No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 近10年公司电力工程(含动力站)总承包项目和设计项目业绩表 Summary of Power Plant Projects conducted by CUC in Recent 10 Years

NO. Items & Description

机组规模 Unit Size

工程范围 Project

Scope

完成时间

Time of

Completion

备注

Notes

锅炉 Boiler

汽机(或燃机)Turbine

(or Combustion engine)

一、特种电站及国外项目

1. Special Power Plants & Overseas Projects 1

广东惠州东江发电厂

Guangdong Huizhou Dongjiang Power Plant - 9×12.5 MW Feasibility Study,

Primary Design & Construction

柴油机 Diesel Engine 2

温岭市调峰电厂

Wenling City Peak Load Regulation Power Plant -

5×2.2 MW

柴油机 Diesel Engine 3 印度尼西亚WPTI 热电站

Indonesia WPTI Heating Power Plant

2×35 t/h 1×C6 MW

Primary

Design & Construction

4 印尼棉兰胶合板厂燃木屑电站

Medan Plywood Factory Power Station, Indonesia (Wood Dust Fired) 1×60 t/h 1×B6 MW Primary

Design & Construction

5

印度尼西亚IIU 公司CFB 锅炉岛 Indonesia PT IIU’s CFB Boiler Station

1×199 t/h

- Primary

Design & Construction

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 NO. Items & Description 机组规模 Unit Size

工程范围 Project Scope 完成时间

Time of

Completion 备注

Notes 锅炉 Boiler

汽机(或燃机)Turbine

(or Combustion engine)

6 印度尼西亚RAPP 公司CFB 锅炉岛 Indonesia PT RAPP’s CFB Boiler Station

1×201 t/h - Primary

Design & Construction

7 印度JINDAL 公司汽机岛 India JINDAL Co., Ltd. Turbine Station

- 1×C25 MW Primary

Design & Construction

8 缅甸TIGYIT 燃煤电厂 Myanmar TiGYIT Coal-Fired Power Plant 3×220 t/h 3×N60 MW Primary

Design & Construction 2005

煤粉炉 CPB

9 苏丹吉里4期石油焦电站工程项目 Sudan Gaili Power Plant Fourth Phase 2×220 t/h 2×N55 MW Primary Design & Construction

2007 燃煤锅炉

CFB 10 印尼北苏拉维西电厂 Indonesia North Sulawesi Power Plant 2×120t/h 2×N25 MW Primary

Design & Construction 2008

燃煤锅炉 CFB

11 印尼PLTU 1 KALIMANTAN TENGAH 电厂 2×240t/h 2×N60 MW Primary

Design & Construction

2009

燃煤锅炉

CFB

12 印尼AWARAWAR 电厂 Indonesia AWARAWAR Power Plant 2×1028t/h 2×N350 MW Construction Drawing 2010

煤粉炉 CPB

13 越南煤头化肥项目热电站单元 Vietnam Coal-based Fertilizer Project Heating Power Plant Units

4×150 t/h 1×B12 MW + 2×N12 MW Primary

Design & Construction 2010

燃煤锅炉

CFB

14 哥伦比亚3号燃煤发电站项目一期

GECELCA 3 1×200MW Coal Fired Power Plant-I,

Colombia

1×608 t/h 1×N185 MW Primary

Design &

Construction Under Construction 燃煤锅炉 CFB

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 NO. Items & Description

机组规模 Unit Size

工程范围 Project

Scope

完成时间

Time of

Completion 备注

Notes

锅炉 Boiler

汽机(或燃机)Turbine

(or Combustion engine)

15

新疆阿克苏纺织工业城天然气分布式能源工程

Xingjiang Asuke Texile Industrial City Natrual Gas Distributed Energy Project

4×25 t/h 4×solar titan130+2×B3 MW Feasibility Study

2012

分布式能源 Distributed Energy 16

越南安庆火电厂 Vietnam Anqing Thermal Power Plant

2×245t/h 2×N57.5 MW Primary

Design &

Construction

2012

燃煤锅炉 CFB 17

哥伦比亚3号燃煤发电站项目二期 GECELCA 3 1×200MW Coal Fired Power Plant-II, Colombia

1×1020t/h 1×300

MW Primary

Design & Construction Under

Construction

燃煤锅炉 CFB 18 印度尼西亚梭罗RUM 公司热电厂项目

PT RUM’s Heating Power Plant in Solo, Indonesia

2×15MW

1×130t/h 1×N15 MW EPC

Under Construction

燃煤锅炉 CFB

二、工程总承包项目 2. EPC Projects 1 杭州天子岭垃圾填埋气利用项目

Hangzhou Tianziling Landfill Gas Utilization Project -

3×970 kW ( Internal Combustion Engine) EPC 2002

垃圾填埋气

Landfill Gas 2

广州大田山垃圾填埋气发电工程

Guangzhou Datianshan Landfill Gas Power Plant -

3×970 kW ( Internal Combustion Engine) EPC 2003

垃圾填埋气

Landfill Gas

3

浙江龙源纺织有限公司热电项目

Zhejiang Longyuan Textile Co., Ltd. Cogeneration

Project

1×35 t/h

1×C6 MW EPC 2004

燃煤锅炉

Coal Fired

Boiler (CFB)

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 4 浙江富丽达纺织有限公司热电项目

Zhejiang Fulida Textile Co., Ltd. Cogeneration Project

3×75 t/h 1×C15 +1×B6 MW EPC 2004 燃煤锅炉 CFB

5

上虞杭协热电有限公司一期工程

Shangyu Hangxie Cogeneration Co., Ltd.

3×130 t/h

1×C12+1×B15 MW

EPC

2005

燃煤锅炉 CFB

6

浙江椒江热电有限公司三期工程

Zhejiang Jiaojiang Cogeneration Co., Ltd. Third Phase Project (Gas Turbine) 1×68 t/h (HRSG) 1×40MW (GT ) +1×N20MW (ST )

EPC 2005

燃气-蒸汽联合循环 Gas- Steam Combined Cycle (GSCC) 7 杭州江东富丽达热电有限公司二期工程 Hangzhou Jiang Dong Fulida Power 2×130 t/h 1×C25+1×B12 MW EPC 2005

燃煤锅炉

CFB 8

上海金联热力供应有限公司工程

First Phase Project of Shanghai Jinlian Thermal Supply Co., Ltd.

3×130 t/h

2×B15 MW

EPC

2008

燃煤锅炉 CFB

9 中石化天津乙烯炼油一体化项目热电工程

Sinopec Tianjing 1Million Ton/ Year Ethane Project & Auxiliary Power Project

3×465 t/h 2×CC100 MW EPC 2009

煤、石油焦

Coal & Coke 10 大庆石化120万吨/年乙烯改扩建工程热电厂120MPa 蒸汽燃煤锅炉项目

Sinopec Daqing 1.2 Million Ton/year Ethane 120Mpa Steam CFB Power Plant Upgrading Project 2×220 t/h - EPC 2012

燃煤锅炉 CFB

11 越南煤头化肥项目热电站单元

Vietnam Fertilizer Coal-Fired Heating Power Plant 4×130 t/h 1×B12+2×N12MW EPM

2012

燃煤锅炉 CFB 12 印尼北苏拉威西燃煤电站项目

Indonesia North Sulawesi Coal-fired Power Plant

2×120t/h 2×25MW

EPC 2012 煤粉炉

Coal Powder Boiler (CPB)

中 国 联 合 工 程 公 司China United Engineering Corporation CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 13 盘锦丰源动力有限公司一期工程

First Phase Project of Panjing Fengyuan Power Co. Ltd.

3x130t/h -

EPM 2012 燃煤锅炉

CFB

14 丽水杭丽热电项目 Lishui Hangli Heating Power Plant Project

5×130 t/h 3×B15+1×B25MW EPC

Under Construction 燃煤锅炉

CFB 15

中化泉州石化动力站工程

The Power Station of Sinochem Qiuanzhou Petrochemical Co.,Ltd

2×310t/h 2×CC50MW EPC

2013 燃煤锅炉

CFB

16

内蒙古中煤蒙大新能源化工有限公司年产50万吨工程塑料项目公用工程Ⅱ(自备热电站)装置EPC

总承包 Inner Mongolia ChinaCoal Mengda New Energy

Chemical Engineering Co., Ltd. 0.5 Mton/year Engineering Plastic Heating Power Plant Project 3×300t/h 2×25 MW EPC

Under Construction 燃煤锅炉 CFB 17

山东神达化工有限公司化工园区供热中心总承包

工程

Shandong Shenda Chemical Engineering Co., Ltd.

Chemical Zone Heating Supply Center

3×130t/h - EPC

Under Construction 燃煤锅炉 CFB 18

神华集团公司榆神工业区清水煤化学工业园动力供应与高纯洁净气体项目

Shenhua Group Yushen Industrial District Qingshui Coal Chemical Engineering Zone Power Supply &

Ultra-Pure Gas Production Project

4×260t/h 2×CB25MW EPC

Under Construction 煤粉炉 CPB 19

浙江嘉化能源化工股份有限公司热电项目扩建工

Zhejiang JIahua Energy Chemical Engineering Co.,

Ltd. Heating Power Plant Expansion Project

1× 450t/h 1×C45MW EPC 2013

燃煤锅炉 CFB 20

神华宁煤400万吨/年煤炭间接液化项目动力站装置

10×640t/h 2×CC50MW+4×N60MW +2×N12MW EPM

Under Construction 煤粉炉

CPB

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Shenhua Ningxia Coal Group Co., Ltd. 4 M ton/year Indirect Coal-liquification Power Station 21

山西潞安矿业集团一体化项目 热电装置

Shanxi Lu’an Coal Indstrial Group Integrated Heating Power Plant Project

4×450t/h 1×B15MW+2×C25MW EPC

Under

Construction 煤粉炉 CPB 22

哥伦比亚GECELCA 3号燃煤发电站项目一期工程GECELCA 3 1x200MW Coal Fired Power Plant-I,

Colombia

1×608 t/h

1×200MW EPC

Under

Construction

煤粉炉 CPB

23 哥伦比亚GECELCA 3号燃煤发电站项目二期工程GECELCA 3 1x200MW Coal Fired Power Plant-II Colombia

1×1020t/h 1×300MW

EPC

Under

Construction 煤粉炉 CPB 24

印度尼西亚梭罗RUM 公司2×15MW 热电厂

PT RUM’s Heating Power Plant in Solo, Indonesia 2×15MW

2×130t/h 2×N15MW EPC Under

Construction

煤燃烧炉 CFB

三、燃煤热电站(动力站) 3. Coal-Fired Power Plant 1

镇海炼化锅炉煤代油技术改造

Zhenghai Refining Boiler Technological Reform Project (Oil replaced by Coal)

