provisioning with radically lower cost and better quality services. Easy access to building systems shall ensures that everything is in perfect condition and functions in the optimal way at all times. Should anything disturbing happen, immediate response shall be available. Integration shall facilitate undisturbed conditions in the building and sustainable development through minimized energy consumption, first-class security and significantly lower life cycle costs.

1.2 SYSTEMINTEGRATION

The System provider shall furnish and install a fully integrated Building Management System (BMS), incorporating distributed control techniques and standard open communication networks. The system shall be implemented as an integrated, open solution, which enables Service Center connectivity through standard Building Operating System (BOS) interface.

The integrated systems shall include controls and monitoring of the whole building (BMS and Security) and each room/apartment whenever applicable.

Integrated Building Management and Security Systems shall include the following

subsystems:

- BMS I Building automation (cooling/heating control, ventilation control, pumps, etc.)

- Lighting control of common areas

- Consumption metering of water, electricity,cooling (heating) energy and gas

- Access control system for common areas

- Intruder alarm system for common areas Video monitoring system for common areas

- Fire alarm system

- Central battery system

Whenever applicable, Guest Room Controls shall include the following subsystems : - Room temperature controls

- Lighting controls, dimming groups

- Lighting controls, on/of groups

- Controlled sockets, enabled/disabled

- Curtain controls (optional)

- Water consumption metering (optional)

- Electricity consumption metering (optional)

- Cooling energy consumption metering (optional)

Please refer to a separate specification for Guest Room Controls.

Whenever applicable, Home Automation shall include the following subsystems: - Cooling/heating control of each apartment

- Ventilation control (when applicable)

- Lighting controls

- Curtain controls

- Other electrical controls

- Leakage/moisture alarms

- Access control

- Intruder alarms

- Camera surveillance (when applicable)

Please refer to a separate specification for Home Automation for Apartments.

All systems shall be integrated with the open Building Operating System (BOS) platform as described in the System Architecture. The BOS shall provide standard connectivity to the Service Center, which shall be capable of providing advanced maintenance and security services.

System Architecture shall be as specified in the following chapter.

Responsibilities of the system provider according to normal specifications and practices.

1.3 USERINTERFACES

Systems shall be accessed through the Building Operating System (BOS). System must have two main user interface types - professional user interface and occupant user interface.

1.3.1 Professional User Interface

The system shall enable a client-based User Interface for professional usage and for central monitoring of systems (Service Center usage). The professional User Interface shall allow for at least the following:

- Alarm monitoring and alarm handling by multiple operators

- Intruder alarms

- Fire alarms

- Alarms from electrical and mechanical systems

- System maintenance alarms

- Video monitoring

- Remote diagnostics, energy optimization and trending

- Setpoint adjustment

- Control optimization

- Peak load management

- Trending

- Remote diagnostics of system/devices

- Preventive maintenance

- Consumption reports for energy management and billing - Logs and reporting

- User profile and role management

- Access rights management

The professional User Interface shall be implemented as a client application, which includes an automatically adapting tree structure of the building, building’s parts, individual spaces, different systems and parts of systems. The tree structure can be used for navigation through the system.

All systems connected to Building Operating System can be accessed through the same graphical User Interface. The client software can be installed to unlimited number of remote computers or laptops. The client software shall allow for remote Internet usage of several sites using the same client.

The professional User Interface shall show system views, floor plan views, trend view, alarm view and event log view per building and system layer. Any alarm shall be shown in red color in both graphical views and tree structure. Each alarm message shall include shortcut to relevant graphical system and floor plan view.

1.3.2 Occupant User Interface

Subsystems in e.g. meeting rooms, hotel rooms or residences shall be usable through a graphical browser-based occupant User Interface, using touch screen panel PC’s, tablet PC’s, IPTV, home computers, laptops, PDA’s and mobile phones. The User Interface shall comply with requirements defined in the System Architecture.

The browser-based occupant User Interface shall be generated automatically using the structure of the building defined in the Building Information Model. The browser-based User Interface shall utilise latest web technologies, such as AJAX. The user interfaces shall provide easy access to frequently needed functionality, such as lighting controls, temperature setpoint modifications, alarms, and configuration of scenes and modes of the space. The same user interface functionality shall be usable through any device with a browser.

The browse-based occupant User Interface shall allow for at least the following actions:

- Changing the mode of the space

- Modifying the mode settings of the controlled devices

- Changing the setpoints

- Modifying the control settings (e.g. dimming level)

- Manual controls

- Door controls

- Camera views

- Alarm list browsing

1.4 SYSTEM ARCHITECTURE

The system shall be implemented as an integrated, open solution, which enables Service Center connectivity through standard Building Operating System (BOS) interface.

The System Architecture shall consist of four levels:

- Service Level

- Management Level

- Control Level

- Field Level

The system shall be completely modular in structure and freely expandable at any stage. Each level of the system shall operate independently of the next level up as specified in the system architecture. For example, Control Level shall operate independently without support from Management Level.

The system shall be fully consistent with the latest industry standards. To enable efficient functional system integration and to provide maximum flexibility and to respond to changes in the building use, the system offered shall support the use of LonWorks, Modbus, M-bus, Ethernet TCP/IP and Internet communication technologies.

1.4.1 Service Level

Service Level shall allow the systems to be connected without additional software to one or several Service Center(s), for providing centralized remote monitoring, alarm and fault detection of connected building management and security systems.

The Service Center shall be capable of accessing remotely the systems through a standard interface through the BOS platform. The standard connectivity shall enable providing advanced maintenance and security services,such as security alarm monitoring, maintenance alarm monitoring, remote diagnostics,main user capabiIity,remote control and optimization of all systems, energy optimization, trending and reporting services.

The Service Center shall support connectivity of multiple sites in multi-operator environment. Predefined alarms from connected sites-e.g. intruder alarms, dilly filter notifications or leakage alarms, for example -shall appear in the alarm list with a specified priority. Alarms shall be stored in the central database.

Remote diagnostics of site systems and devices shall enable proactive maintenance of technical systems, energy optimization and efficient management of the infrastructure. Centralized monitoring of all connected sites with main user capability shall enable e.g. set point changes, manual controls and camera controls by using the remote connection.

1.4.2 Management Level

Management Level shall provide a uniform view to all systems through the open

Building Operating System(BOS) platform. All the systems- controls of cooling, ventilation and lighting, consumption measurements, access controls, intruder alarms, fire alarms and NVR/DVR systems-shall be integrated with the BOS using device drivers.

The BOS shall offer at least the following common services to be used by all connected systems:

o Alarms

o Historical trending

o Logs and reporting

o user profile and role management

To ensure fault-tolerant system functionality, the Management Layer shall not be responsible for any controls. The critical control functionality is taken care of by the intelligence on the control Layer. The Management Layer shall provide standard connectivity through the BOS platform with the service Level, With capability to support very advanced maintenance and security services. The BOS software shall also be capable of acting as a gateway between systems conveying messages, for example, from IP or Modbus devices to LON devices and vice versa.

The BOS Shall Collect trends from defined points, collect and forward alarms from the systems. The BOS Shall enable efficient management of user rights. The BOS shall be capable of forwarding alarms to mobile Phones using SMS, local alarm printers or to Service Center. It shall be possible to browse the alarm history for reporting and statistical purposes.

The BOS Shall include a structured XML object model of the building, its palls and spaces, its connected systems, system parts and effect areas of each systems. The XML object model shall comply with COBA XML schema.

The BOS Shall include an open interface for other applications to interact with the connected systems. Communication method between BOS and Client applications shall include at least Java Messaging Service(JMS). No other primary interfaces are recommended. Web interfaces shall be used for light-weight clients, e.g. automatically generated browser-based user interfaces in residences for panel PC's, PDA's or IPTV.

