本标段主线桥梁上部构造的梁体分别是25m、40m后张预应力T梁,立交桥梁上部构造的梁体分别是25m后张预应力箱梁、30m后张预应力T梁以及现浇连续箱梁。根据现场实际情况,分别在每座桥的桥头处设置预制场,待桥头路基基本成型后开始预制,预制底座数量根据预制梁片量和工期要求设置。预制梁模板用定型大块钢模。预制梁运输用轨道平车运输,用架桥机安装。现浇连续箱梁采用满堂支架现浇。

2.2.

3.2.

4. Bridge Superstructure Construction

The main line bridge tenders of the upper structure of the beam is 25 m, 40m post-tensioned T-beam, the upper beam overpass structure of the beam is 25 m post-tensioned box girder, 30 m post-tensioned T-beam and continuous cast-in-place Box Girder. In accordance with the actual situation at the scene, in each bridge to install prefabricated bridge market, to be the bridge roadbed basically shaped after the prefabricated, according to the number of prefabricated base of precast beam films and Time requested. Liang template using prefabricated stereotypes massive steel form. Rail transport using precast beam flat car transport, use bridging machine installation. Continuous use of cast-in-place box girder stent packed cast-in-place.

2.2.

3.2.

4.1 预制梁施工与安装

1.后张法梁体预制:

①.底模制作

将计划设置的预制场的场地先给以平整规划,而后按规划位置和设计尺寸预制底模。底模中间基础采C20素砼浇灌,底座顶面铺设1cm厚钢板,于起吊位置设活动底模,便于起吊运输。

2.2.

3.2.

4.1 precast beam construction and installation

1. Post-beam of prefabricated:

①. Die at the end of the production

Plans to set up prefabricated field venue to leveling plan given first, then the planning and design position at the end of prefabricated modulus size. At the end of intermediate modulus based mining C20-concrete watering, the base of the top plate laying 1 cm thick, in lifting the position of the end of Die activities, facilitate the lifting transport.

②.绑扎钢筋

钢筋在加工场统一加工,然后运到现场绑扎成型。绑扎时要根据预应力管道的规格,按照钢绞线设计横、竖坐标准确定位波纹管位置,中间接头处要严密包裹,以防脱落、漏浆。最后在两侧绑扎砼保护层垫块。

②. Banding Reinforced

Reinforced in processing unified processing, then transported to the scene banding molding. Banding prestressed pipeline, according to the specifications, according to Strand design , close to the middle connector parcels to prevent falling out of leakage pulp. Finally on both sides banding concrete protective layer垫块.

③.支模

模板采用定型钢模边模(每5m装附着式震捣器1个),上下用Φ16钢筋拉杆紧固,外侧用斜撑支护以防止变形。

③. Branch Die

Template - modulus using stereotypes steel form (each 5 m attached earthquake destroyed the equipment of one), from top to bottom with Φ16 steel rod fastening, lateral support with diagonal bracing to prevent deformation.

④.浇注砼

预应力砼根据经设计配合比调整后的施工配合比,由搅拌站集中厂拌,砼搅拌车运输,人工入模。浇注时自两头向中间分层连续浇注,并使砼表面形成45度斜面。振捣时采用插入式振动棒配合附着式震捣器进行振捣,做到密实均匀,无漏振、过振。在振动过程中注意保护波纹管,严禁振动棒碰撞预应力管道和预埋件等。

④. Pouring Concrete

According Prestressed Concrete Mix Design Construction adjusted Mix by mixing station Mixing Plant, concrete truck mixer transport, artificial to die. Pouring time since two continuous casting to the center stratification, and concrete surface of 45-degree slant. Vibrated when used with plug-vibration bar attached earthquake destroyed the vessels vibrated so dense uniform and seamless vibration, the vibration. Vibration in the process of the need to protect the bellows, no-vibration bar collision prestressed pipeline and embedded parts, and so on.

⑤.张拉、灌浆、封锚

砼浇注完成后,采用麻袋覆盖洒水养护,24小时后即可脱模;然后按设计根数沿预埋的预应力管道穿钢绞线。当梁体砼强度达到设计强度的90%后即进行预应力张拉。

⑤. Tension, grouting, bolt closure

Concrete pouring completed, the use of sprinkler coverage conservation sacks, 24 demoulding; root and click on the design of prestressed few embedded along the pipeline wear Strand. When the beam of concrete strength to meet the design strength of 90 percent after a prestressed tension.

张拉前要彻底清洗孔道和锚具,清洗预应力钢材端部。张拉采用两台200t油压千斤顶从两端同时进行,张拉时,在张拉区域应设置明显的标志和安全防范措施,确保施工安全。在张拉过程中,实行张拉力和延伸量双控。严格控制张拉时间和张

拉应力,认真记录伸长量和张拉力,达到设计和规范要求。

Tension channels cleaned thoroughly before and Anchorage, cleaning prestressed steel end. Tension using two 200 t , the tension in the region should set up clear signs and security measures to ensure construction safety. Tension in the process of implementation of tension and extend dual control. Tension strictly control the time and tension stress, elongation and meticulously recorded tension to the design and specifications.

经监理工程师验收后,开始对预应力管道进行压浆:用压浆机从锚头预留孔中压入拌好的水泥浆。压浆应从一端向另一端连续进行,不可间断,持续压浆直至另一端饱和出浆(排气孔排出与规定稠度相同的水泥浆),并持压10分钟。然后用砂轮切割机切断预留钢绞线后封锚。预应力管道内水泥浆强度达到设计要求后方可吊装。

Acceptance by the supervising engineer after the start of prestressed pipeline be grouted: grouted bolt-from the first the reserve pressed into拌好water slurry. Grouting from one end to the other end of a row, can not be stopped, and sustained until the other end of saturated Grouting a slurry (exhaust vent from the same consistency with the provisions of slurry), and a pressure 10 minutes. Then Wheel cutting machine cut off after the closure reserved Strand anchor. Prestressed slurry pipeline strength to meet the design requirements before the

I intend to use the company self-developed bridging the DF15050 Ⅲ type of installation, the bridge machine is a new type of adjustable Span, the Electrical and Mechanical unit load teloping debugging, testing by be carried out-beam construction.

架梁顺序:从预制场端逐孔架设架梁施工分架桥机就位、喂梁、墩台顶落梁就位三个步骤进行。

- Beam sequence: from prefabricated building market-Hole-by-beam bridge construction machine in place, feeding beam, Pier roof beam in place with three steps.

梁体运输采用轨道平车运输。具体是自预制场至桥上以及路基上铺设工字钢轨道,配备两套轨道平车,预制场设横移轨道供梁体移位及装车,运输采用轨道平车头牵引行车。大梁安装后要及时进行横隔板焊接和接缝砼浇筑,保证梁体在最短时间内形成整体。

Leung Ping-orbit transport vehicle using the transport. Since the precast concrete market to bridge I-beam and the laying on the track roadbed, equipped with two sets of track-car field based teloping prefabricated track for loading and transfer of the beam, the front-orbit transport by road traction. Beam installation timely after diaphragm welding joints and the concrete laying, the guarantee of the beam formed in the shortest possible time overall.

3.梁体预制安装时其它注意事项

(1)梁体混凝土必须达到90%设计强度时方准施加预应力(检验混凝土强度时注意试件的取样及养生条件需与主梁体混凝土相符合)。

3. Beam installation of prefabricated attention to other matters

(1) of concrete beam must reach 90% Design-strength side on prestressed (to test the strength of concrete when the specimen to sampling and order according to design requirements of steel beam No. order. Tension prestressed steel beam to be tensioned both ends and top anchor, the process of tension should be ready to camber changes.

(3) main beam WING PLATES wet joints of the concrete surface must chisel of old and new concrete.

(4)主梁就位后必须及时进行横隔板间及翼板湿接缝混凝土的浇筑。只有其设计强度达到90%并采用压力扩散措施后,方可在其上运梁。

(4) main beam in place after the diaphragm must be timely and WING PLATES wet joints between the concrete pouring. Only its design strength reached 90 percent and pressure-proliferation measures adopted only after its last Yun Liang.