2×410 t/h

Feasibility Study, Primary Design & Construction 1999 2 中国石化镇海炼油化工股份公司第二热电站

Sinopec Zhenghai Refinery Co., Ltd Second Heating Power Plant

2×220 t/h 2×CC25 MW

Feasibility Study,

Primary Design & Construction

2000

石油焦

Coke

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 3

中国石化镇海炼化公司石油焦代油技改项目

Sinopec Zhenghai Finery Co., Ltd Technological Reform Project (Oil replaced by Petrolem Coke)

2×410 t/h 2×CC60 MW

Feasibility Study, Primary Design & Construction 2001 煤、石油焦

Coal & Coke

4 荆门石油化工总厂技改项目

Jingmen Petrolem & Chemical Engineering Co., Ltd Technological Reform Project

2×220 t/h 2×CC25 MW Feasibility Study

2003

5 茂名石化公司锅炉煤代油技改工程

Maoming Petrolem & Chemical Engineering Co., Ltd

Boiler Technological Reform Project (Oil replaced by Coal)

2×410 t/h

1×C40 MW

Feasibility Study, Primary Design & Construction 2005 煤、石油焦

Coal & Coke

6 北京燕山石化第一热电站燃油锅炉改造工程

Beijing Xianshan Petrolem & Chemical Engineering Co., Ltd First Heating Power Plant Oil-fired Boiler Reform Project

2×310 t/h 1×C25 +1×B30 MW

Feasibility Study, Primary Design & Construction

2006 石油焦 Coke

7

中国石化洛阳分公司油品质量升级改造工程石油

焦热电站 Sinopec Luoyang Branch Co., Ltd. Petrolem Coke

Heating Power Plant

2×410 t/h 1×C50+1×B25MW

Feasibility Study 2006 煤、石油焦

Coal & Coke

8

中国石化济南分公司煤焦代油项目

Sinopec Jinan Branch Co., Ltd. Technological Reform Project (Oil replaced by Coal)

2×220t/h 2×CC24

MW Feasibility

Study

2006 煤、石油焦

Coal & Coke

9

中国石化长岭炼油厂石油焦电站工程 Sinopec Changling Refinery Plant Petrolem Coke Heating Power Plant Project

2×220 t/h

2×CC25 MW Feasibility

Study,

Primary Design & Construction

2007 煤、石油焦

Coal & Coke

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 10

镇海炼化100万吨/年乙烯工程动力中心项目

Zhenghai Refinery Co., Ltd. 1 M ton/year Ethane Power Center Project

5×410 t/h 4×CC50 MW

Foundation &

Construction

2007

11 广州石化热电站资源综合利用改造工程

Guangzhou Petrolem & Chemical Engineering Co., Ltd. Heating Power Plant Integrated Reform Project

2×465 t/h 2×CC100 MW

Feasibility Study, Primary Design & Construction 2007 煤、石油焦 Coal & Coke 12 内蒙古伊泰煤制油工程(Ⅰ期)

Inner Mongolia Yitai Coal-to- Oil Project (First Phase)

2×220 t/h 1×N12 MW

Feasibility Study, Primary Design & Construction

2007 13 辽阳石化公司30万吨/年精已二酸技改工程

Liaoyang Petrolem & Chemical Engineering Co., Ltd 0.3 M ton/year Adipic Acid Refinery Reform Project

1×410 t/h 1×CC50 MW

Feasibility

Study

2007 煤、石油焦

Coal &

Coke

14 中石化湖北化肥厂动力站二期扩建工程

Sinopec Hubei Fertilizer Plant Power Station Expansion Project, Second Phase

1×220 t/h 1×CC25 MW

Feasibility Study,

Primary Design & Construction 2007

煤粉炉

CPB

15 中石化塔河分公司2×220t/h 燃石油焦循环流化床

锅炉热电联产项目

Sinopec Tahe Branch Co., Ltd. 2×220t/h

2×220 t/h 2×C25 MW

Feasibility Study

2008

16 大庆石化120万吨/年乙烯改扩建工程热电厂120MPa 蒸汽燃煤锅炉项目

Daqing Petroleum & Chemical Engineering Co., Ltd. 1.2 M ton/year Ethane Expansion 120Mpa Coal-Fired Steam Heating Power Project

2×220 t/h -

Feasibility Study, Primary Design & Construction 2008 17 天津石化乙烯炼油一体化项目热电工程

Tianjin Petroleum & Chemical Engineering Co., Ltd.

3×465 t/h

2×CC100 MW

Feasibility Study, 2009

煤、石油焦

Coal &

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Integration Heating Power Plant Project

Primary Design & Construction Coke 18

中石化长岭分公司锅炉及热力系统改造工程

Sinopec Changling Branch Co., Ltd. Boiler & Themal System Reform Project

1×220 t/h -

Feasibility Study, Primary Design & Construction 2009 19 中化泉州石化动力站工程

Sinochem Quanzhou Petroleum & Chemical

Engineering Co., Ltd. Power Station Project 1×160 t/h+ 2×310 t/h 2×CC50MW

Feasibility

Study & Construction 2011 20 浙江东海炼化一体化合资项目动力站工程

Zhejiang Donghai Refining & Chemical Engineering

Co., Ltd. Integration Joint Venture Power Station Project

7×450 t/h

4×CB30+2×CC60

Feasibility Study

2011

21

山西潞安矿业集团有限公司百万吨级资源综合利用项目 Shanxi Lu’an Mining Group Co., Ltd. Millions tons/year Resource Integration Utilization Project 4×450 t/h 1×B15 MW + 4×C25 MW Overall & Basic Design,

Construction Drawing

2012

煤粉炉 CPB

22

神华宁煤400万吨/年煤炭间接液化项目动力站装置 Shenhua Ningxia Coal Group Co., Ltd. 4 M ton/year Indirect Coal-liquification Power Station

10×640t/h 2×CC50 MW + 4×N50 MW +2×N12 MW

Overall & Basic Design,

Construction Drawing

2012

煤粉炉 CPB

23 伊泰-华电甘泉堡540万吨/年(一期180万吨/年)煤基多联产综合项目热电装置及化学水处理系统

Yitai-Huadian Ganquanbao 5.4 M ton/year (first phase 180 M ton/year) Coal based Integration Project Heating Power Devices & Chemical Water Treatment System

6×480 t/h 1×CB25+2×N25+3×N12

Overall &

Basic Design 2012

煤粉炉 CPB

24

伊泰伊犁能源有限公司年产540万吨煤制油项目首

期工程 热电装置 化学水处理装置

3×440 t/h

1×CB25 MW + 2×N25 MW + Overall &

Basic Design, 2012

煤粉炉 CPB

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Yitaiyili Power Co., Ltd. 5.4 M ton/year Coal-to-Oil Project First Phase, Heating Power Devices & Chemical Water Treatment System

3×N12 MW Construction Drawing 25

神华新疆68万吨/年煤基新材料项目动力中心

Shenhua Xingjiang Co., Ltd. 0.68 M ton/year Coal-based New Material Development Project Power Center

4×480 t/h

2×C50 MW + 2×N25 MW Overall & Basic Design 2012 煤粉炉

CPB

26

内蒙古锦联铝材有限公司100万吨铝镁合金项目配

套动力车间工程

Inner Mongolia JInlian Aluminum Co., Ltd. 1 M ton/year Aluminum-Magnesium Alloy Project

Supporting Power Workshops

2×670 t/h+2×1100 t/h 2×N200 MW+ 2×N350 MW

Feasibility Study & Construction 2012 煤粉炉

CPB

27

神华集团公司榆神工业区清水煤化学工业园动力

供应与高纯洁净气体项目动力中心

Shenhua Group Yushen Industrial District Qingshui Coal Chemical Engineering Zone Power Supply &

Ultra-Pure Gas Production Project

4×260t/h 2×CB25 MW Primary Design & Construction Drawing 2012 煤粉炉 CPB 28

杭州(开发区)杭联热电有限公司工程 Hangzhou (Development Zone) Hanglian Heating Power Co., Ltd.

3×75 t/h

2×C12 MW Feasibility

Study,

Primary Design & Construction 2000 29

河南武陟热电厂

Henan Wuzhi Heating Power Plant 2×220 t/h 2×C25 MW Feasibility Study,

Primary Design &

Construction 2000

30

绍兴马山热电厂

Shaoxing Mashan Heating Power Plant

3×130 t/h 1×C15+2×B6 MW Feasibility Study, 2001

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Primary

Design & Construction 31

张家港保税区热电厂二期扩建工程 Zhangjiagang

2×130 t/h 2×B12 MW

Feasibility Study, Primary Design & Construction 2002 32

杭州杭联热电有限公司二期扩建工程

Hanglian Heating Power Co., Ltd. Expansion Project Phase-II

1×130 t/h 1×CB6 MW

Feasibility Study, Primary Design & Construction 2003 33 宁波长丰热电有限公司二期扩建工程

Ningb Changfeng Heating Power Co., Ltd. Expansion Project Phase-II

1×130 t/h 1×B6 MW

Feasibility Study, Primary Design & Construction 2003 34 宁波众茂杭州湾热电厂

Ningbo Zhongmao Hangzhou Bay Heating Power Plant Project

2×75 t/h 1×C15 MW

Feasibility Study, Primary Design & Construction 2003 35 无锡惠山开发区热电厂

Wuzi Huishan Development Zone Heating Power Plant Project

3×130 t/h 2×C25 MW

Feasibility Study

2003

36 宁波光耀热电有限公司二期扩建工程

Ningbo Guangyao Heating Power Co., Ltd. Expansion Project Phase-II

2×75 t/h 1×C25 MW

Feasibility Study, Primary Design & Construction

2003

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 37

绍兴远东热电有限公司项目

Shaoxing Yuandong Heating Power Co., Ltd. Project

3×130 t/h 1×C25 +1×B12MW

Feasibility Study, Primary Design & Construction 2003 38

开曼铝业(三门峡)有限公司热电厂

Kaiman Aluminum (Sanmenxia) Co., Ltd. Heating Power Plant Project

4×130 t/h 2×C25 MW

Feasibility Study, Primary Design & Construction 2003 39 宁波开发区北仑热电有限公司二期扩建工程

Ningbo Development District Beilun Heating Power Co., Ltd. Expansion Project Phase-II