The network technology shall be based on the IT standards, such as TCP/IP, and be compatible with latest LAN/WAN technology. The operating system of the BOS server shall be Linux The BOS shall be Capable of Supporting current and future building management protocols through implementation of network interface drivers. The BOS shall be capable of current and future systems and devices through implementation of device drivers.

1.4.3 Control Level

The Control Level shall consist of a distributed network of smart controllers, which communicate to each other using a commonly known field bus as specified herein. Connectivity towards Management Level shall utilize standard TCP/lP protocol.

The controllers shall include all the intelligence of the system. All communication shall be event based, real-time peer-to-peer communication. All controllers shall be capable of operating autonomously independently of Management Layer. For example, all systems react to alarms on the Control Layer without interference from upper layers.

Each automation controller shall be capable of handling several different systems in parallel through flexible distribution of 1/0 points. Automation controllers shall function as autonomous units and form an intelligent system by communicating in real time over the free topology (FTT-1O) Local Operating Network (LON) using standard network va『iables (SNVT). Security controllers shall utilize RS-485 connection between the network controller and the interface panels.

1.4.4 Field Level

The Field Level shall consist of industry standard sensors and actuators, industry standard (wiegand) card readers and IP cameras. Field level is specified per system in next chapter.

2 Building Management and Security Systems

Building Management and Security Systems, including building automation, lighting controls, consumption measurements, access control, intruder alarms, video monitoring, fire alarms, central battery system and home automation, shall be integrated using the Building Operating System (BOS) as the integration platform, which shall provide functionality as described in the System Architecture.

2.1 BUILDING AUTOMATI ON

Building automation includes control and monitoring of cooling/heating system, ventilation system, pumps, tanks, lifts etc. All mechanical and electrical systems shall be monitored and controlled by smart control nodes connected to Local Operating Network (LON).

Building automation systems shall be integrated with lighting controls, security systems and fire alarm system as specified in the System Architecture. Building automation shall be connected to the central user interface through the Building Operating System (BOS).

2.1.1 Distribution of intelligence

The intelligence of the automation systems shall be distributed into Smart Control Nodes, which are connected to control network (LON). Smart Control Nodes must be commonly used during past 1O years in large scale commercial facilities, such as offices, business centers or hotels. It shall be possible to integrate the systems on Control Level without interference of Management Level, according to System Architecture.

Communication between Smart Control Nodes shall be peer-to-peer communication via a Free Topology (FTT-1O) Local Operating Network (LON) with the Standard Network Variables Types (SNVT). All communication shall be event based. Nodes shall be intelligent modules, capable of operating autonomously independently of Management Level. For example, all systems must be able to react to alarms on the Control Level without interference from upper levels.

2.1.2 Usage of 1/0 points

Each node shall have about 10 1/0 points to achieve maximum reliability and flexibility. Each node shall be capable of handling several different systems in parallel through flexible distribution of 1/0 points. The 1/0 points of the Control nodes shall be as follows:

- DI: Digital indication, from potential free contact

- DO: Digital control, open collector

- Al: Analog input, standard measurements 0- 10 VDC, PT1000 or Ni100-LG. - AO:Analog control, 0-10 VDC or 20 mA

The Control nodes shall include PIO controllers and ON/OFF (thermostat) functions for implementing the control loops used in engineering system process controls. Logical functions shall be implemented using configurable software objects in the

Control nodes.

Field devices are connected to Control nodes using the common industry standards :

- PT-1000 for temperature

- 0-10 V for other sensors and actuators

- Potential free contacts for ON/OFF indications and push buttons - 24 V relays for ON/OFF controls

- Impulses for consumption measurements

To guarantee openness, flexibility and cost-efficient maintenance of the integrated systems, the field devices shall not include independent control logic.

Control nodes are placed to the nearest electric cabin, side of air-handling units or in separate cabins when adequate. All systems shall use the same control network cabling, which uses free topology to maximize flexibility for future modifications and to minimize the need for cables. Electrical design should utilise star topology for controlled loads to maximize flexibility for changes.

2.1.3 General Purpose Controllers

General Purpose Controllers shall be freely configurable to achieve maximum reliability and flexibility and to meet the sequence of operation and future modifications.

Configuration shall be done with a graphical system configuration tool, which shall be compatible with the Building Operating System (BOS). The tool shall produce BOS compatible XML document about all integrated systems,which can be used as such to run the BOS.

2.1.4 Special Purpose Controllers

Special Purpose Controllers shall be used as autonomous controllers in rooms, zones and fan coil units. Each Special Purpose Controller alone shall be capable of controlling temperature , air quality (C02) and lighting in the room or zone.Special Purpose Controllers shall communicate on LON bus.

It shall be possible for the FCU controller to automatically change the FCU motor speed based on temperature deviation. The FCU controller shall regulate the cooling valve to meet the desired temperature conditions. FCU controllers shall communicate on LON bus and shall be integrated with BMS system to enable energy optimization and reporting.

2.2 LIGHTING CONTROLS

Lighting of common areas of the building shall be controlled by smart control nodes, which shall be connected to LON field bus in the same way as desribed in the chapter Building Automation. Lighting controls shall be implemented as part of the integrated Building Automation system.

Lighting groups in the common areas are on/off controlled (and/or dimmed) as follows:

- Using local push buttons (on/off, on/off/up/down, lighting scenes) - On occupancy

- Based on illumination level (dusk)

- Time schedules

Lighting controls are integrated with building automation and security systems and connected to the central user interface through BOS.

2.3 CONSUMPTION METERING

Consumptions of water, electricity, gas and cooling energy shall be measured in each area/ apartment. Water and electricity meters shall be equipped with impulse outputs. Impulse outputs are connected to Smart Control Nodes, which are connected to Local Operating Network (LON). BTU meters shall be connected direct to control network. All consumptions shall be trended into BOS’s database for generating regular consumption reports.

Different type of reports have to be generated for professional users and occupants. Occupant reports must be easy to understand and they must increase environmental awareness according to LEED and other green building initiatives.

2.4 ACCESS CONTROL AND INTRUDER ALARMS

Access control system shall be integrated with building automation, lighting controls and other security systems using the Building Operating System (BOS) as the integration platform.

Access control shall be implemented with proximity readers, control nodes, electronic keys and electronic locks. Users can be classified so that they have access only to the spaces they are allowed to enter according to

programmed time schedules. The access control system is connected to BOS for full control and reporting, and integrated into the central user interface.

Intruder alarm system shall include perimeter protection and indoor surveillance. Monitored doors and windows shall be equipped with magnetic contacts. Movement detectors used in indoor surveillance shall be sensitive enough for presence detection of a single person, so that they can also be used for lighting controls and air-conditioning controls.

Intruder alarms are seamlessly integrated on software level to access control, CCTV/DVR/NVR, lighting control and building automation. Granted access disarms the alarm zones automatically. In case of burglary the system gives an alarm, which is relayed through BOS to Service Center and/or to specified mobile phones.

2.4.2 Interface Panels

The selection of Interface Panels shall include at least Door/Reader Interface Panel, Input Monitor Interface Panel and Output Control Interface Panel. The Interface Panels shall connect with Network Controllers using RS-485 bus.

Door/Reader Interface Panels shall have two reader interfaces utilizing standard Wiegand protocol. Depending on application, the panel can be configured to control two sets of separate doors with a reader and an exit button,or one door with two-side readers (entry/exit).

In addition to the two reader interfaces, the Door/Reader Interface Panels shall have the following inputs and outputs: door monitor input, exit button input, strike relay output, auxiliary relay output.

Door/Reader Interface Panels shall be capable of indicating door forced and door held alarms also locally by using the internal beeper of the reader.

Interface Panels shall have local inputs for tamper and battery failure for indications and alarms.

