当前位置:文档之家› 辽宁工程薄煤层采煤机总体方案设计及截割减速器设计

辽宁工程薄煤层采煤机总体方案设计及截割减速器设计

辽宁工程薄煤层采煤机总体方案设计及截割减速器设计
辽宁工程薄煤层采煤机总体方案设计及截割减速器设计

特别说明

此资料来自豆丁网(https://www.doczj.com/doc/b44795572.html,/)

您现在所看到的文档是使用下载器所生成的文档

此文档的原件位于

https://www.doczj.com/doc/b44795572.html,/p-56075495.html

感谢您的支持

抱米花

https://www.doczj.com/doc/b44795572.html,/lotusbaob

MG160_150_375_W型采煤机截割部的改进

革新? 改造 文章编号:100320794(2005)0620101204 MG 160(150)Π375-W 型采煤机截割部的改进 宋相坤,杜长龙,王 力 (中国矿业大学机电工程学院,江苏徐州221008) 摘要:简单回顾了高档普采和经济型综采采煤机技术的发展状况,研究了现有的MG 160(150)Π375-W 型采煤机及其截割部的结构特点,分析了存在的不足之处,提出了截割部对称结构的设计方案,确定了改进的要点。 关键词:采煤机;截割部;摇臂;多电机横向布置;对称结构中图号:T D42116 文献标识码:B 1 MG 160(150)Π375-W 型采煤机截割部的现状分 析 鉴于MG 160(150)Π375-W 型采煤机的逐步推广应用以及它在设计、加工制造、装配和生产过程中带来的不便之处,对某些结构进行适当的改善是必要的。尝试对该类型采煤机的截割部进行完善正是 本次改进的重点。图1为MG 160(150)Π375-W 型采煤机摇臂传动结构示意图,采煤机电机通过三级直齿圆柱减速齿轮和一级行星机构减速齿轮传递动力而最终驱动滚筒进行采煤工作;为了调节采高范围,在第1级与第2级减速齿轮、第2级与第3级减速齿轮之间各加了1个惰轮。该类型的采煤机具有左右2个截割部,每个截割部都由置于其尾部的单独的电机驱动,截割部壳体为整体铸造结构,且两者不对称,即不能互换使用。本文正是在实现左右摇臂的通用性方面作一探讨。 (1)实现MG 160(150)Π375-W 型采煤机左右摇臂通用的必要性 定功能的元件组成,其相互之间的关系,将成为关键。这种分解组合的方式,利用LabVIEW 来建立具有很大的方便性,LabVIEW 的模块化控件、事件驱动、多线程特性满足了建立虚拟仪器的各种需要。可以利用LabVIEW 的各种控件,来建立各种虚拟仪器的组件。 虚拟仪器是用户与仪器的交互界面计算机软件,分前面板与程序图。前面板是模仿真实仪器的测试及应用界面,仪器的前面板由控件及指示器组成;程序图是虚拟仪器的“代码”,编程者根据仪器工作的目的,调用LabVIEW 的功能函数模块,连线控制程序流。虚拟示波器主要由软件控制完成信号的采集和显示。系统软件总体上包括数据采集、波形显示、波形文件存储等模块。 3 结语 利用Lab Jack 硬件和LabVIEW 、VC 及Delphi 开发的虚拟仪器是仪器发展的方向,“软件就是仪器”。本文对Lab Jack 产品进行了研究,利用虚拟技术,分析仪器设计的方法,以替代真实仪器,对实现仪器的快速开发,避免仪器的更新换代提供了帮助。 参考文献: [1]杜吉伟,尹光甲.仪器驱动程序开发综述[J ].国外电子测量技 术,1997,(1):27-29. [2]张易知,肖啸,张喜斌,等.虚拟仪器的设计与实现[M].西安:西 安电子科技大学出版社,2002. 作者简介:龙铭(1963-),江西吉安人,副教授,华东交通大学机电工程学院从事机械制造教学与研究,发表论文多篇.E -mail : longming2008@https://www.doczj.com/doc/b44795572.html,. 收稿日期:2005202227 Virtual I nstruments W as Analyzed B ased on Lab Jack LONG Ming (East China T raffic University ,Nanchang 330013,China ) Abstract :In this paper ,design of experimentation virtual instruments was analyzed base on Lab Jack ,with LabVIEW 、VC and Delphi ,Lab Jack ’s function ,peculiarity ,drivers and condition of s oft -hardware was bewrited ,the method of drive and s oft -panel was weaved with LabVIEW.The design method of analyzed instruments based on Virtual technology is the availability way of celerity development instruments ,this paper helps the instruments instead.K ey w ords :Lab Jack ;virtual instruments ;peculiarity ;drivers ;LabVIEW ? 101? 2005年第6期 煤 矿 机 械