1×130 t/h 1×CB7.5 MW

Feasibility Study, Primary Design & Construction 2004 40 中国石化茂名石化高硫焦代油工程

Sinopec Maoming Petroleum & Chemical Engineering Co., Ltd. High-sulfur Coke Replacing Oil Project

2×220 t/h 2×CC25 MW

Feasibility Study 2004

煤、石油焦

Coal & Coke

41 萧山经济开发区热电有限公司二期扩建工程

Xiaoshan Economic Development District Heating Power Co., Ltd., Expansion Project Phase-II

1×130 t/h 1×CB7.5 MW Feasibility Study

2004

42 嘉兴锦江热电有限公司二期扩建工程

Jiaxing Jinjiang Heating Power Co., Ltd. Expansion Project Phase-II

1×130 t/h 1×B12 MW

Feasibility Study, Primary Design & Construction 2004 43 绍兴马山热电厂二期扩建工程

Shaoxing Mashan Heating Power Plant Expansion Project Phase-II

3×130 t/h 1×C15+1×B12 MW

Feasibility Study, Primary Design & Construction

2004

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 44

宁波大榭开发区万华工业园热电有一期工程

Ningbo Daxie Development District Wanhua Industrial Zone Heating Power Plant Project Phase-I

3×220 t/h 1×C50 +1×B25 MW

Feasibility Study, Primary Design & Construction 2004 45

海宁市红宝热电有限公司

Haining City Hongbao Heating Power Co., Ltd.

3×130 t/h 1×C15+2×B6 MW

Feasibility Study, Primary Design & Construction 2004 46

浙江星河热电有限公司一期工程

Zhejiang Xinghe Heating Power Co., Ltd. Phase-I

4×130 t/h 2×C25 MW

Feasibility Study, Primary Design & Construction 2004 47

浙江嵊州热电有限公司二期扩建工程

Zhejiang Chengzhou Heating Power Co., Ltd. Expansion Project Phase-II

1×130 t/h 1×CB18 MW

Feasibility Study, Primary Design & Construction 2005 48 宁波光耀(余姚)热电有限公司项目

Ningbo Guangyao (Yuyao) Heating Power Co., Ltd. Project

3×75 t/h 1×C15+1×B6 MW

Feasibility Study, Primary Design & Construction 2005 49 宁波开发区北仑热电有限公司三期扩建工程

Ningbo Development Zone Beilun Heating Power Co., Ltd. Expansion Project Phase-III

2×130 t/h 1×C15+1×B12 MW

Feasibility Study, Primary Design & Construction 2005 50 绍兴城东热电站三期扩建工程

Shaoxing East City Heating Power Plant Expansion

2×220 t/h

1×C50 MW

2005

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Project Phase-III 51 浙江余杭热电厂

Zhejiang Yuhang Heating Power Plant 4×75 t/h 2×C25 MW

2005 52 江苏阜宁热电厂

Jiangsu Funing Heating Power Plant 2×220 t/h

1×C50 MW

Feasibility Study,

2005

煤粉炉 CPB

53

渭河化肥厂25MW 汽轮发电机组

Weihe Fertilizer Plant 25MW Steam Turbine Power Generation Unit

- 1×N25 MW

54 九江石化大化肥公司汽轮发电项目

Jiujiang Petrolem Fertilizer Co., Ltd. Steam Turbine Power Generation Project - 1×C22 MW

55 内蒙古化肥厂汽轮发电项目

Inno Mongolia Fertilizer Plant Steam Turbine Power Generation Project

- 1×C16 MW

56 兰州石化化肥厂汽轮发电项目

Lanzhou Petroleum & Chemical Engineering Co., Ltd.Fertilizer Plant Steam-turbine Power Plant Project

- 1×C18 MW

57

杭州湾精细化工园热电有限公司项目

Hanghzou Bay Refinery Chemical Industrial District Heating Power Co., Ltd. Project

3×130 t/h 1×C12+1×B15 MW

Feasibility

Study, Primary Design & Construction 2005 58

缅甸TIGYIT (180MW )燃煤电厂

Myanmar TIGYIT(180MW) Coal-Fired Power Plant

3×220 t/h 3×N60 MW

Feasibility Study,

Primary Design &

Construction 2005

煤粉炉

CPB 59

杭州协联热电公司环保改造工程

Hangzhou Xielian Heating Power Co., Ltd. Environmental Protection Reform Project

3×130 t/h -

Feasibility

Study, Primary

2005

煤粉炉

CPB

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Design & Construction

60

浙江长广华泰综合利用发电厂

Zhejiang Changguan Huatai Co., Ltd. Integrated Resources Utilization Power Plant

2×440 t/h 2×N135 MW

Feasibility Study

2005

61

浙江长广煤矿发电厂一期技改工程

Zhejiang Changguang Mining Power Plant

Technological Reform Project, Phase-I

1×180 t/h 1×B15 MW Feasibility Study,

Primary Design 2005

62

海宁市红宝热电有限公司扩建工程 Haining City Hongbao Heating Power Co., Ltd. Expansion Project

- 1×C25

MW Feasibility

Study,

Primary Design & Construction

2006 63

杭州临平工业区热电厂

Hangzhou linping Industrial District Heating Power Plant Project

3×130 t/h

1×C25 +1×B25 MW Feasibility

Study

2006 64

上海吴泾化工公司热电锅炉扩建工程 Shanghai Wujing Chemical Engineering Co., Ltd. Heating Power Plant Boiler Expansion Project

2×75t/h

- Feasibility

Study,

Primary Design & Construction 2007 65

开曼铝业公司热电厂二期扩建工程 Kaiman Aluminum (Sanmenxia) Co., Ltd. Heating Power Plant Expansion Project Phase-II

2×130 t/h

1×B6 MW Feasibility

Study,

Primary Design & Construction

2007 66

汕头万丰热电有限公司技术改造工程 Shantou Wanfeng Heating Power Co., Ltd. Technological Reform Project 1×240 t/h - Feasibility

Study,

2007 煤、石油焦

Coal &

Coke

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 67

宁波众茂杭州湾热电公司二期工程

Ningbo Zhongmao Hangzhou Bay Heating Power Plant Project, Phase-II

1×130 t/h

1×CB12 MW Feasibility Study, Primary Design & Construction 2007 68

绍兴华源热电公司二期扩建工程 Shaoxing Huayuan Heating Power Co., Ltd. Expansion Project Phase-II

1×90t/h

- Feasibility

Study,

Primary Design & Construction 2007 69

张家港长源热电公司三期扩建工程 Zhangjiagang Changyuan Heating Power Co., Ltd. Expansion Project Phase-III

1×130 t/h

1×B7.5 MW Feasibility

Study,

Primary Design & Construction 2007 70

浙江三星热电有限公司二期扩建工程 Zhejiang Sanxing Heating Power Co., Ltd. Expansion Project Phase-II

3×150 t/h

1×B25 MW Feasibility

Study,

Primary Design & Construction 2007 71

海宁市红宝热电公司C24.5MW 热电工程 Haining City Hongbao Heating Power Co., Ltd. C24.5MW Heating Power Plant Project

- 1×C25

MW Feasibility

Study,

Primary Design & Construction 2007 72

绍兴美佳热电有限公司技改工程 Shaoxing Meijia Heating Power Co., Ltd.

Technological Reform Project

3×220 t/h 4×B15 MW Feasibility

Study,

Primary Design & Construction

2008 73

浙江富春江环保热电公司续建工程 Zhejiang Fuchunjiang Environmental Protection

2×130 t/h 1×C25 MW Feasibility

Study, 2008

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Heating Power Co., Ltd. Continuing Construction Project

Primary

Design & Construction 74 宁波开发区热电公司技术改造热电联产项目

Ningbo Development Heating Power Co., Ltd.

Heat-Power Cogeneration Technological Reform Project

2×130 t/h

2×B15 MW

Feasibility Study, Primary Design & Construction 2008 75 新疆富丽达纤维有限公司动力中心项目

Xinjiang Fulida Texitile Co. Ltd. Power Center Project

3×130 t/h 2×B15 MW

Feasibility Study, Primary Design & Construction 2008 76 上海金联热力供应有限公司工程

First Phase Project of Shanghai Jinlian Thermal Supply Co., Ltd.

