Quality Control Plan

质量控制计划

1. Quality policy

质量方针

The policy aims at satisfying our customer by way of initializing an updated quality management and sticking to the top requirement of “quality first” in an attempt to achieve an elite project finally.

坚持“质量第一”的原则,确保质量体系有效运行,向业主提供满足合同与标准要求的产品。

2. Quality objective

质量目标

Provide our customer with products in full line with relevant contract and standard by way of strictly conforming to quality control procedure and intensifying avoiding common quality faults to be sure of an effective operation of the quality assurance and quality control system, achieve a zero quality accident rate and realize good project construction quality.

坚持质量标准,严格质量控制程序,加大质量通病治理,实现质量事故为零,确保工程质量优良,争创优质工程。

Try hard to finish the project in an excellent way

努力以如下目标完成项目:

(1)Qualification rate for unit project:100%

单位工程质量合格率:100%

(2)Choiceness rate for unit project:above 95%

单位工程质量优良率:95%以上

(3)Qualification rate for inspection items with allowable tolerances:above 95% 允许项目测点合格率:95%以上

(4)Qualification rate for measure of location by self-inspection:above 95% 定位测量自检合格率:95%以上

(5)Qualification rate for radiographic test (not including testing weld joints

reworked) above 95%

焊缝拍片一次合格率:95%以上

(6)Quality accident rate: 0

质量事故发生率为零

(7)Mission success rate for one-time commissioning: 100%

试车一次成功率100%

3. Quality Assurance System and Function

质量保证体系

https://www.doczj.com/doc/674040074.html,anization and Structure

建立质量保证体系组织机构

Establish quality assurance and effective quality control system before construction in order to ensure the realization of construction quality objective. (As for system organization, see the Chart attached herewith).

为确保工程施工质量达到既定目标及在施工过程中工程质量得到有效控制,在工程开工前建立本工程的质量保证体系,质保体系组织机构如下图。

4. Work-Post Responsibility

质量体系人员职责

4.1.Responsibility of Project Manager

项目经理职责

Organize and establish the quality system and put it into effective operation. Supervise and inspect the responsibility and authority limit of relevant department and responsible person of the Project Department to maintain that the project quality meets relevant stipulation and requirement. Be fully responsible for construction quality of the project and have responsibility to FW.

负责组织建立健全项目质量保证体系,并采取措施,确保质量体系持续、有效、实际地运行,在工程质量和质量管理上代表公司经理直接向FW负责。

Be responsible for optimizing resources, which are adequate for the need of construction field, strengthening inspection such as preparing more inspectors, inspection tools and equipment, increasing inspection frequency, intensifying quality control in project construction.

负责组织项目资源优化配置工作,确保满足施工现场需要,加大检查、试验人员、设备、器具的投放,增强质量控制手段。

Organize construction strictly as per the requirement of Construction Organization Planning, be familiar with construction quality state in a timely and accurate way, intensify management in self-supervision, self-control and self-inspection, organize internal joint quality inspection during any necessary construction stage, and support joint quality inspection organized by FW and/or other quality inspection departments.

按施工组织设计组织施工。及时、准确掌握工程质量动态,加强施工过程自管、自控、自查管理力度,并在施工各阶段适时组织联合质量检查;积极配合FW和技术质量监督部门组织的质量大检查,对存在问题彻底整改。

Organize the work named as “3 inspections and 4 confirmations”, ensure project interim acceptance, quality service during commissioning, and after service.

组织“三查四定”工作,保证实现高标准中交,在试车及保运阶段提供优质服务。

Organize maintenance and return investigation to project quality, undertake that the new-built units run in a quiet, stable, persistent, full-loaded and excellent way.

组织工程质量回访及保修工作,为装置“安、稳、长、满、优”运行提供一流的服务。

4.2. Responsibility of construction manager

施工经理职责

Be responsible for project construction and quality control under the leadership of project manager.

在项目经理领导下,负责项目生产和质量工作。

Be liable for checking and auditing construction schedules, coordinating construction and implementing project construction quality schedules.

负责审核、检查落实项目施工生产计划,组织协调项目施工生产,贯彻执行项目质量计划。

Attending routine meetings about quality.

参加项目质量例会。

Be responsible for organizing quality inspection and tracing quality rectification.

组织检查项目施工质量情况及质量整改落实情况。

Organize project construction coordination meetings and timely deal with construction quality problems.

组织项目生产调度会,及时组织处理工程质量存在问题。

4.3. Responsibility of QA/QC Manager

总工程师职责

Be mainly in charge of implementation of our Company quality policy, objective, and quality system document and be specifically responsible for arrangement of establishment and compilation of the Project Department quality system and quality system document with them being put into effective operation. Be in charge of the construction quality within the authorized work scope.

代表项目经理行使质量管理和工程检验、试验等管理职权,负责组织编制质量体系运行计划和项目质量控制规划。

Supervise and inspect the quality activity, quality control work and relevant coordination work made by the inferior departments.

主管项目质量体系的日常运行管理,组织落实各职能部门质量职责,协调各项质量管理工作。

Periodically summon the quality work meeting in which the actual status on the quality work is analyzed and the experience is concluded and the improvement measures are sought out in contrast with the weak link on the quality work.

领导项目质检组做好工程质量检验、试验控制工作,严格按报检程序实施工程质量确认,按专业对质量通病治理情况及考核结果进行确认。

Be in charge of handling any quality accident and putting an end to any practice neglecting the project quality. When necessary, an instruction on redoing a job or halting a job for a good check-up shall be given with the quality appraisal and penalty methods to be implemented.

负责组织召开工程项目质量例会,组织专业人员分析,处理质量信息,并针对存在问题的原因组织制定纠正预防措施,对措施实施的效果进行评价。

Organize relevant personnel to cooperate with relevant personnel from the owner and/or FW and audit the quality management and quality system of the project.

负责组织单位工程质量评定,做到质量评定与工程进度同步,在工程中交前及时组织质检组做好质量初评工作,根据质量奖惩规定组织实施工程质量奖惩。

4.4. Responsibility of Quality Control Department

质量控制经理

Organize professional personnel to control, inspect and accept construction quality, take measures to realize the project construction quality objective.

组织项目专业人员对分管项目实施全过程质量控制和验收,实现项目工程质量目标。

Be responsible for working out quality schedules for the project construction and then put it into practice.

负责编制项目工程的质量规划,并组织实施。

Be liable for taking measures to prevent unqualified products from being used, for marking identification, and for the inspection and management relating to records about project data and information.

在施工过程中,负责采取措施,防止出现不合格品,负责对项目工程标识和可追溯性的检查、管理工作。

Participate in investigating, analyzing and dealing with quality accidents.

召集专业人员进行性质量检查,对发现的质量缺陷、隐患监督整改。参与质量事故的调

查、分析和处理。

Be responsible for checking construction quality records and organizing relevant work regarding unit projects like “3 inspections and 4 confirmations”, interim handover, after service, return investigation, quality evaluation, auditing document used for project handover and summarizing quality control experience.

组织检查单项工程在实施中的质量记录,负责组织分管项目的“三查四定”、中间交接、保运、回访、质量评定、交工资料审查和工程质量的总结工作。

Assist project manager to control procurement document regarding materials supplied by subcontractor, receiving check at handing over of materials, and to control unqualified materials.

协助项目经理进行乙供物资采购资料的控制、进场物资的验证以及不合格物资的控制。

Be responsible for transportation, stocking, packing, protection, identification and records of materials.

组织对物资的搬运、贮存、包装、防护及标识、可追溯性的控制。

Be liable for quality management and supervision at construction field.

负责所管工程项目施工现场质量管理与监督工作。

Be responsible for organizing and completing quality evaluation for unit projects.

负责组织工程项目专业性质量、检查。负责组织完成有关部门进行项目单项工程质量评定。

4.5. Responsibility of professional engineer专业工程师职责

Be responsible for technical preparation under the leadership of construction manager.

在施工经理领导下负责各自专业施工过程中的前期技术准备工作。

Be responsible for progress management and quality control of specialized construction.

掌握本专业工程质量规程、规范以及验证标准,做好对工程项目施工质量监督检查。

Familiarize with specialized design document and construction drawings, participate in design clarification and joint checkup of drawings, and raise questions in writing (if any).

参加工程施工阶段“共检点”分级划分和共检内容的检查实施。

Participate in compilation of Construction Organization Planning and Construction Schedule.

具体负责本专业施工阶段的进度、质量控制管理。参加施工组织设计与施工方案的编制工作。

Participate in unpacking of equipment and materials at work site.