掘进机截割部设计汇总

2.1.2 各部件的结构型式的确定 2.1.2.1 切割机构 (3)行星减速器 主要由箱体、减速齿轮、二级行星轮架、输入、输出轴构成。太阳轮与行星轮相啮合,此行星轮通过两个轴承装在星轮轴上,两端装有孔用弹性挡圈,星轮装在第一级行星架相应的轴孔内,内轮与箱体组成一体并与行星轮啮合带动第一级行星架,实现第一级减速[7]。 第二级的太阳轮与第一级行星架为渐开县花键联结,太阳轮与第二行星轮啮合,此行星轮装在第二级的轮轴,此轮轴装在第二级行星架相应轴孔内。这里内轮与减速器壳体组成一体与行星轮啮合,此星轮不仅自转还绕太阳轮公转,从而实现第二级减速器。 图2-1 EBZ200E掘进机的截割部行星减速器结构 Fig.2-1 EBZ200E roadheader in Jiamusi Coal Mine Machinery Co. Ltd. 2.2.4 截割机构技术参数的初步确定 2.2.4.3 电动机的选择 根据行业标准MT477-1996YBU系列掘进机用隔爆型三相异步电动机选择,确定截割功率为200kw,额定电压AC1140 /660 V,转速1500rpm

表2-2电动机的基本参数[13] 功率/kW 效率η/% 功率因数 /cos?堵转转矩堵转电流最小转矩最大转矩冷却水流 量/31 m h- ? 额定转矩额定电流额定转矩额定转矩 200 92 0.85 2.0 6.5 1.2 2.6 1.3

3悬臂式掘进机截割机构方案设计 3.1截割部的组成 掘进机截割部主要由截割电动机、截割机构减速器、截割头、悬臂筒组成。见图3-1.截割部是掘进机直接截割煤岩的装置,其结构型式、截割能力、运转情况直接影响掘进机的生产能力、掘进效率和机体的稳定性,是衡量掘进机性能的主要因素和指标。因此,工作部的设计是掘进机设计的关键。 1 截割头 2 伸缩部 3 截割减速机 4 截割电机 图3-1 纵轴式截割部 ?3.2 截割部电机及传动系统的选择 切割电机的选择应根据工作条件选取,由设计要求可知,所设计的掘进机可截割硬度为小于85Mpa的中硬岩,查表2-1可知应该选取功率为200KW的截割电动机。电机动力经传动系统传向截割头进行截割,且机体为焊接结构,前端与行星减速器相联,后端联接回转台。电机输出力矩,通过花键套传递给减速器,再由花键套传到主轴,主轴通过内花套键与截割头相联,把力(矩)传递到割头上,截割头以此方式进行工作。 3.5 传动方案设计 悬臂式掘进机的传动方式为电机输出轴通过联轴器将转矩传递给减速器的输入轴,减速器输出轴通过联轴器将转矩传递给主轴,主轴带动截割头转动。

采煤机截割部的整体设计

摘要 我所设计的题目是采煤机的截割部设计,即截割部的设计。当前我国采煤技术已经有了一定的发展,而且逐渐趋于自动化。 通过老师任务书的下达,我初步了解了我所要设计的采煤机的截割部的用途——用于进行地下采煤工作。 通过对此题目的分析以及对一些相关书籍和文献的查阅,截割部的设计重点应在于摇臂传动部分的设计。本设计的主要内容包括: 对课题的来源、选题的目的、以及截割部在国内外发展的形势,及所存在的问题进行了相关的论述。 采煤机截割部分一般结构,然后根据自身的需求选取适当的结构组件。 掌握一些基本概念、特点、应用以及基本工序,进而分析采煤技术的现状和发展方向,这样就能使大家对采煤技术有了总体的认识。 掌握的重点——对摇臂传动部进行设计。先分析力的传动过程;然后对截割部进行工艺分析,为设计奠定基础;最后对截割部传动进行整体设计,画好装配图。 最后对以设计出的数据进行整理和验算。 关键词:采煤机;截割部;传动部分;摇臂电动机