3×130 t/h 2×B15 MW

Feasibility Study, Primary Design & Construction 2008 77 辽宁华锦化工集团乙烯改扩建配套热电项目

Liaoning Huanjing Chemical Engineering Group Ethane Finery Heating Power Plant Upgrading Project

2×410 t/h 2×B30 MW

Feasibility Study, Primary Design & Construction 2008 78 孝义市兴安化工有限公司动力中心项目

Xiaoyi xing’an Chemical Engineering Co., Ltd. Power Center Project

3×220 t/h 1×B25 MW

Feasibility Study, Primary Design & Construction 2008 79 广西田东锦盛化工有限公司热电项目

Guangxi Tiandong Jinsheng Chemical Engineering Co. Ltd. Heating Power Project

3×220 t/h 2×C25 +1×B25 MW

Feasibility Study,

Primary

Design &

2008

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Construction

80

湖北兴瑞化工有限公司有机硅单体工程配套供热系统热电联产技改项目 Hubei Xingrui Chemical Engineering Co., Ltd. Organic Silicon Monomer Heat-Power Cogeneration Technological Reform Project

2×130 t/h +1×35 t/h 1×B30 MW Feasibility Study,

Primary Design & Construction 2008

81

龙达(江西)差别化纤维公司动力中心项目

Longda (Jiangxi) Differetial Fibre Co., Ltd. Power Center Project

3×130 t/h

1×B15 +1×C7.5 MW Feasibility Study, Primary Design & Construction

2008 82

浙江荣成纸业一期50MW 自备热电站工程 Zhejiang Rongcheng Paper Corporatoin 50MW Heating Power Plant Project, Phase-I

1×220t/h 1×C50

MW Primary

Design & Construction 2008 煤粉炉

CPB 83

无锡荣成纸业三期40MW 自备热电站工程 Wuxi Rongcheng Paper Corporation 40MW Heating Power Plant Project

1×220t/h 1×C40

MW Feasibility

Study,

Primary Design & Construction 2008 煤粉炉

CPB

84

浙江荣成纸业二期扩建工程 Zhejiang Rongcheng Paper Corporatoin Expansion Project, Phase-II

2×75 t/h

1×C12MW Feasibility

Study, Primary Design & Construction 2008 CFB &

Paper-Slag Boiler 85

杭州临江环保热电项目 Hangzhou Linjiang Environmental Protection Heating Power Plant Project

4×150 t/h

2×B15+1×B7.5 MW Feasibility

Study,

Primary Design & Construction

2009

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 86

浙江三元热电有限公司二期扩建工程

Zhejiang Sanyuan Heating Power Plant Expansion Project, Phase-II

- 1×B15MW

Feasibility Study, Primary Design & Construction 2009 87

绍兴远东热电有限公司二期扩建工程 Shaoxing Yuandong Thermal Power Co., Ltd. Expansion Project, Phase-II

3×150 t/h

1×B15+1×B18MW Feasibility

Study,

Primary Design & Construction 2009 88

越南煤头化肥项目热电站单元 Vietnam Coal Fertilizer Heating Power Plant Unit Project

4×150 t/h

1×B12+2×N12MW Feasibility

Study,

Primary Design & Construction 2009 89

开曼铝业(三门峡)热电厂四期扩建工程 Kaiman Aluminium (Sanmenxia)Corporation Heating Power Plant Expansion Project, Phase-IV

1×260 t/h

1×B25MW Feasibility

Study,

Primary Design & Construction 2009 90

奎屯锦疆化工合成氨尿素项目热电工程

Kuitun Jinjiang Chemical Engineering Co., Ltd.

Synthesize Ammonia & Urea Production Heating

Power Plant Project 1×160 t/h 1×B12MW Feasibility

Study,

Primary Design &

Construction

2009

91

宁波明州热电有限公司二期扩建工程 Ningbo Mingzhou Heating Power Co., Ltd. Expansion Project, Phase-II

1×130 t/h

1×B12MW Feasibility

Study,

Primary Design & Construction

2010 92

浙江景兴纸业集团平湖热电厂技改工程 Zhejiang Jingxing Paper Group Co., Ltd. Pinghu

2×260 t/h 1×C25+1×B25MW Feasibility

Study, 2010

中 国 联 合 工 程 公 司China United Engineering Corporation

CHINA UNITED ENGINEERING CORPORATION

No. 338 Shiqiao Road, Hangzhou, People’s Republic of China Tel: (+86)571-88155674 Fax: (+86)571-88153199 Heating Power Plant Technological Reform Project

Primary

Design & Construction 93

新疆富丽达纤维有限公司动力中心二期工程

Xinjing Fulida Texile Co., Ltd. Power Center, Phase-II

2×130 t/h 1×C12+1×B12MW

Feasibility Study, Primary Design & Construction 2010 94 玖龙纸业(太仓)公司纸渣锅炉扩建工程

Jiulong Paper (Taicang) Co., Ltd. Paper Slag Boiler Expansion Project

1×75 t/h -

Primary Design & Construction 2010 CFB & Paper-Slag Boiler 95 广西田东锦盛化工有限公司热电项目

Guangxi Tiandong Jinsheng Chemical Engineering Co., Ltd. Heating Power Plant Project

2×410 t/h 2×N135 MW

Primary

Design & Construction 2010

煤粉炉

CFB

96 宁波正源电力有限公司三期技改扩建项目

Ningbo Zhengyuan Power Co., Ltd. Expansion Project Phase-III

2×130 t/h 1×B25MW

Feasibility Study, Primary Design & Construction 2011 97 浙江建德建业热电有限公司项目

Zhejiang Jiande Construction Co., Ltd. Heating Power Plant Project

2×75 t/h 2×B7.5WM

Feasibility Study, Primary Design & Construction 2011 98 湖北兴瑞化工热电联产项目二期扩建工程

Hubei Xingrui Chemical Engineering Heat-Power Cogeneration Expansion Project, Phase-II

1×220 t/h 1×B25MW

Feasibility Study, Primary Design & Construction 2011 99 大连福佳甲醇制烯烃动力站及海水淡化工程

Dalian Fujia Methyl-to-ethily Power Station & Seawater Desalination Project

7×460 t/h 2×CC100+3×CB40

Feasibility Study

2011

中国中煤能源集团有限公司2010年度财务收支审计结果

2012年第21号公告:中国中煤能源集团有限公司2010年度财务收支审计结果 【时间:2012年06月01日】【来源:审计署办公厅】【字号:大中小】 中国中煤能源集团有限公司2010年度财务收支审计结果

(二○一二年六月一日公告) 根据《中华人民共和国审计法》的规定,审计署2011年对中国中煤能源集团有限公司(以下简称中煤集团)2010年度财务收支情况进行了审计,并对审计范围内涉及的重大事项追溯相关年度。 一、基本情况 中煤集团2009年4月由中煤能源集团公司改制成立,注册资本155亿元,拥有全资和控股二级子公司41家,主要从事煤炭生产及贸易、煤化工、坑口发电、煤机制造、煤矿建设、煤层气开发及相关工程技术服务等。据中煤集团合并财务报表反映,截至2010年底,中煤集团资产总额1725.61亿元,负债总额706.84亿元,所有者权益总额1018.77亿元;当年营业收入960.17亿元,利润总额121.23亿元。 二、审计评价意见 本次重点审计了中煤集团本部及所属6家企业,涉及资产量占中煤集团资产总额的50%以上。审计结果表明,中煤集团近年来不断深化改革,加强内部管理,较好地执行了国家有关法律法规,会计信息基本真实地反映了企业财务状况和经营成果,但也存在多计利润、未按规定缴纳职工社会保险费等问题。这些问题对中煤集团2010年度财务收支状况的影响主要是:少计资产18669.28万元,占资产总额的0.11%;少计负债2896.24万元,占负债总额的0.04%;多计利润5513.76万元,占利润总额的0.45%。 对审计发现的问题,审计署已依法出具了审计报告、下达了审计决定书,要求中煤集团予以整改。此外,本次审计发现所属单位涉嫌经济违法案件线索1起,已依法移送有关部门调查处理。 三、审计发现的主要问题及整改情况 (一)会计核算和财务管理存在的问题。 1.2010年,中煤集团及部分所属企业存在财务报表合并范围不完整、关联交易事项抵销不充分、未及时将长期挂账的往来款结转收入、未确认房租收入等问题,造成少计资产18669.28万元、少计负债2896.24万元、少计所有者权益15773.04万元、多计利润5513.76万元。 审计指出上述问题后,中煤集团及相关企业调整了相关会计账目,在2011年决算中将之前未纳入财务报表合并范围的4家企业纳入合并范围并上报国资委审核备案,对内部交易作了充分抵销。 2.2008年至2010年,中煤集团通过煤炭回购、重复交易等方式,多计销售收入和销售成本各14.03亿元,其中2010年多计销售收入和销售成本各2.67亿元。 审计指出上述问题后,中煤集团已停止此类不规范做法,制定了《煤炭物流管理暂行办法》和《煤炭外购资源采购管理暂行办法》,以规范外购贸易行为。 3.2010年,中煤集团及部分所属企业存在费用跨期入账、费用列支与实际不符、记账凭证与原始发票不符等问题。 审计指出上述问题后,中煤集团和部分所属企业规范了发票的填制要求,完善了审批程序和内控审核流程,并督促各部门和职工及时报销。 4.2010年,所属中煤张家口煤矿机械有限责任公司少结转半成品成本差异等936.61万元;未将2010年4月收到的商标奖励款30万元计入营业外收入;2003年以前年度减免的教育费附加371.06万元长期挂账。 审计指出上述问题后,相关企业已调整了相关会计账目。 5.2008年至2010年,所属中国煤矿机械装备有限责任公司使用北京中煤机械装备公司办公楼未缴