参加设备、材料现场的开箱检验。

Report to construction manager if finding out serious construction quality problems.

在施工中如发现重大质量问题,要立即向施工经理报告。

Inspect construction quality and daily construction progress, help solve problems regarding technology and quality during construction.

负责按日检查施工班组的工程进度完成和质量情况,协助解决在施工中发生的有关技术、质量问题。

Be responsible for inspecting item and part projects, and for offering inspection notification to FW and/or local inspection department regarding concealed work and joint-inspection points.

负责对分部分项工程进行检查,与质检员一道对隐蔽工程和“共检”点进行报验。组织施工班组按设计图纸文件要求和规范、标准进行施工,发现问题应及时处理。

Be responsible for inspection and repair of executed work before completion of the project.

在中间交接过程中,负责本专业的“三查四定”工作。

4.6. Responsibility of quality inspector

质检员职责

Familiarize with regulations, codes and standards, do a good job in supervision and inspection of construction quality.

掌握本专业工程质量规程、规范以及验证标准,做好对工程项目施工质量监督检查。

Participate in classifying, carrying out and inspecting joint-inspection points.

参加工程施工阶段“共检点”分级划分和共检内容的检查实施。

Participate in quality inspection for specialized construction and urge construction teams to rectify defects if finding out any problems.

参加对工程项目专业性质量检查,对发现的质量问题、缺陷或事故隐患进行收集、汇总,

提出整改意见,督促施工队、班组制定整改措施,限期整改。

Participate in investing, analyzing and handling quality accidents during construction.

参加工程施工阶段质量事故的调查、分析和处理。

Participate in quality evaluation for part projects, unit project and individual project.

参加单位工程、单项工程和项目工程的质量评定。

4.7. Management system for “quality system operation”

质量体系运行管理制度

QA/QC manager, as a representative of project manager, shall organize work as per the requirement “quality system operation schedule”such as monthly interior checkup for quality system operation, regular quality meeting every month, specialized quality inspection per week, and joint quality inspection executed by stages according to specific conditions.

项目总工程师代表项目经理按质量体系运行计划组织质量体系运行管理工作,质量经理协助总工程师做好各项具体管理工作,每季度组织一次项目质量体系内部审核;每月组织召开项目质量例会;每周组织专业质量检查(周检);根据工程进展情况适时组织阶段性质量大检查。

Regular quality meetings

质量例会

Project manager summons a meeting every month whose specific works shall be organized by QA/QC manager. The purpose of meetings is to solve problems in quality management, construction quality and work process, to coordinate functional departments, to bring management responsibility into practice, to analyze quality problems and work out corresponding precaution measures and then put into effect.

项目部每月召开一次质量例会,会议由项目总工程师主持,质量经理负责组织落实各项具体工作。会议主要是解决质量管理、工程质量、工作程序上出现的问题,协调各职能部门之间的工作关系,落实管理责任,并针对质量问题进行分析,制定纠正及预防措施,并严格贯彻实施。

Weekly quality inspection

周检

Project Department organizes specialized quality inspection every week which

includes execution of Quality Schedule, construction quality, construction records, detection for measurement instrument, quality evaluation and treatment of common quality faults. Inspection results shall be recorded in the format of “inspection record for project construction quality”. As for existing problems, rectification shall be brought into effect in time as per the requirement of “requisition for quality rectification”.

施工项目部每周组织专业质量检查(周检),检查内容包括:质量计划执行情况、工程质量、施工记录、检测(计量)器具、质量评定、质量通病治理情况等,检查结果以《工程质量检查记录》形式做好记录,对存在的问题下发《质量整改通知单》随期整改,并在项目生产调度会上或质量例会上进评,落实整改责任,实施考核与质量奖惩。

Specialized quality joint inspection专业性质量大检查

Quality joint inspection for different specialties like prefabrication of steel structure, prefabrication of piping, rigging equipment, installation of piping and equipment, package pressure test, pre-trial run of rotary equipment, and commissioning, shall be organized by QA/QC manager with the help of functional departments such as quality, safety, technology and comprehensive departments. “Specialty Group”and “Management Group” shall do the joint inspection, in detail, “Management Group” is responsible for inspection of management procedures, responsibility execution, files and documents, and “Specialty Group”for inspection of specialize construction quality, construction records and confirmation of joint-inspection points.

在工程施工各阶段,一般分为钢结构预制、管道预制,设备吊装,设备、管道安装,系统试压、单机试运、联动试车等,由项目总工程师组织质量、安全、技术、计调等职能组进行专业质量大检查,检查分管理组和专业组,管理组负责检查管理程序、职责落实、文件资料,专业组负责检查专业工程质量(施工难点、关键环节、隐蔽工程质量)、施工记录(交、竣工文件、检试验状态记录、无损检测报告)自检及质量通病治理、共检点确认情况等。

4.8. Management of quality assurance system operation

质量体系运行管理内容

Quality control during preparation for construction

施工准备阶段的质量控制

Establish and perfect quality assurance system for project construction and its assurance measures, bring into effect quality control organization, and work out quality system operation schedule, quality control schedule (including treatment schedule for common quality faults) and quality schedule.

建立、健全项目质量保证体系,完善质量保证措施,落实质量控制组织,制定质量体系运行计划、质量控制规划(包括质量通病防治计划)和质量工作计划。

Compile Construction Organization Planning and Construction Schemes.

编制施工组织设计、施工技术方案。

Organize professional technicians to familiarize design document and drawings, precisely understand design intent and participate in joint checkup of drawings and design presentation.

组织专业技术人员熟悉设计图纸,准确领会设计意图并参加图纸会审、设计交底。Confirm project construction quality control points (A, B, C) which shall be confirmed by FW.

确定专业工程质量控制点(A、B、C),报FW确认。

Prepare for construction equipment and apparatus which have been confirmed to be qualified.

施工机具、工艺设备、检测设备准备,确保检试验设备检定合格并有合格标识。Confirm conditions for welding material warehouse and valve pressure test.

对焊材库、阀门试压等使用条件进行确认。

Check qualification certificates of personnel and report to FW to confirmation.

各类人员、施工资质审查,并报FW确认。

Strengthen workers and staff training and quality education.

职工培训及质量教育。

Confirm conditions for starting construction work.

开工条件确认。

Quality management during construction

施工阶段质量管理

Strengthen the management and distribution of equipment, materials and accessories, prevent low quality materials and equipment from entering

construction field and protect all on-site materials from being damaged or lost.

严格设备、材料、配件验收管理和发放,控制进入现场设备、物资质量,做好现场物资的防护。

Organize construction technology presentation, and ascertain construction procedures, methods, quality criteria, and requirement for self-inspection and inspection to be done by others.

组织施工技术交底,明确施工程序、方法、质量标准和自检、报检要求。

Perform quality inspection for construction working procedures as per the Quality Control Procedures or coordinate with external departments for inspection.

按质量控制程序实施工序质量检查确认、报检、共检。

Summon regular quality meetings every month and perform interior checkup for quality system as the “quality system operation schedule” in order to gain enough information in quality management and construction quality and bring quality schedule into effect.

每月定期召开质量例会按质量体系运行计划组织项目质量体系内部审核,掌握质量管理工作和工程质量动态,落实质量计划,制定、落实纠正预防措施。

Strengthen control to common quality faults and unqualified products and perfect quality accident treatment measures.

加强质量通病预检预防控制,严格不合格品控制,按“三不放过”原则做好质量事故处理工作。

Monitor and control particular process and working procedures in a continuous way.

对特殊工序或过程进行连续监控。

Keep executing construction records and quality evaluation in pace with construction proceeding.

做到施工记录、质量评定与工程进度同步。

Organize professional or stage-by-stage major inspection and coordinate with FW, Quality Supervision and Inspection Station and/or local Labor Departments in joint inspection.

组织专业或阶段质量大检查,积极配合FW、质量技术监督部门和地方政府劳动部门

组织的质量大检查,对存在的问题彻底整改。

Organize joint inspection according to pressure test packages and handover system.

按试压系统、交工系统组织联合检查,做好系统质量确认工作。

Quality management before ending of construction and during construction project acceptance

收尾、交工验收阶段质量管理

Organize inspecting punch list and rectify thoroughly quality problems and potential perils.

组织工程交工前的“三查四定”工作,彻底整改质量问题和隐患。

Establish organization for trial run, ascertain responsibilities, organize a series of work like system pressure test, airtight test, flushing and blowing, and pre-trial run for equipment in a good way, keep in touch with FW, supervision unit and design unit in time to finish getting confirmed and preliminary evaluation in order to ensure successful interim handover, and transact “interim handover certificate”.