ABSTRACT I design is the subject of the shearer cutting design, the cutting of the design. China's current mining technology has made certain development and the growing trend of automation. Teachers through the mandate was issued, My initial understanding of my design of the shearer cutting unit uses -- for the underground mining work. Through the analysis of this topic and a number of related books and literature search, Cutting the Ministry of design should focus on the transmission arm of the design. The design of the main contents include : the source of the subject, the purpose of topics, and the cutting of the development of the situation at home and abroad, and the problems related to the exposition. Shearer cutting some of the general structure, according to the needs of their own selection of appropriate structural components. Master some basic concepts, features, applications and basic processes, thereby mining technology analysis of the status and direction of development, This will enable everyone to have mining technology overall awareness. Grasp the key -- right arm of the Department of transmission design. Analyze the edge of the drive; Then cutting the Department of Technical Analysis and lay the foundation for the design; Finally, the Ministry of cutting drive overall design, drawn assembly. Finally, the design of data collation and checking. Keywords : Shearer; Cutting Department; Transmission; Rocker Motor 目录 前言 (1) 1 绪论 (7) 1.1 课题的设计目的及意义 (7) 1.2 与课题相关国内外研究现状分析 (7) 1.2.1 采煤机在国内的发展情况 (7) 1.2.2 国外采煤机的发展 (9) 1.2.3 对采煤机在国内发展的建议 (11) 1.3 设计内容和预期结果 (12) 1.3.1 设计内容 (12)

更换采煤机右截割电机安全技术措施正式样本

文件编号:TP-AR-L1904 In Terms Of Organization Management, It Is Necessary To Form A Certain Guiding And Planning Executable Plan, So As To Help Decision-Makers To Carry Out Better Production And Management From Multiple Perspectives. (示范文本) 编制:_______________ 审核:_______________ 单位:_______________ 更换采煤机右截割电机安全技术措施正式样本

更换采煤机右截割电机安全技术措 施正式样本 使用注意:该解决方案资料可用在组织/机构/单位管理上,形成一定的具有指导性,规划性的可执行计划,从而实现多角度地帮助决策人员进行更好的生产与管理。材料内容可根据实际情况作相应修改,请在使用时认真阅读。 1603工作面采煤机在生产过程中右摇臂截割电 机出现异常,需进行更换到地面检修,为保证施工期 间施工人员的人身安全及设备安装质量,特编制本措 施。 一、施工前的准备: 1.准备好更换电机工作所需要的工具及材料,1 个2T葫芦、2个3T葫芦、扳手一套、一张2米长的 皮带。 2.在机尾处打2个起吊点,作为电机装车、缷 车起吊用,用2.2m的锚杆,每根锚杆使用3卷树脂

锚固剂,锚固深度不低于1.5m。 3.将采煤机牵到工作面机尾处,造好机窝,把运输机开空后。班长安排专职电工对采煤机、运输机开关停电闭锁,并挂上“有人工作,禁止合闸”安全警示牌,安排专人看管开关,防止误送电伤人事故发生。 4.施工前把煤机隔离刀闸打到零位,再将离合器手把拉至断开位置。 5.由地面后勤将新电机装入矿车并下井,由运搬工区将其运到三中场下平台,再由综采工区井下运料人员用无极绳运至尾轮。再用3T葫芦将电机吊起放到准备好的2米皮带上,用3T葫芦托运到运输机机尾。 二、施工步骤: 1.将采煤机牵至机尾,造好机窝。

掘进机截割头设计

掘进机截割头设计 煤矿掘进是煤炭生产和建设的基础工程。近年来,我国煤矿掘进机械化得到了迅速的发展,装备水平也有很大的提高,在自主创新能力上也有长足的进步。 煤炭工业是我国国民经济的主要支柱产业。在未来50年内,煤炭仍是主要的能源和战略物质,具有不可替代性,是国民经济和社会发展的保证。随着国民经济的快速发展,以及国加入WTO后,煤炭工业现代化的步伐也在加快。目前,国内掘进机发展水平相对落后,巷道掘进成为煤矿发展的一个瓶颈,制约着煤炭工业的发展。各国早期研制的悬臂式掘进机都是以煤炭为作业对象,机重在13-17吨之间、切割功率在30KW左右的轻型机,代表机型是前苏联的ЛК-3型掘进机。中期产品主要是用于切割煤系地层中的各种煤岩的中型掘进机,机重在25吨左右、切割功率50-100KW,可切岩石硬度系数f6,如英国的MKA-2400型、奥地利的AM-50型、日本的S100型等。近期产品主要是以煤系地层中的中硬度岩石为作业对象的重型机,一般机重40-80吨、切割功率150-200KW、可切岩石硬度系数f8,如英国的LH-1300型、奥地利的AM-75型、日本的S200M型掘进机等。 我国的掘进机技术开发工作始于1965年,最初是仿前苏联的ЛК-3型掘进机,1979年后,先后从日本、奥地利、英国、美国、西德、原苏联、匈牙利引进了多种型号的掘进机,通过引进日本MRH-5100-41型、奥地利AM-50等型掘进机的制造技术和先进加工设备,并进行技术转化,到1989年底,我国已自行研制成功了AM50、ELM-55、EMIA-30、EL-90、5100等6种8个型号的掘进机,使我国中小型掘进机不再依赖进口。此后,我国又开始了重型掘进