(5)主梁吊运按兜托梁底起吊法考虑(吊装孔离支座中心线不大于1m),不设吊环。预制时应在梁底预留穿索兜底所需

的活动段底模,同时在主梁翼板的对应位置预留穿索孔洞。

(5) main beam being lifted onto the end joist by soliciting consider lifting Act (Hoisting bearing 1 m) with no rings. Prefabricated should be set aside at the end of the beam reeving transparency of the activities required at the end of mold, in the main beam at the corresponding position WING PLATES reserved reeving steel at a lower intensity (such as A3, steel) intensity.

(7)为避免和减少边梁在施加预应力时产生侧向翘曲,外翼板按设计要求设置断缝(钢筋也需割断)。

(8)为确保梁体在运输过程中及安装就位时的稳定性,应采取有效的防倾倒措施。

(7) To prevent and reduce the side on prestressed beams generated lateral warping, the WING PLATES according to design requirements set off seam (also reinforced the need sever).

(8) To ensure that the beam in the transport process of the installation in place, and the stability is necessary to take effective anti-dumping measures.

(9)架桥机架设梁体施工时必须尽量按对称、均衡的原则进行安装。

(9) bridge-erection of beam construction must be kept on symmetry, balance and the principle of the installation.

(10)预制梁起吊时时须注意保持梁体横向稳定,架设后

应加强横向临时支撑措施,以增强梁的整体稳定性。

(11)T梁预制时须按设计要求设置向下反拱。

(10) precast beam lifting beam always to maintaining the stability of cross-cutting, cross-cutting should be strengthened after erecting temporary support measures to enhance the overall stability of beam.

(11) T-beam when the subject of prefabricated design requirements set down against arch.

4.湿接缝施工:

湿接缝模板采用木模,模板通过吊杆螺栓吊挂在梁顶上横架的槽钢上。吊杆外套套管。先进行横隔板的施工,横隔板拆模后才进行湿接缝的施工。拆模时,用绳将模板吊离桥底。

4. Construction wet joints:

Wet wood joints used template model, the template through boom bolt the top横架the channel steel beam on. Suspenders jacket casing. For the first diaphragm construction, Wang clapboard拆模later wetlands construction joints.拆模, the template will be used ropes -place concrete construction waterproof layer:

With construction conditions in the construction of the bridge deck waterproofing concrete construction can be carried out. First clean up debris and to bridge clean, before laying deck reinforced network, and then沿桥-left, middle and right channel steel production by three elevation zone to control the construction waterproofing

concrete elevation. Pouring Concrete at the pump or use Transporter will be directly sent to the concrete deck, artificial materials and can generally be shared leveling, using plug-in with plate vibrator vibrating rods, vibration beam vibration, rough-cylinder, 6 m aluminum alloy feet scraping Ping, or slurry拉毛. Pouring Concrete Construction at the main control in the formation of its control in the 3 mm within. Finally, the deck using film or草袋coverage sprinkler conservation.

6防撞护栏:

防撞护栏施工较为简单,在桥面施工前后均可进行。本工程拟在桥面防水层砼施工后开始。模板采用定型钢模,通过预埋钢筋支撑模板,通过对拉螺杆及钢丝蝇固定。施工中主要控制砼入模的坍落度及平纵线型,使墙体平、纵顺适,无波浪起伏现象,要求砼表面光洁,线条顺直,没有麻面、气孔等。

6 bull parapet:

Bull guardrail construction simplicity, the construction of the bridge can be carried out before and after. This works to be concrete in the bridge deck waterproofing layer after construction began. Using stereotypes steel form template, template support through embedded steel bars, and screw through the Rafah fly wire fixed. Construction of concrete into the main control module slump and the longitudinal linear-to-wall, vertical-Sik, undulating wave phenomena without requiring concrete surface bright and clean,

straight lines, no anesthesia face, such as porosity.

2.2.

3.2.

4.2 现浇连续箱梁施工

(1)支架及模板安装

①.箱梁通过搭设门式脚手架来进行逐孔现浇,跨地方路的中跨在地方路两侧、中间用钢管柱设临时墩,设计时考虑的荷载主要是现浇箱梁的重量,在计算支架受力时,适当提高设计的安全系数。临时墩墩顶用型钢连接,钢管柱基础采用条形扩大基础或支撑在承台上。支架上设置槽钢分配纵梁,纵梁顶上铺设箱梁底模横梁,横梁上再铺设底、侧模。用临时墩设置通道孔以不中断交通,同时在路口设立醒目标记,并派专人疏导交通,支架下布置全封闭竹篱笆交通防护设施,以确保施工和交通安全。施工方法同跨河通道。

2.2.

3.2.

4.2 cast-in-place box girder construction row

(1) stent and the template installation

①. Box beam through the erection of scaffolding to conduct door-by--place, the cross-road in the local inter-on both sides of the road at the local middle Steel String temporary pier, the design load is considered the weight of cast-in-place box girder in calculating stent force, designed to increase the safety factor. Provisional Pier Top connected with steel, strip steel pipe columns used to expand the basis of support on the basis or for the stage. Providing distribution channel steel stent carling, laying carling

top box girder beams die at the end, then laying on the beams at the end, lateral mode. Using temporary pier facilities to ensure that construction and road safety. Construction method with the Cross River channel.

②.对搭设支架基础进行整平、夯实。

③.通过测量放样铺设纵横地基枕木,使脚手架下托支承于木板上并钉以铁钉固定,对于表面为软弱土层者,首先挖出软弱土层,以后填砂,用冲实再在水平地面上铺5cm厚的木板,用铁钉把底座钉牢在木板上,在脚手架之间加以交叉拉杆,并加设水平钢管和斜角钢管。

②. Erection stent based on the whole-ping, lay a solid foundation.

③. Lofting laying by measuring the vertical and board nailed to nail fixed, the surface soil for the weak, weak first excavated soil, sand filling after using it again - level ground spread 5 cm thick wooden boards with nails to base钉牢the board, in between the scaffolds to be cross-pull rod and setting up a standard steel pipe and diagonal steel pipe.

④.安装底模,安装底模过程中需注意底模中线的准确。施工前支架进行预压,随着腹板施工逐步减压。

④. Die at the end of the installation, the installation process to die at the end of the attention at the end of the center line model accurately. Pre-construction scaffold for surcharging, with the web of gradual decompression.

⑤.底模安装好,按设计高度安装外侧模及翼板底模,用组合钢模拼装,为防止筑混凝土过程中漏浆,须在底模与外侧模接触处垫以海棉条,端模用8mm厚的钢板分块制作,块件之间使用槽钢通过螺栓连接,内模使用组合钢模和木模拼装,安装模板时,内外侧模之间,两边外侧之间均需拉以对拉螺栓,所有的模板内侧均涂以脱模剂,以利脱模。

⑤. Die at the end of the installation, and according to design order to prevent leakage in the process of building concrete slurry, should die at the end of the lateral mode contact with the mat to Spongiform of the end-use 8 mm thick steel plate production block, block between pieces through the use of channel steel bolt connections, internal model portfolio steel form and the use of wood-assembly and installation template, between the lateral mode, on both sides of the lateral inter need to pull bolts on Rafah, all the templates are coated inside with Release Agent for the benefit of demoulding.

⑥箱梁不设预拱度,但应考虑支架的弹性及非弹性变形。

⑥ Box Girder no pre-camber, but the stent should be considered flexible and non-elastic deformation.

(2)钢筋和预应力管道安装

钢筋在钢筋制作棚下料,底板及顶板钢筋采用现场绑扎,绑扎过程中注意尺寸准确。对梁肋钢筋,按照设计图纸绑扎成钢筋骨架,然后运至施工现场,吊到模板内适当位置安装。

(2) installation of reinforced and prestressed pipeline

Shelf in the production of reinforced steel bars under expected, floor and roof reinforced by the scene banding, banding process of attention to size accurately. The ribbed steel beam, in accordance with the design drawings banding into steel skeleton, and then shipped to the construction site, within the template installation.