建立试运领导组织机构,落实责任,组织做好系统试压、气密、吹扫和单机试运等项工作,及时与FW、监理、设计单位联系办理好确认工作,完成工程质量初评工作,保证顺利中交,并办理“中间交工证书”。

Establish a maintenance team with full category of workers adequate for skillful operation, which shall serve during warranty period and be furnished with excellent maintenance apparatus, to coordinate with FW during commissioning and trial run with load, complete final quality grade confirmation and document handover and sign “project acceptance certificate”.

组建“工种齐全、机具配套、素质较高、服务周到”的保运队伍,配合FW做好联动试车、投料试车工作,按时完成工程质量等级最终核定和交工资料确认工作,办理交工资料交接手续,签订“交工验收证书”。

Deliberatively organize and arrange the work of warranty and return-investigation

精心组织,做好保运工作,并按“工程保修书”做好回访、保修等项工作。

5. Measures for quality control质量控制措施

To realize the quality objective, perfect quality assurance system shall be built as

per the regulations from Company’s “ISO-9002 Quality Manual”, and all relevant management and work criteria shall be implemented. Furthermore, quality control shall be carried out in the whole process of construction.

为保证质量目标的实现,工程项目将按照本公司ISO-9002《质量手册》的规定,建立完善的质量体系,全面贯彻执行有关管理标准和工作标准,实行施工全过程的质量控制,在施工准备、设备检验、原材料供应、机械安装、试车及机械竣工各阶段进行系统的质量控制。

Coordinate with FW in receiving check and acceptance of materials at work site.

协同FW,搞好现场物质交接、验收工作。

Specialize inspectors shall be provided in order to carry out quality control for different working procedures, and quality control points shall be set. As for the same discipline, each working procedure should be completed in order.

按专业配备质检员,按质量控制程序实施各专业施工工序质量控制,在各工序建立质量控制点,上道工序合格后,才能进行下一道工序。

In order to ensure important working procedures to meet the requirement of related regulations, those important process shall be set up as quality control points which shall be inspected and tested.

为确保施工过程中对工程质量产生直接影响的重要工序或过程能满足规定要求,必须将这些工序作为质量控制点进行检验和试验,通过共同验后可进行下道工序的作业。Specialize joint-inspection items and inspection grade, which shall be part of Quality Schedule”, shall be set and then hand out to construction teams after being confirmed by FW. “C-degree”inspection points shall be inspected by subcontractor’s Inspection Group.

编制的工程“质量计划”,应包括各专业设立的“共检点”内容,确定共检级别并报FW确认后,下达到施工队,在施工过程中负责共检工作的组织并参加共检,负责对C类“共检点”的确认签证。

Construction Team is responsible for self-inspection work concerning A, B, C degree inspection points and specialized technicians shall be responsible for filling out inspection requisition and submitting to quality inspection department in charge. 施工队根据“共检点”设置和检查确认要求,逐点负责A、B、C级“共检点”的自

检工作,专业技术员负责填写“共检点”通知单报送主检单位。

Better construction technology management and work as per construction procedures, do a good job in issuing and receiving drawings, design clarification, and joint checkup of drawing.

施工技术管理,按施工程序办事,搞好图纸的收发、设计交底和图纸会审以及各专业之间的核对。

Strengthen management of technical archives and work out strict management regulations. All minutes of meetings, negotiation records, design variations and engineering liaison letters, relating to field representatives of FW and design institute, shall be submitted to documentor who shall issue them as controlled files when handing over the construction project to Owner.

严格技术档案管理制度,凡与FW、设计院现场代表的会议纪要、谈判纪要、设计变更、工程联络笺必须交付资料员作为受控文件签发,并作为施工交工的依据。Establish warehouse for equipment and materials and perfect regulations for material storage and issuance. All materials such as pipes, tightening materials, welding rods etc. shall have product certificate and material specification, and shall be placed, stocked, marked and registered after being classified. As for welding rods or wires, management shall be executed as per the requirement of “regulations for stocking, drying and issuing welding rods”

建立健全设备、材料的仓库、保管和领用制度,所有入库管材、紧固件、焊条、焊丝、型材以及设备等均应有合格证、材质说明书,并按材质、规格分类堆放、保管,登记上卡。焊条、焊丝的管理、收发按《焊条的保管、烘干和领用制度》执行。

Take strict measures to prevent common quality faults and unstable procedures and punish personnel or departments who ignore rectification in potential quality perils

在施工过程中要认真执行“三检一证”制度,严格“共检点”制度,工序完工特别是隐蔽工程必须按程序进行质量检查和验收,凡不符合质量标准的工序不转序、不验收。Unpacking and receiving check shall be done after equipment is transported to construction field. For heavy equipment, transportation routes and placement locations shall be designed in order to prevent equipment from being transported

and/or placed again.

对质量通病和质量不稳定的工序应严格要求,并采取预防性措施。如加强焊工的持证上岗和焊条二级库的管理。实物质量否决权,凡质量不合格,质检人员拒绝签字,对质量隐患不及时整改或弄虚作假人员或单位,采取经济处罚。

设备到货后要做好开箱清点、验收交接工作,对大型设备进场要事先规划如进场路线及放置的位置,减少现场的二次搬运。

Project construction quality joint- inspection items classification

工程质量共检点分级表

品质部年度工作计划书.

2011年品保部工作计划 根据公司质量方针和质量目标,制订并组织实施本部门的质量管理计划和目标,开展标准化体系的完善、维持以及产品的标准管理、产品质量事故处理等工作;开展进料、成品和生产过程检验、样品检测等工作,,提高工作效率和服务质量,以满足公司各部门业务和客户的需要。 目前,SCC工厂品质部仅有1人,但是职责范围甚广,包括:进料,制程,成品,出货,投诉处理,还要包括体系完善,部门建立等,而当生产规模逐渐扩大,产品越来越丰富,业务量就会越来越大,后期发展需要,品质部还需增加人员. 为了保证后续生产规模的扩大,计划使用生产部自检 +品质部(生产巡检 + 成品检验 + 出货确认): 序 号 工作内容执行周期 每天 每 周 每 月 每 季 半 年 每 年 每 批 即 时 平 时 1 体系的完善. 2 技术要求及标准等信息的收集整 理 3 制定质量改进计划并推进 4 参与生产工艺研究,落实相应产 前准备 5 根据要求制定相应检验标准(和 研发讨论) 6 样品以订单检验 7 来料异常处理 8 供应商质量管理,并参与合格供 应商的评定

9 生产现场巡视 10 让步接收批准与否决 11 不合格品标识处理 12 客户投诉处理 13 质量事故处理 14 质量异常现场分析 15 负责计量器具检定周期 16 质量工作总结与汇报 17 负责相关文件,记录,信息的管理和追踪 18 预防与纠正措施的实施和效果确认 19 6S 的实施与监督 20 参加工作例会 21 完成上级临时交办任务 目前现状和后续跟进 序号 项 目 执行情况

质量部工作计划

质量部工作计划 质量部工作计划1 一:现状 1:QC人员能力(包括:专业技能,工作岗位技能,制程控制能力等)较差,有待于培训,另:现QC人员流动性较大,现有QC较多为辞工快到期者,目前急需新招人员填补。2:现场5S工作做得不够到位。 3:生产部人员品质意识不到位。管理人员在生产作业手法及产品生产过程中品质自行检查没有很好的培训员工,没有落实到位。 4:生产部人员与品质部人员配合度不够好,对品质部人员提出的要求不够重视。 5:作业人员未戴手指套或手套作业,对品质存大很大隐患,(尤其为注塑部最为严重) 6:装配现在还处在于组合式作业方式(几个人围在一堆作业),第一,生产效率低下,第二:品质存在重大隐患,得不到保障。应该采取排拉式生产。 7:各部门人员自身工作认知度不够。 8:新产品前期开发准备工作做得不够到位,品质标准不够明确及统一,很多产品没有检验标准。 9:各部们间沟通不到位,对客户投诉不够重视。缺乏向心力,执行力。 二:目前品质人员编制 1:经理:1人,组长:2人,领班:1人,客诉:1人。 2:IQC:1人,注塑QC:2人,印刷QC:1人,喷涂QC1人,装配QC1人, 3:线检(全检)员:5人——喷涂3人,印刷2人。 共:16人次。