采煤机截割部设计本科毕业设计

摘要 本文描述了中煤层电牵引采煤机整机方案设计以及截割部的设计过程。 中煤层电牵引采煤机可用于煤层厚度为2-4m、煤质中硬的缓倾斜煤层。与传统的纵向布置的单电机采煤机相比,该采煤机将截割电机直接安装在截割部壳体内,齿轮减速装置全部集中在截割部壳体及行星减速器内,取消了螺旋伞齿轮、固定减速箱、摇臂回转套等结构,使其结构更简单、紧凑,可靠性更高。 截割部是采煤机直接落煤、装煤的部分,其消耗的功率约占整个采煤机功率的80%-90%,主要由截割部壳体、截割电机、齿轮减速装置、滚筒等组成。该采煤机的截割部采用四级传动;前三级为直齿传动,第四级为行星传动。二级传动的圆柱齿轮为可换齿轮,使输出转速可根据不同的煤质硬度在两档速度内选取。截割部采用了三个惰轮轴,使采煤机能够满足截割高度对截割部长度的要求。设计将截割部行星减速器和滚筒直接联结,取消了安装在滚筒上的截齿,使结构简单、可靠。 关键词:采煤机,截割部,结构,设计

Abstract This brochure describes the type of hydraulic shearer traction unit program design and cutting the Department of Design and calculation process. traction Shearer hydraulic seam thickness can be used for 2-4 m, Hard coal to the gently inclined seam. With the traditional vertical layout of the single-motor compared to Shearer, Shearer will be the ranging-arm installed directly in the cutting of the shell, gear device exclusively on cutting Shell and planetary reducer, the abolition of the spiral bevel gears, gear box fixed, Rocker rotating sets of structures, their structure is simpler, more compact and higher reliability. Ranging-arm of the shearer is directly charged coal, the coal loaded, its about the power consumption of the entire power shearer 80% -90%, mainly by cutting Shell, cutting electrical, Gear and drum components. The shearer cutting unit used four drive; Before three straight tooth drive, the fourth level of planetary transmission. 2 Drive Gear to be for the gears, enabling the output speed can be based on different coal hardness in two tranches within the selected speed. Cutting the Department has adopted a three lazy axle, to meet the shearer cutting height on the ranging-arm degree requirements. Designed to be cutting planetary reducer and drum direct link, canceled installed in the drum Pick, simple and reliable. Keywords: shearer, ranging-arm,structure,design

采煤机截割部设计

摘要 我国中薄煤层储碳量丰富,对适合于薄煤层开采的采煤机的需求量很大。而炮采安全性比较低,生产率也比较低;综采对设备要求较高,而且投资费用比较大。所以对中薄煤层来说开发适应高档普采的采煤机是非常必要的,而该设计正是针对中薄煤层适应高普而进行的设计。 主要从机械传动的角度对电牵引薄煤层采煤机的摇臂进行了设计,采取双电机横向布置,截割电机容量为2×100kW;开采含有夹矸等较硬煤质的综合机械化采煤工作面,可靠性高,性能先进。采煤机摇臂工作时由扭矩轴驱动,能量逐级传递,三轴起均载作用,四轴和五轴构成齿轮的变速级,末级为四行星减速器用以降低速度。并对各级齿轮及相应的传动轴进行了设计计算和校核,设计计算结果满足设计要求。 关键词:采煤机;摇臂;传动系统;行星机 构 I

