当前位置:文档之家› 单词积累

单词积累

Supplier Quality Engineer

Responsibilities:

1.This positon reports to Site Manager of the company at the joint venture

2.Supplier quality system and process audit, and supplier performance assess

3.Supplier PPAP technique review/inspection/qualification

4.Create and maintain Receving Inspection Operation Sheets

5.Supplier process capablity study, tracking and improvement

6.Supplier measuring system evaluation and improvement9

7.Supplier quality defects analysis, re-occurrence problems investigation,and c

8.Suppliers training on parts specification, inspection skill and quality tools

9.To conduct failure parts analysis and 8D procedure

10.Suppliers and receiving inspection’s data/files maintenance and managem

11.Report SQA progress on monthly base

Requirements:; m. v6 j+ b

1.University degree majored in mechanical or material engineering7

2.Several years relevant working experiences in supplier quality engineering /

3.Good english skills in reading and writing. Good english speaking is preferab

4.Familiar QS9000 and TS16949 quality standards

5.Good communcaiton and interpersonal skills

6.Willing do to over time work on urgent base

https://www.doczj.com/doc/5515667024.html,puter Operation skill in Win Word and Excel is necessary

PCS Pieces 个(根,块等)

PRS Pairs 双(对等)

CTN Carton 卡通箱

PAL Pallet/skid 栈板

PO Purchasing Order 采购订单

MO Manufacture Order 生产单

D/C Date Code 生产日期码

ID/C Identification Code (供应商)识别码

SWR Special Work Request 特殊工作需求

L/N Lot Number 批号

P/N Part Number 料号

其它

OEM Original Equipment Manufacture 原设备制造

PCE Personal Computer Enclosure 个人电脑外设

PC Personal Computer 个人电脑

CPU Central Processing Unit 中央处理器

SECC SECC` 电解片

SGCC SGCC 热浸镀锌材料

NHK North of Hongkong 中国大陆

PRC People's Republic of China 中国大陆

U.S.A the United States of America 美国

A.S.A.P As Soon As Possible 尽可能快的

E-MAIL Electrical-Mail 电子邮件

N/A Not Applicable 不适用

QTY Quantity 数量

VS 以及

REV Revision 版本

JIT Just In Time 零库存

I/O Input/Output 输入/输出

OK Ok 好

NG Not Good 不行,不合格

C=0 Critical=0 极严重不允许

ESD Electry-static Discharge 静电排放

5S 希腊语 整理,整顿,清扫,清洁,教养

ATIN Attention 知会

CC Carbon Copy 副本复印相关人员

APP Approve 核准,认可,承认

CHK Check 确认

AM Ante Meridian 上午

PM Post Meridian 下午

CD Compact Disk 光碟

CD-ROM Compact Disk Read-Only Memory 只读光碟

FDD Floppy Disk Drive 软碟机

HDD Hard Disk Drive 碟碟机

REF Reference 仅供参考

CONN Connector 连接器

CAV Cavity 模穴

CAD Computer Aid Design 计算机辅助设计

ASS'Y Assembly 装配,组装

MAT'S Material 材料

IC Integrated Circuit 集成电路

T/P True Position 真位度

TYP Type 类型

WDR Weekly Delivery Requitement 周出货需求

C?T Cycle Time 制程周期

L/T Lead Time 前置时间(生产前准备时间)

S/T Standard Time 标准时间

P/M Product Market 产品市场

3C Computer,Commumcation,Consumer electronic's 消费性电子 5WIH When,Where,Who,What,Why,How to

5M Man,Machine,Material,Method,Measurement

4MIH Man,Materia,Money,Method,Time 人力,物力,财务,技术,时间(资源)

SQA Strategy Quality Assurance 策略品质保证

DQA Desigh Quality Assurance 设计品质保证

MQA Manufacture Quality Assurance 制造品质保证

SSQA Sales and service Quality Assurance 销售及服务品质保证

LRR Lot Rejeet Rate 批退率

BS Brain storming 脑力激荡

EMI Electronic Magnetion Inspect 高磁测试

FMI Frequency Modulatim Inspect 高频测试

B/M Boar/Molding(flat cable)

C/P Connector of PC

A/P Assembly

SPS Switching power supply 电源箱

DT Desk Top 卧式(机箱)

MT Mini-Tower 立式(机箱)

DVD Digital Vedio Disk

VCD Vdeio Compact Disk

LCD Liquid Crystal Display

CAD Computer AID Design

CAM Computer AID Manufacturing

CAE Computer AID Engineering

ABIOS Achanced Basic in put/output system 先进的基本输入/输出系统

CMOS Complemeruary Metoll Oxide Semiconductor 互补金属氧化物半导体

Balance between quality and cost

Last day, I visited a supplier again for issue.

The supplier provided us a cable. The cable is very easy to produce. Cut a cable But the supplier won't do and always searches excuse. The supplier said the requ One week ago, the supplier promised they would give a solution this Tuesday. Bu I remembered my fore-boss told me a word. Any problems in business can be sol Then we had a meeting. I confirmed the problem was not and industry standard o Supplier had agreed with us and promised on this Friday it would give a saying. A

It is too tired. But we hope it will keep its words this time.

Your responsibilities will include:-

Provide leadership and direction for all members of the quality assurance work te Maintain contact with customers, suppliers, manufacturing, and other department Manage, monitor and control material, labor, and overhead costs in respective are Lead the development of philosophy and procedures that support the manufactur Lead the effort to internal quality systems that meet or exceed ISO9000 /TS 1694 Direct and manage direct stuff to finish first article inspection for raw material and Handle customer quality complaint, work with other department to find root cause Implement and improve supplier quality system, and do site audit if needed.