中国能源现状

中国能源现状及发展前景分析 学号;作者: [ 摘要] 能源是人类社会生活和发展的物质基础,一直为世界各国所重视。本文从中国能源现状的分析入手,对石油、天然气、煤炭、电力四大主要能源现状作了初步考察,充分认识到我国能源面临着一系列挑战。同时对我国实现社会主义现代化征途中对能源的发展前景进行了展望和对策分析。 [ 关键词] 能源;现状;挑战;发展前景;中国 一直以来, 能源问题都被世界各个国家所重视, 因为能源是人类社会生活和发展进步的物质基础。在过去的20 世纪中, 人类使用的能源主要有四种, 就是原油、天然气、煤炭和电力。而根据国际能源机构的统计, 假使按目前的势头发展下去, 不加节制, 那么,地球上原油、天然气、煤炭三种能源供人类开采的年限, 分别只有40 年、60 年和220 年了。进入21 世纪, 能源问题的重要性更是越来越突出, 确切地说, 能源问题已经不仅仅是某一个国家的问题,而是整个世界, 整个人类社会所要面对和所要解决的问题。 一、我国能源的现状 我国既是能源的消费大国, 也是能源的生产大国。虽然1990年以来能源生产总量已名列前茅, 但人均占有能源消费量只有发达国家的5%-10%; 但在另一方面, 每万美元国民生产总值能耗方面则为世界各国之首, 为印度的2.2 倍, 为发达国家的4-6 倍; 使用能源的设备效率偏低, 又造成能源的浪费, 能源利用效率不高。[1]再者, 我国能源生产与消费以煤及石油为主, 造成严重的环境污染。 (一)煤炭资源 中国是世界最大煤炭生产国和消费国。我国以煤为主的能源结构在相当长的时间内难以改变。然而, 煤炭利用严重污染环境, 据统计, 每燃烧1 吨标准煤排放二氧化碳约26 公斤, 排放二氧化硫约24 公斤、排放氮氧化物约7 公斤。[2] 这不仅影响和危害人类的身体健康, 还直接影响人类赖以生存的条件。 (二)石油资源 我国石油资源相对短缺。中国目前有待发现和探明的石油资源比较丰富, 但勘查难度比较大。随着社会经济的发展, 我国的石油需求量将会越来越大。据有关部门预测, 到2020 年, 我国石油消费量最少也要4.5 亿t, 届时石油的对外依赖度将有可能接近60%。国际能源署公布的数据甚至称, 到2030 年中国进口石油占石油总需求的百分比将激增至80%以上。[3] (三)天然气资源 天然气是一种清洁和使用方便的能源, 我国是开发利用天然气最早的国家, 天然气资源储藏量达380000 亿立方米, 目前已探明储量仅占5%, 天然气在能源结构中的比重仅占2.1%, 为世界平均水平的十分之一。目前, 国家已开始全国天然气管网的大规模建设,特别是启动了西部大开发序幕性工程的"西气东输"工程, 为天然气的合理利用打下了坚实的基础。 (四)电力资源 过去十多年, 中国电力工业高速发展, 2003 年发电量为1990年的3 倍。2003 年, 发电装机容量391 40GW。到2004 年5 月, 发电装机容量达400GW。2004 年9 月, 水电装机容量达100GW, 居世界首位。全国1GW以上电站共有107 个, 最大水电站是三峡水电站, 已装机5 9GW; 最大火电站是山东德州电站, 2 4GW; 最大核电站是广东岭澳核电站, 1 98GW。[4] 但是, 中国20 世纪60 年代中期出现大范围缺电。造成严重缺电局面的原因是多方面的, 但主要是体制问题, 包括: 高耗电产业过度发展, 电力预测和规划失误, 以及电力改革尚未从根本上改变垄断经营格局等。

中国央企煤炭集团名录

中国央企煤矿名录 目前,我国中央企业共有生产、建设煤矿279处,年产能9.30亿吨。2010年,央企所属煤矿原煤产量7.11亿吨,占全国原煤总产量的21.9%。全国年产能1000万吨以上的煤矿中,央企所属煤矿有33处,占89%。 《中央企业煤矿安全生产年度报告(2010年度)》显示,截至2010年底,中央企业投资经营煤炭开采的企业有16家,除了以煤炭开采为主业的神华集团和中煤能源集团外,有电力企业6家,投资、房地产、钢铁、科研、铁路、军品贸易、化工、农业企业各1家,共涉及8个行业。其所属煤矿分布在山西、内蒙古、黑龙江、江苏、安徽、山东、河南、湖南、四川、云南、贵州、陕西、宁夏、甘肃、新疆等15个省(自治区)。 除神华集团和中煤能源集团以外,其余14家涉煤央企中,2010年原煤产量超过千万吨的有6家,分别是:中国电力投资集团5392万吨、华能集团4886万吨、国电集团2653万吨、国家开发投资公司2582万吨、国家电网公司1752万吨、大唐集团1140万吨。规划年产能超过千万吨的则有8家,其中华能集团、中电投集团和国家电网公司生产、建设矿井总产能均超过了7000万吨。

利东二号露天煤矿矿山数字化建设项目顺利进行 胜利东二号露天煤矿的建设目标是,打造世界一流的大型现代化露天煤矿,畅通、高效的数字化管理是一流矿山的重要内容。锡林浩特矿业公司高度重视矿山数字化建设,将矿山数字化建设列为今年重点科技项目。2009年胜利东二号露天煤矿数字化建设的主要内容有:企业门户系统、Biee报表综合查询系统、EAM资产管理系统、GPS卡车调度系统、FMIS财务管理系统、OA协同办公系统、CCS基建管理系统等。该项目已同多家信息系统公司合作,项目顺利进行。该项目计划总投资2700万元,今年计划投资1300万元,计划2012年全部系统投入使用。 大唐煤业有限公司甘肃庆阳天俊能源公司刘园子煤矿

勘察设计企业工程项目管理模式探析

勘察设计企业 工程项目管理模式分析及选择 中国中元国际工程公司 二OO七年六月八日 在我国相当长的一个时期内,在计划经济体制下,固定资产投资项目呈现投资结构单一、建设项目管理模式单一、参与建设的单位功能单一的特点。随着市场经济体制改革的

不断深入,建设项目的投资结构日趋多元化,国家投资比例逐渐减小,企业投资、社会投 资的比重加大,企业自主决策、自担风险的自主意识逐步形成。同时,市场经济体制改革 带来现代科学技术的发展,使得建设项目的技术含量越来越高,也越来越复杂,建设单位 依靠自身力量难以完成整个项目的实施管理,为实现科学决策、规避风险,出于企业自身 利益的考虑,企业会主动放弃原有的工程项目自主管理模式,转而依赖技术含量高、专业 化强、管理更加科学、规范的工程项目管理和工程总承包公司,这一需求推动了我国建设项目管理和工程总承包市场的迅速发展。 1.工程建设项目管理沿革 我国工程建设项目管理体制的改革,已经走过了20 余年的发展历程。20 年来,全国许多工程勘察设计、施工、监理企业和建设单位在工程总承包和工程项目管理方面进行了不同程度的探索和实践,取得了很好的效果,积累了一定经验。为完善建筑市场,我国出台了一系列政策、法规文件,可以清晰地勾勒出勘察设计企业在我国工程建设市场成熟发展的轨迹…… 1984 年9 月,国务院印发了《关于改革建筑业和基本建设管理体制若干问题的暂行规定》(国发[1984]123 号),明确指出"各部门、各地区都要组建若干个具有法人地位、独

立经营、自负盈亏的工程承包公司,并使之逐步成为组织项目建设的主要形式II "工程承包公司对项目建设的可行性研究、勘察设计、设备选购、材料定货、工程施工、生产准备 直到竣工投产实行全过程的总承包或部分承包"。 1984年11月,国务院又批转了国家计委《关于工程设计改革的几点意见》(国发[1984]157号),指出"承包公司可以从项目的可行性研究开始直到建成试车投产的建设全过程实行总承包,也可以实行单项承包"。 1984年12月,国家计委、建设部联合发出关于印发《工程承包公司暂行办法》的 通知(计设[1984]2301号),指出工程承包公司的主要任务是:"在国家计划的指导下,接受建设项目主管部门或建设单位的委托,对建设项目的可行性研究、勘察设计、设备询价与选购、材料定货、工程施工和竣工投产,实行全过程的承包或部分承包。并负责对各项分包任务进行综合协调管理和监督工作"。 1987年4月,国家计委、财政部、中国人民建设银行、国家物资局发出了《关于设 计单位进行工程建设总承包试点有关问题的通知》(计设[1987]619号),批准了广东建设承包公司(广东省建筑设计院)、中国武汉化工工程公司等12家设计单位被列为总承包试点单位。 1989年4月,建设部、国家计委、财政部、中国人民建设银行、物资部联合发出了 《关于扩大设计单位进行工程总承包试点及有关问题的补充通知》(89建设字第122号),批准了北京钢铁设计研究总院等31家工程建设总承包试点单位。 1992年11月,建设部颁发了《设计单位进行工程总承包资格管理有关规定》(建设[1992]805号),先后有560家设计单位领取了甲级工程总承包资格证书,2000余家设计单位领取了乙级工程总承包资格证书。 1999年8月,建设部印发了《大型设计单位创建国际型工程公司的指导意见》(建设 [1999]218号)。同年12月,国务院颁发了《关于工程勘察设计体制改革的若干意见》2003年2月13日建设部制定了《关于培育发展工程总承包和工程项目管理企业的指导意见》,明确将EPC模式作为一种主要的项目管理模式进行推广。 可以说,建设部“关于培育发展工程总承包和工程项目管理企业的指导意见”,对进一步完善和推行工程总承包和工程项目管理模式提供了具体的、可操作性强的实施办法,为大型勘察设计企

中国中煤能源集团有限公司电力管制部1.doc

中国中煤能源集团有限公司电力管理部1 中国中煤能源集团有限公司电力管理部 工作人员公开招聘面试通知 根据中国中煤能源集团有限公司电力管理部工作人员公开招聘安排,现将面试有关事项通知如下: 一、主管岗 1.面试时间: 2017年3月19日(周日)上午9:00开始面试,当天结束。 2.面试地点: 面试:中煤大厦三层313会议室 二、处长岗 1.面试时间: 2017年3月20日(周一)上午9:00开始面试,当天结束。 2.面试地点: 面试:中煤大厦三层313会议室 3.详细地址:北京市朝阳区黄寺大街1号(鼓楼外大街与黄寺大街交叉口西北角) 三、考生须知

1.参加主管岗面试的考生请于2017年3月19日(周日)上午8:30在中煤大厦一层大厅前台办理登记手续后,到三层301会议室凭身份证进行签到;参加处长岗面试的考生请于2017年3月20日(周一)上午8:30在中煤大厦一层大厅前台办理登记手续后,到三层301会议室凭身份证进行签到。 2.请在参加考试时提供以下材料: 身份证、学历证书、学位证书、学信网学历电子注册备案表 (全日制及后续学历,打印时间为近1个月内)、专业技术资格证书、职业资格证书、执业资格证书、荣誉证书等材料的复印件及《中煤集团社会公开招聘报名表》本人签字版原件。以上材料使用A4纸打印或复印,应聘人员应对提交的信息或材料的真实性负责,凡弄虚作假的,一经查实,即取消考试或聘用资格。中煤集团承诺对应聘人员提交的有关材料进行保密,恕不再退回。 3.面试主要内容为竞职演讲(简要介绍个人基本情况、求职动机、个人优势及专长等)和考官自由提问。完成面试人员可自行离开,严禁与其他人员谈论关于面试有关话题。 4.面试期间请将移动电话等有通讯功能的电子设备关闭或 调到静音状态,并与其他物品放到指定位置,保持安静,禁止吸烟和随意走动。 5.违反考场有关规定和纪律者,取消考试资格。 四、有关事宜