Abstract In the present coal mine of our country,the thin reserves of coal seam are still rich ,are larger for the demand of the small-power machine of coal mining.And cannon pick safety comparison little,productivity is also low;Zong pick for equipment requirement higher,and investment cost is compared.So for in thin coal seam development meet the high general machine of coal mining is very necessary. And the design is adapted for thin seam in general and for high design. Mainly from the mechanical point of view of the electric traction drive thin seam shearer's arm was designed to take two-motor horizontal layout, cutting electrical capacity of 2×100kW; mining and other hard parting with the comprehensive mechanization of coal mining face, high reliability and advanced performance. Shearer work by the torque arm shaft drive, the energy transfer step by step, from both three-axis load, four-axis and five-axis gear shift level form, the end of grade four planetary gear reducer to reduce the speed. And levels of gear and drive shaft were designed corresponding calculation and verification, design calculations to meet the design requirements. Keywords:Shearer;Ratio Rocker;Transition system II

掘进机的截割机构的设计

摘要 随着煤炭行业机械化程度的加快,煤炭行业以前只是重视采煤的机械化,大多数的煤炭行业很少有在掘进方面有较大的投入和研究,这样就造成了采掘速度远远大于开拓速度,此时怎样来提高出煤量,开拓的机械化就显得极其重要了。作为我国主要能源的煤炭资源在开采上日趋机械化的同时,迫切需要拥有先进的掘进机械,掘进机的研制成功标志着我国的煤炭行业已达到世界的先进水平。 掘进机截割机构是掘进机的主要组成部分,按照掘进机截割部的总体、动力部分、传动部分以及执行部分的设计思路进行掘进机截割部的设计。在设计时,动力部分做选型计算,传动部分的行星减速机构做具体的设计计算和校核,执行部分只对执行元件进行设计计算和校核。设计对于提高和改进掘进机工作性能,发展我国大口径全断面掘进机产业以及进一步提高我国的盾构研发能力、改善研发条件具有重大战略意义。 关键词:掘进机; 截割臂; 行星减速器

Abstract With the accelerating of coal industry, the degree of mechanization mining coal industry is the importance before, the most mechanized excavating in coal industry has rarely have large investment and research, thus causing the mining speed than develop, how to improve the speed of coal, development of a mechanized appears very important. As our main source of energy in the exploitation of coal resources in the increasingly urgent need, mechanized excavating the advanced mechanical, swinging the successful development of the coal industry, China has reached the advanced world level. Determing cutting mechanism is the main component, the product in accordance with the overall determing cutting parts, power transmission part and the part, the part of the design thought for the design of determing cutting. In the design, selection of part, transmission parts of planetary gearhead institutions do specific design calculation and test execution part only, design calculation of actuators and checking. Design for improvement in China, the development work performance swinging big caliber, whole section roadheader industry and further enhance our shield developing capability, improve development condition with the strategic significance. Key words:roadheader ; cutting arm ; planetary-gear drive

电牵引采煤机截割部设计

摘要 摘要:本文完成了MG400/930一WD电牵引采煤机的整机外形的布局设计,介绍了采煤机的类型和工作原理,以及目前国内采煤机的现状和发展趋势,从左摇臂、左牵引部、左行走部、左电器控制箱、右电器控制箱、右行走箱、右牵引部、右摇臂的具体布局到各次的特点都有所涉及;重点完成了采煤机摇臂的设计计算,包括摇臂壳体以及壳体内一轴、第一级惰轮组、二轴、第二级惰轮组、第三级惰轮组、中心轮组、第一级行星减速器、第二级行星减速器几乎所有零部件的装配关系,各轴的转速计算,功率的传递计算,第一级圆柱直齿齿轮减速器的设计计算,第二级圆柱直齿齿轮减速器的设计计算,第一级行星减速器的设计计算,第二级行星减速器的设计计算,各轴的设计以及校核,所有轴承支撑处轴承的选择校核、花键连接处花键的选用以及校核。 关键词:采煤机;电牵引;摇臂;行星轮减速器

ABSTRACT Abstract:This paper completed a MG400/930 WD Electric Traction Shearer of equipment configuration for the layout .Shearer introduced the type and principle,and the current domestic Shearer's current situation and development trend .From The left arm、left traction Department、the Department of left running,、the electrical control box on the left and right electrical control box,、dextral box、and the right of traction 、right arm to the specific layout of the features have been covered,shearer will focus on completing the design of the Rocker which including Shell and Shell within one axis,、the first-round group inert、two-axis,、the second-round group inert、the third-round group inert,、the center round group、first-class planetary reducer,、and the second-stage planetary reducer almost all parts of the assembly.The shaft speed and power transmission are calculated importont .First-class Spur Gear reducer design calculation, the second-straight cylindrical gear reducer design, first-class planetary reducer design calculation, the second-stage planetary reducer design, the design of the shaft and Verification, Bearing all the support bearings choice Department Verification, Key spent connecting Department spent Key Selection and Verification. Keywords:seam;shearer;electrical haulage;Rocker ;Planetary gear reducer