The Input Monitoring Interface Panel shall be used to interface e.g. magnetic contacts and motion detectors to indicate alarm events. 丁he Input Monitoring Interface Panel shall include 16 supervised alarm inputs and 2 relay outputs.

Output Control Interface Panel shall be used mainly to control lifts. The Output

Control Interface Panel shall have 12 relay outputs and 2 supervised alarm inputs.

It shall be possible to create complex I/0 linking and rules between Network Controllers and Interface Panels.

2.4.1 Readers

The system shall support a variety of readers using standard Wiegand protocol, including plain readers, keypad readers, long-range readers and biometric readers. Readers should be based on 125 kHz proximity technology or 13.56 MHz contactless smart card technology,e.g. Mifare or iCLASS.

The system shall support a variety of credentials, including but not limited to e.g. traditional proximity cards and tags.

2.5 VIDEO MONITORING

Video monitoring shall be implemented with Digital Video Recording (DVR) or a fully IP based Network Video Recording (NVR) system. The video monitoring system shall be integrated to BOS server so that the system shall start recording video stream upon triggering from intruder alarm system, access control, CCTV or any other system integrated to BMS.

The video monitoring system shall support both analog and IP cameras. The system shall preferably run on Linux operating system. Usage can be done both via video monitoring system’s own User Interface Client and the integrated user interface of the BOS.

In addition to the software based user interface, it shall be possible to additionally expand the operator workstation with hardware based keypad and joystick interfaced with the system.

2.6 FIRE ALARMS

Fire alarm system shall be integrated with BMS for monitoring. Fire alarm system can be integrated either by 1.) using potential free contacts of Fire Alarm Panels connected to control modules or as 2.) using system driver which gives alarm information on individual sensor level to BOS. In both cases alarms are relayed to BOS and shown in the integrated graphical user interfaces. Ventilation is shut down in the area concerned.

2.7 OTHER SYSTEMS

Other systems shall enable integration to BOS,whenever applicable.

建筑电气设计手册[1].

建筑电气设计手册(含材料表及工程概算)

§表达线路敷设方式、部位、照明灯具安装方式的文字代号§ 表达内容 标注代号对照 表达内容 标注代号对照 表达内容 标注代号对照 英文代号汉语拼音代号英文代号汉语拼音代号英文 代号 汉语拼音代号 用轨形护套线敷设GBV 沿钢索敷设SR S 线吊式CP 用塑制线槽敷设PR XC/VXC 沿屋架或层架下弦敷设BE LM 自在器线吊 式 CP X 用硬质塑制管敷设PC VG 沿柱敷设CLE ZM 固定线吊式CP1 X1 用半硬塑制管敷设FEC ZVG/BYG 沿墙敷设WE QM 防水线吊式CP2 X2 用可挠型塑制管敷设KRG 沿天棚敷设CE PM 吊线器式CP3 X3 用薄电线管敷设TC DG 在能进入的吊顶内敷设ACE PNM 链吊式CH L 用厚电线管敷设G 暗敷在梁内BC LA 管吊式P G 用水煤气钢管敷设SC G/GG 暗敷在柱内CLC ZA 吸顶式或直 附式 S D 用金属线槽敷设SR GC/GXC 暗敷在屋面内或顶板内CC PA 嵌入式R R 用电缆桥架(或托盘)敷设CT 暗敷在地面内或地板内FC DA 顶棚内安装CR DR 用瓷夹敷设PL CJ 暗敷在不能进入的吊顶内AC PNA 墙壁内安装WR BR 用塑制夹敷设PCL VT 暗敷在墙内WC QA 台上安装T T 用蛇皮管敷设CP 柱上安装(灯具)CL Z 支架上安装SP J 用瓷瓶式或瓷柱式绝缘子敷设K CP 座装(灯具)HM ZH 壁装式W B 2

3 §室内电气管线、配电设备与其它管道、设备之间的最小距离表§ 注:1、表内无括号数字为电气管线在管道上面时的数据,有括号数字为电气管线在管道下面时的数据。 2、在不能满足表中所列距离情况下,应采取下列措施: (1) 电气管线与蒸气管线不能保持表中距离时,应在蒸气管或电气管外包以绝热层,此时平行净距可减减至200毫米,交叉处仅 须考虑施工操作和便于维护的距离。 (2) 电气管线与暖水管不能保持表中距离时,可在暖水管外包绝热层。 (3) 裸母线与其它管道交叉不能保持表中距离时,应在交叉处的裸母线外加装保护网或罩。 3、当上水管与电气管线平行敷设且在同一垂直面时,应将电气管线敷设于水管之上。 线路布线 方式 各种布线与其它用途的管道间最小距离 煤气管 乙炔管 氧气管 蒸气管 暖热水管 通风管 上水、下水管 压缩空气管 工艺设备 平行 交叉 平行 交 叉 平行 交 叉 平行 交叉 平行 交叉 平行 交 叉 平行 交叉 平行 交 叉 平行 交叉 导线穿金属管 100 100 100 100 100 100 1000 (500) 300 300 (200) 100 电缆 500 300 1000 500 500 300 1000 (500) 300 500 100 200 100 200 100 200 100 明敷绝缘导线 1000 300 1000 500 500 300 1000 (500) 300 300 (200) 100 200 100 200 100 200 100 裸母线 1000 300 2000 500 1000 500 1000 500 1000 500 1000 500 1000 500 1000 500 1500 1500 吊车滑触线 1500 500 3000 500 1500 500 1000 500 1000 500 1000 500 1000 500 1000 500 1500 1500 配电设备 1500 3000 1500 500 100 100 100 100

建筑电气工程施工技术课程标准

《建筑电气工程施工技术》课程标准 课程名称: 建筑电气工程施工技术 适用专业: 建筑电气工程技术专业 参考学时、学分: 56学时/3学分 1.课程性质: 《建筑电气工程施工技术》建筑电气工程施工技术是电子电气工程系建筑电气专业的专业课。它的任务是:使从事建筑电气施工与管理工作的学生工作时具有建筑供配电、电气照明、防雷与接地、建筑弱电(电话通信系统、有线电视与闭路电视系统、消防与防盗监控系统等)设备工程的专业基本知识,以及掌握这些基本知识和技术所必备的基本理论,以解决建筑电气施工、管理及监理工作中与建筑设备专业很好协调配合的问题。 2.典型工作任务描述: 本课程讲述的内容包括供电系统施工技术、照明系统施工技术、动力系统施工技术、低压配电线路施工技术、火灾报警与联动控制系统施工技术、电话通信系统施工技术、广播音响系统施工技术、电视系统施工技术、保安系统施工技术、建筑物防雷施工技术、接地与安全、智能建筑自动化系统施工技术等。建使学生获得建筑电气的基本概念、基本原理和基本设计方法、重点掌握建筑电气的各项施工技术,培养学生分析问题、解决问题及工程施工的能力和工艺。 建筑电气施工技术是施工人员根据图纸及国家标准规范选择适当的施工工艺进行安全文明施工,有序合理完成施工任务,设计人员也根据国家标准规范及当前主流的可靠的施工技术来设计图纸。建筑电气施工技术是施工人员必须掌握的能力。 3.工作与学习内容 工作对象