预应力管道均采用定位钢筋控制,以保证管道中心各标高正确,定位钢筋是在箱梁钢筋骨架成型时根据设计位置焊在钢筋骨架上,在安装管道时把它固定于定位钢筋上,曲线段应加密定位钢筋,若预应力管道与普通钢筋位置发生冲突时,保持管道位置不变,适当挪动普通钢筋位置。所有在弯道的起点和终点上,均设置定位钢筋,以保证符合曲线要求。

Pipelines are prestressed reinforced by positioning control, in order to ensure the correct elevation pipeline Center, in the positioning of reinforced steel box girder skeleton molding location, in accordance with the design of the welding steel skeleton, in the pipeline when it installed in a fixed position reinforced, the curve of should encryption positioning reinforced, prestressed pipeline if ordinary steel reinforcement and conflicts, and maintain pipelines position remains unchanged, appropriate moving ordinary steel reinforcement. All corners starting and ending points, positioning are provided reinforcement to ensure that the requirements of the curve.

设置锚头的位置,将锚垫板牢固地固定在端模上,并注意锚垫板面的角度符合设计要求。

The first set anchor position, Anchor Pad will be firmly fixed in the terminal mode, and attention to the perspective of Anchor Pad comply with design requirements.

(3)砼浇注

箱梁采用搭架现浇,每段施工顺序:先浇注中段砼,然后再浇注墩顶段砼,以防止收缩和沉降裂缝;每段砼的浇注顺序为:先浇底、腹板,在底、腹板达到70%的设计强度后浇顶板。横隔板下半部分随腹板一起浇筑,横隔板的上半部分随顶板一起浇筑。对砼新浇结合面,须进行凿毛并清理干净,砼由拌和站生产。采用插入式振动器振捣密实,对于两侧的腹板分层浇注,分层振捣密实,浇注砼时,应避免振动器碰撞预应力管道、预埋件,浇注砼时应特别注意的是管道密集部位及锚头垫板部位,箱梁底调平契块需与箱梁一起浇筑。

(3) Pouring Concrete

Using搭架cast-in-place box girder, each construction sequence: first the middle of pouring concrete, then pouring the top of the concrete pier to prevent shrinkage and settlement cracks; each Concrete Pouring order: first jiaodi, web, in the end , the web reaches 70% of the design strength after pouring roof. With the lower portion

of diaphragm pouring web together, the diaphragm on the first of pouring new concrete surface, and to carry out cutting . Using plug-in vibrator vibrated dense, layered on both sides of the web casting, vibrated density stratification, pouring concrete, prestressed should avoid collisions pipeline vibrator, embedded parts, we should pay particular attention to the pouring of concrete is pipeline-intensive parts and bolt of the concrete laying condensate can be carried out seven days a sprinkler of the roof pouring water with wet sacks

Prestressed imposed before the test on concrete, appearance and size should meet the requirements, concrete box girder design strength to strength of the 90 percent, while age of not less than five days before tension. The steel beam dual-tension control, and that control tension of steel beam extension, elongation of the measured and calculated the difference between the amount requested extension not exceeding ± 6%. No impact anchor the jack Tension in the use of machines when unusual circumstances or when to use 200 times re-calibration, pressure gauge and other equipment should be tensioned with the design and specification requirements.

钢束张拉完成后,要立刻进行管道压浆,压浆前用高压水清除管道内杂质,检查钢绞线有无断丝、滑丝,最后确认无误后压浆,管道压浆要求密实,采用真空辅助压浆工艺。

Tension steel beam after the completion of a pipeline to immediately grouting, grouting with Strand broken wires, slippery

silk, after the final confirmation unmistakably grouting, plumbing requirements compaction grouting, Grouting by vacuum-assisted process.

(5)施工注意事项

①.现浇预应力砼箱梁施工顺序严格按设计进行施工。

②.预应力管道应严格按设计的座标定位。

(5) Construction of attention

①. Cast-in-place construction of prestressed concrete box beam design in strict accordance with the sequence of construction.

②. Prestressed pipeline design should be strictly in accordance with the coordinates of positioning.

③.箱梁钢束必须严格按照设计图纸规定的须序进行张拉,张拉纵向预应力钢束时,应对称张拉,以便箱梁对称受力。

④. 对砼初期养护工作应给予特别的重视,以防止混凝土的不均匀收缩变形或开裂,确保砼的质量。

③. Beam steel box girder design drawings must be in strict accordance with the provisions of the order should be carried out tension, tension vertical prestressing steel beam, said tension respond to box girder symmetry force.

④. Initial conservation work on the concrete should be given special attention in order to prevent uneven shrinkage of the concrete cracking or deformation to ensure that the quality of concrete.⑤支架的拆除,都必须在张拉完钢束且砼强度达到设计强度的

100%后方能进行。

⑥.箱梁桥台背墙必须待箱梁纵向预应力束张拉完成后施工。

⑦.伸缩缝安装时应选择合适的温度,避免极端高温、低温,根据安装时的温度,锁定缝宽。

⑤ stent removed must be tensioned End steel beam and concrete strength to meet the design strength of 100 percent after a can.

⑥. Box girder bridge abutment back wall must wait until the box beam of prestressed beams tensioned vertical after the completion of construction.

⑦. Joints to be installed choose a suitable temperature, avoid extreme accordance with the installation, lock Width.

⑧砼防撞栏施工时应参照设计图纸设置断缝,模板使用前应清洗干净,保证全桥砼表面光洁、颜色一致,位于曲线上的需结合平面线形设置适应的孤线,保证线形美观。

⑨伸缩缝安装完毕后,应清扫现场,避免砂、石落入伸缩缝槽内,以免损坏橡胶条和积水。

⑧ concrete crash barrier construction design drawings should be set up off the light slit, the template should be clean before use, ensure the smooth surface concrete bridge, the color line in the curve on , site clean-up should avoid sand, stone falling into the joints bed so as not to damage rubber and stagnant water.

(6)其他部分施工同上。

(6) other parts of the construction Ibid.

3.各分项工程的施工顺序

3.1.路基土石方挖方施工顺序

恢复中桩→放出边桩→开挖征地沟→砍树挖根→清除表土→挖掘土方至设计标高→翻松整平→碾压路基→检测各项质量→修整边坡→挖基砌筑防护工程。

3. Various sub-projects under construction order

3.1. Roadbed construction sequence of excavation of earth and stone

Recovery pile → released while excavating land pile → tree felling - dug ditch → root → remove topsoil → earthmoving to design elevation → Ping→ turned loose the whole of the roller compacted subgrade → quality → dug-dressing Slope → masonry protection works.

3.2.路基石方爆破施工顺序

施爆区环境调查→爆破设计与设计审批→配备专业施爆人员→用机械或人工清除施爆区覆盖层和强风化层岩石钻孔→爆破器材检查与试验→炮孔废碴清除→装药并安装引爆器材→布置安全岗→爆破→安全员检查清除

瞎炮解除警戒→测定爆破效果(包括飞石、地震波对施爆区内外构造物造成的损伤及造成的损失)。

3.2. Roadbed construction sequence rock blasting

Oxfam unexploded District Environmental Investigation → Design and bursting with professional design approval → unexploded Oxfam staff → removed by mechanical or artifi cial Oxfam unexploded regions cover layer and layer-weathered rock drilling → blasting equipment inspection and test → of security arrangement Kong → blasting → check security clearance blind artillery lifting of the warning → blasting effects (including fly-rock, Oxfam burst of seismic waves inside and outside the region Structure and the damage caused by the losses caused by).