计划品质部人员编制架构图 品质经理:1人,QE工程师:1人,品质组长:2人,领班:1人,QA:1人, 7人(注塑QC:2人待招,喷涂QC:1人待招)QC: 6人——喷涂:3人,印刷:2人,装配:1人(线检:2人待招)线检: 三:对品质部各组人员要求 质量部工作计划2 1. 加强对检验员质量意识和技能的培训,提高检查员的责任意识和控制能力,减少错检漏检事件的发生,降低质量损失。 2. 重新梳理检验员的工作职责,明确各检验员的工作内容。 3. 重新整理检验标准和操作方法,将已发生过的不良品照片和资料收集汇总,作为检验参照控制的资料,提高检验员快速识别产品不良现象和控制不良现象发生的能力。 4. 开展查库工作,实施过程工序尺寸稳定性检查工作。 5. 继续完善规范质量统计术语和格式设计,提高统计的准备性和数据的真实性,为质量持续改进对策提供事实数据。 6. 多做简易量检具,提高检验员的工作效率。 7. 制定20xx年度量检具周期检定计划并实施。 8. 制定20xx年度体系审核计划,整理TS体系审核资料。 9. 配合采购部加强对供应商的考核和质量意识施加影响,提高供应产品质量。 10. 加强过程控制,对工序废品率高的过程进 质量部工作计划3 XXXX年是全新的一年,公司质保部将以崭新的环境为契机,积蓄内力,夯实基础,着力做好质量管理的基础建设工作,努力营造良好的生产运作环境,坚持以科学的质量策划为基石,有序可控的过程管理为手段,完善的质量体系为保障,塑造良好的质量形象,提高公司在重要客户中的战略地位,降低内外部故障成本,增强顾客满意。

品质部工作计划

品质部工作计划(一) 为了提高物业整体工作质量,更好地为公司持续发展培养优秀人才,20XX年,品质培训部将在上一年度工作基础上,立足公司发展,创新工作形式,拓展工作的深度和广度。20XX年度工作计划如下所示:(一)继续贯彻质量环境管理体系 组织所有品质管理人员(含物业处办公室主任、管理部长、维修部长、项目经理)参加标准体系培训,深入研究讨论。贯彻质量环境管理体系要求,按照ISO9001和ISO14001体系标准,强化管理,提升物业服务水平。 (二)创优工作 抓好物业处创优工作,适时、适宜的提供指导和服务;分批次组织创优项目员工赴物业管理优秀示范项目参观学习,提升认识,为创优工作顺利进行创造有利条件。 (二)经理绩效考核 根据各物业处、职能部门不同情况修订完善考核标准和体系,明确考核人员、考核方法、考核时间等,促进考核工作制度化、规范化。 (三)品质检查工作 每月采用日常检查与不定期暗访、夜查相结合方式,利用作业记录、工作巡查记录等相关记录,将检查发现的问题追本溯源,彻底整改,杜绝隐患。 (四)满意度调查 上、下半年各进行一次入户满意度调查,据调查数据分析物业服务存在的问题。将业主提出的问题和建议整理分类,需要改进的积极整改,有待提升的服务进一步规范。 (五)经理级外出考察

组织经理级以上员工外出参观,学习一流物业服务企业的管理模式和管理经验,促使经理提高意识、看到差距,主动查找不足,不断提升物业服务与管理水平。 (六)物业全员知识竞赛 完善物业试题库,并发放至各物业处自行组织学习,拟于下半年举办一次全体员工物业知识竞赛,增强员工的学习意识,普及物业专业相关知识,进而提升物业员工专业素养。 品质部工作计划(二) 斐然的20XX已经过去,在过去的这一年里,我们的工作是值得肯定的,每一个发展和进步,都与领导的关怀指导和全体员工的积极努力分不开的;也有一些工作给我们留下了深刻的教训。为了在新的一年里更好地打造“**物业”服务品牌,树立良好的服务口碑,我们满怀信心,将每件事做的更好,迎接我们的将是灿烂辉煌的20XX。现对20XX年的工作展望如下: 一、全面推行品质管理体系,构筑**物业服务品牌 为了让**物业品牌更上一个新的台阶,健全各岗位工作手册,完善管理职能,实现规范化运营。打造一支强有力、高素质的物业服务队伍。品质部根据**物业20XX年物业公司服务战略方案,制定了20XX 年品质管理体系运行方案。主要目的是:第一,为岗位员工工作提出岗位要求和提供工作指引,以提高岗位工作能力和工作质量;第二,作为各岗位工作考核的重要依据之一,通过对岗位员工工作完成量、工作质量以及岗位目标是否实现,来判定员工工作是否称职和素质能力级别;第三,为公司物业服务积累经验财富,每一项管理工作,都会有其自身管理特点和关注焦点。 为了更好的全面运作质量管理体系,品质部将做好各岗位工作手

质量部门工作计划

质量部门工作计划 质量部门工作计划 光阴如水,我们的工作同时也不断更新迭代,是时候开始制定工作计划了。但是工作计划要写什么内容才是正确的呢?以下是为大家收集的质量部门工作计划,欢迎阅读与收藏。 质量部门工作计划1 20xx年,我们质量管理办公室将根据公司的年度工作要点,紧紧围绕公司“改革、发展、质量、效益”的总体要求,认真做好质量体系的管理工作,积极开展质量管理活动,确保公司员工教育与培训质量管理体系持续、有效的运行。 一加强部门管理工作,努力提高部门人员的综合素质和管理水平本年度将根据公司学习计划的总体安排,认真组织部门所属人员进行技能学习,使部门人员能深入公司的路线、方针、政策,关注时事,与时俱进。并结合部门工作特点和实践经验,不断强化服务意识、质量意识,在提高管理水平的同时,认真学习质量体系文件,深入研究质量管理的新方式、方法,不断提高综合素质,努力推动我部门的质量管理工作再上新台阶。 二加大质量体系的执行力度,进一步强化全员质量意识 本年度,质管办将在开展各种质量管理活动中,对各受控部门进一步加强体系文件的宣贯和学习指导,并要求各受控部门及分承包方对所属人员定期进行集中学习,对新引进人员、转岗人员及时进行质

量培训。通过各种形式的宣贯,努力使各受控部门和人员能及时、准确地掌握外审后修订的文件、新增部分乃至整个体系文件的内容和特点,严格按文件规定的要求开展日常工作,进一步强化全员质量意识,确保公司质量体系得到持续、有效的运行。 三认真组织内部审核和管理评审工作,严格实行质量管理 根据公司内部质量审核程序和管理评审程序的规定,本年度我部计划安排两次内部审核和一次管理评审工作,质管办将从质量活动的组织、开展形式、内容和审核、评审过程等各个环节进行规范化,严格执行文件要求和质量管理。内审的重点是审核体系文件的符合性和贯彻培训情况,检查质量管理记录填写的情况和不合格项纠正的情况,检查质量体系运行的有效性和连续性。同时,协助有关职能部门,对分承包方提供的服务开展评估工作。在内审中发现的不合格项和缺陷情况时,将及时督促纠正。在管理评审中,将对质量体系运行的有效性予以分析、评价,研究并改进内审中出现的问题,分析不合格项产生的原因及体系运行方面的缺陷等。并将通过管理评审工作总结经验,为下一年开展质量管理工作提供借鉴。 四做好各项预备工作,推进质量管理全员化 本年度,质管办将依据管理者的要求,努力推进质量管理全员化工作。一是认真开展调查与研究,主动与主管部门联系,到兄弟公司参观学习;二是根据我们部的机构设置和工作实际,制定全员质量管理的可行性方案,采取新的管理模式。三是落实质量文件的起草、汇编、定稿等工作。