1.本课程讲述的内容包括供电系统施工技术、照明系统施工技术、动力系 统施工技术、低压配电线路施工技术、火灾报警与联动控制系统施工技术、电话通信系统施工技术、广播音响系统施工技术、电视系统施工技术、保安系统施工技术、建筑物防雷施工技术、接地与安全、智能建筑自动化系统施工技术等。使学生获得建筑电气的基本概念、基本原理和基本设计方法、重点掌握建筑电气的 各项施工技术,培养学生分析问题、解决问题及工程施工的能力和工艺。 电气施工阶段 1.施工准备 〃技术准备,熟悉、会审图纸,熟悉施工规范、验收规范、技术规程、质量验收标准,编制施工方案、编制工程预算 〃施工机具及材料的准备 〃了解和创造施工条件 2.施工过程 〃关键技术交底 〃对土建工程的要求 〃与土建工程的配合 〃按施工方案施工 〃安全注意事项 3.施工后 〃分项检查、质量评定与验收 〃保存文档资料 〃进行技术经济分析 工具材料 〃通用工具 测电笔、钢丝钳、螺丝刀、活板手、剥线钳、尖嘴钳、电烙铁、压线钳、手电钻、电锤、射钉枪、切割机、弯管器、套丝机、手动葫芦 〃缆线专用工具 电缆剪、扁形电缆剪、电缆刀、去套剪、手工虎钳 〃常用仪表

建筑电气设计内容

3.6 3 初步设计/建筑电气 3.6.1 初步设计阶段,建筑电气专专业设计文件应包括设计说明书、设计图纸、主要电气设备表、计算书(供内部使用及存档)。 3.6.2 设计说明书 1 设计依据 1)建筑概况:应说明建筑类别、性质、面积、层数、高度等; 2)相关专业提供给本专业的工程设计资料; 3)建设方提供的有关职能部门(如:供电部门、消防部门、通信部门、公安部门等)认定的工程设计资料,建设方设计要求; 4)本工程采用的主要标准及法规。 2 设计范围 1)根据设计任务书和有关设计资料说明本专业的设计工作内容和分工; 2)本工程拟设置的电气系统。 3 变、配电系统 1)确定负荷等级和各类负荷容量; 2)确定供电电源及电压等级,电源由何处引来,电源数量及回路数、专用线或非专用线、电缆埋地或架空、近远期发展情况; 3)备用电源和应急电源容量确定原则及性能要求,有自备发电机时,说明启动方式及与市电网关系; 4)高、低压供电系统结线型式及运行方式:正常工作电源与备用电源之间的关系;母线联络开关运行和切换方式;变压器之间低压侧联络方式;重要负荷的供电方式; 5)变,配电站的位置、数量、容量(包括设备安装容量、计算有功、无功、视在容量、变压器台数、容量)及型式(户内、户外或混合);设备技术条件和选型要求; 6)继电保护装置的设置; 7)电能计量装置:采用高压或低压;专用柜或非专用柜(满足供电部门要求和建设方内部核算要求);监测仪表的配置情况; 8)功率因数补偿方式: 说明功率因数是否达到供用电规则的要求,应补偿量和采取的补偿方式和补偿前后的结果; 9)操作电源和信号:说明高压设备操作电源和运行信号装置配置情况; 10)工程供电:高、低压进出线路的型号及敷设方式。 4 配电系统 1)电源由何处引来、电压等级、配电方式;对重要负荷和特别重要负荷及其它负荷的供电措施; 2)选用导线、电缆。母干线的材质和型号,敷设方式; 3)开关,插座,配电箱、控制箱等配电设备选型及安装方式; 4)电动机启动及控制方式的选择。 5 照明系统 1)照明种类及照度标准; 2)光源及灯具的选择、照明灯具的安装及控制方式;

建筑电工试题库完整

建筑电工试题库 一、填空题 1、我国安全生产的基本方针是安全第一,预防为主,综合治理。 2、特种作业人员,必须积极主动参加培训与考核。 既是法律法规的规定,也是自身工作,生产及生命安全的需要 3、触电急救,首先要使触电者迅速脱离电源,越 快越好。 @4、TN系统有三种类型,即TN—S系统,TN—C—S系统,TN—C 系统。 5、从事特种作业的人员必须经过专门培训,方可上 岗作业。 6、安全电压是指人体较长时间接触而不致发生危险 的电压。 7、漏电保护器后不得采用重复接地,否则送不上电。 8、对不遵守安全生产法律法规或玩忽职守、违章操 作的有关责任人员,要依法追究行政责任、民事责任和刑事责任。. @9、《施工现场临时用电安全技术规范》JGJ46---2005于2005 年___7_月1 日起施行。

@10、兆欧表主要用来测量各种绝缘电阻。 11、钳形电流表主要用于在不断开线路的情况下直接测量线路电流 12、触电人如意识丧失,应在10S内用看、听、试 的方法判定其呼吸心跳的情况。 13、建筑施工场所临时用电线路的用电设备必须安装 漏电保护器。 @#$14、建筑施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压电力系统,必须符合下列规定:采用三级配电系统采用TN-S接零保护系统;采用二级漏电保护系统。 @#$15、对配电箱、开关箱进行定期维修、检查时,必须将其前一级相应的电源隔离开关分闸断电,并悬挂“禁止合闸、有人工作”停电标志牌,严禁带电作业。 16、配电箱的电器安装板上必须分设N线端子板和PE线端子板。 17、建设部规范中规定在施工现场专用的中性点直接接地的电力线路中必须采用TN---S接零系统 18、临时用电工程必须经编制、审核、批准部门和使用单位共同验收,合格后方可投入使用。 19、PE线上严禁装设开关或熔断器,严禁通过工作

建筑电气工程施工方案

目录 一、编制说明 2 二、工程概况 2 三、施工部署 3 四、施工方法及技术措施 5 五、质量保证体系 11 六、确保安全施工的技术组织措施 14

第一章编制说明 1.1 编制依据 1.xx区综合治理项目,xx电气施工图。 2.建筑电气工程施工质量验收规范(GB50242-2002)。 3.《建筑工程技术资料管理规程》(DB13(J)35-2002)。 4.05系列建筑标准设计图籍05D1-05D11。 5、本楼号的图纸会审、设计变更及工程洽商。 6. 最新出版的电气工程施工类书籍。 1.2 编制目的 为确保工期、质量及安全、成本及文明工地条件,编制出有针对性的施工组织设计(方案),以指导施工顺利地完成本工程项目的安装。大力推广应用新技术、新工艺、新材料,控制工程成本,缩短工期,创建优质工程为目的。 第二章工程概况 本工程(xx区综合治理项目,xx小区),位于前进大街以西,联防路以北,北环路以南,剪力墙结构,基础形式为筏板基础,地下二层,地上二十八层,地下一、二层均为住宅储藏间,地上为住宅。建筑总高度为81.110m,总建筑面积约为18935.46m2。其中电气设计包括:配电、照明、通信电话、宽带网、访客对讲、有线电视和火灾报警等。 1、负荷等级:消防电梯、正压送风机、排烟风机、消防电梯基坑潜污泵与应急照明等按一级负荷供电,其余为三级负荷 2、配电系统本建筑物380/220V电源引自室外变电站,住宅用电与公共设施用电分开引入,公共设施两路电源由不同变压器的低压母线段供电;配电系统接地形式为TN-C-S; 3、照明系统:公共部位采用双电源供电。消防电梯前室、封闭楼梯间、公