3.3.路基填方施工顺序

恢复中桩→ 放出边桩→ 砍树挖根→ 挖沟排水(要时)清除表土、腐质土、淤泥(如果有)→翻松路床凉晒→ 挖台阶(必要时)→填前整平、压实→挖基砌筑防护工程→分层填筑、整平、碾压至设计标高→ 修整路堤边坡→ 挖基砌筑防护工程或铺草皮护坡→挖排水沟。

3.3. Roadbed fill construction order

Recovery pile → released while digging pile → tree felling root → digging drainage (to) remove topsoil, rot soil, sludge (if any)

单层工业厂房施工组织设计

单层工业厂房施工组织设计 本施工组织计划书由天津大学工程管理专业同学完成,其中施工组织方案由邢子培、徐莹莹设计完成,施工准备由钱麒雨设计完成,Project部分由孙铭志设计完成,施工图纸由武帅设计完成。其余工作,由组长张振宇完成。 一、工程概况 该工程为装配式单层工业厂房,建筑面积为24000平方米,有厂房和生活间两部分组成。厂房为预制排架结构,共有10跨,其中8跨是总成车间(组装),跨度18米;两跨是恒温车间,跨度12米。生活间为混合结构,三层,层高为2.9米。厂房基础为钢筋混凝土杯形基础,其维护墙下有预制钢筋混凝土基础梁,生活间为钢筋混凝土条形基础。 二、工程特点 本工程规模大,工期长,作业面广。 结构工程方面:厂房部分为预制钢筋混凝土柱、预应力混凝土薄腹梁、大型屋面板、联系梁、吊车梁及钢天窗架等。维护墙为砖体,生活间为砖墙组合柱,层层设圈梁,楼面为预应力短向圆孔板,采用预制钢筋混凝土楼梯。 设备方面:本工程设有上下水、雨水、采暖、及动力照明系统。 装修方面:普通水泥地面、屋面加气混凝土、二毡三油防水层,厂房外挂板装饰采用喷涂工艺(群青和氧化铁黄按1:4配制)。

三、施工部署 厂房施工大体分为三个阶段:基础工程、主体工程、装饰工程阶段。其中主体工程又可细分为模板工程、预制构件、砌筑工程、吊装工程及脚手架工程。各施工阶段应尽可能相互衔接,平行流水立体交叉作业,确保关键路径作业及时完成,不拖延工期,同时为以后工作做好准备。 生活间施工应与厂房施工同步进行,力争生活间的基础、主体、装饰作业分别与厂房相应部分同期完成。 基础工程施工应采取主体结构先于设备基础,以确保基础施工及预制柱现场施工时有较宽的作业面;吊装构件时,便于起重机行走;同时有利于加速主体结构的施工进度。 主体工程中的模板工程及预制工程应尽量安排外加工。混凝土柱的预制影安排在基础回填土之后进行且预制柱应布置在杯形基础附近,分别与相应的杯形基础对号就位,以尽量避免二次搬运。不能够外加工的特殊构件应安排在施工现场集中预制。装饰工程应在结构验收后进行,为实现平行流水立体交叉作业,可在分跨结构验收后陆续进入装修。为保证装修顺利进行,装修作业面应优先完成屋面防水、围护墙封闭和外门窗的安装。 四、施工方法 (一)基础工程 1. 施工顺序 基础工程各道工序应采取流水作业方法连续施工,以浇筑混凝土为主

施工组织设计范本8851890847

目录 第一章编制依据及说明 第二章工程概况 第一节 建筑设计特点 第二节结构设计特点 第三章现场平面布置 第一节平面布置原则 第二节施工现场平面布置图 第三节施工道路 第四节材料堆放 第四章施工组织及施工进度计划第一节施工段的划分 第二节主要工序 第三节劳动力安排 第四节施工管理机构和项目经理部的组成 第五节施工进度计划及措施 1. 进度计划监督管理 2. 施工进度计划 第六节施工协调配合 第五章质量保证措施 第一节施工质量把关措施 第二节施工现场监督检查 第六章工期保证措施 第一节建立严格的施工进度计划检查制度 第二节保证材料及外加工构件的供应 第三节土建与安装的配合协调工作

第四节实行资金专款专用 第七章施工部署 第一节质量目标 第二节工期目标 第三节安全管理目标 第四节文明工地管理目标 第五节以科学管理为目标 第六节抓好施工现场环境建设 第八章施工技术措施 第一节建立严格的技术管理体系 第二节施工过程技术控制 第三节冬季施工管理措施 第四节雨季施工管理措施 第九章机械设备配备情况 第十章安全施工措施 第一节安全生产组织机构 第二节安全保证体系 第三节安全用电管理措施 第四节现场保卫治安安全措施 第五节施工现场消防安全措施 第六节施工现场机械设备安全措施 第七节施工现场用电安全措施 第八节建筑施工安全措施 第九节架子工程安全措施 第十一章文明施工措施第一节创建文明工地的目标

第二节文明工地管理体系的建立 第三节认真搞好场容场貌 第四节进场材料堆放规范化 第五节生产区文明施工管理 第六节生活区文明工地管理 第七节其它方面文明工地管理 第十二章竣工交付使用后的回访工作

煤矿建设项目施工组织设计

遵义县山盆镇遵沿煤矿技改(15万吨/年)建设工程施工组织设计 编制: 工程师: 矿长: 遵义县山盆镇遵沿煤矿 二〇〇九年五月

目录 第一章编制说明 (4) 第一节编制依据 (4) 第二节编制范围 (4) 第三节编制原则 (4) 第四节遵循的主要规范、标准 (6) 第二章工程概况 (7) 第三章施工布署 (7) 第一节指导思想 (9) 第二节施工目标 (9) 第三节项目管理系统 (9) 第四章施工准备及场区布置 (11) 第五章工程测量 (12) 第一节控制测量 (12) 第二节施工测量 (12) 第三节测量检查.............................................12第六章主要工程的施工方案及方法 (13) 第一节总体施工方案 (13) 第二节地质超前预报.......................................13第七章作业指导书 (16) 第一节爆破 (16) 第二节装岩 (18) 第三节支护……………………………… (18) 第八章施工进度、工期及保证措施 (22) 第一节作业方式 (22) 第二节循环进度及工期 (22)

第三节循环进度及工期 (23) 第九章安全及文明施工保证措施 (25)

第一章编制说明 第一节编制依据 一、贵州兴源煤矿科技有限公司(2008年8月)《遵沿煤矿 (技改)开采方案设计说明书》。 二、贵州兴源煤矿科技有限公司(2008年8月)《遵沿煤矿 (技改)安全专篇》。 三、《煤矿安全规程》、相关检验评定标准、规范及工程相关安全、消防、环保、文物等管理规定。 第二节编制范围 遵沿煤煤矿建设工程所规定的范围。详见投产时井巷工程量表。 第三节编制原则 一、“安全第一”的原则 施工组织设计的编制始终按照技术可靠、措施得力、确保安全的原则确定施工方案,特别是地质构造地段复杂的井巷施工安全。必须在安全措施落实到位,确保万无一失的前提下组织施工。 二、优质高效的原则 加强领导,强化管理,优质高效。根据我们在施工组织设计中明确的质量目标,贯彻执行质量体系标准,积极推广、使用“四新”技术,确保创优规划和质量目标的实现。施工中强化标准化管理,控制成本,降低工程造价。 三、方案优化的原则 科学组织,合理安排。优化施工方案是工程施工管理的行动指南,在施工组织设计编制中,对不同围岩类别的爆破掘进、地质构造地段复杂的处理等关键工序进行多种施工方案的综合比选,在技

经典版市政道路及配套工程施工组织设计方案

经典版 市政道路及配套工程施工组织设计方案

a、工程概况 (一)、总体概述 **一期市政配套**路南段工程是**的重点市政工程项目,位于**,是**市市政基础设施中干线道路之一。本次**路实施范围南起建武路交叉口K0+000桩号;北至人民渠桥K1+057桩号,新建道路全长1057m,道路规划红线是37m,道路范围内包括建武路T字交叉口和建文路十字交叉口,另外在K0+857.7~K0+946.4桩号间与园区开发大道形式十字相交。本次市政配套工程招标包括道路工程、交通标志标线工程、雨污水管道工程、给水管道工程、通信线路工程、路灯照明管线工程、绿化工程、以及道路防护工程等等。道路建成后对地方的经济建设将具有十分重要的推动作用。(二)、编制依据 1、**发布的**一期市政配套工程**路南段(K0+000~ K1+057)工程施工招标文件和工程量清单。 2、**一期市政配套工程**路南段工程(K0+000~ K1+057)道路、管线施工图设计第一册和第二册(招标专用)。 3、业主对施工单位提出问题的答疑纪要及我单位有关人员对施工现场踏勘和调查情况。 4、施工招标文件所列的本工程适用的标准及规范,以及**市、****市的相关法规等。