生产计划与控制测试题

一 三、多项选择题(每小题1分,共10分) 1.ABCE 2.ABD3.ADE4.CDE 5.ABC 6.ABCD 7.ABDE 8.ABCD 9.BCE 10.ABE 四、填空题(每空1分,共16分) 1.完好2.报废更新3.综合4.物资库存5.构成6.分开 7.计划8.层次9.MRP 10.生产顺序11.产品出产进度计划 12.正态分布13.研讨性方法14.技术设计15.生产管理16.周期变动 五、名词解释(每小题3分,共12分) 1.是指为了维持设备所规定的机能,在规定的时间内,按规定的检查标准(内容)和周期,由操作工或维修工凭感觉和简单的测试工具,对设备进行检查,并依据标准判断设备的技术状况和决定维护检修工作的设备维护管理制度。 2.是在工艺消耗定额的基础上,按一定比例加上各种非工艺性消耗而制定的定额。 3.在生成物料需求计划之后,对生产这些物料所需要的生产能力进行计算,即制定生产能力需求计划,然后检查这个计划的可行性,若存在不可行之处,就返回去修正计划,在达到满意的平衡后,进入车间作业控制子系统,监控计划的实施过程。 4.就是按照生产工艺的特点划分生产单位,例如,铸造车间、机械加工车间或车床组、磨床组等。 六、简答题(每小题6分,共12分) 1.(1)产品图样的工艺分析检查产品结构的工艺性和经济性。 (2)拟定工艺方案指出产品试制的技术关键及其解决方法,规定工艺工作应遵守的基本原则。 (3)制定工艺文件,编制工艺规程为安排生产作业计划、调度、质量控制、原材料供应等提供依据。 (4)工艺装备的设计与制造指实现工艺过程所需的工具、夹具、模具、量具的设计与制造,以保证加工质量和提高效率。 (每点1.5分) 2.工业企业生产能力指一定时期内,企业的固定资产在正常的技术组织条件下所能生产某类型产品的最大数量。(1.5分) 决定生产能力的因素包括: (1)设备数量。有些工艺过程象铸造、铆焊、装配等则用生产面积表示。(1.5分) (2)设备有效工作时间。(1.5分) (3)设备的生产率定额。(1.5分) 七、论述题(10分) 1.常用的时间序列分析的预测方法有简单移动平均法、加权移动平均法、指数平滑法和季节因素调整法等。 2.(1)简单移动平均法适用于主要存在随机变动的时间序列。该法取最近若干期数列的平均数作为本期的预测值。而取平均数的作用是消除数列的波动。故当时间序列呈现出明显的趋势变动和季节变动时,会使预测误差较大,而不能应用。 (2)加权移动平均法适用于存在多种变动因素的场合。因它是按不同时期的不同重要性给予不同的权重,然后计算加权平均数作为本期的预测值。故可根据时间序列的特点调整权重的分配使它能较适当地反映时间序列的变动。 (3)指数平滑法的作用与加权移动平均法相似,它是通过调整平滑系数来起到反映时间序列特点的作用。 (4)季节因素调整法适用于存在很强的季节变动的时间序列。因它能求出季节因子,并用季节因子对变化的平均趋势进行调整,因而能较精确地预测出季节变化。 八、计算题(共15分) 1.(1)方案Ⅰ成本、生产率 (2 + 2)×10000 + 10000 = 50000 r1 = (5×10000)/50000 = 1(2分) (2)方案Ⅱ成本、生产率 (1 + 1)×10000 + 3000 + 11000 = 34000 r2 = (5×10000)/34000 = 1.47(2分) (3)方案Ⅲ成本、生产率 (0.5 + 0.5)×10000 + 14000 + 11000 = 35000 r3 = (5×10000)/35000 = 1.42(2分) (4)选方案Ⅱ,当生产率为1.5时,应生产产量为Y 1.5 = 5y/(2y + 14000)= 10500(件)(4分) 一、名词解释 1、独立需求:是指需求量和需求时间由企业外部的需求来决定,对它的需求与其它种类的需求无关,其 需求具有随机性、不确定性,是企业自身不能控制的需求。 2、相关需求:是指某种需求与其它需求具有内在的相关性,可根据物料之间的结构组成关系由独立需求 的物料所产生的需求,例如,半成品、零部件、原材料等的需求。 3、精良生产(Lean Production,LP):是一种由日本企业实施,由美国总结提出的精简式管理方式。LP通 过系统结构、人员组织、运行方式和市场供求等方面的变革,使生产系统能很快适应用户需求不断变化,并能使生产过程中一切无用、多余的东西被精简,最终达到包括市场供销在内的生产的各方面最好的结果。 4、JIT——即Just In Time是20世纪80年代初日本丰田汽车公司创立的一种生产管理技术。JIT的基本思 想是“只在需要的时候,按需要的量,生产所需的产品”。JIT的管理理念是在正确的时间、正确的地点干正确的事情,以期达到零库存、无缺陷、低成本的理想生产模式。 5、“拉式生产”:是一种下“求”上“供”的生产方式,如由销售拉动总装,总装拉动部件装配,部件装配拉 动零件加工,零件加工拉动采购的从后续工序拉动前道工序的生产模式。实现将必要的材料和零件,以必要的数量,在必要的时间,送达必要的地点,即一切生产活动包括制造、搬运、交货、供应,只有在需要产生时才发生,是用需求触发和拉动生产活动。 6、“推式生产”:是由生产计划部门计算每种零部件的需要量和各生产阶段的生产提前期,确定每个零部 件的投入生产计划,按计划发出生产和订货指令,每个车间按指令进行生产,并将实际完成反馈到计划部门,不管后车间和后工序是否需要,均将生产完的零部件送到后车间和后工序。 7、客户关系管理(Customer Relationship Management,CRM):是一种旨在改善企业与客户之间关系的新 型管理机制,实施于企业的市场营销、销售、服务与技术支持等与客户有关的领域。CRM的目标是一方面通过提供更快速和周到的优质服务吸引和保持更多的客户;另一方面通过对业务流程的全面管理降低企业成本。CRM既是一种概念,也是一套管理软件和技术。 8、供应链管理(Supply Chain Management,SCM):是以市场需求和客户需求为导向,以核心企业为盟主, 以提高市场占有率和获取最大利润为目标,以协同商务、协同竞争和双赢原则为商业运作模式,通过全面运用现代企业管理思想、方法和手段,达到对供应链上的信息流、物流、资金流、业务流和价值流实行有效的规划和控制,从而将客户、研发中心、供应商、制造商、销售商和服务商等合作伙伴连成一个完整的网链结构,形成一个极具竞争力的战略联盟。 1、财务会计:主要为企业外部提供财务信息的会计事务称为财务会计。 2、管理会计:主要为企业内部各级管理人员提供财务信息的会计事务称为管理会计。 二、填空 3、MRP编制零件的生产计划和采购计划的依据是主生产计划(MPS)、物料清单(BOM)和库存信息。 4、闭环的MRP在MRP的基础上主要补充了能力计划和信息反馈功能。以解决计划的可行性;并通过信息反 馈,以了解计划和实际执行情况。 5、ERP中的计划层次有五层,第一层至第五层分别是:经营规划、销售与运作规划(生产大纲)、主生产计划、 物料需求计划和车间作业计划。 6、在的五个计划层次中,经营规划和生产大纲带有宏观规划的性质;主生产计划是宏观向微观过渡的中 间层计划;物料需求计划和车间作业计划是微观计划,是具体的详细计划。 7、在ERP系统中,在第1时区生产计划变动的审批权是厂长;在第2时区生产计划变动的审批权是主生产计 划员;在第3时区生产计划变动的审批权是计划员。 8、ERP中,生产规划用以协调满足经营规划所需求的产量与可用资源之间的差距。 9、ERP中,主生产计划是企业生产计划大纲的细化,用以协调生产需求与可用资源之间的差距。 10、ERP中,物料需求计划(MRP)主要用于协调物料需求和库存之间的差距。 11、ERP中,能力需求计划(CRP)用以协调生产能力和生产负荷的差距。 12、ERP车间作业控制的主要信息依据包括MRP生成的建议计划或确认计划及人工添加的定单、工艺路线、 工作中心以及工艺装备或工具文件。13、ERP (Enterprise Resource planning)企业资源计划中的成本包括标准成本、现行标准成本、模拟成本和 实际成本四种基本成本类型。 14、ERP中产品成本的计算,按其所包括的范围可分为完全成本计算、变动成本计算和制造成本计算三种。 15、JIT的管理理念是在正确的时间、正确的地点干正确的事情,以期达到零库存、无缺陷、低成本的理想生 产模式。 16、JIT与MRP有何区别在于前者是一种“拉动式”生产方式,而后者是一种“推动式”生产方式。 17、精益生产强调消除的七种浪费是:库存、搬运、返工、过量生产、多余的动作、等待和过程不当。 18、CIM(计算机集成制造)哲理中最突出的两个观点是系统观点和信息观点。 19、三、简述 1、库存有哪些作用和弊端: 答:库存的作用是维持销售产品的稳定、维持生产的稳定、平衡企业物流、平衡流通资金的占用,弊端是:占用企业大量资金、增加了企业的产品成本与管理成本、掩盖了企业众多管理问题,如计划不周、采购不力、生产不均衡、产品质量不稳定、市场销售不力等。 2、MRP的前提和假设是什么? 答:MRP的前提和假设是:要有一个生产计划,即要有一个关于生产什么产品和什么时候产出的权威计划;要求赋予每项物料一个独立的物料代码(包括原材料、零部件和最终产品);计划编制期间必须有一个通过物料代码表示的物料清单,它指出某一产品的所有构成项目和结构关系(隶属关系);要有完整的库存记录;物料的提前期是已知的或可以估计的,且数值唯一。 3、MRP的基本原理是什么? 答:MRP基本原理是:将企业产品中的各种物料分为独立物料和相关物料,并按时间段确定不同时期的物料需求;基于产品结构的物料需求组织生产,根据产品完工日期和产品结构规定生产计划;从而解决库存物料订货与组织生产问题。 4、MRP、闭环的MRP的主要缺陷分别是什么? 答:MRP的主要缺陷是:没有考虑到生产企业现有的生产能力和采购的有关条件的约束。因此,计算出来的物料需求的日期有可能因设备和工时的不足而没有能力生产,或者因原料的不足而无法生产。同时,它也缺乏根据计划实施情况的反馈信息对计划进行调整的功能。 闭环的MRP的主要缺陷是:闭环的MRP仅仅涉及物流,并未涉及资金流,企业的经营规划与生产规划分别制订,互不相关。因而不清楚计划执行后能给企业带来多大效益。在许多企业中,财务信息是由财会人员另行管理,造成了数据的重复录入与存贮,甚至造成数据的不一致性。 5、与MRP相比,MRPII具有哪些显著特征? 答:与MRP相比,MRPII不仅是一个计划系统,更是一种管理模式。MRPII管理模式具有下列显著特征:①计划的一贯性;②计划的可执行性;③管理的系统性;④物流与资金流的统一⑤数据的共享性;⑥动态应变性; ⑦模拟预见性。 6、MRPII在闭环的MRP的基础上补充了哪些功能? 答:MRPII在闭环的MRP的基础上,把企业生产、财务、销售、采购等各个子系统集成起来形成一个面向整个企业的一体化的系统。其中,生产和财务两个子系统更密切。同时,MRPⅡ具有模拟功能,能根据不同的政策方针模拟出未来将会发生的结果;MRPⅡ的所有数据来源于企业的中央数据库,各子系统在统一的数据环境下工作。 7、ERP的实施一般包括哪些主要环节? 答:ERP的实施一般包括以下几个主要环节:①原理培训、企业诊断、需求分析、软件选型等前期工作;②软件产品培训、数据准备、系统安装调试、软件原型测试等实施准备工作;③程序员培训、工作准则与工作规程制定、模拟运行及用户化开发等实施工作;④以及系统切换运行和新系统运行等。 8、简述“精良生产”的特点? 答:精良生产的主要特点包括:强调人的作用,推行“以人为中心”的管理;改变传统观念,永无休止地、无情地消除浪费,以尽善尽美作为追求目标;实现生产过程的同步化;将“推式”生产控制系统变为“拉式”生产控制系统。 单选题 1、在定期控制系统中,企业补充库存的订货方法为( B)。 A.当库存余量下降到订货点时,向供应商发出固定批量订货请求 B.每经过一个固定的时间间隔,企业就发出一次订货将现有库存补充到一个最高水平 C.采用“双堆法”进行库存控制 D.每日都需要进行库存补充 2、库存品的ABC管理方法中,对于A类物品的管理策略有(D )。 A.按品种大类进行控制 B.采用集中大量订货的方式 C.采用“双堆法”进行库存控制 D.按最优订货批量,采用定期订货的方式 3、.大批量生产多使用专业化的机器设备,并按照产品原则布置,其典型的排序方法是( A)。 A.有限负荷、前向排序 B.有限负荷、后向排序 C.无限负荷、前向排序 D.无限负荷、后向排序 4、主生产计划的对象主要是(A )。 A.具有独立需求的物料和比较重要的物料 B.物料需求计划 C.企业主生产车间的生产计划 D.企业的生产流程 5、.在网络图中,关键路径是指(C )。 A.最早开始的那条路径 B.总时间最短的那条路径 C.总时间最长的那条路径 D.最迟开始的那条路径 6、在ABC分类法中,B类库存品的确定标准是累计品目百分数为20%—30%,而平均资金占用额累计百分数为(B )。 A.5%—15% B.20%—30% C.60%—80% D.50%—60% 7、在制造业企业中,主要用于确定每次订货所需的产品数量和交货日期的计划类型是( C)。 A.物料需求计划 B.生产作业计划 C.主生产计划 D.流程规划 8、在纯项目的组织结构中( C) A.每一个项目都归属于一个职能部门 B.执行每个项目时可以从不同的职能部门抽调员工 C.独立的项目小组负责项目中的全部工作 D.职能部门的管理者控制人员与技术 9、表示质量特性波动与其潜在原因关系的图称为( C)。 A.调查表 B.排列图 C.因果图 D.直方图 10、根据经济订货批量模型,当每次的订货费用增大时,经济订货批量应该( A)。 A.增大 B.减小 C.先增大后减少 D.不一定 11、在项目的组织结构中,专业化程度最高的组织形式是( D)。 A.纯项目制 B.直线制 C.职能项目制 D.矩阵制 12质量管理发展的最初阶段——质量检验阶段,对产品质量的检验方式为(B )。 A.半成品抽样检验 B.成品100%全检验 C.成品抽样检验 D.半成品100%全检验 13、服务企业往往通过哪种方式对顾客进行排程,以控制顾客到达时间,从而有效利用服务能力。(D) A.顾客排序系统 B.信息管理系统 C.排号系统 D.预约系统 14、.实行全面质量管理,放在第一位的应该是(D )。 A.质量统计数据 B.全企业参与 C.预防在前 D.用户需求 15、企业为持有和保管库存而发生的成本支出为( A)。 A.持有成本 B.准备成本 C.订货成本 D.缺货成本 16、一般而言,小批量生产的产品种类较多,自动化程度较低,其典型的排序方法是( C)。 A.有限负荷、前向排序 B.有限负荷、后向排序 C.无限负荷、前向排序 D.无限负荷、后向排序 17、ISO是哪个组织的简称?(D ) A.国际质量协会 B.国际标准化理事会 C.国际质量保证技术委员会 D.国际标准化组织 18、统计质量控制阶段的主要特点是(A )。 A.用统计学的技术和工具进行质量控制 B.强调生产和检验人员间的分工 C.重结果,轻预防 D.凭借个人的经验和判断进行质量控制 19、在三点时间估计法中,最乐观时间指的是(B) A.在最正常情况下完成一项活动所需要的时间 B.在最有利的条件下顺利完成一项活动所需要的时间 C.在最不利的情况下完成一项活动所需要的时间 D.在一般的情况下完成一项活动所需要的时间 20、MRP系统的主旨是(B )。 A.降低库存水平 B.使合适的物料在合适的时间到达合适的地点 C.确定产品生产的优先等级 D.保证生产销售的均衡 21 看板管理系统中,“取货指令”的使用规则是(C ) A.前一道工序根据“看板”的种类和数量生产 B.逐步增加看板数量 C.后一道工序按照“看板”到前一道工序去领产品 D.必须生产百分之百的合格品 22、准时生产制中的“浪费”指的是( D)