中国银泰投资有限公司简介

中国银泰投资有限公司简介中国银泰投资有限公司是中国著名的投资公司之一。中国银泰投资有限公司的成功在于其优良高效的服务和信誉,从而获得众多国内外客户的认可和信赖。 中国银泰投资有限公司总部设在北京,主要投资的产业包括:房地产投资、大型商业百货业、能源产业及酒店业,还从事资本经营、资产托管、股权投资、投资咨询、基础设施开发建设等业务,与国内外数百家客商建立了长期稳固的业务关系,目前公司总资产为110亿元人民币。 中国银泰投资有限公司主要下属企业主要有:银泰置地集团、银泰百货集团、银泰控股股份有限公司(国内A股上市公司600683)、北京银泰置业有限公司、北京银泰雍和房地产开发有限公司、北京银泰置地房地产开发有限公司等。 中国银泰投资有限公司执行现代企业管理制度,严格遵循公司管理制度,公司股东、董事会、监事会和董事长定期召开会议,讨论公司业务,完全符合透明、公正、诚实的原则。中国银泰投资有限公司拥有一批经验丰富的资本运营专家和精干的专业团队,并有着在资本管理方面的丰厚经验和专业知识,公司成功地在房地产、商业、投资等领域进行了颇具战略意义的投资,并借此迅速扩大企业规模,取得了丰厚利润。

在中国最重要的城市,北京、上海、广州、重庆、大连、沈阳、长沙、杭州和宁波等地,中国银泰投资有限公司都有投资,这些企业均以其优异的业绩被广泛称赞和认可。 中国银泰投资有限公司在北京曾成功地开发了雍和家园、泰悦豪庭两个地产项目。目前正在积极筹备和开发的项目是王府井吉祥大厦和北京银泰中心项目。此外,集团公司计划与凯悦集团合作投资约20-30亿元人民币,在宁波开发东钱湖项目,建成当地最高品质的大型酒店和社区。 中国银泰投资有限公司在全国拥有五家大型百货商店,均良好服务于当地社会,并对当地经济发展做出了贡献。在浙江省内商业零售业各项业绩统计中,银泰百货目前已连续四年稳居浙江百货业第一。2004年银泰百货销售规模超过30亿元。2005年10月与美国华平投资集团签署了战略联盟合作暨投资协议。

中国能源建设集团有限公司简介

中国能源建设集团有限公司简介中国能源建设集团有限公司(简称“中国能建”)2011年9月29日成立。是经国务院批准,由中国葛洲坝集团公司;中国电力工程顾问集团公司和国家电网公司;中国南方电网有限责任公司所属15个省(市、区)的勘察设计企业、电力施工企业和修造企业重组而成。由国务院国有资产监督管理委员会履行出资人职责的国有独资公司。中国能建注册资本为260亿元,2010年营业收入和年末资产总额均为1000多亿元,职工总数16万人。 中国能建是国内领先、国际先进的特大型能源建设集团公司,拥有集项目总承包、工程管理、规划、勘测、设计、施工、修造、投资运营于一体的完整业务链。 经营范围包括:境内外电力(包括水电、火电、核电、风电及太阳能发电等新能源及送变电)和水利(包括水务)、矿山(包括煤炭)、公路、铁路、港口与航道、机场、房屋、市政工程、城市轨道、环境工程、冶炼、石油化工等基础设施项目的工程项目规划、评审、咨询、评估,工程勘察与设计,施工安装,工程总承包、施工总承包与专业承包,工程项目管理、工程监理,项目运营管理、启动调试与检修,技术研发,招标代理、进出口业务、科技服务等业务;境内外电力行业发展规划研究;境内外电力(包括水电、火电、核

电、风电及太阳能发电等新能源及送变电)和水利(包括水务)、矿山(包括煤炭)、公路、铁路、港口与航道、机场、房屋、市政工程、城市轨道、环境工程、冶炼、石油化工等基础设施项目的开发、投资、建设、经营、管理和相关业务的生产、销售及招标代理业务、进出口业务等;相关设备制造、修造、销售、采购与租赁,相关专有技术开发与产品销售,相关建筑材料的生产、物流、配送与销售,民用爆破产品制造与服务等;房地产开发与经营;实业投资、经营与管理;国际资本运作与境外项目投融资;经国家批准,从事非银行金融服务业务,开展外贸流通经营、国际合作与对外投资、对外工程承包和对外劳务合作等业务。 中国能建承载着党中央、国务院的殷切希望,肩负着做强做优,打造世界一流企业的光荣使命,将按照国务院国资委总体部署,积极履行央企责任,做好行业表率,竭诚与社会各界和衷共济,携手并进,矢志为中国能源开发建设事业作出新的更大贡献。 主要领导中国能源建设集团有限公司: 董事长:杨继学(原任中国葛洲坝集团公司总经理)中国能源建设集团有限公司; 党委书记:汪建平(原任中国电力工程顾问集团公司总

中国十大房地产公司排名

中国十大房地产公司排名 建筑与经济2010-03-29 15:58:32 阅读1948 评论1 字号:大中小订阅 万科(Vanke) 公司前身为成立于1984年的深圳现代科教仪器展销中心,1987年3月更名为“深圳现代企业有限公司”,同年11月进行股份制改组,并向社会发行股票。1988年深万科股票在深圳特区证券公司挂牌,1991年1月29日“深万科A”在深圳证券交易所上市,上市首日开盘价14.58元,1993年4月首次发行B股,同年5月28日“深万科B”上市。 中海地产 中海地产集团有限公司是香港中国海外集团有限公司控股的属下企业,在香港交易所上市的地产公司。主要业务是物业发展及投资、楼宇及土木建筑、基础工程及项目管理、房地产代理及管理,以及基建项目投资。是恒生指数成份股(蓝筹股)。 合生创展 民营企业家朱孟依先生于1992年成立,1998年在香港联合交易所有限公司主板上市,是以发展中高档大型住宅地产物业为主的大型地产集团。主要业务是投资控股、物业发展、物业投资及物业管理业 务。 保利地产

中国保利集团旗下的大型房地产国有企业。公司总部设在广东广州。1992年底成立后开始进入房地产行业,在坚持以中高端精品住宅开发为主。1983年,解放军总参谋部、中国联合组建一家对外贸易公司,起名“保利”,保卫胜利之意。英文前缀词POLY-有“多”“聚”的含义,与中文“保利”一词发音相同且寓意也契合。保利集团的主标志,取英文“PLA”(中国人民解放军缩写)、“POLY”、“POWER”等单词首字母P变形而来。一大批老一辈国家领导人都在保利。 碧桂园(Country Garden 名字来自广东顺德的“碧江”和“桂山”合称而成。物业买家大多数是香港人,用途是香港人的渡假屋(香港亲朋假日社交联谊)、安顿在内地居住的家人、或者退休回乡的长者父母。碧桂园根据社会和人居发展的需求,不断丰富“大规模社区+优美环境+优质产品+优质管理服务+超级配套体系+合理定价” 为内涵的碧桂园家园模式。 首都开发 由城开集团与天鸿集团合并重组,于2005年12月10日正式挂牌成立的国有大型房地产开发企业。2008年奥运会重大工程项目中, 两大集团也是重要的投资建设者。 恒大地产 恒大地产集团是集房地产规划设计、开发建设、物业管理于一体的现代化大型房地产综合企业,连续五年荣登中国房地产企业10强。拥有中国一级资质的房地产开发企业、中国甲级资质的建筑设计规划研究

年度工程总承包完成合同额排行榜

2014年度工程总承包完成合同额排行榜 按照《关于2014年开展从事工程项目管理和工程总承包企业完成合同额百名排序工作的通知》(中设协字[2014]21号)的有关精神,中国勘察设计协会建设项目管理和工程总承包分会(以下简称分会)在全国勘察设计行业组织开展了从事工程项目管理和工程总承包企业完成合同额百名排序工作。 在各行业、地方勘察设计协会支持与配合下,有关企业完成了工程总承包资料的自主申报,各地方、各部门勘察设计同业协会和分会秘书处按照规定对企业的申报表内容和数据进行审核、汇总和复核等工作。经中国勘察设计协会批准,现将2014年度工程总承包完成合同额排行榜予以公布。单位:万元人民币 序号单位名称完成合同额 1中国寰球工程公司1,991,437 2中国中材国际工程股份有限公司1,535,378 3中国石油集团工程设计有限责任公司1,470,129 4中国电力工程顾问集团公司1,463,799 5中国石油工程建设公司1,374,930 6中钢设备有限公司1,285,179 7中石化洛阳工程有限公司1,167,004 8中国核电工程有限公司1,052,514 9中冶京诚工程技术有限公司965,991 10中国天辰工程有限公司949,401 11中国石化工程建设有限公司874,053 12中石化上海工程有限公司833,979 13中冶南方工程技术有限公司780,445 14中石化宁波工程有限公司703,589 15中国建材国际工程集团有限公司681,900 16中国成达工程有限公司585,183 17天津水泥工业设计研究院有限公司528,164 18中国五环工程有限公司527,518 19中冶赛迪工程技术股份有限公司498,894 20中机国能电力工程有限公司488,776 21中国航空规划建设发展有限公司461,496 22中国海诚工程科技股份有限公司458,857 23华陆工程科技有限责任公司453,763 24中冶焦耐工程技术有限公司441,300 25赛鼎工程有限公司436,332 26山东电力工程咨询院有限公司436,128