5、我单位可调入本工程的人员、设备等综合实力情况。 6、我单位有同类工程的施工经验。 (三)、编制原则 1、“百年大计,质量第一”的原则 以“百年大计,质量第一”的思想编制各施工工序的质量控制措施,以高标准的工序质量来保证全部工程的施工质量,确保质量目标的实现,树立良好的企业形象。同时以设备保工艺,以工艺保质量的原则,配备先进的施工设备保证可靠的施工工艺,以可靠的施工工艺保证施工质量,从根本上确保质量目标的实现。在管理上编制完备的质量保证体系指导现场施工质量目标的具体实施与控制。 2、确保工期的原则 根据招标要求工期编制本工程施工进度计划,并以此为前提配备施工队伍、机械设备、劳动力、材料等,以足够的资源配置,满足施工工期的要求,采取分段组织施工,安排好工序衔接,实行平行作业、流水作业相配合,确保工期目标的实现。 3、优化施工方案的原则 严格遵照合同要求,结合本标段的实际情况,优化施工方案。积极推进技术与管理创新,确保工程质量,采取各种技术组织措施和管理措施降低工程造价。同时合理安排施工进度,搞好工序衔接,实行平行作业、流水作业相配合,突出重点,均衡生产,力求施工方案优化。

工业厂房施工组织设计方案

第1章 变电站施工组织设计 第1节 指导思想及实施目标 1、 指导思想 我公司针对本工程的指导思想是:质量第一,服务周到,业主满意,以质量为中心,按照《质量管理和质量保证》系列标准,建立工程质量保证体系,选配高素质的项目经理,积极推广应用新技术、新工艺、新设备、新材料,精心组织、科学管理,优质、高速地完成本工程的施工任务,创出湖北省以至全国第一流水平的工程。 2、 公司简介 (略) 3、 工程实施目标 1. 质量目标 (略) 在本工程施工过程中,我们将严格按质量保证体系组织施工,加强施工全过程质量控制,达到国家有关施工验收规范和设计要求,达标创优质工程,分部分项工程合格率达,建筑分部分项工程优良品率≥,质量承诺:甲方可在我方报价中提取万元作为质量保证金,由甲方每月考核乙方工程质量完成情况,若达不到合同质量要求,可每月扣除万元,累计不超过万元;若达到合同质量要求,则从质量基金中每月支付万元给乙方。工程最终验收达到合同质量要求,质量保证金的剩余款全部支付乙方。 2. 工期目标 我们将组织技术过硬,素质高的施工作业队伍,加强施工过程中的组织管理及平衡调度,同时制定切实可行的工期奖罚措施,如果年月日开工,确保8月日屋外配电装置交安。工期承诺:若达不到该工期目标,每延误一天扣元,最高扣罚不超过万元。如延误合同工期达三个月,甲方除按上述原则罚款外,有权终止合同。 3. 安全目标 我们将加强职工安全教育,在职工思想中树立牢固的安全意识,同时加大安全资金投入,从而杜绝死亡及重伤事故,轻伤频率控制在‰以下,实现“双零”标准。安全承诺:甲方可在我方报价中提取万元作为安全基金,由甲方每月考核乙方工程安全情况,若达不到合同规定的安全要求,可每月扣除万元,累计不超过万元;若

(强烈推荐)建筑工程项目施工组织设计案例(案例)

(此文档为word格式,下载后您可任意编辑修改!) 广成大厦建设工程施工组织设计

某建筑工程公司 目录 一、施工方案.............................................................................................................................. 2.1.1 施工目标 ...................................................................................................................... 2.1.2 施工组织 ........................................................................................................................ 2.1.2.1 优选项目经理组建项目管理班子,项目经理部机构图如下: ................................... 2.1.2.2 项目劳务层................................................................................................................. 2.2.1 施工总进度布置............................................................................................................... 2.2.2 机械设备部署................................................................................................................. P=1.1×(0.5×588.1÷0.75+0.6×162)×1.15×0.8=496KVA ................................................ 3.1 测量工程.............................................................................................................................. 3.1.1 主体工程测量................................................................................................................. 3.1.2 沉降观测.......................................................................................................................... 3.1.3 施工测量措施................................................................................................................. 3.1.4 施工测量技术要求 ......................................................................................................... 3.2.1.1测量定位 ....................................................................................................................... 3.2.1.2桩孔降水 .......................................................................................................................

市政道路、排水工程施工组织设计方案

市政道路、排水工程施工组织设计方案 编制依据、范围及原则 1.1.1编制依据 一、某国家高新区工业园I 期市政工程施工图。 二、建设部颁发的现行设计规范、施工规范、验收标准及有关文件。 三、从现场调查、采集、咨询所获取的资料。 四、集团公司积累的成熟技术、科技成果、施工方法以及多年来从事同类工程的工法和施工经验。 五、集团公司可供调用到该工程的各类资源。 1.2.1编制范围 编制范围为某国家高新区工业园I 期市政道路工程**大道,主要包括**大道的涵洞、路基、路面基层、面层、附属构筑物(侧石、人行道、收水井)以及原有道路结构层的拆除等工程。 1.3.1编制原则 一、安全第一的原则 在施工组织设计的编制中始终按照技术可靠、措施得力、确保安全的原则确定施工方案。本工程是永两公路与桂柳高速连接的主干道,亦是工业园市政的主干道,目前受道路行车干扰大,必须把安全措施落实到位、确保

万无一失的前提下组织施工。 二、优质高效的原则 加强领导,强化管理,优质高效。根据我们在施工组织设计中明确承诺的质量目标,贯彻执行ISO9001 质量体系标准,积极推广和使用“四新”技术,确保创优规划和质量目标的实现。施工中强化标准管理,加强内部核算管理,降低工程成本,提高经济效益。 三、方案优化的原则 科学组织,合理安排,优化施工方案是工程施工管理的行动指南,在施工方案的编制中,对路基土方填筑、路床及基层碾压、沥青砼面层施工等关键工序进行多种施工方案的综合比选。 四、确保工期的原则 根据建设单位对本工程的工期要求,编制科学的、合理的、周密的施工方案,合理安排进度,实行网络控制,搞好工序衔接,实施进度监控,特别要抓住重点控制工程,确保实现工期目标,满足业主要求。 五、科学配置的原则 根据本工程的工程量大小及各项管理目标的要求,在施工组织上,施工要素实行科学配置,选派有施工经验的管理人员,组织专业化施工队伍,投入高效先进的施工设备,确保建设资金的周转使用,选用优质材料,确保人、财、物设备的科学合理配置。 六、合理布局的原则 从合理利用临时占地、便于施工、搞好环保、实施文明施工等多角度出发,合理安排二灰碎石、水泥稳定层拌和站及沥青拌和站布局。

投标用施工组织设计[范本]

五、施工组织设计

一、总体施工组织布置及规划 1、工程概况 本项目起点为上海虹桥站,终于杭州东站,路线全长160Km,设计速度达350km/h。沿途设松江南、枫泾南、嘉善南、嘉兴南、海宁、桐乡、余杭等站。其中嘉善南站为一级公路技术标准,设双向六车道,设计速度80km/h,桥梁设计荷载为公路-I级,路基宽度为35m,其中行车道宽2×(2×3.75)m。 第2合同段二号路BK0+000~BK2+717及四号路DK0+000~DK0+355,全长3.072km。采用双向四车道标准横断面,路基宽35m,其组成为:5.0m中央分隔带+2×0.5m左侧路缘带+2×(2×3.75)m行车道+2×0.5m右侧路缘带+2×2.0m非机分隔带+2×4.0m辅车道+2×0.5m土路肩。 2、编制依据 2.1浙江省交通规划设计研究院编制的《嘉兴平湖至江苏黎里公路嘉善段公路改扩建工程(平黎公路嘉善南站连接线)》施工图设计,本项目招标文件,相关函件,投标前答疑会议纪要及补遗书。 2.2招标文件明确的《公路工程标准施工招标文件》范本(2009年版);现行《技术规范》及《公路工程技术标准》,现行的道路工程施工手册、公路桥涵施工手册,《公路工程质量评定及验收标准》及《公路工程预算定额》等。 2.3通过现场踏勘工地,调查、采集和咨询获得的资料。 3、项目各项目标 3.1 质量目标 标段交工验收的质量评定:交工验收工程质量评定90分及以上; 3.2 工期目标 本工程我单位投标工期为12个月(拟定开工日期2010年3月 2日,交工日期2011年3月1日)。 3.3 安全目标 加强安全管理和健全安全监督机制,杜绝重大交通事故、机械事故和伤亡事故发生,结合本标段的特点,采取有效的安全及防护措施,做好交通的管制与疏导,搞好安全生产。 3.4 环境目标 把施工对环境的影响控制在有关标准要求以内,不出现重大违规投诉;建筑垃圾及生