180 滚筒采煤机截割部的设计

滚筒采煤机截割部的设计 1 引言 煤是重要的能源物质,在我国有着很大的储量。采煤一直以来都被人们看作一 项非常危险的事情。在以前国内有很多小型煤窑,由于规模小,技术落后,大部分 都是靠人工进行挖煤、运输煤。因此经常出现各种事故,而且大量浪费了资源。大 型的采煤机械的出现使这一现象得到了改观。采煤机作为采煤的主要工具是实现煤 矿生产机械化和现代化的重要设备之一。机械化采煤可以减轻体力劳动、提高安全 性,达到高产量、高效率、低消耗的目的。它对提高煤的采掘效率有着重要的影响。 因此国内外采煤机的设计、改进一直都在以较快的速度向前发展。 最早的滚筒采煤机出现在英国,它是把截煤机的减速箱部分改成允许安装一根 横轴和截割滚筒。由于其水平轴截割滚筒的设计优于截煤机,因此其改进型比刨煤 机更适宜英国开采条件,但在 20 世纪 50 年代这种采煤机并非是唯一应用的采煤设 备。另外有一种有竞争的采煤机是钻削式采煤机。这种采煤机配有一个按螺钻原理 设计的主截割部,其应用范围主要局限与薄煤层。 滚筒采煤机经过多次改进设计而得到不断的发展。最早设计的滚筒采煤机仅能 单向采煤,输送机和液压支架在向前推移之前,留在轨道上采出的煤在回空段被装 载。后来又研发了双向采煤的滚筒采煤机。然而由于这种采煤机受到调向的限制, 加之固定滚筒缺乏自由性,因此摇臂滚筒采煤机应运而生。 20世纪60年代末,久益公司生产出10CM、11CM 系列的连续采煤机,它是现代这 种机型的雏形。到70年代末,在11CM型基础上又生产出12CM系列连续采煤机。经过 对12CM系列连续采煤机的不断改进、完善和提高,生产出适用于开采中硬煤层的 12CM12—10B、12CM18—10D和B型机,以及适用于特别坚硬煤层的12HM31C型和B型机 (神东常用12CM12—10B、12CM18—10D)。80年代后期至今连续采煤机在采煤业中得 到了广泛的应用,并且得到了长足的发展。我国对这种连续型采煤机的应用始于70 年代中期。那时主要靠引进外国的产品,80年代以前主要是引进单机。随着国内采 煤机技术的发展到了90年代变成以配套引进为主。目前国内在采煤机研发和设计方 面和国外有很大的差距。煤炭科学研究总院太原分院早在1990年就开始进行连续采 煤机的研究,曾完成了轻型连续采煤机的设计、引进设备的国产化大修等工作。煤 炭科学研究总院上海分院也承担了一些项目。尽管国内各大科研院所、生产厂家、 煤矿企业曾开展过规模不等的连续采煤机等技术的国产化研究, 但均存在一些问题, 仍没有真正在煤矿上见到国产连采机的新产品。