2013年最新央企名单

2013年最新央企名单 1 中国核工业集团公司60 中国机械工业集团有限公司 2 中国核工业建设集团公司61 机械科学研究总院 3 中国航天科技集团公司62 中国中钢集团公司 4 中国航天科工集团公司63 中国冶金科工集团有限公司 5 中国航空工业集团公司64 中国钢研科技集团公司 6 中国船舶工业集团公司65 中国化工集团公司 7 中国船舶重工集团公司66 中国化学工程集团公司 8 中国兵器工业集团公司67 中国轻工集团公司 9 中国兵器装备集团公司68 中国工艺(集团)公司 10 中国电子科技集团公司69 中国盐业总公司 11 中国石油天然气集团公司70 华诚投资管理有限公司 12 中国石油化工集团公司71 中国恒天集团公司 13 中国海洋石油总公司72 中国中材集团公司 14 国家电网公司73 中国建筑材料集团有限公司 15 中国南方电网有限责任公司74 中国有色矿业集团有限公司 16 中国华能集团公司75 北京有色金属研究总院 17 中国大唐集团公司76 北京矿冶研究总院 18 中国华电集团公司77 中国国际技术智力合作公司 19 中国国电集团公司78 中国建筑科学研究院 20 中国电力投资集团公司79 中国北方机车车辆工业集团公司 21 中国长江三峡集团公司80 中国南车集团公司 22 神华集团有限责任公司81 中国铁路通信信号集团公司 23 中国电信集团公司82 中国铁路工程总公司 24 中国联合网络通信集团有限公司83 中国铁道建筑总公司 25 中国移动通信集团公司84 中国交通建设集团有限公司 26 中国电子信息产业集团有限公司85 中国普天信息产业集团公司 27 中国第一汽车集团公司86 电信科学技术研究院 28 东风汽车公司87 中国农业发展集团总公司 29 中国第一重型机械集团公司88 中国中纺集团公司 30 中国第二重型机械集团公司89 中国外运长航集团有限公司 31 哈尔滨电气集团公司90 中国中丝集团公司 32 中国东方电气集团有限公司91 中国林业集团公司 33 鞍钢集团公司92 中国医药集团总公司 34 宝钢集团有限公司93 中国国旅集团有限公司 35 武汉钢铁(集团)公司94 中国保利集团公司 36 中国铝业公司95 珠海振戎公司 37 中国远洋运输(集团)总公司96 中国建筑设计研究院 38 中国海运(集团)总公司97 中国冶金地质总局 39 中国航空集团公司98 中国煤炭地质总局 40 中国东方航空集团公司99 新兴际华集团有限公司

中国中煤能源集团公司生产安全事故责任追究办法(暂行)0

中国中煤能源集团公司 生产安全事故责任追究办法(暂行) 第一章总则 第一条为有效防范生产安全事故(以下简称事故)的发生,严肃追究事故责任人的责任,保障职工生命和企业财产安全,根据国家安全生产有关法规规定并结合企业的实际情况,制定本办法。 第二条对在发生的生产安全事故中有失职或负有领导责任的单位负责人、事故的有关责任人,依照本办法规定进行责任追究。 第三条凡涉及二级企业负责人的责任追究处理,由集团公司决定。对其他人员的责任追究由集团公司二级企业做出处理决定的报集团公司备案。 第四条事故等级划分按照国家生产安全事故报告和调查处理条例(国务院493号令)标准执行。 第五条本办法适用于集团公司(含中国中煤能源股份有限公司)所属独资、控股的企业。 第二章事故责任追究 第六条按照生产规模、管理跨度、安全风险程度、安全管理难度,将集团公司所属企业分为A、B、C、D四类。 A类企业:煤矿和矿建施工企业,包括平朔公司、大屯公司、

煤气化公司、进出口公司、中煤龙化公司、一建公司、五建公司。 B类企业:煤焦化和土建安装施工和煤机装备企业,包括焦化公司、建安公司、中煤装备公司、中煤建公司。 C类企业:地面生产和设计企业,包括、综合利用公司、煤层气公司、西安设计公司、邯郸设计公司。 D类企业:其它企业。

党委书记交叉任职的,比照安全第一责任人进行责任追究,没有交叉任职的矿处级党委书记的责任追究,由二级企业党政联席会议决定。 第八条非死亡责任事故的责任追究依据国家生产安全事故报告和调查处理条例的划分标准,一般责任事故由二级企业进行追究,报集团公司备案;较大及以上责任事故由集团公司追究。 第九条特殊时期发生或性质严重事故的二级企业负责人的责任追究,由集团公司党政联席会议根据具体情况做出决定。 第三章事故的报告 第十条事故发生后,事故现场有关人员应当立即向本单位负责人报告;单位负责人接到报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产

中国设计院排名

1-10名: 中国水电工程顾问集团公司、中国成达工程有限公司,中国电力工程顾问集团公司,中铁二院工程集团有限责任公司,铁道第三勘察设计院集团有限公司,中铁第四勘察设计院集团有限公司,中国中建设计集团有限公司,中国建筑设计研究院,上海现代建筑设计有限公司,中国寰球工程公司。 11-20名: 中国石油天然气管道工程有限公司,中国联合工程公司、同济大学建筑设计研究院有限公司、中国水电顾问集团成都勘察设计研究院、深圳中广核工程设计有限公司、中国水电顾问集团华东勘察设计研究院,中交公路规划设计院有限公司,中国水电顾问集团西北勘察设计院、上海市政工程设计研究院总院公正无私,中交第一公路勘察设计研究院有限公司。 21-30名: 中国水电顾问集团昆明勘察设计研究院、中国石化集团洛阳石油化工工程公司,中国电力工程顾问集团西南建立设计院、中交第二公路勘察设计原则有限公司、广东省电力设计研究院、北京城建设计研究总院优先责任公司,中国公路工程咨询集团有限公司、中国水电顾问集团中南勘察设计研究院,中国电力工程顾问集团中南电力设计院。 31-40名: 中国恩菲工程技术有限公司,中国电力工程顾问集团西北电力设计院、中国天辰工程有限公司,中国中元国际工程公司、河南省电力勘测设计院、中国水电顾问集团贵阳勘测设计研究院、中国电力工程顾问集团华东电力设计院、中国电力工程顾问集团东北电力设计院、中交第三航务工程勘察设计院有限公司,中交水运规划设计院有限公司。 41-50名: 中国海诚工程科技股份有限公司,中铝国际工程股份有限公司,江苏省交通科学研究院股份有限公司,广东省建筑设计院,中冶南方工程技术有限公司,中交第四航务工程勘察设计院有限公司,浙江省电力设计院,中国石化集团上海工程有限公司,中国五环工程有限公司,五洲工程设计研究院。 51-60名: 中冶焦耐工程技术有限公司,中国电子工程设计院,中业赛迪工程技术股份有限公司,东风设计研究院有限公司,上海市隧道工程轨道交通设计研究院,武汉市建筑设计院,河北省建立勘测设计研究院、中交第一航务工程勘察设计院有限公司,中船第九设计研究院工程有限公司,中交第二航务工程勘察设计院有限公司。

中国能源现状及未来的发展

中国能源现状及未来的发展 改革开放以来,中国发生了翻天覆地的变化,面对持续、快速增长的中国经济,对能源的需求,特别是对一次能源的需求的不断增长,产生了很多的问题。煤炭开采的安全、利用率、深加工的研发,石油对国外进口的依赖所带来的安全问题,煤层气等个别气体产业化建设问题等等都在制约着中国经济平稳快速发展。中国的能源发展在20年里也取得了很大的成就,实现GDP翻2 番,能源消费翻1 番,完成了中国经济增长所需能源一半靠开发,一半靠节约的目标。 一 对中国能源现状的认识 随着经济建设的推进,资源储量的勘探也越来越清楚。中国地大物博,能源资源丰富,据2006 年中国统计年鉴的数据,全国主要能源的基础储量为:石油248972.1 万t、天然气28185.4亿m3、煤炭3326.4 亿t;但若以“人均拥有量”来衡量,中国却是资源贫瘠国,2006 年人均石油储量只有1.9t, 人均天然气储量2168m3,人均煤炭储量256t,分别为世界平均值的11.1%、4.3%和55.4%,中国的人均资源储量远远低于世界水平。二 中国能源存在的问题 中国能源结构不合理,能源消费以煤占主导地位,偏离了世界能源结构以油气为发展趋势主流。落后的用煤方式、生产设备、管理方式产生了严重的污染。中国经济现代化正面临能源的严峻挑战:能源供需矛盾尖锐、转换方式落后、能耗高、效率低、生态环境破坏严重、经济损失巨大。 1、 人均能源资源少,供需有差距 中国人口众多,占世界人口的21%,能源矿产人均探明储量相对较少,煤炭资源可以满足较长期需求,而石油和天然气资源则需要以国外资源作为重要补充,才能满足当前和长远的需求。中国是世界能源大国, 一次能源的生产和消费均居世界前列,但人均能源消费水平还很低。 2、 能耗强度高,效率低 由于我国产业结构的不合理性与管理技术上的落后,尽管在能源消耗上有了很大的改善,但是与发达国家比还是存在很大的差距。中国产业生产和居民生活中大量使用高耗能的落后技术和产品,现有的近400 亿m2建筑中, 99%属于高能耗建筑。中国发电、冶金、建材、化工等产业消耗全部一次能源的80%左右,单位产品能耗平均高于国际先进水平20% ~30%。 3、结构不良,污染严重 能源资源决定了中国能源长期以来是以煤为主的能源结构, 不论是火力发电还是工业用煤, 都会造成大量污染排放。SO2和CO2排放量分别

当前世界各国能源发展战略的特点及影响(一)

当前世界各国能源发展战略的特点及影响(一) 摘要:不同经济发展阶段的国家,能源发展战略有其不同的立足点。各国政府依据本国经济发展和能源状况,阶段性地调整发展战略目标以及自身的能源政策。综合分析,发达国家的能源发展战略代表了世界能源发展的新潮流;发展中国家的能源发展战略存在着重视各自国情,积极跟踪世界潮流的共性。本文分析了当前世界各国能源发展战略的特点以及将产生的各种影响。 关键词:能源发展战略,世界,影响 不同经济发展阶段的国家,能源发展战略有其不同的立足点。而且,各国政府都在依据本国经济发展和能源状况,阶段性地调整发展战略目标以及自身的能源政策。综合分析,发达国家的能源发展战略代表了世界能源发展的新潮流;发展中国家的能源发展战略存在着重视各自国情,积极跟踪世界潮流的共性,也有我们可以借鉴之处,需要注意加强研究。 1、当前世界各国能源战略的主要特点 1.1能源安全是最重要的战略目标 在当前全球气候变化的形势下,以及意识到不可再生资源总有一天会日渐耗竭的背景下,随着紧缺的石油资源问题突出,国际油价持续攀升、各国对能源资源安全关注程度也随之普遍上升。维护国家能源安全是当今世界各国面临的重大课题,无论是发达国家,还是发展中国家都将保障能源安全作为国家能源战略的首要目标。