房屋建筑工程施工组织设计

宁南县红星乡中心小学校教师周转房建设 项目 施工组织设计 四川蜀都东方建设工程有限公司 二〇一五年十月十日

编制依据 一、建设方 业主所发的招标文件及其有关说明。 由设计公司设计的全套建筑、结构设计图纸。 合同文件中业主对工期、质量、文明施工等要求。 业主提供的施工现场平面、占地范围、水、电源及道路。 二、承包方 我公司可投入本工程施工的管理人员、工程技术人员及施工人员。 我公司可投入本工程施工的机械设备、周转材料、检测、检验仪器等。 我公司的新版《公司质量手册》、《程序文件》、《工程质量管理标准》及其它支持性企业文件。 三、政策法律法规、规范文件 《中华人民共和国建筑法》、《中华人民共和国合同法》、《建设工程管理条例》、《中华人民共和国安全生产法》等。 国家、行业、省市等有关工程的强制性标准、规程、规定。 省、市关于开展创建文明工地和创建优质工程的有关规定。 四、国家和行业现行的施工质量验收规范 《建设工程项目管理规范》(GB/T50326-2001) 《混凝土结构工程施工质量及验收规范》(GB50204-2002) 《混凝土质量控制标准》(GB50204-2002) 《建筑地面工程施工质量及验收规范》(GB50209-2002) 《屋面工程质量验收规范》(GB50207-2002) 《建筑装饰装修工程质量验收规范》 (GB50210-2001) 《建筑地基基础工程施工质量及验收规范》(GB50202-2002) 《建筑桩基技术规范》 (JGJ94-94) 《建筑基坑支护技术规程》 (JGJ120-99) 《钢筋焊接及验收规程》 (JGJ18-2003) 《砌体工程施工质量验收规范》(GB50203-2002) 《钢结构工程施工质量验收规范》(GB50205-2001) 《建筑工程施工质量验收统一标准》(GB50300-2001) 《施工现场临时用电安全技术规范》(JGJ46-88) 《建筑施工安全检查标准》(JGJ59-99) 《建筑施工高处作业安全技术规范》(JGJ80-91) 《普通混凝土用砂质量标准及检验方法》(JGJ52-92) 《普通混凝土用碎石和卵石质量标准及检验方法》(JGJ53-92)

市政道路施工组织设计方案

市政道路施工组织设计方案 一、工程概况 本工程为太原市I期市政东峰路道路工程,该路段北起于南内环东延南至龙城大街,全长约7.88公里。本次中标(山西安宇建设监理有限公司)路段为道路工程(K0+000—K3+392.687)段。计划施工工期为575日历天。 该道路红线宽度40m,两边再各预留5m绿化带,设双向六车道、两侧非机动车道和人行道。按城市II级主干道设计,计算行车速度40Km/h。 二、施工总体部署 2.1、施工准备 与甲方协议签订之后,本公司根据现场工程实际情况,,调动一切积极因素,利用熟悉本地施工条件的优势,就近调集施工人员(中铁十七局)做好上场准备。 由项目经理带领施工技术部、安全质量部、物资设备部、计划部、中心试验室、综合办公室等在本地的人员10人进驻现场,进行前期准备,其余人员在10天内调集完毕,在最短时间内进驻现场。并组织精测人员根据施工图纸及业主提供的原始测量基准点、测量标志、基准线或水准点或其他书面资料,按国家测绘标准和本工程精度要求,对本工程测设施工加密控制网,并及时提交监理单位,直至获得认可,在此同时,施工单位将陆续组织工程所需的各种施工机械、各项设备进场,联系各种材料厂家准备供料计划,并做好开工前的其他工作,

按要求向监理单位(山西省安宇建设监理有限公司)提交开工申请报告。 2.2、各种临时工程及临时设施、施工措施 2.2.1、施工营地布置 项目经理部租用当地房屋,施工队住房、料库、值班室、保安室及其他施工用房均利用现有的房屋,材料进场及车辆出入均可以利用现有便道,周围场地较平整。 2.2.2、施工用水 施工用水采用老虎口水库里的水或打井取用地下水。 2.2.3、施工用电 工程施工用电,附近电力为工业用电,可就近利用,不考虑单独设置变压器。 2.2.4、工地排水 设置集水坑将水集中、沉淀、过滤后,利用水泵、临时排水通道排入沟渠,局部水位较高处采用井点降水,重点地段雨季施工采取临时覆盖。 2.2.5、环保及三废处理 本工程拟集中建立垃圾站,并于环保部门联系统一处理,施工中生活废水、施工污水经与有关部门联系征得同意后,排向指定地点,处理效果达到国家规定的三废处理标准后排放,并征得三废主管部门的同意。 三、现场恢复

工程施工组织设计范本

1、编制依据 1.1、916-ZZ工程施工招标文件 1.2、总参工程兵第四设计研究院设计的916-ZZ工程图纸; 1.3、主要法规、规范、规程、标准、图集; 1.4、质量保证手册、程序文件、项目管理手册及项目策划书; 1.5、河北省和总参有关建筑工程的设计、施工等规范、规程、标准及规 定。 2、工程概况 2.1工程简介(详见下表): 工程简介

10 工程类别国防重点工程 2.2、建筑概况 本工程为总参六十一所试验大队综合试验场,位于总参六十一所试验大队试验基地院内。主体工程分为A B、C三个区段,A区为舞台及观众厅,地上一层(带夹层)框剪结构,檐高13.3M; B区地上一层为 排架结构,檐高9.3M; C区为以大小会议为主的办公区,地上三层框架结构,檐高13.3M。 砌筑工程:本工程外墙均采用300mm厚的陶粒混凝土砌块,内墙选用200厚陶粒混凝土砌块。 门窗工程:B区西立面人行入口用玻璃感应门,南北两面车行入口用电动推拉门;A区及C区入口为玻璃幕墙面开玻璃门。门窗颜色、品种、分隔待定。 外装修:采用浅灰色与米黄色相间的面砖,浅灰色涂料、玻璃幕墙等相结合。 屋面:除东立面为有组织外排水,其余主面为有组织内排水。其中A区屋面利用屋面自然坡度排水,C区屋面用水泥粉煤灰页岩陶粒找2% 坡,B区屋面保温、排水由网架厂家另行设计。A C区防水采用SBS改性沥青防水卷材。 其它:卫生间地面采用1.5mm厚聚氨脂涂膜防水,其地面标高比同楼层地面标高低0.02米。建筑四周均做900mm宽素混凝土散水,纵向每隔12m以及其与外墙相接处均设20mn宽伸缩缝,缝内填沥青砂浆。 各房间的具体装修做法详见下表:

建设工程项目施工组织设计

建设工程项目施工 组织设计 1

20 15~20 第1学期 施工组织课程设计 班级: 工管一班 学号: 姓名: 李佳鑫 指导老师: 姚荣 执行时间: .9.14~ .9.30

目录 第一章编制说明 ................................ 错误!未定义书签。 1.1 指导思想.................................. 错误!未定义书签。 1.2 实施目标.................................. 错误!未定义书签。 1.3 编制依据.................................. 错误!未定义书签。 1.4 编制原则.................................. 错误!未定义书签。第二章工程概况 ................................ 错误!未定义书签。 2.1 工程概况.................................. 错误!未定义书签。 2.2 施工特点.................................. 错误!未定义书签。第三章施工部署 ................................ 错误!未定义书签。 3.1 施工部署原则.............................. 错误!未定义书签。 3.2 组织机构及职能划分........................ 错误!未定义书签。 3.3 施工程序.................................. 错误!未定义书签。 3.4 施工顺序.................................. 错误!未定义书签。 3.5 施工流水段划分............................ 错误!未定义书签。 3.6 施工准备工作.............................. 错误!未定义书签。第四章施工平面布置图 .......................... 错误!未定义书签。 4.1 布置依据.................................. 错误!未定义书签。 4.2 布置原则.................................. 错误!未定义书签。

道路工程施工组织设计方案

道路工程施工组织设计方 案 Final revision by standardization team on December 10, 2020.