《建筑电气》课程标准

《建筑电气》课程标准 课程名称:建筑电气适用专业:楼宇智能化工程技术专业1、前言 1.1 课程的性质 本课程是楼宇智能化工程技术专业开设的一门必修课程。它的任务是:使从事建筑电气施工与管理工作的学生工作时具有建筑供配电、电气照明、防雷与接地、建筑弱电(电话通信系统、有线电视与闭路电视系统、消防与防盗监控系统等)设备工程的专业基本知识,以及掌握这些基本知识和技术所必备的基本理论,以解决建筑电气施工、管理及监理工作中与建筑设备专业很好协调配合的问题。1.2 设计思路 本课程讲述的内容包括供电系统施工技术、照明系统施工技术、动力系统施工技术、低压配电线路施工技术、火灾报警与联动控制系统施工技术、电话通信系统施工技术、广播音响系统施工技术、电视系统施工技术、保安系统施工技术、建筑物防雷施工技术、接地与安全、智能建筑自动化系统施工技术等。建使学生获得建筑电气的基本概念、基本原理和基本设计方法、重点掌握建筑电气的各项施工技术,培养学生分析问题、解决问题及工程施工的能力和工艺。 本课程建议课时为72 学时。学分为3.5 分。2、课程目标工作与学习内容工作对象 1.本课程讲述的内容包括供电系统施工技术、照明系统施工技术、动力系统施工技术、低压配电线路施工技术、火灾报警与联动控制系统施工技术、电话通信系统施工技术、广播音响系统施工技术、电视系统施工技术、保安系统施工技术、建筑物防雷施工技术、接地与安全、智能建筑自动化系统施工技术等。使学生获得建筑电气的基本概念、基本原理和基本设计方法、重点掌握建筑电气的 各项施工技术,培养学生分析问题、解决问题及工程施工的能力和工艺。电气施工阶段1.施工准备?技术准备,熟悉、会审图纸,熟悉施工规范、验收规范、技术规程、质量验收标准,编制施工方案、编制工程预算 ?施工机具及材料的准备 ?了解和创造施工条件 2.施工过程 ?关键技术交底 ?对土建工程的要求 ?与土建工程的配合 ?按施工方案施工 ?安全注意事项 3.施工后 ?分项检查、质量评定与验收 ?保存文档资料 ?进行技术经济分析工具材料 ?通用工具 测电笔、钢丝钳、螺丝刀、活板手、剥线钳、尖嘴钳、电烙铁、压线钳、手电钻、电锤、射钉枪、切割机、弯管器、套丝机、手动葫芦 ?缆线专用工具 电缆剪、扁形电缆剪、电缆刀、去套剪、手工虎钳 ?常用仪表 钳形电流表、接地电阻测量仪、万用表、兆欧表、直流电桥、晶体管毫伏表、信号发生器、示波器?常用材料 电线、电缆、管子、灯具、配电箱、低压电器、电机、电话、探测器、摄像 头、消防设备、安全报警设备 ?相关国家标准、施工规范、标准图集

建筑电气各系统概述

建筑电气主配电室的简要概况 1、变电和配电系统 变电和配电系统380伏,但输电线路一般电压为10千伏、35千伏或以上。因此,独立的建筑物需设自备变压设备,并装设低压配电装置。这种变电、配电的设备和装置组成变电和配电系统。 2、动力设备系统 建筑物内有很多动力设备,如水泵、锅炉、空气调节设备、送风和排风机、电梯、试验装置等。这些设备及其供电线路、控制电器、保护继电器等,组成动力设备系统。 3、照明系统 包括电光源、灯具和照明线路。根据建筑物的不同用途,对电光源和灯具有不同的要求。照明线路应供电可靠、安全,电压稳定。 4、防雷和接地装置 建筑防雷装置能将雷电引泄入地,使建筑物免遭雷击。另外,从安全考虑,建筑物内用电设备的不应带电的金属部分都需要接地,因此要有统一的接地装置(接地极,接地母线、接闪器、引下线、均压环、等电位;等电位可以将静电安全导入地下,防止电击伤,这是漏电保护和短路保护装置无法做到的。等电位的运作原理,是将卫生间内金属给排水管、金属淋浴杆、金属采暖管、金属浴盆以及建筑钢筋网和卫生间电源插座的PE线联结到等电位装置上,形成一个相对独立的整体,做了卫生间局部等电位联结后,整个卫生间没有电位差,即使卫生间发生漏电、雷电,也不会有电流产生,等电位联结就是在卫生间中构造一个这样的电位相等的空间。没有电位差就形成不了电流,人体发生触电死亡是因为人体高电阻像一个用电设备,等电位联结导致电流处于静止状态没有流动,没有电流通过人体也就不会发生触电。 5、弱电系统 主要用于传输信号。有电话系统、有线广播系统、消防监测系统、闭路监视系统,共用电视天线系统、对建筑物中各种设备进行统一管理和控制的计算机管理系统等 变电和配电系统 配电室高压主要设备有 1、高压柜五防概念(防止带负荷合刀闸、防止带负荷拉刀闸、防止带电挂接地线、防止带接地线合闸、防止误入带电间隔)、开关间隔;母线间隔;电缆间隔;操作机构间隔;控制保护间隔;二次仪表室;母线室;断路器手车室;电缆室 2高压断路器 3、高压负荷开关 高压负荷开关具有简单的灭弧装置,能通断一定的负荷电流和过负荷电流,但是它不能断开短路电流,所以它一般与高压熔断器串联使用,借助熔断器来进行短路保护。 4、10kV电流互感器 环氧树脂真空浇注支柱式结构电流互感器用于电流、电能测量和继电保护用。 5、10kV电压互感器 环氧树脂浇注式电压互感器把高电压按比例关系变换成100V或更低等级的标准二次电压,供保护、计量、仪表装置使用。高压柜内电压互感器常规将10kV变为100V。 6、零序电流互感器 当电路中发生触电或漏电故障时,互感器二次侧输出零序电流,使所接二次线路上的设备保护动作使配电柜自动断开。 7、氧化锌避雷器

建筑电气工程施工方案完整版

编号:TQC/K796 建筑电气工程施工方案完 整版 Through the proposed methods and Countermeasures to deal with, common types such as planning scheme, design scheme, construction scheme, the essence is to build accessible bridge between people and products, realize matching problems, correct problems. 【适用制定规则/统一目标/规范行为/增强沟通等场景】 编写:________________________ 审核:________________________ 时间:________________________ 部门:________________________

建筑电气工程施工方案完整版 下载说明:本解决方案资料适合用于解决各类问题场景,通过提出的方法与对策来应付,常见种类如计划方案、设计方案、施工方案、技术措施,本质是人和产品之间建立可触达的桥梁,实现匹配问题,修正问题,预防未来出现同类问题。可直接应用日常文档制作,也可以根据实际需要对其进行修改。 一、电气工程概况 该工程建筑电气主要由照明配电系统、防雷接地系统、闭路电视系统及宽带网系统等,电源采用埋地引入,在各AP箱总开关前零线与保护接地体可靠连接(做重复接地),保护地线-40×4镀锌扁钢与接地体可靠连接,接地体与防雷共用。 二、施工前的准备工作 1、技术准备 施工前技术人员必须详细审图,对照招标文件,提出问题并在图纸会审时落

建筑电气工程图基本知识及识图 哦

目录

一建筑电气工程图基本知识 (一)、建筑电气工程施工图概念 建筑电气工程施工图,是用规定的图形符号和文字符号表示系统的组成及连接方式、装置和线路的具体的安装位置和走向的图纸。 电气工程图的特点 (1)建筑电气图大多是采用统一的图形符号并加注文字符号绘制的。 (2)建筑电气工程所包括的设备、器具、元器件之间是通过导线连接起来,构成一个整体,导线可长可短能比较方便的表达较远的空间距离。 (3)电气设备和线路在平面图中并不是按比例画出它们的形状及外形尺寸,通常用图形符号来表示,线路中的长度是用规定的线路的图形符号按比例绘制。 (二)、建筑电气工程图的类别 1、系统图:用规定的符号表示系统的组成和连接关系,它用单线将整个工程的的供电线路示意连接起来,主要表示整个工程或某一项目的供电方案和方式,也可以表示某一装置各部分的关系。系统图包括供配电系统图(强电系统图)、弱电系统图。 供配电系统图(强电系统图)是表示供电方式、供电回路、电压等级及进户方式;标注回路个数、设备容量及启动方法、保护方式、计量方式、线路敷设方式。强电系统图有高压系统图、低压系统图、电力系统图、照明系统图等。 弱电系统图是表示元器件的连接关系。包括通信电话系统图、广播线路系统图、共用天线系统图、火灾报警系统图、安全防范系统图、微机系统图。 2、平面图:是用设备、器具的图形符号和敷设的导线(电缆)或穿线管路的线条画在建筑物或安装场所,用以表示设备、器具、管线实际安装位置的水平投影图。是表示装置、器具、线路具体平面位置的图纸。 强电平面包括:电力平面图、照明平面图、防雷接地平面图、厂区电缆平面图等;弱电部分包括:消防电气平面布置图、综合布线平面图等。 3、原理图:表示控制原理的图纸,在施工过程中,指导调试工作。 4、接线图:表示系统的接线关系的图纸,在施工过程中指导调试工作。 (三)、建筑电气工程施工图的组成 电气工程施工图纸的组成有:首页、电气系统图、平面布置图、安装接线图、大样图和标准图。 1、首页:主要包括目录、设计说明、图例、设备器材图表。 (1)设计说明包括的内容:设计依据、工程概况、负荷等级、保安方式、接地要求、