The ideal applicant will have the following experience:-

Bachelor or above degree in mechanical engineering or material.

At least 5 years experience in multinational company in automotive industry.

Be familiar with CCC & UL, CSA GB standard for electric products.

Have strong plastics, metal sheet , machining or assembly knowledge.

Be familiar with ISO9000/TS 16949 and supplier quality control system, certified I Good oral English skill is must.

Good communication and team work spirit.

Be willing to work under pressure.

In return, you will be working in a very friendly team environment with a long term

he joint venture

pplier performance assessment

on Sheets

rovement

oblems investigation,and correction / preventive action and on site audit

n skill and quality tools

aintenance and management

al engineering7

plier quality engineering / assurances

nglish speaking is preferable

s necessary

FQC运作类

AQL Acceptable Quality Level 运作类允收品质水准

S/S Sample size 抽样检验样本大小

ACC Accept 允收

REE Reject 拒收

CR Critical 极严重的

MAJ Major 主要的

MIN Minor 轻微的

AOQ Average Output Quality 平均出厂品质

AOQL Average Output Quality Level 平均出厂品质

Q/R/S Quality/Reliability/Service 品质/可靠度服务

MIL-STD Military-Standard 军用标准

S I-S IV Special I-Special IV 特殊抽样水准等级

P/N Part Number 料号

L/N Lot Number 特采

AOD Accept On Deviation 特采

UAI Use As It 首件检查报告

FPIR First Piece Inspection Report 百万分之一

PPM Percent Per Million 批号

制程统计品管专类

SPC Statistical Process Control 统计制程管制

SQC Statistical Quality Control 统计品质管制

R Range 全距

AR Averary Range 全距平均值

UCL Upper Central Limit 管制上限

LCL Lower Central Limit 管制下限

MAX Maximum 最大值

MIN Minimum 最小值

GRR Gauge Reproducibility&Repeatability 量具之再制性及重测性判断量可靠DIM Dimension 尺寸

DIA Diameter 直径

FREQ Frequency 频率

N Number 样品数

其它品质术语类:

QCC Quality Control Circle 品质圈

QIT Quality Improvement Team 品质改善小组

PDCA Plan Do Check Action 计划 执行 检查 总结

ZD Zero Defect 零缺点

QI Quality Improvement 品质改善

QP Quality Policy 目标方针

TQM Total Quality Management 全面品质管理

MRB Material Reject Bill 退货单

LQL Limiting Quality Level 最低品质水准

RMA Return Material Audit 退料认可

QAN Quality Amelionrate Notice 品质改善活动

ADM Absolute Dimension Measuremat 全尺寸测量

QT Quality Target 品质目标

7QCTools 7 Quality Controll Tools 品管七大手法

通用之件类

ECN Engineering Change Notes 工程变更通知(供应商)

ECO Engineering Change Order 工程改动要求(客户)

PCN Process Change Notice 工序改动通知

PMP Product Management Plan 生产管制计划

SIP Specification In Process 制程检验规格

SOP Standard Operation Procedure 制造作业规范

IS Inspection Specification 成品检验规范

BOM Bill Of Material 物料清单

PS Package Specification 包装规范

SPEC Specification 规格

,时间(资源) DWG Drawing 图面

系统

氧化物半导体

y to produce. Cut a cable and clamp terminals on the both ends. But the clamping force is required The supplier said the requirement was beyond the industry standards and it hoped we could provid solution this Tuesday. But on Monday it didn't do anything except saying it was not the industry sta ms in business can be solved by money. Yesterday I accompanyed purchaser to the supplier again ot and industry standard one.It was a balance problem between cost and quality .The supplier sho y it would give a saying. Anyway it should spend money on it.

assurance work team and coordinates the team's efforts with other support areas.

ng, and other department to ensure that quality assurance systems are meeting objectives and co ead costs in respective area. Develop, review and maintain budgets and expenses for department. at support the manufacturing of high quality product through improved processes continuously. exceed ISO9000 /TS 16949 quality assurance standards both internally as well as with suppliers. ction for raw material and finished goods, implement and improve current process quality control s artment to find root cause and provide short term and long term solution,8D will be a tool.

site audit if needed.

material.

automotive industry.

ic products.

bly knowledge.

control system, certified ISO9000 auditor is preferable.

ironment with a long term personal development opportunity in a stable yet fast growing business

性判断量可靠与否

e is required strictly. The first delivery was rejected for the strength NG. And second t

ed we could provide supporting. I said of course we supported them. But the supplier is responsib not the industry standard. I told the purchaser that we coundn't accept the excuse. it is not a proble o the supplier again. Arriving there, I directly went to the workshop. I told them to prepare some ter y .The supplier should solve it soon.Our purchaser said directly. If the supplier couldn't solve it in te

as.

objectives and continuously improving. es for department.

s continuously.

s with suppliers.

ss quality control system.

be a tool.

growing business environment.

ond time it was checked strength NG in our headquarter. HQ asked the supplier to re upplier is responsible for the problem and is active to think a solution.

se. it is not a problem of standard. We have express our requirement before releasing the PO. So o prepare some terminals and cable. I did the experiment with the supplier engineer and sales man ouldn't solve it in technology.it should solve it in business.

r to renew a batch.

easing the PO. So fot the batch goods, the supplier must be responsible for giving a solution.

eer and sales manager together. The result of the experiment indicated that the supplier could ma

lution.

supplier could match the requirement if they used more strength to clamp terminals. Problem is th

roblem is that it spent the operators much more time and energy. And they won't buy

t buy a automatic claming machine for it. In another words, it won't spend more mone

money on it.

相关主题
文本预览
相关文档 最新文档