发达国家人均能耗高,需要大量进口补充境内能源资源的短缺,因此,能源发展战略除了考虑本国的资源因素外,极为注重涉及到国外资源开发利用的国际因素影响,甚至关注其他国家能源需求变化对国际能源市场的影响及对自身的影响程度。在历年的石油危机后,针对当前石油资源紧张的形势,发达国家以其较充沛的经济实力逐渐加大石油战略储备力度,建立和加强战略石油储备是发达国家保障能源安全的主要措施。而且,由于国家的经济实力强,对能源发展战略的考虑既重视近期的能源供应安全问题,又重视长远的能源可持续发展。 发展中国家在国际竞争中处于弱势,多偏重于建立当前自身的能源安全供应体系。能源资源充裕的发展中国家已认识到利用资源优势发展国家经济的重要性,逐步加大了国家对国外企业开采和资源输出的控制。菲律宾明确国家能源和经济安全的底线是“确保实现国家能源60%自给自足”。巴基斯坦战略目标明确,突出增加本土能源比重,减少对外进口依赖的重要性,并对落实目标,做出了详尽的项目规划。乌克兰在经历了能源供应危机后,能源战略更加强调节能降耗、提高能源自主供应能力的必要性。墨西哥强调能源立法,同时,要及时分析阻碍国家能源发展的主要障碍,进行能源战略调整。 石油战略储备曾是以石油消费为主的发达国家应付石油危机的最重要手段,作为保障石油供应安全的这一战略措施也逐渐为发展中国家所效仿。现在,具有一定经济实力的国家为减少供应风险,都开始着手石油战略储备。石油战略储备已超出一般商业周转库存的意义,更重

中国投资有限责任公司员工行为规范(PDF)

中国投资有限责任公司员工行为规范 前言 中投公司作为主要从事外汇资金投资与管理业务的国有独资公司,秉持“责任、合力、专业、进取”的核心价值观,致力于成为受人尊重的国际一流专业投资机构。为实现这一目标,公司要求所有员工严格遵守一切适用的法律法规,执行最高的职业道德与操守标准。 作为公司的一项重要制度和企业文化建设的重要内容,《中投公司员工行为规范》不仅全面阐述了公司在重大问题上的基本原则,而且对保护公司的声誉、利益、资产和信息等提出了详尽要求。每位员工在加入公司前均须了解、认可,并自觉以此为行动指南。 总则 为帮助中投公司员工准确识别和正确处理工作中遇到的各种道德和法律问题,做出有助于开展公司业务、维护公司声誉和利益的良好判断,防范道德、法律及经营操作风险,制定本规范。 本规范所指公司员工包括:高管、职员、派出董监事、临时及借调人员。接受公司委托的第三方机构人员在代理公司业务期间应参照执行。 公司员工应认真阅读并充分了解本规范的全部内容,知悉与否不能构成减轻义务或推卸责任的理由和借口。如对有关问题不清楚或难

以处理时,员工应寻求上级主管或公司相关部门的建议和帮助。 公司核心价值观 核心价值观是企业本质和永恒的原则。中投公司的核心价值观是:责任、合力、专业、进取。公司员工的一切行为应当以此为导向,无论何时何地,恪守并践行公司的核心价值观。 保护公司的声誉 良好的声誉对于公司的发展和成功至关重要。公司员工应当认识到:任何不当行为都有可能破坏公司声誉且一旦破坏将极难恢复。因此,员工务必正确理解和严格遵循所有适用的法律、法规和社会与职业道德标准,避免因任何不当行为损害公司的声誉,给公司形象抹黑。 遵守法律规定。只有严格遵守本国和投资接受国或地区的法律法规才能保护公司的声誉不受侵害。公司业务涉及的法律法规涵盖但并不限于:反垄断、反腐败、反商业贿赂、环境保护、保密、防止内幕交易、知识产权、隐私以及信息披露等。公司员工应当树立主动合规的意识,理解和遵守所有适用于其身份、岗位或与经办业务相关的法律、法规、规章和准则,以及公司的内控制度与业务流程。 社会道德与责任。遵守社会秩序、尊重社会公德、履行社会责任是每个公民应尽的义务。公司员工应自觉做到知礼守法、健康向上,积极参与和谐社会建设,努力为当地经济繁荣与发展做出贡献。员工不得组织、参与、支持非法的罢工、集会、游行、示威等活动;不得参加非法组织、团体,或者为之提供场所、资金等便利;不得参与黄赌毒等活动,或有其他违反社会公德的行为。 诚信与公平对待。诚实守信是员工职业道德与操守的本质要求。

中国中煤能源集团公司章程

中国中煤能源集团公司章程 第一章第一章总则 第一条为确立中国中煤能源集团公司(以下简称集团公司)的法律地位和行为准则,保障集团公司的合法权益,规范集团公司的管理和运作,根据《企业国有资产监督管理暂行条例》等有关法律、法规,制定本章程。 第二条集团公司是国务院国有资产监督管理委员会(以下简称国资委)履行出资人职责的国有独资企业,具有独立的企业法人资格,其合法权益和经营活动受国家法律保护。 集团公司根据业务发展需要,依据国家有关法律、法规并经国家有关部门批准,可在境内外投资设立全资子公司、控股公司、参股公司(以下简称所出资企业)和分公司、代表处等分支机构。集团公司以其出资额为限,对所出资企业承担有限责任。 第三条集团公司的中文全称:中国中煤能源集团公司。集团公司英文名称:ChinaNational Coal Group Corporation。 集团公司的法定住所:北京市东城区安定门外大街乙88号。 第四条集团公司在国家宏观调控和行业监管下,依法经营,照章纳税,维护国家利益,自主进行各项经营活动。 第五条根据国务院《国有企业监事会暂行条例》和《企业国有资产监督管理暂行条例》有关规定,集团公司接受国资委派出监事会的监督,支持监事会依法开展监督检查工作。 集团公司接受国务院有关部门的业务指导和行业管理。 第二章注册资本、经营宗旨和经营范围 第六条集团公司的注册资本为人民币453728.2万元。 第七条集团公司的经营宗旨是:执行国家法律、法规和政策,保障国有资产安全、保值与增值,依靠科技进步,深化企业改革,发挥集团整体优势,实

现社会效益和经济效益的统一。着力发展煤炭生产与国内外贸易、煤焦化、煤层气、煤电铝和煤矿装备、科研设计、工程建设等产业,提高公司核心竞争力。 第八条经国家主管部门批准,经营范围为:组织所属企业煤炭开采、煤炭洗选加工、煤炭焦化和制气、煤层气开发、电力生产、电解铝生产和铝材加工、煤矿机械设备制造、科研、勘察、设计、工程和设备招投标、工程建设施工和监理;自营和代理各类商品及技术的进出口业务,包括煤炭出口,其他国家规定的专营进出口商品和国家禁止进出口等特殊商品除外;经营进料加工和“三来一补”业务,开展对销贸易和转口贸易;煤炭经营;矿产品和机械设备的国内销售;焦炭、煤炭制品的销售(国家有专项专营规定的除外)。 第三章组织机构 第九条集团公司实行总经理负责制,总经理为集团公司法定代表人。集团公司设副总经理、总会计师,副总经理、总会计师根据集团公司章程的规定和总经理的委托履行相应的职责,协助总经理工作,并对总经理负责。集团公司领导班子和领导人员由国资委管理。 第十条总经理负责集团公司的全面工作,主要行使下列职权: (一)贯彻执行国家的法律、法规和方针政策,执行国资委的决议,向国资委及有关部门和单位请示、报告工作。 (二)组织拟订和实施重大投融资规划、发展战略和规划,组织制定和实施年度经营计划及其他重要生产经营决策。 (三)组织制订和实施集团公司年度财务预、决算方案。 (四)组织制订集团公司利润分配方案和弥补亏损方案。 (五)召集并主持总经理办公会议。 第十一条集团公司总经理办公会议研究决定以下重要事项: (一)集团公司年度经营计划、市场策划、技术开发、业务规章、内部管理体制、组织结构调整及内部机构设置等重要决策。

2010中国工程设计企业60强

2010中国工程设计企业60强 (以2009年工程设计营业收入为依据) 单位:万元人民币 排名企业名称工程设计营业收入 1 中国成达工程有限公司 China Chengda Engineering Co., Ltd. 664332.80 2 中国水电工程顾问集团公司 Hydrochina Corporation 663872.91 3 中国石化工程建设公司 SINOPEC Engineering Incorporation 620166.80 4 中国电力工程顾问集团公司 China Power Engineering Consulting Group Co. 607739.40 5 中铁二院工程集团有限责任公司 China Railway Eryuan Engineering Group Co., Ltd. 385645.13 6 中铁第四勘察设计院集团有限公司 China Railway SIYUAN Survey and Design Group Co., L TD 279972.00 7 铁道第三勘察设计院集团有限公司 The Third Railway Survey and Design Institute Group Corporation 260097.77 8 上海现代建筑设计(集团)有限公司 Shanghai Xian Dai Architectural Design (Group) Co., Ltd. 241047.00 9 中国建筑设计研究院 China Architecture Design & Research Group 210371.42 10 中国石油天然气管道工程有限公司 China Petroleum Pipeline Engineering Corporation 189470.90 11 中国寰球工程公司 China Huanqiu Contracting & Engineering Corporation 182301.00 12 中国水电顾问集团成都勘测设计研究院 Hydrochina Chengdu Engineering Corporation 170565.29 13 深圳中广核工程设计有限公司 China Nuclear Power Design Company Ltd.(Shen Zhen) 155312.56 14 中国联合工程公司 China United Engineering Corporation 131843.00 15 同济大学建筑设计研究院(集团)有限公司 Architectural Design & Research Institute of Tongji University (Group) Co., Ltd. 129518.00 16 中国电力工程顾问集团西北电力设计院 Northwest Electric Power Design Institute of China Power Engineering Consulting Group 127376.00 17 广东省电力设计研究院 Guangdong Electric Power Design Institute 116312.59 18 中国水电顾问集团西北勘测设计研究院 Hydrochina Xibei Engineering Corporation 114018.60 19 中国水电顾问集团华东勘测设计研究院 East China Investigation and Design Institute 110353.59 20 中交第一公路勘察设计研究院有限公司

相关主题
文本预览
相关文档 最新文档