矿业大学采煤机截割部往年问答整理

采煤机的功率是如何确定的? 根据设计年产量M 计算设计生产力Q →采用单位生产力所消耗的能量的方法来计算截割功率→根据截割功率以及截割比能耗计算装机总功率)..(P j 3214060K K K H Q x w j +?=η 截割部是如何密封的? 高速轴油封选用最合适密封材料、结构、提高其使用寿命; 摇壁回转轴承用油脂 (2# 锂基脂) 润滑并用油封把它与固定箱油池隔开; 对低速轴 (如滚筒轴、行走轮轴等) 改用端面浮动油封。通过 O 型密封圈弹性变形产生端比压。使浮动环靠紧并传递扭矩,补偿磨损。该油封对振动、冲击及轴向、径向偏斜不敏感,特别适用于低速 (2m/ s 以下) 、有煤粉泥浆条件下密封 齿轮材料机械性能有哪些要求??材料如何选择? 齿轮材料的基本要求: 1、齿面要硬,齿芯要韧,以防止齿面的各种失效 2、易于加工及热处理 3、在交变荷载和冲击荷载下有足够的弯曲强度 速度较高的齿轮传动,齿面容易产生疲劳点蚀,应选择齿面硬度较高而硬层较厚的材料;有冲击载荷的齿轮传动,轮齿容易折断,应选择韧性较好的材料;低速重载的齿轮传动,轮齿容易折断,齿面易磨损,应选择机械强度大,齿面硬度高的材料。 中厚煤层对该设计体现在哪些方面?? 根据自己的型号回答 摇臂的输出轴与滚筒连接方式及其特点? 滚筒的连接方式采用方形法兰机构,利用方形法兰机构把截割滚筒安装在摇臂的输出轴上。并用螺栓进行轴向固定,以防止滚筒割煤过程中产生的轴向移动。螺栓安装好后,必须用铁丝串接降松。 摇臂的壳体结构设计? 零件图的材料标注? 传动冷却方法? 滚筒的设计与绘制? 轴承的选择与定位? 1. 根据轴承工作条件(包括载荷方向及载荷类型、转速、润滑方式、同轴度要求、定位或非定位、安装和维修环境、环境温度等),选择轴承基本类型、公差等级和游隙; 2. 根据轴承的工作条件和受力情况和寿命要求,通过计算确定轴承型号,或根据使用要求,选定轴承型号,再验算寿命; 3. 验算所选轴承的额定载荷和极限转速。 选择轴承的主要考虑因素是极限转速、要求的确良寿命和载荷能力,其它的因素则有助于确定轴承类型、结构、尺寸及公差等级和游隙工求的最终方案。 一般情况下:对承受推力载荷时选用推力轴承、角接触轴承,对高速应用场合通常使用球轴承,承受重的径向载荷时,则选用滚子轴承。 锁紧螺母定位法,隔套定位法,阶梯轴套定位,固定端盖定位法 零件图的标注? 完整的尺寸,技术要求,标题栏 刮板机的工作过程?自己看着说

掘进机截割部设计

各部件的结构型式的确定 2.1.2.1 切割机构 (3)行星减速器 主要由箱体、减速齿轮、二级行星轮架、输入、输出轴构成。太阳轮与行星轮相啮合,此行星轮通过两个轴承装在星轮轴上,两端装有孔用弹性挡圈,星轮装在第一级行星架相应的轴孔内,内轮与箱体组成一体并与行星轮啮合带动第一级行星架,实现第一级减速[7]。 第二级的太阳轮与第一级行星架为渐开县花键联结,太阳轮与第二行星轮啮合,此行星轮装在第二级的轮轴,此轮轴装在第二级行星架相应轴孔内。这里内轮与减速器壳体组成一体与行星轮啮合,此星轮不仅自转还绕太阳轮公转,从而实现第二级减速器。 图2-1 EBZ200E掘进机的截割部行星减速器结构

EBZ200E roadheader in Jiamusi Coal Mine Machinery Co. Ltd. 截割机构技术参数的初步确定 电动机的选择 根据行业标准MT477-1996YBU系列掘进机用隔爆型三相异步电动机选择,确定截割功率为200kw,额定电压AC1140 /660 V,转速1500rpm 表 2-2电动机的基本参数[13] 功率/kW效率η/% 功率因数 /cos?堵转转矩堵转电流最小转矩最大转矩 冷却水流 量/31 m h- ? 额定转矩额定电流额定转矩额定转矩 20092

3悬臂式掘进机截割机构方案设计 截割部的组成 掘进机截割部主要由截割电动机、截割机构减速器、截割头、悬臂筒组成。见图3-1.截割部是掘进机直接截割煤岩的装置,其结构型式、截割能力、运转情况直接影响掘进机的生产能力、掘进效率和机体的稳定性,是衡量掘进机性能的主要因素和指标。因此,工作部的设计是掘进机设计的关键。 1 截割头 2 伸缩部 3 截割减速机 4 截割电机 图3-1 纵轴式截割部 ? 截割部电机及传动系统的选择 切割电机的选择应根据工作条件选取,由设计要求可知,所设计的掘进机可截割硬度为小于85Mpa的中硬岩,查表2-1可知应该选取功率为200KW的截割电动机。电机动力经传动系统传向截割头进行截割,且机体为焊接结构,前端与行星减速器相联,后端联接回转台。电机输出力矩,通过花键套传递给减速器,再由花键套传到主轴,主轴通过内花套键与截割头相联,把力(矩)传递到割头上,截割头以此方式进行工作。

采煤机截割部传动方案设计开题报告

本科毕业设计开题报告 题目: 900/2215型采煤机截割部传动结构设计院(系):机械工程学院 班级:机设09-2班 姓名: 学号: 指导教师: 教师职称:

黑龙江科技学院本科毕业设计开题报告 题目900/2215型采煤机截割部传动系统结构设计来源工程实际1、研究目的和意义 煤炭开采已经不仅仅是投入与采出的问题,随着经济社会的发展,市场对煤炭的需求越来越大,企业对于煤炭的开采要求越来越高,对煤炭的开采既要充分又要高效,能够适应不同的开采条件,既有薄煤层,又有厚煤层。尤其是对于大功率电牵引采煤机应用更是提出了挑战与创新,因此,这次毕业设计的大功率 900/2215型采煤机是适应我国煤炭开采发展趋势而设定的。 2、国内外发展情况(文献综述) 采煤机国内发展情况:我国与1963 年设计出的MLQ- 64 型单滚筒采煤机,这是我国第一台以螺旋滚筒为工作机构,集破煤、装煤为一体的采煤机。从20 世纪80 年代后期至90 年代中期的近10年的间,我国采煤机设计、开发进入了大发展阶段。,2005 年初步掌握了大功率大采高采煤机技术和机电一体化技术,2001 年大倾角电牵引采煤机和2002 年短壁电牵引采煤机标志着我国采煤机总体设计技术达到或接近国际先进水平。2009 年研制出世界最大功率2500KW电牵引采煤机,2011 年11 月研制出世界上最大功率3000kw电牵引采煤机[3]。 随着科技的进步,开发高产高效矿井综合配套设备已成为我国煤炭科技发展的主流:大功率,大截深电牵引采煤机被广泛的开发和使用,一些世界前沿的先进技术也被用到了采煤机的开发应用中,如变频调速技术,远程监控,无线遥控等等,为更好的服务我国煤矿事业奠定了坚实的基础。 20世纪九十年代以来,随着科技的迅猛发展,开发出集电子,微电子,信息管理及计算机智能技术一体化的的大功率采煤机,在自诊断检测、记忆截割和多参数远程监控等方面的技术日益成熟。如德国Eickhoff 公司的EDW 系列、SL 系列,美国JOY 公司的LS 系列等[2]。 综合筛分机械的发展状况,煤用筛分机械有以下发展趋势[2] : (1)向标准化、系列化、通用化发展主要包括振动筛的品种、振动器、筛框侧板、筛板、横梁、传动轴等设备的标准化、系列化、通用化。 (2)向大型化发展工业的现代化进程促使企业的规模扩大,生产能力大大提高。(3)向高振动强度发展 (4)向理想运动方式振动筛发展[2]

综采工作面更换采煤机截割电机的安全技术措施实用版

YF-ED-J6903 可按资料类型定义编号 综采工作面更换采煤机截割电机的安全技术措施实 用版 In Order To Ensure The Effective And Safe Operation Of The Department Work Or Production, Relevant Personnel Shall Follow The Procedures In Handling Business Or Operating Equipment. (示范文稿) 二零XX年XX月XX日

综采工作面更换采煤机截割电机的安全技术措施实用版 提示:该解决方案文档适合使用于从目的、要求、方式、方法、进度等都部署具体、周密,并有很强可操作性的计划,在进行中紧扣进度,实现最大程度完成与接近最初目标。下载后可以对文件进行定制修改,请根据实际需要调整使用。 一、工程概况 由于112202工作面采煤机右截割在生产过 程中电机无法启动,经厂家检查判定,电机烧 坏,需升井处理,为确保运输,拆装过程的安 全及更换电机后采煤机正常运转特制定本安全 措施。 二、运输路线 地面装车→副立井→﹢900水平车场→辅助 运输上山→112202回风顺槽→工作面上口(回 收路线相反)

三、施工前的准备 1、工器具:采煤机随机甩锤一套,5T手拉葫芦两台,Φ18.5mm×1m钢丝绳扣两根,Φ18.5㎜×2.5m钢丝绳扣两根,36mm套筒头1件,18寸活扳手1把,1.5m长钢钎2把,2.8m 单体支柱一根,M30×300mm螺栓,加力杆及其它拆卸工具。 2、在地面内对采煤机备用电机的铭牌核对是否与使用电机相符,并对电机外观进行检查是否有损伤,冷却水完好,测试绝缘符合规定值。 3、夜班生产结束后,将采煤机停在机尾段采高相对高的位置,并将影响施工的电缆槽拆除及架前的文明生产清理干净。 4、施工前,三机工负责联系将工作面运输

相关主题
文本预览
相关文档 最新文档