A4 施工组织设计(方案)报审表工程名称:安康今东物流园区室外工程

陕西省建设监理协会印刷 安康今东物流区室外道路工程 施 工 组 织 设 计 编制人: 审核人: 审批人: 安康市康泰建筑工程有限公司 2017年2月12日 (一)编制说明及编制原则 一、编制说明: 1、陕西安康今东物流园项目道路工程施工合同;

2、陕西安康今东物流园项目道路工程施工图纸; 3、《城市道路路基工程施工及验收规范》(CJJ44-91) 4、《公路路面基层施工技术规范》(JTJ034-2000) 5、《公路路基施工技术规范》(JTJ033-95) 6、《公路工程质量检验评定标准》(JTGF80/1-2004) 7、《全国通用给水排水标准图集》(04S516) 8、《市政排水管道工程及附属设施》(06MS201) 9、《混凝土结构工程施工质量验收规范》(GB50204-2002) 10、《市政排水管渠工程质量检验评定标准》(CJJ3-90) 二、编制原则 根据工程特点,确定编制原则为:精心组织、科学管理、合理安排、突出重点、重点环保、文明规范。 1、确保实现业主所要求的安全、质量目标 在充分理解业主意图的基础上,以施工设计图纸为主导,采用先进、合理、经济、可行的施工方案,并满足施工规范和设计要求,确保施工安全和质量优良。 2、确保实现业主要求的工期目标 依据我单位现有技术水平、施工管理经验和设备配套能力,施工进度安排合理、高效,施工区段划分协调、统一,资源配置合理、有效,做到均衡生产,以确保工程施工总

工业标准厂房施工组织设计

工业标准厂房施工 组织设计 长江工业标准厂房施工组织设计 一、工程概况及工程特点: 1.1 工程概况本工程为长江工业园标准生产厂房工程,建筑东北面与已建首期厂房相邻,西南面相邻园区公路,场地比较平坦,拟建工程为:C 厂房 5 层框架工业通用厂房。倒班房为 6 层框架职工宿舍。值班室为 4 层框结构。 1

拟建C厂房工程平面呈”7”字形,建筑布局为:柱网为8.3X 7.2、17跨,层高5.5m,总高度为23.1m,建筑南北长98.9m,东西宽16m,在2-1轴、2-2轴间设沉降缝,建筑面积为6866.37m2。拟建倒班房工程平面呈”一”字形, 厂房的基础为独立柱基,持力层为残积砂质粘性土,基础埋深为 2 . 8 m ,主体结构为现浇框架结构,楼面梁与框架梁采用密肋形式联系, 楼面采用单向板承载,车间部分楼面荷载为10.0KN/m 2,屋面为1.5KN/m 2,围护结构为190 多孔砖填充墙,采用Mu7.5 砖M5 混合砂浆砌筑,结构抗震烈度为7度,抗震等级为三级。 室内装修,楼地面除车间、变压器室、室外楼梯采用水泥砂浆压光面层,其余均为水磨石面层,车间内墙刷涂乳白色817 涂料二度,其余内墙均刷乳黄色乳胶涂料,天棚大部分刷白色817 涂料,仅公共部分作铝合金龙骨石膏板吊顶。 外墙大面采用白色面砖, 局部采用铝塑板装饰。 二、施工总体部署及协调管理: 2.1 施工总体布置: 本工程施工主要分为基础工程、主体结构工程、室内外装修工程,施工主要集中在砼结构工程,砖砌围护结构工程和室内外装修工 程三个阶段,主体结构施工中影响进度的主要因素为砼浇筑,考虑到该工程长形布局,单层面积大(约4000m2)将单层平面分成两段施工区组织流水作业。可为下道工序创造施工面,不但使其它工序提前插入,而且可节约一半模板。 2

施工组织设计范本新版

施工组织设计范本: 一、编制依据 1.1工程设计施工图纸及总平面图; 1.2对现场和周边环境的调查; 1.3现行国家和浙江省各种相关的施工操作规程、施工规范和施工质量验收标准; 1.4现行国家和浙江省关于建设工程施工安装技术法规和安装技术标准; 1.5国家工期定额和建设单位对本工程提出的施工工期及质量要求; 1.6本公司ISO9002国际质量体系标准,质量手册体系运行程序等; 1.7本公司有关施工技术、施工质量、安全生产技术管理、文明施工、环境保护等文件; 1.8工程规模、工程特点、各节点部位的技术要求、施工要点、类似工程的施工经验及公司的技术力量和机械装备; 1.9公司对本工程确立的施工质量、工期、安全生产、文明施工的管理目标。 二、工程概况 2.1工程地点及地貌 大酒店工程位于,紧靠南龙公路,交通十分便利,三通一平己经完成,场地比较开阔。 2.2建筑形式 本酒店平面几何形状为“角尺”形,东西向长度为40.27米,南北向长度为38.08米;东侧面房为框架结构,西侧面房为混合结构,共计层数为五层。框架部分层高为3.8米,混合结构部分层高为3.2米,室内外高差为0.6米,总高度为89米(室外地坪至檐口标高);建筑面积为7899.78平方米。 2.3工程结构

本工程分为东侧房和西侧房两部份,东侧房为四层框架结构,西侧房为五层混合结构,设计抗震设防烈度为7级,建筑场地类别按三类。 2.3.1地基基础及地下室 基础采用震动沉管灌注桩(桩基施工己有专业施工单位完成)东侧房基础桩下为钢筋混凝土独立桩承台,桩承台之间有钢筋砼地梁连接,西侧房基础为条形有筋桩承台,基础承台及梁下均铺100厚素砼垫层,混凝土强度等级,基础垫层为C10,±0.000以下基础采用C20混凝土,砖基础为MU10标准砖,砂桨为M7.5水泥砂桨。 2.3.2主体结构 该工程设计为框架填充墙与砖混结构二种结构形式。 (1)框架填充结构混凝土柱梁均采用C30,现浇板采用C25,填充内外墙均采用MU100标准砖,M5.0混合砂桨砌筑,柱与砌体连接处须沿墙高每隔500MM设2Φ6的拉接筋。 (2)混合结构混凝土构造柱,圈梁及现浇梁、板均采用C20砼。砖为MU100标准砖,M7.5混合砂桨 (3)沉降观察点设置:观察点作法参见(省标DBJ-1-90)。 2.4工程装饰 2.4.1屋面工程 (1)所有平屋面做法:20厚1:2.5水泥砂桨粉面且抹光,挤塑保温25厚,高分子卷材一层,20厚1:2.5水泥砂桨找平,高分子涂膜,20厚水泥砂桨找平层。 (2)坡屋面做法:红色小型波形,20厚1:3:9混合砂桨,15厚1:2.5水泥砂桨找平(掺3%防水剂) 2.4.2楼地面工程 一层地面为20厚1:2水泥砂桨,压实抹光,60厚C15混凝土,100厚碎石压实,素

建筑工程项目施工组织设计文件

5.2 钻孔灌注桩施工方案 本工程桩基处理设计采纳φ800mm钻孔灌注桩,桩顶标高为底板底标高,桩底标高-42.800m,有效桩长35m,砼标号C30,桩底端进入⑤2层。钻孔灌注桩内插钢格构柱兼为支撑立柱桩使用。打算投入20台GPS-20型钻机,拟采纳泥浆护壁正循环钻进成孔,导管灌注水下混凝土的方法施工。先施工第Ⅱ、Ⅲ施工段,然后紧随地下连续墙施工从基坑南、北两端向基坑中间推进。 5.2.1钻孔灌注桩施工工艺流程

图5.2.1 钻孔灌注桩施工工艺流程框图 5.2.2施工前钻孔触探 因拟建场地表层杂填土较厚,不仅夹有混凝土、块石、砖块及煤渣等杂物,且原上钢三厂厂区部分基础均未拆除洁净。 在钻孔灌注桩前,先行在桩位处,采纳工程钻机进行深度在7.0m 左右的钻孔触探,探明地下障碍物情况,以确定障碍物部位。关于旧的基础,采取开挖凿除旧基础,关于表层夹有混凝土、块石、砖块及煤渣等杂填土,采取挖掘清除表层杂物,然后用优质粘土回填夯实。先回填至护筒底部,护筒定位后再对称回填至地面; 5.2.3钻孔灌注桩施工方法