品质部年度工作计划书5篇

品质部年度工作计划书5篇 全员服务质量管理。把诉求服务和业主(用户)满意度作为服务质量管理的源头。突出主动服务、及时服务、温馨服务。下面就是小编给大家带来的品质部年度工作计划书,希望能帮助到大家! 品质部年度工作计划书1 一、协助总经理对公司现行质量管理体系进行审核,评估,构建与企业相符的质量管理体系并持续改进。 2. 建立组织内部协调一致的质量管理目标。 3. 重视并做好内部质量审核,充分利用质量管理体系这个有效的管理手段,促进内部体系的保持和持续改进。 4. 建立相应的组织程序,培训人员,制定计划,实施质量管理体系。 5. 协助总经理确保质量管理体系的实施和持续改进过程得到必要的支持。 6. 定期向总经理汇报质量管理体系的业绩,包括改进的需求,以事实为依据,确保企业产品质量的持续改进,使之与客户要求相适应。 二、内部审核 1 制定并审核企业年度内审计划和审核实施计划以供总经理批准.

2 拟定内部质量管理体系审核报告. 3 协助总经理定期召开管理评审会议. 4 全面负责内部质量管理体系审核工作. 5 担任审核组长并选定审核员,并制定年度内审计划、每次的审核实施计划和内部质量管理体系审核报告. 6 指导编写《年度内审计划》并负责组织实施. 7 组织、协调内审活动的开展. 三、实现质量计划目标 1.审查各有关部门编制的质量计划. 2.负责对各部门质量策划的实施情况进行监督检查. 3.协助各部门负责人制定相关的质量策划及编制、实施相应的质量计划。 四、处理好与顾客有关的质量问题 4. 协助营销部,识别顾客的需求与期望,组织有关部门对产品需求进行评审,并负责与顾客进行质量方面的沟通. 5. 评审对新产品质量要求的检测能力. 6. 协助技术部评审新产品的设计开发能力. 7. 协助生产部评审产品的生产能力及交货期. 8. 协助采购部负责评审所需物料采购的能力. 9. 审查特殊合同的产品要求评审表. 五、质量标准制定和实施 3.