西南大学《建筑电气》网上作业及参考答案

1:[论述题] 互感器的作用是什么? 参考答案: 1.将一次回路的高电压和大电流变为二次回路标准的低电压和小电流,使测量仪表和保护装置标准化,小型化,便于屏内安装。 2.使二次设备与高电压部分隔离,而且互感器一次侧都接地,从而保证了设备和人身的安全。 2:[论述题] 简述基尔霍夫电压定律的适用范围。 参考答案: 适用于闭合回路。 3:[论述题] 1、熔断器应在电路中。 2、电气设备工作时的实际值等于其额定值。 3、电压是两点之间的之差。 4、电路是的通路。 5、电压的正方向是。 6、电动势的实际方向是由电源指向电源。 7、电路通常由电源、以及连接电源与负载的中间环节组成。 8、电路的作用: 实现电能的和。

9、电路的三种工作状态是:、、。 参考答案: 1.串联 2.不一定 3.电位 4.电流所流过 5.高电位点指向低电位点 6.低电位点高电位点 7.负载 8.传输转换 9.负载、开路、短路 4:[填空题] 简述常用的三相异步电动机的起动方法。 参考答案: 1.直接起动。 2.鼠笼式电动机降压起动。 3.绕线式异步电动机的起 动。

1:[论述题] 简述变压器安装时注意事项。 参考答案: 1.应使通风良好,进出线方便,尽量靠近高压电源。 2.工地变压器应尽量靠近负荷中心或接近大容量用电设备。 3.远离交通要道,远离人畜活动中心。 4.远离剧烈震动,多尘或有腐蚀气体的场所,并且符合爆炸和火灾危险场所电力装置的有关规定。 2:[论述题] 配电导线截面积选择原则有哪些? 参考答案: 按发热条件、机械强度和允许电压损失选择。 3:[填空题] 1、照度的单位是。 2、亮度的单位是。 3、在直流电路中,功率P= 。 4、一台容量为1000V A(视在功率)的发电机,如果cosφ=1,则能发出的有功功率。 5、在频率一定时,相位差 由决定 6、影响照度稳定性的因素有。

建筑电气工程图基本知识及识图 免费哦

目录 一建筑电气工程图基本知识 (2) (一)、建筑电气工程施工图概念 (2) (二)、建筑电气工程图的类别 (2) (三)、建筑电气工程施工图的组成 (2) 二电气工程图的识读 (3) (一)、常用的文字符号及图形符号 (3) (二)、读图的方法和步骤 (4) (一)、模拟项目图纸组成 (18) (二)、电力系统的组成 (18) (三)、总干线 (18) (四)、配电系统识读 (18) (五)、平面图 (19)

一建筑电气工程图基本知识 (一)、建筑电气工程施工图概念 建筑电气工程施工图,是用规定的图形符号和文字符号表示系统的组成及连接方式、装置和线路的具体的安装位置和走向的图纸。 电气工程图的特点 (1)建筑电气图大多是采用统一的图形符号并加注文字符号绘制的。 (2)建筑电气工程所包括的设备、器具、元器件之间是通过导线连接起来,构成一个整体,导线可长可短能比较方便的表达较远的空间距离。 (3)电气设备和线路在平面图中并不是按比例画出它们的形状及外形尺寸,通常用图形符号来表示,线路中的长度是用规定的线路的图形符号按比例绘制。 (二)、建筑电气工程图的类别 1、系统图:用规定的符号表示系统的组成和连接关系,它用单线将整个工程的的供电线路示意连接起来,主要表示整个工程或某一项目的供电方案和方式,也可以表示某一装置各部分的关系。系统图包括供配电系统图(强电系统图)、弱电系统图。 供配电系统图(强电系统图)是表示供电方式、供电回路、电压等级及进户方式;标注回路个数、设备容量及启动方法、保护方式、计量方式、线路敷设方式。强电系统图有高压系统图、低压系统图、电力系统图、照明系统图等。 弱电系统图是表示元器件的连接关系。包括通信电话系统图、广播线路系统图、共用天线系统图、火灾报警系统图、安全防范系统图、微机系统图。 2、平面图:是用设备、器具的图形符号和敷设的导线(电缆)或穿线管路的线条画在建筑物或安装场所,用以表示设备、器具、管线实际安装位置的水平投影图。是表示装置、器具、线路具体平面位置的图纸。 强电平面包括:电力平面图、照明平面图、防雷接地平面图、厂区电缆平面图等;弱电部分包括:消防电气平面布置图、综合布线平面图等。 3、原理图:表示控制原理的图纸,在施工过程中,指导调试工作。 4、接线图:表示系统的接线关系的图纸,在施工过程中指导调试工作。 (三)、建筑电气工程施工图的组成 电气工程施工图纸的组成有:首页、电气系统图、平面布置图、安装接线图、大样图和标准图。 1、首页:主要包括目录、设计说明、图例、设备器材图表。 (1)设计说明包括的内容:设计依据、工程概况、负荷等级、保安方式、接地要求、

建筑电气课程设计参考.

目录 第1章概述 (3) 1.1工程概述........................................................................ .. (3) 1.2 设计要求 (3) 第2章供配电系统设计 (4) 2.1动力系统的负荷计算 (4) 2.2插座的选择与布置 (5) 2.3 动力系统导线型号及截面的选择 (5) 第3章照明系统设计 (12) 3.1 光源的选择 (12) 3.2灯具的选择 (13) 3.3照明负荷计算 (17) 第4章电气设备的选择 (19) 4.1低压断路器的选择 (19) 4.2低压开关柜的选择 (21) 4.3 系统原理图 (22) 参考资料 (23) 课程设计总结 (23)

一、概述 1.1工程概述: 设计对象为某部队综合楼第二层,假设其高为3.5m,窗高1.8m,卫生间,开关,楼梯间的工作面高度为地面,其余工作面高度均为0.75米。电源采用三相四相制AC380v/220v供电。设计内容包括照明灯具设计、开关、插座、配电箱布置,电气管线选用,以及总配电箱、分配电箱内部线路、电气设备选用。 1.2设计要求: (1)总的要求: 室内布线应在基建施工时布置在墙内,墙上应留有足够的插座,保证居民住进去后不需要布置明线而各种家电都可以使用。由于单相用电设备的使用是经常变化的,不可能做到两相平衡,因此一般情况下不要两个单相支路共用一根中性线。 (2)配线: 室内配线不仅要使电能的输送可靠,而且要使线路布置合理、整齐、安装牢固,符合技术规范的要求。内线工程不能降低建筑物的强度和影响建筑物的美观。在施工前要考虑好与给排水管道、热力管道、风管道以及通讯线路布线等的位置关系。室内配线技术要求如下: ①室内布线根据绝缘皮的颜色分清火线、中性线和地线。 ②选用的绝缘导线其额定电压应大于线路工作电压,导线的绝缘应符合线路的安装方式和敷设的环境条件。导线的截面应满足供电能力和供电质量的要求。还应满足防火的要求。 ③配线时应尽量避免导线有接头。因为往往接头由于工艺不良等原因而使接触电阻太大,发热量较大而引起事故。必须有接头时,可采用压接和焊接,务必使其接触良好,不应松动,接头处不应受到机械力的作用。 ④当导线穿过楼板时,应装设钢管或PVC管加以保护,管子的长度应从高楼板面2m处到楼板下出口处为止。 ⑤当导线互相交叉时,为避免碰线,在每根导线上应套上塑料管或绝缘管,并需将套管固定。 (3)穿管: 若导线所穿的管为钢管时,钢管应接地。当几个回路的导线穿同一根管时,管内的绝缘导线数不得多于8根。穿管敷设的绝缘导线的绝缘电压等级不应小于500V,穿管导线的总截面积(包括外护套)应不大于管内净面积的40%。 (4)开关: 住宅室内的总开关、支路总开关和所带负荷较大的开关(如电炉、取暖器等)应优先选用具有过流保护功能、维护操作简单且能同时断开火线和中性线的负荷开关,如HK-2系列闸刀等。表箱内每户出线的火线上安置1个单极自动开关,用户住宅门口的接线盒内安装1个漏电开关,室内总开关和分支总开关用闸刀。所有灯具的开关必须接火线(相线),否则会影响到用电安全及经济用电。 1)有利于对人的活动安全、舒适和正确识别周围环境,防止人与环境之间失去协调;

建筑电气设计

××××××工程概况 -------电力 一、建筑概况(略) 二、设计依据; 1、各市政主管部门对初步设计的审批意见; 2、甲方设计要求及各专业提供的设计资料; 3、《民用建筑电气设计规范》(JB16—2008); 4、《供配电系统设计规范》(GB50052—2009); 5、《汽车库、修车库、停车场设计防火规范》(GB50067—97); 6、《汽车库建筑计设范规》(JGJ100-98); 7、《建筑照明设计标准》(GB50034—2004); 8、《建筑物电子信息系统防雷技术规范》(GB50343—2004) 三、设计范围 1、配电系统; 2、照明配电系统; 3、设备控制系统; 4、接地及安全系统; 5、电气节能系统; 6、本次设计不包含车库内变电所部分电气设计及由变电所引至各个单体及防火区的线路路径的设计; 7、其他; 四、设计内容

(一)配电系统: 1、负荷等级:本楼消防负荷、火灾自动报警系统、安防设备、消防泵、防火卷帘门、消防风机、污水泵、应急照明及疏散指示灯为一级负荷;其他为三级负荷。 2、供电电源:本工程电源由市政电网引人两路独立10kv电源,每路均能承担本工程全部负荷,两路10kv电源同时工作,互为备用。 地下车库内设置1#变配电所及2#变配电所,1#变配电所供电范围为3#商住楼、4#商住楼、5#综合楼、6#住宅楼及其对应的地下车库、库房和设备用房;2#变配电所供电范围为1#s商住楼、2#商场及其对应的地下车库、库房和设备用房。地下车库及设备用房电源由车库内变电所引来,供电电压AC220/380V,进线采用交联聚乙烯铜芯电缆穿桥架引入地下一层车库各个防火区内的配电箱。 3、无功补偿:本工程在变配电所低压柜设置集中无功补偿自动装置,气体放电灯,单灯均带电子整流器,功率因数大于0.9. 4、低压配电接地采用TN—S系统,配电采用放射式、树干式、链式相结合的配电方式。 楼内消防风机、消防电梯等消防负荷用电均采用双电源供电,在设备末端设置双电源切换箱,其配电路在同一桥架上敷设的同一路径向消防设备供电的双路电源电缆应用阻燃隔板隔开,消防负荷电缆在桥架内应分开敷设。 (二)照明配电系统 1、楼内分别设有正常照明、应急照明及疏散指示照明。 2、应急照明灯、出口指示灯、疏散指示灯采用交直流两用型,内设可浮充蓄电池,持续供电时间除消控室、水泵房、配变电所、风机房大于180分钟,其他场合持续时间30min.。

建筑电气知识

建筑电气知识:超高压架空输电线路施工中必须挂双放线滑车 一、垂直于滑车轴方向的荷载超过滑车的承载能力时; 二、压接管或压接管加保护钢甲过滑车时的荷载超过其允许荷载(通过试验确定),可能造成压接管弯曲时; 三、放线张力正常后,导线在放线滑车上的包络角超过30°,可能造成导线在滑车上劈股时。 建筑电气知识:超高压架空输电线路施工中放线滑车应满足的要求 一、与牵放方式相配合。牵引绳通过滑车中心轮,同时牵放的各子导线与滑车中心轮严格对称。若同时牵放子导线数为奇数,中间轮既通过牵引绳、又通过导线,则需特殊考虑。 二、牵引板与放线滑车相配合,保证牵引板的通过性。 三、轮槽底径和槽形符合《放线滑轮直径和槽形》SD158—85.的规定。 四、轮槽宽度能顺利通过压接管或压接管保护钢甲及各种联结器。 五、轮槽接触导线部分应使用韧性材料,减轻导线与轮槽接触部分的挤压和提高导线防振性能。 建筑电气知识:超高压架空输电线路张力架线的优点 一、避免导线与地面摩擦致伤,减轻运行中的电晕损失及对无线电系统的干扰; 二、施工作业高度机械化,速度快,工效高; 三、用于跨越江河、公路、铁路、经济作物区,山区、泥沼、河网地带等复杂地形条件,更能取得良好经济效益; 四、能减少青苗损失。 建筑电气知识:超高压架空输电线路张力架线的基本特征 一、导线在架线施工全过程中处于架空状态; 二、以施工段为架线施工的单元工程,放线、紧线等作业在施工段内进行; 三、施工段不受设计耐张段限制,可以直线塔作施工段起止塔,在耐张塔上直通放线; 四、在直线塔上紧线并作直线塔锚线,凡直通放线的耐张塔也直通紧线; 五、在直通紧线的耐张塔上作平衡挂线或半平衡挂线; 六、同相子导线要求同时展放、同时收紧。 建筑电气知识:220~500kV高压断路器现场验收试验项目规定 1.测量绝缘电阻值。 2.测量直流泄漏电流,试验电压为直流40~60kV。 3.对辅助和控制回路进行2000V、1min工频耐压试验。

建筑电气课程教学大纲

建筑电气课程教学大纲 课程代号:06022120 学时:32 适用专业:电气工程及其自动化 一、课程的性质、目的和任务 1、课程的性质 本课程是高等工程本科专业《电气工程及其自动化专业》的专业方向选修课, 课程性质为专业方向选修课。本课程是建立在电路、电机、电子技术、自动控制技术、供电技术等基础知识之上的, 要求学生在学习本课程前应具备电路、电机、电子技术、自控原理、供电技术等专业基础知识。 2、课程的目的 开设本课程的主要目的是为了拓宽该专业学生的专业知识面,体现学以致用的原则, 适应就业市场的需要。使电气技术的有关理论直接与建筑电气技术与设计有机结合,侧重于民用建筑,侧重于应用和适用性。 3、课程的任务 本课程分为电路基础、电子技术基础和建筑电气技术与设计两大部分,电气工程及其自动化专业主要侧重于民用建筑的电气技术与设计的学习。其后一部分主要包括民用建筑供电、民用建筑常用电气设备、民用建筑电气照明设计、民用建筑弱电系统与消防报警系统、建筑防雷与接地、建筑的总体电气设计等内容。 其任务是:通过本课程的学习,使学生了解电气技术在建筑中的应用;获得建筑电气设计的基本知识和初步能力训练。使本专业学生具有应用电气技术知识于一般建筑中的初步能力,可以从事一般工业和民用建筑的电气设计和施工及管理工作,为后续课程及今后在建筑工程方面从事技术和管理工作打下一定理论和实践基础。 二、课程教学内容及基本要求 1、民用建筑常用电气设备 (1)教学目的与要求 了解建筑电气技术与智能建筑技术的应用。 理解电力变压器、干式变压器及特殊变压器结构和工作原理。 掌握民用建筑中常用电气仪表的使用方法。 (2)主要内容 建筑电气技术概述(建筑电气技术与智能建筑技术简介);电力变压器;干式变压器及特殊变压器结构;民用建筑中常用电气仪表的使用方法。 (3)重点、难点 重点:建筑电气与智能建筑技术简介、干式变压器、民用建筑中常用电气仪表。 难点:民用建筑中常用电气仪表的使用方法。 2、民用建筑供电 (1)教学目的与要求

建筑电气报告(完整版)

摘要: 能源的紧缺是现在全国乃至全世界都在关注的一个话题,尤其在中国,能源方面的平均利用率是日本的六倍多,美国的三倍多。我国的建筑能耗占全国总能耗的26.7%,高居全国榜首,而电气能耗是建筑能耗的主要组成部分,因此建筑电气方面的节能研究刻不容缓。文章主要从建筑电气的节能分析与研究入手,主要探讨的是电能的节约、合理的供配电系统的选用、选择合理的节能设备这三方面,使得在不影响其功能的前提下,尽可能的提升能源利用率,达到建筑电气节能的效果。 关键词:建筑电气节约能源节能设备供配电系统 Abstract: The entire country and the world is focusing on a topic that the storage of energy is badly needed, especially in China, the energy of average utilization rate is six times more than Japan, is more than three times in the United States. Our country's building energy consumption accounts for 26.7% of the total energy consumption in China and the country. And electrical energy consumption is the main part of building energy consumption .So building electrical energy saving research is urgently needed. This article mainly contract to the analysis and study of building electric, focuses on the energy savings, selection and reasonable supply and distribution system, a reasonable choice of energy-saving equipment, so that does not affect its function under the premise, as far as possible enhance energy efficiency, achieve the construction of electrical energy-saving effect. Key words: building electrical; energy saving energy; saving equipment; power supply; distribution system

建筑电气设计流程

建筑电气设计流程 方案设计阶段一、确定设计内容:根据建筑规模、功能定位及使用要求确定本工程拟设置的电气系统。 二、确定变、配电系统容量及要求1、确定负荷级别:1、 2、3级负荷的主要内容。2、负荷估算:本阶段主要采用单位容量法或单位指标法进行估算;。 3、电源:根据负荷性质和负荷容量,提出要求外供电源的回路数、容量、电压等级的要求。 4、确定变、配电所位置、数量、容量,变压器台数。 三、确定是否需要设应急电源系统以及备用电源和应急电源型式。四、对照明、防雷、接地、智能建筑设计的相关系统构成形式进行说明。初步设计阶段本阶段应在方案设计确定的设计内容基础上与业主沟通后展开各系统的技术设计;向设备专业了解设备配置情况,跟建筑、结构专业提出电气技术设计要求;一、确定变配电系统型式:1.确定负荷等级:1、2、3级负荷的主要内容;2.负荷计算:根据设备专业提供的设备资料,分类进行负荷计算,并算出总负荷;此计算书应在初设校审阶段与图纸一并提交,并同时归档;3.对于大中型项目专业负责人应提供两个以上的变配电系统方案提交专业委员会进行讨论比选并由项目工作会议确定设计方案,并将方案报给业主,协

助业主配合供电部门确定最终供电方案;4.根据确定的变配电方案,提出电源数量及回路数要求,向业主了解电源引自何处;确定高低压供电系统结线型式及运行方式;确定重要设备的供电方式;明确是否需要设置备用电源;5.确定变配站的数量、位置、面积,绘制设备布置平剖面图;6.绘制竖向系统图,标注各配电箱编号、对象名称;7.确定配电干线主要敷设路由;确定各主要配电间、电气管井位置及面积;8.画出配电干线平面图并标出主要配电箱位置及编号;二、考虑照明系统1.确定照明种类、灯具型式、照度标准;2.确定应急照明电源型式;3.确定照明线路型号的选择及敷设方式。4.绘制照明灯具平面布置图,可以不连线;三、设计消防系统1.依据《火灾自动报警设计规范》确定该项目的消防保护等级;2.绘制消防系统图;3.绘制消防布点平面图;四、考虑弱电系统了解业主对建筑项目智能化程度的设想及现有市政条件;1.确定各弱电系统的构成形式;绘制各系统原理图;2.确定各弱电主机房位置及面积;3.确定弱电主要敷设路由; 五、防雷及接地系统确定防雷等级,校审时提供防雷等级计算书;六、按照工程报批要求,在规定时间内提交本专业人防、消防报批图纸;七、初步设计图纸清单初步设计阶段电气专业应包括以下图纸:1.目录;

(建筑电气工程)建筑电气化作业精编

(建筑电气工程)建筑电气 化作业

建 筑 电 气

洛阳理工学院 工程管理系 房地产运营和估价专业 胡举 Z09085823 建筑电气 在现代飞速发展的科学技术的影响之下,人们也提高了对生活环境、工作环境的要求,智能建筑电气设计便是在这种要求之下而诞生的。建筑电气化是现代建筑的基本特征之壹,电和气给人们的生活带来了许多方便,使人们的生活进入了自动化和智能化,电和气可谓是现代建筑的灵魂。 一、供电和配电系统 现代建筑基本上都是以电作为动力的。由于发电厂大都距离负荷中心较远,从发电厂到用户只有通过输电线路和变电系统,才能把电能输送给用户。为了提高供电的可靠性和实现经济运行,常将许多发电厂和电力网连接在壹起且联运行组成了电力系统。 1.配电系统——由各变电站(发电厂)10(6)kV出线母线侧刀闸开始至公用配电变 压器二次侧出线套管为止,及10(6)kV高压用户的高压设备和供电部门的产权分 界点为止范围内所构成的配电网络。

2.配电系统设备 (1)配电系统变电站设备——包括从变电站(发电厂)10(6)kV母线侧出线刀闸算 起,至下述各连接点为止的所有中间设备。即: 当以架空线路出线时,至出线终端杆塔引连线为止; 当以电缆线路出线的架空线路时,至出线终端杆塔电缆头搭头为止; 当以电缆出线的长距离电缆线路时,至变电站(发电厂)开关柜下部出线隔离开关 和电缆头连接点为止。 (2)线路设备——由变电站(发电厂)10(6)kV出线杆塔或出线电缆头搭头至用户 用电配电变压器二次侧出线套管或用户高压设备引连线搭头为止所连接的中间 设备。 (3)电力负荷应根据对供电可靠性的要求及中断供电在对人身安全、经济损失上所造成影响的程度进行分级,且应符合下列规定符合下列情况之壹时,应为壹级负荷: 1)中断供电将造成人身伤害时。 2)中断供电将在经济上造成重大损失时。 3)中断供电将影响重要用电单位的正常工作。 符合下列情况之壹时,应为二级负荷: 1)中断供电将在经济上造成较大损失时。 2)中断供电将影响较重要用电单位的正常工作。 民用建筑中消防用电的负荷等级,应符合下列规定: 1、壹类高层民用建筑的消防控制室、火灾自动报警及联动控制装置、火灾应急照明及疏散指示标志、防烟及排烟设施、自动灭火系统、消防水泵、消防电