5.2.3.1桩位测放 施工前,依照桩位布置图和测量操纵网测放灌注桩桩位,桩位偏差不大于10mm,且标桩埋设牢固有醒目标志。 5.2.3.2护筒埋设 护筒采纳钢护筒,Ф800mm灌注桩护筒内径为810mm,采纳人工挖坑法埋设,护筒埋设应位置正确、稳定,护筒与坑壁之间用粘土填实,护筒中心与桩位中心线偏差不大于30mm,表层土质情况较好的部位护筒埋深 1.0~1.5m,对表层杂填土较厚部位采纳加长护筒,护筒埋深约2.0~3.0m。 5.2.3.3泥浆护壁 泥浆的作用在于维护槽壁的稳定,携出孔内的悬浮物钻渣。灌注桩施工所用泥浆要求粘度适当、比重合理、稳定性好、过滤失水量小,泥皮形成时刻短且薄而又有韧性。 本工程灌注桩钻孔深度约47.0m,钻孔作业要穿越杂填土、饱和粘性土、粉性土层,进入⑦层砂(粉)土层,③层灰色淤泥质粉质粘

市政配套工程施工组织设计完整版

(此文档为word格式,下载后您可任意编辑修改!) XXXX一期市政配套工程 XX路南段(K0+000~K1+057)工程施工组织设计 a、工程概况 (一)、总体概述 XXX一期市政配套XX路南段工程是XXX的重点市政工程项目,位于XXXX,是XX 市市政基础设施中干线道路之一。本次XX路实施范围南起建武路交叉口K0+000桩号;北至人民渠桥K1+057桩号,新建道路全长1057m,道路规划红线是37m,道路范围内包括建武路T字交叉口和建文路十字交叉口,另外在K0+857.7~K0+946.4桩号间与园区开发大道形式十字相交。本次市政配套工程招标包括道路工程、交通标志标线工程、雨污水管道工程、给水管道工程、通信线路工程、路灯照明管线工程、绿化工程、以及道路防护工程等等。道路建成后对地方的经济建设将具有十分重要的推动作用。(二)、编制依据 1、XXX发布的XXX一期市政配套工程XX路南段(K0+000~ K1+057)工程施工招标文件和工程量清单。 2、XXX一期市政配套工程XX路南段工程(K0+000~ K1+057)道路、管线施工图设计第一册和第二册(招标专用)。 3、业主对施工单位提出问题的答疑纪要及我单位有关人员对施工现场踏勘和调查情况。 4、施工招标文件所列的本工程适用的标准及规范,以及XXX市、XXXXXX市的相关法规等。 5、我单位可调入本工程的人员、设备等综合实力情况。 6、我单位有同类工程的施工经验。 (三)、编制原则 1、“百年大计,质量第一”的原则 以“百年大计,质量第一”的思想编制各施工工序的质量控制措施,以高标准的工序质量来保证全部工程的施工质量,确保质量目标的实现,树立良好的企业形象。

工业厂房工程施工组织设计

XXXXXXX有限公司 5# 厂房 施工组织设计

XXXXXX有限公司 X年X月 目录 一、编制依据 二、工程概况 三、施工部署 四、施工准备 五、施工现场平面布置图 六、主要施工机械设备 七、主要分部分项工程施工方法 八、保证质量措施及质量通病防治 九、重点部位施工方法及技术措施

十、冬雨季施工措施 十一、保证工期质量、安全和文明施工措施 十二、质量安全保证体系 十三、地下管线及地上地下设施的加固措施 十四、加强管理、减少扰民噪音、降低环境污染的技术措施 十五、降低工程造价措施 十六、新工艺、新技术、新材料的应用合理化建议 一、编制依据及原则 (一)编制依据 1、XXXXXXXXXX有限公司5#厂房工程技术标书,施工合同及相关文件; 2、施工图纸的全部内容: 3、国家颁布的现行建筑施工标准、规范、规定; 4、现行的法律法规; 5、与本工程配套的相关图集及做法说明; 6、建筑工程施工工艺标准; 7、安装工程施工工艺标准; 8、XXX公司的一体化管理手册、程序文件、支持性文件;

9、XX公司《施工现场管理规定》等。 (二)编制原则 本工程施工组织设计遵照XXXXX有限公司5#厂房工程的设计要求及现场实际环境条件,根据本工程结构特点,依照本工程招标文件、施工合同及相关文件的规定要求,总体本着既经济合理,又优质高效,同时便于操作的原则,以实现对各分部分项及有关的保证安全、质量、工期、控制造价、环境保护、文明施工,冬雨两季施工的要求进行编制。 本工程施工组织设计已达到资源合理配备和充分利用,本着想工程所想,急工程所急,充分做好各分部分项施工之前的准备工作和各项施工计划的落实,为保证工程质量所采取的得力措施,为整个工程全过程实现顺利施工,保证质量、保证工期、顺利完成全部施工任务创造良好条件。 二、工程概况综合说明及现场平面布置 一)、总体概况 (一)工程概况 XXXXXXXXX有限公司5#厂房工程由XXXXX设计有限公司设计院设计,由建设单位自筹资进行工程建设;本工程座落在XXXXX工业新区XXXXX有限公司厂区内,本工程要求2011年2月10日开工,2011年5 月31日竣工,日历工期为为111天。 (二)建筑设计 该工程为框架结构二层,无地下室,东西长158.0米,南北宽35.0米,建筑高度12.6米,建筑面积10795.9平方米。相对标高±0.000相对于绝对标高58.00米。墙体采用外墙250厚的加气砼砌块砌筑;屋面防水等级为二级,防水层合理使用年限为15年;楼地面分别为水泥砂浆楼面,大理石地面,铺地砖楼地面;内墙为混合水泥墙面和瓷砖墙面;顶棚分别为混合砂浆吊顶,PVC板吊顶;外墙为高级涂料墙面;外窗均采用铝合窗。 (三)结构设计 本工程结构安全等级为二级,基础处理采用独立基础,基槽持力层为(4)层强风化片麻岩层,

森林公园建设项目施工组织设计方案

森林公园建设项目施工组织设计方案 第一部分编制依据

1、贵州修文小箐乡崇恩村森林公园建设项目(荷花池)施工图纸; 2、招投标文件; 3、现行法律法规; 4、施工合同; 在编制过程中,我们立足于施工的专业化、机械化、标准化,重点工程重点安排,做到方案切实可行、经济合理,满足于高标准建设的需要。 第二部分工程概述 第一节工程概况 建设单位:修文县文化旅游投资发展有限公司 设计单位:重庆华宇园林有限公司设计分公司 监理单位:江西省建科工程技术有限公司 施工单位:重庆华宇园林有限公司 本工程为贵州修文县小箐镇田园综合体(荷花池)工程,位于修文县小箐镇崇恩村,占地约90亩。主要内容为土方工程、防水工程、广场工程、绿化工程、建筑及构筑工程、水电工程。 第二节气象水文

修文县属亚热带季风湿润区,春到迟,秋临早,夏季短,冬季长,阴雨多,日照少,夏无酷暑,冬无严寒,雨热同期,气候温和。年平均气温13℃到16℃之间,平均降水量1000毫米至1250毫米之间,无霜期269天,冬无严寒,极端低温为-3 ℃,夏无酷暑,极端高温为30 ℃。 第三部分施工部署 (一)队伍设营 组织先遣人员,调配部分机械进入施工现场工作。同时指挥部要密切与建设单位、设计单位、监理单位关系,作好施工准备;并积极地与地方政府及有关部门取得联系,征得支持和协助组织。施工管理和技术人员,对整个合同段进一步现场调查,结合工程任务划分,安排队伍设营,认真调查水电及料源情况、协助和施工等。 (二)技术准备 1、全面复测根据现场监理工程师或设计代表提供的工程定线资料和现场测量标志资料,认真搞好交接桩工作,组织测量人员对合同段内线路中线及高程进行贯通和闭合测量,并向相邻合同段延伸复测,资料整理后报