品质部年度工作计划(新版)

品质部年度工作计划(新版) Through the work plan, you can make a plan for future work and work out a detailed plan; the work plan function greatly improves work efficiency. ( 工作计划) 部门:_______________________ 姓名:_______________________ 日期:_______________________ 本文档文字可以自由修改

品质部年度工作计划(新版) 导语:通过工作计划,可以对未来工作进行一个规划,制定出详细计划;这样能让工作更有条理性,还能对工作进行全局的管理,可以更好的应对工作中遇到的问题,工作计划功能对提升工作效率有很大提升。 品质部年度工作计划(一) 一、质量管理体系审核 1、协助总经理对公司现行质量管理体系进行审核,评估,构建与企业相符的质量管理体系并持续改进。 2、建立组织内部协调一致的质量管理目标。 3、重视并做好内部质量审核,充分利用质量管理体系这个有效的管理手段,促进内部体系的保持和持续改进。 4、建立相应的组织程序,培训人员,制定计划,实施质量管理体系。 5、协助总经理确保质量管理体系的实施和持续改进过程得到必要的支持。 6、定期向总经理汇报质量管理体系的业绩,包括改进的需

求,以事实为依据,确保企业产品质量的持续改进,使之与客户要求相适应。 二、内部审核 1、制定并审核企业年度内审计划和审核实施计划以供总经理批准、 2、拟定内部质量管理体系审核报告、 3、协助总经理定期召开管理评审会议、 4、全面负责内部质量管理体系审核工作、 5、担任审核组长并选定审核员,并制定年度内审计划、每次的审核实施计划和内部质量管理体系审核报告、 6、指导编写《年度内审计划》并负责组织实施、 7、组织、协调内审活动的开展、 三、实现质量计划目标 1、审查各有关部门编制的质量计划、 2、负责对各部门质量策划的实施情况进行监督检查、 3、协助各部门负责人制定相关的质量策划及编制、实施相

企业生产计划与控制方法

企业生产计划与控制方法 企业生产计划与控制方法 电力企业的生产计划,安排出发点根据本地萄重要人口,居民用电情况,根据本地区企事业单位量多少,再余富一些来进行生产安排,黑龙江地区发电生产计划基本以火力发电为主,南方则从水力发电,风力发电,核发电为突出的特点,由于发电的手段不同,生产计划与生产过程供应的原材料就存在很大的差差异和价格因素。 1.MPS作用与意义 主生产计划是按时间分段方法,去计划企业将生产的最终产品的数量和交货期。主生产计划是一种先期生产计划,它给出了特定的项目或产品在每个计划周期的生产数量,这是个实际的详细制造计划,这个计划力图考虑各种可能的制造要求。 2.MPS编制的基本原则 2.1全面代表原则 计划的项目应尽可能全面代表企业的生产产品。MPS应覆盖该MPS驱动的MRP程序中尽可能多数组件,反映关于制造设施,特别是瓶颈资源或关键工作中心尽可能的多的信息。 2.2适当稳定原则 在有效的期限内应保持适当稳定,主生产计划制订后在有效的期限内应保持适当稳定,那种只按照主观愿望随意改动的做法,将会引起系统原有合理的正常的优先级计划的破坏,削弱系统的计划能力。 2.3适当裕量原则

留有适当余地,并考虑预防性维修设备的时间。可把预防性维修作为一个项目安排在MPS中,也可以按预防性维修的时间,减少工 作中心的能力。 2.4关键项目原则 列出对生产能力,财务指标或关键材料有重大影响的项目。对生产能力有重大影响的项目,是指那些对生产和装配过程起重大影响 的项目,如一些大批量项目,造成生产能力的瓶颈环节的项目或通 过关键工作中心的项目。而对于关键材料而言,是指那些提前期很 长或供应厂商有限的项目。 2.5最少项目原则 用最少的项目数进行主生产计划的安排。如MPS中的项目数过多,就会使预测和管理都变得困难。因此,要根据不同的制造环境,选 取产品结构不同的级,进行主生产计划的编制。使得在产品结构这 一级的制造和装配过程中,产品(或)部件选型的数目最少,以改进 管理证券交易审与控制。 2.6对于关键材料而言,是指那些提前期很长或供应厂商有限的 项目。 3.主生产计划的主要对象 3.1在为库存而生产(MTS)公司 用很多种原材料和部件制造出少量品种的标准产品,则产品,备品备件等独立需求项目成为MPS计划对象的最终项目。对产品系列 下有多种具体产品的情况,有时要根据市场分析估计产品占系统产 品总产量的`比例。此时,生产规划的计划对象是系列产品,而MPS 的计划对象是按预测比例计算的。产品系列同具体产品的比例结构 形式,类似一个产品结构图,通常称为计划物料或计划BOM。 3.2在为订单生产(MTO)的公司 最终项目一般就是标准定型产品或订货要求计划的产品,MPS的 计划对象可以放在相当于T形或V形产品结构的低层,以减少计划

工作计划 品质部2021年工作计划

品质部xx年工作计划 质量部xx年度工作计划 为了有计划的开展xx年度的质量管理工作,稳步提升中心的质量管理水平,进一步完善中心质量管理体系,规范中心的质量管理工作,特制定本年度工作计划。 一、指导思想 推动质量方针和质量目标指标的完成,促进质量管理水平的提升及质量管理体系的持续改进,履行质量承诺,确保检验工作质量,满足客户需求,确保对社会出具第三方数据的公正性。 二、工作计划 1、完成中心检验资质法人变更手续的工作。 2、建立新的质量管理体系,包括质量手册、程序文件的编写修订,使中心的质量管理体系更加完善。 3、开展年度内审工作一次。 4、开展年度管理评审工作一次。 5、组织开展实验室检测设备的年度检定工作。 6、督促、指导实验室检测设备的年度自校工作。 7、组织进行实验室内部质量监督工作,全年不少于4次。 8、开展一次全面的实验室检验质量控制工作,保证检验质量。 9、组织开展实验设备的期间核查工作,保证设备状态。 10、组织参与省技术监督局等上级单位举办的能力验证、比对试验和考核活动,全年至少一次。

11、积极组织人员学习新的《资质认定管理办法》和新的《检验检测机构资质认定评审准则》,提升中心质量管理水平。 12、完成领导交办的其他工作。 三、工作措施 1、为了强化质量管理能力意识,提升人员职能素养,提高人员质量管理水平,积极组织外派人员学习最新版《检验检测机构资质认定评审准则》及《检验检测机构资质认定管理办法》等,同时在内部开展了相关内容的培训与学习工作。 2、整体规划质量体系的建设并按职能部门将质量职能分解到各部门及相应的人员,做到“人人有职责,事事有依据,作业有标准,层层有监督。” 3、加强日常监督管理,完善质量管理制度,确保中心的质量管理工作连续有效。 xx年2月22日篇二:《品质部xx年工作总结与xx年工作计划》 品质部xx年工作总结与xx年 工作计划 一、质量团队的建设: 1.0 xx年,我们对质量管理团队进行了人员调整,过去的不足,需要进一步优化管理,加强部门能力、细化人员分工;同时在现有人员有限的条件下,我们实施一人多岗制、确保在来料、制程、成品检验每个质控点都有专人负责。

2020年品质部年度工作计划三篇【精品】

品质部年度工作计划三篇 明确工作计划 做好工作计划目标就是一个工作的方向,就可以开展工作。在工作中不能忽视每一个工作细节。学习就是使命,放弃了学习就是放弃进步。学习就是终身任务和长期实践的行为可以贯穿个人的工作始终。做为一个品管职业,那就是要对消费者负责。思想上要高度重视产品要求,达到国家检测标准。把公司产品配合社会共赢的局格。 产前样办标准 认真审核产前样,一旦批办样批准合格后为正确的大货样,只有此办供工厂大货生产用。在大批生产经营之前,还须打一次样,叫做产前样,产前样也称为封样,在制作封样衣时,所有的主敷料都必须用正确物料。 跟踪品质货期 善于用文字和语言与客户沟通。预测加工客户的需求,生产能力及物料的供应情况,便于生产及交货的安排。要对产品尺寸、做工、款式、工艺进行全面细致地检验。出具检验报告书(大货生产初期/中期/末期)及整改意见,经加工厂负责人签字确认后留工厂一份,自留一份并传真公司。 尾期检验要求 1、面料、辅料品质符合我司要求,大货得到我司确认或得到权威认证机构的检验报告; 2、款式配色准确无误; 3、尺寸在允许的误差范围内; 4、做工精良; 5、产品干净、整洁、卖相好;包装美观、配比正确、纸箱大小适合。 常规工作要求 认真做好检查工作,有记录,有评价,找己不足的缺点。要细致严密及时改正工作的不足。使品质能真实有效促进我司的品质要求。树立服务意识,找好位置做好品质部一员好的助手。 工作理念 对所的产品要熟悉,了解产品的原材料特点及成分。知道产品的特点、款式、质量,便于和生产人员的沟通。认真做好每天工作,顺境中不骄不躁,加倍努力学习。

品质沟通分析要求 1:沟通表达能力:有口才、有技巧。善于用文字和语言与客户沟通。品质工作涉及到加工商,沟通语言随和以便做出更快更好的反应和决策。 2:分析能力:分析出加工厂的能力,生产进度与订单交货期相吻合,做到不提前也不推迟。 团队理念 公司是一个团队,同事之间要有宽容他人的胸怀。我们是一个大家庭要相互帮助。每位同事持续创新的思维,如能人尽其才,物尽其用。关键还是要靠公司的'高层管理。我做为公司的一员,我愿尽我所能,尽我所力,专心专注的太态共赢新的格局。 为了做好品质管理部各项工作,达到公司要求的发展目标,现将20xx年度工作计划安排如下: 1月份: 1)完成体系文件的管理评审工作,保证满足体系认证的符合性; 2)准备公司物业资质申报工作,并做好相关的工作; 3)加强与业主的沟通,制定公司工作简报; 2月份: 1)2月底完成体系文件的第二次内审工作;并及时整改和关闭不合格项,力求体系文件运行的完好性; 2)确保大厦评优资料的全面和完整性,有必要向市局提出书面性报告,并协助相关资料的移交工作; 3)完善公司规章制度的内部建设,确保公司工作开展的正常运作; 3月份: 1)做好一切ISO9000质量认证体系的准备工作,并保证认证工作顺利的通过; 2)做好大厦评"区优"的申报工作,同时完善好评优资料的创建工作; 4月至6月:

质量部门工作计划范本3篇

Formulate objectives and tasks and daily work items management, so as to enhance the initiative and make the work orderly. 姓名:___________________ 单位:___________________ 时间:___________________ 质量部门工作计划3篇

编号:FS-DY-20409 质量部门工作计划3篇 质量部门工作计划范文一: 为了提升公司质量管理水平,有计划的开展质量管理工作,推动质量方针和质量目标指标的完成,促进质量管理和质量管理体系的持续改进,增强企业竞争力,增强顾客满意度。特制定20xx年质量管理工作计划,现将我部质量管理工作计划汇报如下: 一、20xx年工作目标 为了贯彻“科学管理,诚信守法、争创优质、持续改进”的质量方针,加强施工质量管理,提高我项目部承担的******工程质量水平,建立健全质量保证体系和质量管理机构,明确施工质量管理职责,实现“工程合格率100%,****、让业主满意。”的质量目标。 二、质量管理规章制度建立及完善 为保证20xx年对施工质量的控制达到规范管理和严格

验收的目的,并且做到有章可依的工作要求,计划制定和健全以下规章制度: (1)质量保证体系 (2)质量管理制度 (3)质量管理措施 (4)质量管理奖惩办法 (5)质量管理工艺策划 (6)质量管理实施细则 三、质量管理组织机构 1、项目经理岗位职责 (1)领导项目部的一切工作,对项目部所承担的施工质量活动全权负责,为质量管理第一责任人,负责质量保证体系的建立和在本单位的有效运行。 (2)负责贯彻质量方针,确保质量目标的实现。 (3)负责质量计划、施工组织设计的审批,并组织实施。 (4)负责配置资源,确保合同顺利实施。 2、工程技术部质量职责 (1)协助内部质量审核和质量体系正常运行,使质量方针

2020年物业公司品质部年度工作计划(新整理)

( 工作计划 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 2020年物业公司品质部年度工 作计划(新整理) The work plan has clear goals and specific steps to enhance work initiative, reduce blindness, and make work proceed in an orderly manner.

2020年物业公司品质部年度工作计划(新 整理) 20xx年物业公司品质部年度工作计划(一) 一、全员服务质量管理。把诉求服务和业主(用户)满意度作为服务质量管理的源头。突出主动服务、及时服务、温馨服务。把责任制作为落实全员服务质量的关键手段。充分调动全体管理者和业主(用户)的积极性和创造性,促进我们的员工不断提高素质,牢固树立“质量第一”的思想,关心物业服务质量,参与质量管理。 物业公司品质部年度工作计划: (一)目标:全面开展品质管理工作,提高服务和管理质量。 (二)工作重点 项目管理处的服务质量是品质管理的核心,公司职能部门的管

理质量是各项目管理处服务质量的保障。因此,品质部将在公司领导的领导下,首先致力做好以下几方面的工作,搞好管理质量: 一、改善职能部门为一线服务的观念,提高团队协作质量。公司的职能部门首先是服务各项目管理处,为各项目管理处提供各项支持;其次才是监控,促成项目管理处各项指标的达到。只有树立了为一线服务的理念,才能营造和谐的工作环境和团队协作关系。管理工作才会更顺畅,更有效。 二、改善业绩观。把员工、业主满意度考核和财务考核放到同等重要的位置上,推行全方位的质量管理。 三、改进管理方式,提高制度执行质量。多到现场去,走动管理,既有利于提高自身,又能帮助一线员工提高现场发现问题、解决问题的能力。改善干部对员工的管理方式。多了解员工的思想动态和工作状态,爱护和激发员工的工作热情和积极性。减少因管理方式不当而伤害了员工的工作热情和积极性。执行制度时,先要沟通,做到准确无误,提高制度执行质量。 四、改进在岗培训方式,提高培训质量。按照员工不同的工作范

品质部2018年度工作计划

XXX品质部 2018年度工作计划

目录 前言 1. 组织架构 1.1 组织架构 1.2 部门职责 1.3 岗位说明 2. 体系管理 3. 标准化管理 3.1 程序流程 3.2 检验标准 3.3 闭环作业 4. 工程项目管理 5. 供应商品质管理 6. 品质控制 6.1 原辅材料控制 6.2 客供料来料品质控制 6.3 包装线品质控制 6.4 出货产品品质控制 7. 生产现场管理

8. 成本控制 9. 客户投诉 10. 检测设备/仪器/工具/治具的管理 11. 文件管理与统计控制 12. 相关部门协调管理 13. 部门目标与绩效考核 13.1 部门目标 13.2 绩效考核 13.3 教育培训 13.4 公司企业文化 14.品质改善活动推进 14.1 QCC品管圈 14.2 5S活动 14.3 改善提案制度 15. 总结

根据公司质量方针和质量目标,制订并组织实施本部门的质量管理计划和目标,组织下属开展标准化体系的完善、维持以及产品的标准管理、产品质量事故处理等工作;组织下属开展原辅材料、客供料来料、成品和生产过程检验、性能检测等工作,保证检验结果的公正性、准确性和及时性,控制检测费用,提高工作效率和服务质量,以满足公司各部门业务和客户的需要。 1.组织结构 目前,品质部人力严重短缺,仅有23人(包括包装部和IQC、OQC、QA、IPQC以及管理人员,实际需要47人才能满足生产要求,欠缺24人),其中 15人为2017年新进员工。2018年计划设置品质部经理1人,品质部QE 1人,品质部领班1人,品质部文控文员兼物理实验室实验员兼生产文员1人,包装组长2人,IPQC(制程巡检员)1人,IQC(来料检验)2人,QA(质量保证检验)4人,OQC(出货检验)2人,包装LQC 12人(每班6人);但是职责范围甚广,包括:进料、包 装、制程控制、入库、出货、性能检测、模具注塑加工、客户投诉处理(含返工和不良品处理),还包括体系建立和完善,体系内审和外审,部门架构建立,制定和评审公司产品品质标准,协助与客户有关产品品质的沟通和谈判,因此,品质管理工作越来越需要系统化,标准化,品质管理者也需要较强的塑胶及电镀生产工艺的基本常识。 1.1组织架构 2018年计划品质部组织架构如下图1: