待月榭

建筑面积:(12.4+0.22)*(8.2+0.22)=12.62*8.42=106.26㎡

(7-7剖):[12.4+(0.1+0.3)*2-3.6+8.2+0.1*2]*2=(13.2+3.6+8.4)*2=18*2=36m (8-8剖):3.6*2=7.2m

J-1:1.4*1.4*4=7.84㎡ , J-2:1.20*1.20*6=8.64㎡

一.土方部分:1.地槽:[(1.1+0.3*2)*36+(1.6+0.3*2)*7.2]*1.1=(1.7*36+2.2*7.2) *1.1=(61.2+15.84)*1.1=77.04*1.1=84.74 m3

2.地坑:(1.4+0.6)2*1.1*4+(1.2+0.6)2*1.1*6=2.00*2.00*1.1*4+1.8* 1.8*1.1*6=17.6+21.38=38.98m3

3.人工挖1/2墙,基槽:0.22*0.72*(2.5+2.8)*4=0.22*0.72*19.2=3.04 m3

4.回填土:(84.74+38.98+3.04)-(6.76+14.15+22.2)=126.76-43.11=83.65 m3 5.余土外运:41.06m3

6.槽坑原土夯实:61.2+15.84+16+19.44=112.48㎡

二.C15砼垫层:1.(7-7剖):0.1*1.1*36=3.96m3

2.(8-8剖):0.1*1.6*7.2=1.152m3

3.J-1:0.1*1.4*1.4*4=0.784m3

4.J-2:0.1*1.2*1.2*6=0.864m3

合计:3.96+1.152+0.784+0.864=6.76m3

三.C25砼带形基础:1.(7-7剖):0.25*0.9*36=8.1 m3

2.(8-8剖):0.25*1.4*7.2=2.52 m3

合计:8.1+2.52=10.62 m3

四.C25独立基础:1.J-1:0.3*1.2*1.2*4=1.73 m3

2.J-2:0.3*1.00*1.00*6=1.8 m3

合计:1.73+1.8=3.53 m3

五.砖基础:1.(7-7剖):[0.87*0.49-(0.12*0.17+0.32*0.23)]*[12.4+(0.155+0.15) *2-3.6+8.2+0.155*2]*2+(1.05*0.3-0.9*0.09)*(0.3*4+0.6 *14)=0.3323*(13.01-3.6+8.51)*2+0.234*9.6=0.3323*35.84 =11.91+2.25=14.16m3

2.(8-8剖):0.8*0.9-(0.15*0.4+0.23*0.32)*7.2=(0.72-0.1336)*7.2 =4.22m3

3.J-1:0.74*0.74*0.85*4=1.862m3

4.J-2:0.62*0.62*0.85*6=1.96m3

合计:14.16+4.22+1.86+1.96=22.2m3

六.地圈梁:0.32*0.23*(35.84+7.2)=0.0736*43.04=3.17m3

七.石作部分:1.压沿石(150*400):0.4*(12.4-3.6+8.2+0.15*4)*2=0.4*35.2=14.08m2 2.台阶石(150*300):0.4*3.3*2*2=5.28㎡

3.垂带:0.6*0.3*4=0.72㎡

4.菱角石:(0.6*0.3+0.3*0.5*1/2*2)*4=1.32㎡

5.侧墙石(120*170):0.17*35.2=5.98㎡

6.磉石:(0.6*0.6*10)+(0.25*0.5*14)+(0.25*0.25*4)

7.鼓石:0.2*4个 0.17*6个 0.155*18个

八.木作部分:1.柱:(0.222/4)*3.14*(3.9-0.155)*18=0.037994*3.74*18=2.561 (0.242/4)*3.14*[(6.47-0.17)*2+(4.78-0.17)*4]=0.045216*31.04=1.4 m3

(0.282/4)*3.14*(4.78-0.2)*4=1.127 小计:2.56+1.4+1.13=5.09m3

待月榭

2童柱:0.16*0.24*0.815*2*4+0.12*0.22*0.875*2+0.12*0.2*0.74*18=0.0384 *0.815*8+0.0264*0.875*2+0.024*0.74*18=0.25+0.046+0.32=0.62m3

3. 雕花柁墩:0.76*0.17*(0.15*4+0.12*20)=0.3876≈0.58m3

1.12㎝*12㎝千斤销4个

2.老戗:0.18*0.22*(1.6+0.5*2)*1.414*4=0.18*0.22*3.6764*4=0.58m3

3.嫩戗:0.16*0.2*1.1*4=0.141m3

4.戗山木:0.919*0.4*sin125o*0.08*1/2*4=0.919*0.4*0.8192*0.08*4*1/2

=0.048≈0.05

8.枕头木:1.6*0.4*1/2*0.1*8=0.256≈0.26m3

9.梁:(1).三架梁:0.12*0.35*(2.5+0.26*2)*4=0.042*3.02*4=0.507

(2).五架梁:0.15*0.4*(5.00+0.52)*4=0.06*5.52*4=1.325

(3).挑梁:0.12*0.3*[(2.1+0.26)*14+(1.6+0.5+0.26)*1.414*4] =0.036*(33.04+13.35)=0.036*46.39=1.67m3

10.檩条:(0.22/4)*3.14*[(12.4-1.6*2)*5+(12.4+8.2-0.8*4)*2+(12.4

+8.2)*2+0.2*14]=0.0314*(46+34.8+41.2+2.8)=0.0314*124.8=3.919 (0.182/4)*3.14*(12.4+0.7*2+8.2+1.4)*2+5*2=0.0081*3.14*56.8 =1.4465≈1.44m3计:5.36 m3

11.壁板:(0.78+0.615)*(9.2+5.00-0.28*2-0.24*3)*2=1.395*12.92*2=36.05m2

12.连机:0.08*0.14*124.8+0.06*0.12*46.8=1.398+0.337=1.735≈1.74m3

13.枋:(0.12*0.25+0.1*0.3)*(9.2+5.00)*2=(0.03+0.03)*28.4=0.06*

*28.4=1.704m3

14.椽子:(1).本椽:0.07*0.08*[(4.1+1.00)*1.1413*(9.2/0.2+1)+2.6

*1.118*(5.00/0.2+1)]*2=0.0056*(5.1*1.1413*47+2.6

*1.118*26)*2=0.056*(273.57+75.58)*2=0.0056*349.15

*2=3.91m3

(2).飞椽:0.045*0.06*0.75*(47+26)*2=0.045*0.06*0.75*146 =0.296

(3).摔网椽:0.0056*3.68*9*8=0.0056*3.68*72=1.48m3

(4).立脚飞椽:0.0027*0.75*72=0.1458≈0.146m3

(5)摔网板:3.35*3.35*1.1413*4=51.23 m2

17.里口木:(12.4+8.2+1.25*4)*2=25.6*2=51.2m

18.大连檐:51.2m, 19.封檐板:51.2 m.

20.门窗:(1).门框:(3.6-0.28+2.92)*2*2=24.96m

(2).窗框:[(2.5-0.24+1.92)*2+(2.8-0.24+1.92)*2]*4=[(2.26 +1.92)*2+(2.56+1.92)*2]*4=(8.36+8.9)*4=17.32

*4=69.28m

(3).门扇:3.18*2.6*2=16.54㎡

(4).窗扇:(2.1+2.4)*1.74*4=4.5*1.74*4=31.32㎡

21.木栏杆:[(2.5-0.22+2.8-0.22)*4+(1.6-0.22)*6]*1.00=[(2.28+2.58)

*4+1.38*6]*1.00=(4.86*4+1.38*6)*1.00=(19.44+8.28)*1.00

=27.72*1.00=27.72㎡

22.木挂落:(12.4+8.2)*2-0.22*14=41.2-3.08=37.92m

23.山花板:(2.5*1.89*1/2*2)*2=4.725*2=9.45㎡

24.花撑子:18个

九.屋面部分:1.蝴蝶瓦屋面:[(8.2+1.25*2)*9.2+2.85*2.85*4]*1.1413+5*2.85*1.118*2 =(10.7*9.2+32.49)*1.1413+5*2.85*1.118*2=149.43+31.86

=181.29㎡

2.望砖:(8.2+2+0.75*2)*9.2*1.1413+(2.6+0.75)*5*1.118*2=(11.7*9.2)

*1.1413+3.35*5*1.118*2=107.62*1.1413+37.45

=122.83+37.45=160.28㎡,

3.望砖加工厂160.28㎡

4.屋脊:(1).正脊:9.2m

(2).垂脊:4.1*1.1413*4=18.72m

(3).戗脊:(2.85*1.414=4.03m)*4条,(戗根吞头:4只).

(4).搏脊:(5.00+0.4*2)*2=5.8*2=11.6m

5.排山沟滴:18.72m

6.沿口花边(滴水):(10.7+14.9)*2=51.2m

7. 屋面防水材料:(1)1.5厚JS-Q防水材料181.29㎡

(2)25厚1:2水泥沙浆钢丝网层181.29㎡

(3)卷材防水层181.29㎡

(4)¢6钢筋0.222*[51.2+(12.4+8.2)*2+10.7*1.1413*10]=

0.222*(51.2+41.2+122.12=0.222*214.52/1000=0.48T

(5)望砖钉木条:(0.02*0.02): 9.2*3*4+(12.4+8.2)*2*3*3=110.4+41.2*9

=110.4+370.8=481.2M

十.地面部分:1.室内原土夯实:12.4*8.2-(0.742*4+0.622*6)-0.25*(0.25*4+0.5*14) =12.4*8.2-(2.19+2.31)-2=101.68-4.5-2=95.18㎡

2.150厚碎石垫层:0.15*95.18=14.28 m3

3.80厚C15砼垫层:0.08*[12.4*8.2-0.6*0.6*10-0.25*(0.25*4+0.5*14)] =0.08*(101.68-3.6-2)=0.08*96.08=7.6864≈7.69 4.30厚砂垫层:0.03*96.08=2.88m3

5.40厚方砖地面:101.68-[0.6*0.6*10+0.25*(0.25*4+0.5*14)]=96.08m2

6.砖细踢脚线:0.2*19.2=3.84㎡

7.方砖加工:96.08+3.84+3.65=103.57㎡

十一.脚手架:(1)[12.4+0.22+8.2+0.22]*2*3.9=(12.62+8.42)*2*3.9=164.11m2

(2)斜道一座, (3)竹笆栏板:42.08*0.8=33.66 m2

十三.其它1.(1/2)砖墙:0.12*[(2.5+2.8)*4-(0.24*6+0.28*2)]*0.96=0.12*(21.2-2)

*0.96 =0.12*19.2*0.96=2.21m3

2.砖细窗台板:0.19*19.2=

3.648≈3.65m2

3.墙面粉刷:19.2*0.96*2=36.86m2

4.山墙粉刷:2.5*1.89*1/2*4= 9.45m2

5.粉钢丝网博风板:(4.1+1.25)*1.1413*4=5.35*1.1413*4=24.42M

十四.油漆涂料(一)油漆1.柱:[0.22*3.74*18+0.24*(6.3*2+4.6*4)+0.28*4.58*4]*3.14 =(13.464 +7.45+5.135)*3.14=26.044*3.14=81.78㎡

2.童柱:(0.16+0.24)*2*0.815*8+(0.12+0.22)*2*0.875*2+(0.12+ 0.2)*2*0.74*18=0.8*0.815*8+0.68*0.875*2+0.64*0.74*18 =5.22+1.119+8.52=14.93㎡

3.柁墩:0.17*0.76*24=3.1㎡

4.老戗:(0.18*2+0.22)*3.68*4=0.58*3.68*4=8.54㎡

5.嫩戗:(0.16+0.2)*2*1.1*4=0.72*1.1*4=3.17㎡

6.戗山木:0.919*0.4*0.819*1/2*2*4=1.2㎡

7.枕头木:1.6*(0.4*1/2*2+0.10)*16=1.6*0.4*1/2*16=5.12㎡

8.梁:(1).三架梁:(0.12+0.35)*2*3.02*4=0.94*3.02*4=11.36m2

(2).五架梁:(0.15+0.4)*2*5.52*4=1.1*5.52*4=24.29㎡

(3).挑梁:(0.12+0.3)*2*(2.36*14+3.02*4)=0.84*(33.04+ 12.08)=0.84*45.12=37.9㎡

9.椽子:(0.08+0.07*2)*(5.1*1.1413*94+2.6*1.118*52+3.68*72) =0.22*(547.14+151.15 +264.96)=0.22*963.25=211.92m2 10.飞椽:(0.045*2+0.06)*0.25*218=0.15*0.25*218=32.7 m2

11.里口木.大连檐:51.2*2=102.4*0.45=46.08m

12.封檐板:51.2*2.2=112.64m

13.花格门:3.32*2.92*2=19.39*1.43=27.73

14.窗:(2.26+2.53)*1.92*4=37.02*1.45=53.65

15.枋子:(0.12+0.25+0.1+0.3)*2*28.4=1.54*28.4=43.74㎡

16.壁板:36.05*2=72.1㎡

17.连机:(0.08+0.14*2)*124.8+(0.06+0.12*2)*46.8=0.36*124.8+ 0.3*46.8=44.93+14.04=60.84㎡

18檩条:0.2*3.14*124.8+0.18*3.14*46.8=78.37+26.45=104.82㎡

19.古式栏杆:27.72*1.32=36.59㎡

20.木挂落:37.24*0.45=16.76m

21.山花板:9.45*2.4=22.68㎡

22.花撑子:(0.1+0.2)*2*1.00*18=10.8㎡

23.摔网板:51.23㎡

门窗合计:27.73+53.68+36.59+16.76=134.76㎡

古式构件:81.78+14.93+3.1+8.54+3.17+1.2+5.12+11.36+24.29+37.9+211.92+ 32.7+ 60.84+43.74+104.82+10.8=656.21㎡

其他:壁板72.1+山花板22.68+摔网板51.23=146.01㎡

封檐板与里口木等: 46.08+112.64=158.72m

(二).乳胶漆:1.坐凳墙壁:36.86㎡

2.山墙:9.45㎡

3.博风板:2

4.42*0.35=8.55㎡

1-3计:54.86㎡

草堂

建筑面积:(8.1+0.12*2)*(5.2+0.24)=8.34*5.44=45.37㎡

1-1剖:(8.1+0.1*2+5.2+0.2)*2-3.3=(8.3+5.4)*2-3.3=13.7*2-3.3=24.1m

2-2剖:3.3m, J-1:1.2*1.2*4=5.76㎡

一.土方:1.挖地槽:[(1.1+0.3*2)*24.1+(1.35+0.6)*3.3]*1.1=(1.7*24.1+

1.95*3.3)*1.1=(40.97+6.44)*1.1=47.41*1.1=5

2.15m3

2.地坑:(1.2+0.3*2)2*1.1*4=1.82*1.1*4=14.26m3

3.回填土:52.15+14.26-(3. 1+0.57+6.37+1.2+8.04+1.31+2.53)=66.41

-23.13m3=43.28m3

4.余土外运:23.12m3

5. 槽底原土夯实:1.7*24.1+1.95*3.3=40.97+

6.44=4

7.41㎡

二.基础:1.C15砼垫层:0.1*(1.1*24.1+1.35*3.3)=0.1*30.965=3.1m3

J-1:0.1*1.2*1.2*4=0.576

2.C25砼带形基础:0.25*(0.9*24.1+1.15*3.3)=0.25*25.485=6.37m3

3.C25砼独立基础:0.3*1.00*1.00*4=1.2m3

4.砖基础:0.37*0.55*[(8.1+0.115*2+5.2+0.23)*2-3.3]+[0.67*0.9-

(0.15*0.3+0.23*0.32)]*3.3+(1.05*0.3-0.9*0.07)*(0.3*4 +0.6*8)=0.37*0.55*24.22+(0.67*0.9-0.1186)*3.3+0.252*6 =4.93+1.6+1.51=8.04m3

J-1:0.62*0.62*0.85*4=1.31m3

5.圈梁:(0.15*0.14+0.23*0.32)*24.22+0.23*0.32*3.3=(0.021+0.0736) *24.22+0.736*3.3=2.29+0.24=2.53

三.石作部分1.压沿石:0.3*(8.1+5.2+0.15*4)*2-3.3=0.3*24.5 =7.35㎡

2.侧墙石(120*170):0.17*24.5=4.17

3.台阶:0.3*3.3*2=0.3*6.6=1.98㎡

4.垂带:0.5*0.3*2=0.3㎡

5.凌角石:(0.3*0.5+0.42*0.3*1/2*2)*2=0.27*2=0.54㎡

4.磉石:500*500*4个 250*500*8个 250*250*4个

5.鼓石:170*380*4个 155*350*12个

四.楼地石:1原土夯实:8.1*5.2-0.3*(0.3*4+0.6*8)-0.62*0.62*4=42.12-(1.8 +1.54)=42.12-3.34=38.78㎡

2.150厚碎石垫层:0.15*38.78=5.817m3

3.80厚C15砼垫层:0.08*38.78=3.1024≈3.1m3

4.30厚砂垫层:0.03*38.78=1.16 m3

5.40厚400*40方砖地面:8.1*5.2-0.25*[(0.25*4+0.5*8)+0.5*0.5*4]

42.12-(0.25*5+1)=42.12-2.25=39.87㎡

6.方砖加工:39.87+3.7=43.57㎡

五.木作部分:1柱:(0.242/4)*3.14*(3.7-0.17)*4=0.0144*3.14*3.53*4=0.638

(0.222/4)*3.14*[(3.7-0.155)*4+(3.00-0.155)*8]=0.0121 *3.14*(3.545*4+2.845*8)=0.0121*3.14*36.94=1.4

2.童柱:(0.22/4)*3.14*0.72*4=0.01*3.14*2.88=0.09m3

3.梁:0.12*0.28*(2.4+0.4*2)*4=0.12*0.28*3.2*4=0.43m3

4.挑梁:0.12*0.24*(1.4+0.4)*8=0.12*0.24*1.8*8=0.415m3

5.檩条:(0.182/4)*3.14*(8.1+0.39*2)*5=0.0081*3.14*8.88*5=1.13 m3

6.连机:0.08*0.14*8.88*5=0.497≈0.5m3

7.枋:0.12*0.2*(8.1*5+2.4*2)=0.12*0.2*45.3=1.09m3

8.壁板15厚:(0.25*2+0.42*2+0.3)*8.1=1.62*8.1=13.12㎡

9.山花板:2.69*1,6*1/2*4-2.4*0.2*2=8.61-0.96=7.65㎡

10.椽子:0.06*0.07*3.2*1.1413*(8.88/0.2+1)*2=0.0042*3.2*1.1413

*90=1.381m3

11.屋面板:6.4*8.88*1.1413=64.86

12.门窗:(1).门框:(3.06+2.43)*2=10.98m

(2).窗框:(2.18+1.43)*2*4+(3.08+1.43)*2*2=7.22*4+9.02

*2=28.88+18.04=46.92m

(3).门扇:2.91*2.11=6.14㎡

(4).窗扇:1.25*(2.00*4+2.93*2)=1.25*13.86=17.33㎡

13.小连檐:8.88*2=17.76m

14.闸椽板:17.76m

15.搏风板(25*350):3.2*1.1413*4=14.61m

六.屋面部分:(5.2+0.6*2)*(8.1+0.39*2)*1.1413=6.4*8.88*1.1413=64.86

1.150厚茅草:64.86㎡

2.防水卷材层:64.86㎡

3. 1:2水泥砂浆钢丝层:6

4.86㎡

4.屋脊:8.88-1.1=7.78m

5.方脚头(长0.55)*2个

七.墙体:1.1/2墙:0.12*1.00*(8.1*2-0.24-0.22*4-3.3)=0.12*1.00*11.78=1.41m3

2.砖墙:0.24*(3.00*5.2+0.2*2.4)*2=0.24*(15.6+0.48)*2=

0.24*16.08*2=7.72m3

3砖细踢脚线:0.2*(11.78+5.2*2)=0.2*22.18=4.44㎡

4.水泥砂浆粉墙面:(1).外墙:11.78+32.16=43.94㎡

(2).内墙:43.94*0.93=40.86㎡

八.油漆涂料:1:乳胶漆:43.94+40.86=84.8㎡

2.油漆:(1)柱:0.24*3.14*14.12+0.22*3.14*36.94=10.64+25.52 =36.16㎡

(2)童柱:0.2*3.14*2.88=0.628*2.88=1.81㎡

(3)挑梁:(0.12+0.24)*2*1.8*8=0.72*1.8*8=10.37㎡

(4)三架梁:(0.12+0.28)*2*3.2*4=0.8*12.8=10.24㎡

(5)椽子:(0.06*2+0.07)*3.2*1.1413*90=0.19*3.2*1.1413 *90=62.45

(6)连机:(0.08+0.14*2)*8.88*5=15.96㎡

(7)枋:(0.12+0.2)*2*(40.5+4.8)=0.64*45.3=28.99

(8)壁板:[(0.25+0.42)*2+0.3]*2*8.1=3.28*8.1=26.57m2

(9)山花板:7.65*2.4=18.36㎡

(10)屋面板(檩):6.4*8.88*1.1413=56.832*1.1413=64.86*1.1*0.83

=59.22㎡

(11)门:3.06*2.43*1.43=10.63㎡

(12)窗:(2.18*4+3.08*2)*1.43*1.45=14.88*1.43*1.45=30.85㎡

(13)小连檐闸椽板:17.76*2*0.45=15.98m

(14)搏风板:3.2*1.1413*4=14.61*2.2=32.14

合计:1门窗:10.63+30.85=41.48㎡

2其他木材面: 26.57+18.36+59.22=104.15㎡

3古式构件:36.16+1.81+10.37+10.24+15.98+28.99+62.45=166㎡ 4搏风板(小连檐,闸椽板):15.98+32.14=48.12m

九.脚手架: 1.双排脚手架:5.2*(3.3+1.6*1/2)*2=5.2*4.1*2=42.64㎡

2.工具脚手架:8.1*

3.3*2=53.46㎡

3.斜道一座

. 4. 竹笆栏板(8.1+5.2)*2*0.8=26.66*0.8=21.28㎡

廊亭

建筑面积:5.48*(4.2+0.24*2)=5.48*4.68=25.65㎡

9-9剖:[5.2+(0.6+0.1)*2]*2=13.2 m, 10-10剖:5.2m

一.土方:1.地槽:(1.1+0.3*2)*0.95*18.4=1.7*0.95*18.4=29.72 m3

2. 地槽原土夯实:1.7*18.4=31.28㎡

3.回填土:29.72-(2.442+5.085+8.411+1.696)=36.5-17.63=18.87m3

4.外运土:17.63m3

二.基础:1.C15砼垫层:0.1*1.1*(13.6+5.4)=0.1*1.1*18.4=2.024m3

2.C25砼带形基础:0.25*0.9*18.4=4.14m3

3.砖基础(9-9):0.49*0.72*{[5.2+(0.6+0.155)*2]*2-(0.12*0.17+0.23* 0.32)}+(0.9*0.3-0.75*0.09)*(0.3*4+0.6*8)=0.49*0.72 *(13.42-0.094)+0.2025*6=0.49*0.72*13.326+0.1575*3=

4.7+1.22=

5.92m3

(10-10):0.24*0.9*5.2+0.9*0.3*0.6*4=1.123+0.648=1.77 m3计:7.69 m3 4.地圈梁:(5.2+0.6*2)*2*0.23*0.32+0.24*0.22*5.2=12.8*0.23*0.32 +0.24* 0.22*5.2=0.942+0.275=1.217≈1.22m3

三.石作部分:1.压沿石(150*300):0.3*12.8=3.84㎡

2.侧墙石(120*170):0.17*12.8=2.18㎡

3.磉石.[0.25*0.25]*4个, [0.25*0.5]*8个4.鼓石:[140*310]*12个. 四.楼地面:1.室内原土夯实:5*2.00*2-0.3*(0.3*4+0.6*8)=20-1.8=18.2㎡

2.150厚碎石垫层:0.15*18.2=2.73m3

3.80厚C15砼垫层:0.08*18.2=1.46m3

4.30厚砂垫层:0.03*18.2=0.55m3

5.方砖地面:20-0.25*(0.25*4+0.5*8)=20-1.25=18.75m2

6.砖细坐凳板:0.3*[(5+0.6*2+0.12*4)*2-1.4]=0.3*11.96=3.59m2

7 砖细踢脚线: 0.2* 13.36=2.67㎡

8.方砖加工:18.75+3.59+2.67=25.01㎡

9.墙(1)坐凳墙0.24*0.46*(5.24+0.72*2)*2=0.24*0.46*13.36=1.475 m3 (2)分隔墙:0.2*(4.155-0.2*3)*5.2-0.2*2=0.2*3.555*4.8=3.41m3 10.水泥砂浆粉墙:( 0.46*13.36+3.56*4.8)*2=(6.15+17.09)*2=46.48m2

11.粉山墙:1.00*1.355*1/2*4=2.71㎡,

12.钢丝博风板: 1.26*1.1413*4=5.75 m

五.木构件部分:1.柱:0.22/4*3.14*2.86*12=1.0776≈1.08m3

2.童柱:0.01*3.14*0.525*4=0.0659≈0.07m3

3.梁:0.01*3.14*(1.00+2.2+0.26*2)*4=0.467︽0.47m3

4.檩:0.01*3.14*[(2.6+0.2*2)*5+5.4*4+(4.2+0.4)*2+1.6*2 =0.0314*(15+21.6+9.2+3.2)=0.0314*49=1.54m3

5.枋(连机):0.08*0.22*(5.4+4.4)*2=0.08*0.22*19.6=0.345m3 6.短机:0.05*0.06*0.6*4个

7.椽:0.072/4*3.14*[2.6*1.1413*(2.6/0.2+1)*2+1.7*1.118*(1.8 /0.2+1)*2]=0.072/4*3.14*(2.6*1.1413*28+1.7*1.118*20) =0.072/4*3.14*(83.09+38.01)=0.072/4*3.14*121.1=0.466m3 8.飞椽:0.04*0.06*0.7*(28+16)=0.04*0.06*0.7*48=0.081 m3

9.摔网椽:0.072/4*3.14*1.7*1.414*40=0.3698︽0.37 m3

廊亭

10.立脚飞椽:0.0024*0.7*40=0.067m3

11.老戗木:0.18*0.15*2.667*4=0.288m2

12.嫩戗:0.07*0.12*0.97*4=0.033

13.戗山木:0.97*0.4*0.788*1/2*0.08*4=0.0489 m3

14.枕头木:1.2*0.4*1/2*0.1*8=0.192m3

15.山花板:1.00*1.355*1/2*4=2.71m2

16.里口木:(5.00+4.2+0.75*4)*2=24.4m

17.大连檐:24.4m 18.封檐板:24.4 m

19.挂落:12.4-0.2*6=11.2m

20.摔网板2.4*2.4*1.1413*4=26.3㎡

六.屋面:1.蝴蝶瓦屋面:[(4.2+0.75*2)*2.6+1.95*1.95*4]*1.1413+1.95*1.8*1.118*2

=(14.82+15.21)*1.1413+7.85=34.27+7.85=42.12㎡

2.望砖:(5.2+0.7*2)*2.6*1.1413+2.4*1.8*1.118*2=6.6*2.6*1.1413

+9.66=17.16*1.1413+9.66=19.58+9.66=29.24㎡

3.花边滴水:24.4m , 4.排山瓦:5.75m, 5.环包脊:3.6m.

6.垂脊:5.75m 7.围脊:2.52m

8.戗脊:(2.667m)4条 9.戗根吞头:4只

10.屋面防水:(1).1.5厚JS-Q防水材料:42.12m2

(2).25厚1:2防水砂浆钢丝网层:42.12m2

(3).卷材防水层:42.12m2

11.钢筋加固:0.222*[5.7*1.1413*4+(6.3+5.7)*2=0.222*50.02/1000=0.011T

12.望砖缝钉木条(0.02*0.02):2.6*3*4+(5.7+6.3)*2*3=31.2+72=103 m

13.望砖加工:29.24㎡,

七.油漆:1.柱:0.2*3.14*2.86*12=21.55m2, 2.童柱:0.2*3.14*0.525*4=1.32m2 3.梁:0.2*3.14*3.72*4=9.34m2, 4.檩:0.2*3.14*49=30.77m2

5.枋:(0.08+0.22*2)*9.52*2=0.52*19.6=10.19m2

6.短机:(0.05*2+0.06)*0.6*4=0.16*0.6*4=0.38m2

7.椽:0.07*3.14*(121.1+2.404*40)+(0.04*2+0.06)*0.25*(48+40)=0.07 3.14*217.26+0.14*0.25*88=47.75+3.08=50.83m2

8.老戗:(0.18+0.15*2)*2.667*4=0.48*2.667*4=5.12m2

9.嫩戗:(0.12+0.07)*2*0.97*4=0.38*0.97*4=1.47m2

10.戗山木:0.97*0.4*0.788*1/2*2*4=1.22

11.枕头木:1.2*0.4*1/2*2*8=3.84m2

12.山花板:2.71*2.4=6.5m2

13.摔网板:26.3*0.83=21.83㎡

14.里口木,大连檐:24.4*2*0.45=21.96m

15.封檐板:24.4*2.2=53.68m

16.挂落:11.2*0.45=5.04m2

小计①(1-11)计:136.03㎡②(12-13)计:28.33㎡

③(14-15):75.64m ④(16)挂落:5.04㎡

17.墙面子乳胶漆:46.48+2.71+5.75*0.35=51.2m2

八.脚手架:1.工具脚手架:(5.2+0.7*2)*2*3.3=13.2*3.3=43.56m2

2.斜道一座, 3.栏板:13.2*0.8=10.56㎡.

半亭

建筑面积:(2.8+0.24*2)2=3.28*3.28=10.76 m2

9-9剖:2.9+0.1+1.4=4.4m

一.土方:1.挖地槽:(1.1+0.3*2)*0.95*4.4=1.7*0.95*4.4=7.11m3

2.回填土:7.11-(0.48+0.99+1.77+0.31)=7.11-3.55=3.56m3

3.余土外运:3.55m3

4.基槽夯实:1.7*4.4=7.48m2

二.基础部分:1.C15砼垫层:0.1*1.1*4.4=0.484m3

2.C25砼带形基础:0.25*0.9*4.4=0.99m3

3.砖基础:9-9剖:0.49*[0.72*(2.9+1.4+0.155)-(0.12*0.17+0.23*

0.32)]+(0.9*0.3-0.75*0.09)]*(0.3*2+0.6)=0.49* [0.72*

4.46-(0.0204+0.0736)]+0.2025*1.2 =0.49*(3.21-0.094)+0.243

=0.49*3.12+0.243 =1.53+0.243=1.77 m3

5. QL: 0.23*0.32*4.2=0.0736*4.2=0.309≈0.31m3

三.石作部分:1.压沿石(150*300):0.3*(2.8+0.15+1.4+0.15)=1.35m2 2.侧墙石(120*170):0.17*4.5=0.77m3

3.磉石:(0.25*0.25)*2个(0.25*0.5)*1个

4.鼓石:(140*310)*3个

四.楼地面:1.原土夯实:2.8*2.8-0.25*(0.25*2+0.5)=7.84-0.25=7.59 2.150厚碎石垫层:0.15*7.59=1.14m3

3.80厚C15砼垫层:0.08*7.59=0.61m2

4.30厚砂垫层:0.03*7.59=0.23m2

5.方砖地面:7.59m2

6.砖细坐凳板:0.3*3.2=0.96m2

7.砖细踢脚线:0.2*(2.8*2+3.2)=0.2*8.8=1.76㎡

8.砖细加工:10.31㎡

五.墙体:1.坐凳墙:0.24*0.46*(2.8+1.4-1.00)=0.24*0.46*3.2=0.35 m3

2.马头墙:0.24*5*1.45=1.74 m3

3.粉墙面:3.2*0.46*2+5*1.45=10.19m2,与(粉山墙:1.14*0.6*1/2*2=0.68㎡) 4.内外墙面涂料:10.19+0.68=10.87m2

六.木作部分:1.柱:0.22/4*3.14*(3-0.14)*5=0.01*3.14*2.86*5=0.449m3

2.童柱:0.01*3.14*0.35*6=0.066m3

3.梁:0.162/4*3.14*(1.2+0.25*2)*2=0.068m3

0.22/4*3.14*(2.8+0.5)*2=0.207m3

4.檩条:0.182/4*3.14*(2.00+0.2)*3+(2.8+0.2)*2+(2.8+0.2*2)+1.2

+0.18=0.182/4*3.14*(6.6+6.00+3.2+1.38)=0.182/4*3.14*17.18 =0.437m35.连机:0.07*0.2*2.8*3=0.117≈0.12m3, 6.短机:6个.

7.本椽:0.072/4*3.14*[1.84*1.1413*(2/0.2+1)*2+1.24*1.118*

(1.2/0.2+1)=0.072/4*3.14*(1.84*1.1413*22+1.24*1.118* 7)=0.072/4*3.14*(46.2+9.7)=0.072/4*3.14*55.9=2.15m3 8.摔网椽:0.072/4*3.14*1.24*1.414*20=0.135

9.飞椽(立脚):0.04*0.06*0.7*(22+7+20)=0.0024*0.7*49=0.082

10.老戗:0.16*0.16*1.24*1.414*2=0.08977≈0.09m3

11.嫩戗:0.14*0.14*1.1*2=0.043m3

半亭

12.戗山木:0.919*0.4*0.788*1/2*0.08*2=0.017m3

13.枕头木:0.8*0.4*1/2*0.1*4=0.064m3

14.挂落:2.8+1.4-0.2*2=3.8m

15.里口木:2.8+0.66*2+(2.8+0.66)*2=4.12+6.92=11.04m

16.大连檐:11.04m, 17.封檐板:11.04m.

18.山花板:1.14*0.6*1/2*2=0.68㎡.

19.摔网板:2.16*2.16*1.1413*2=10.65㎡

七.屋面部分:1.蝴蝶瓦:[(2.8+0.66*2)*2.00+1.46*1.46*2]*1.1413+1.46*1.2*

1.118=(8.24+4.26.)*1.1413+1.96=14.27+1.96=16.23m2

2.沿口花边滴水:11.04m+5*2(马头墙)=21.04 m

3.黄瓜环脊:2.0m , 4.垂脊:2.28m.

5.戗脊:1.75m*2条, 6.戗根吞头:2只.

7.搏脊:1.00m, 8.排山沟滴:2.28m.

9.望砖:(2.8+0.44*2+0.7*2)*2.00*1.1413+(1.46+0.7)*4.12*1.118

=5.08*2.00*1.1413+2.16*4.12*1.118=11.6+9.95=21.55-

4.87=16.68m2

10.望砖加工:16.68㎡, 11.(砖砌泛水:2.8+0.7*2=4.2M).

12.1,5厚JS-Q高弹性复合防水材料: 16.23m2

13.25厚水泥砂浆钢丝网找平层16.23m2

14.JS-C高分子防水卷材: 16.23m2

15.钢丝网层钢筋加固:0.222*[(2.8+0.66*2)*1.1413*3+4.12+3.46*2]=0.222*

(14.11+11.04)=0.222*25.15/1000=0.00558︽0.006T

16.望砖缝钉木条(0.02*0.02):2.00*12+(4.12+6.92)*3=24+33.12=57.12 m

17. 马头墙脊:5m, 18. 双落水:5m.

19.钢丝网博风板:1.00*1.1413*2=2.28M.

九.油漆:1.柱:0.2*3.14*2.86*5=8.98m2

2.童柱:0.2*3.14*0.35*6=1.32m2

3.梁:0.16*3.14*1.7*2+0.2*3.14*3.3*2=1.71+4.14=5.85m2

4.檩:0.18*3.14*17.18=10.06m2

5.连机:(0.07+0.2*2)*2.8*4+(0.06+0.08)*2*0.4*6=5.26+0.67=5.93m2

6.椽子:0.07*3.14*(55.9+1.24*1.414*20)=0.07*3.14*90.97=20m2

7.飞椽:(0.04*2+0.06)*0.7*49=4.8m2

8.老戗:0.16*4*1.75*2=2.24m2

9.嫩戗:0.14*4*1.1*2=1.23m2

10.戗山木:0.919*0.4*0.788*1/2*4=0.58m2

11.枕头木:0.8*0.4*1/2*8=1.28㎡ (1-11计:62.27m2)

12.挂落:3.8*0.45=1.71m2

13.封檐板:11.04*2.2=24.29m,14.里口木:11.04*0.45=4.97m.

15.大连檐:4.97m (13-15计:34.23 m)

16.摔网板:10.65*1.1*0.83=9.72㎡.

17.山花板.0.68*2.4=1.63㎡, 计:11.35㎡

八.脚手架:(1)工具脚手架:2.8*4*3.3=36.96m2 , (2)斜道一座

(3)竹笆栏板:2.8*4*0.8=8.96㎡.

长风亭

建筑面积:(1,4+0.16)2*2.5981=1.56*1.56*2.5981=6.32㎡

长1.4*6=8.4m

一.土方:1.基槽:(1.1+0.3*2)*1.4*1.1*6=1.7*1.4*1.1*6=15.71m3

2.回填土(余土外运):15.71-(0.92+1.89+2.96+0.75)=15.71-6.52=9.19m3

3.基槽夯实:1.7*8.4=1

4.28㎡

二.基础部分:1。垫层(C25砼):0.1*1.1*8.4=0.92m3

2.带型基础(C25砼):0.25*0.9*8.4=1.89m3

3.砖基础:0.37*0.66*8.4+(1.05*0.3-0.9*0.07)*0.6*6=2.05+0.25

*3.6=2.05+0.91=2.96m3

4.地圈梁:0.24*0.37*8.4=0.7459≈0.75m3

三.石作部分:1.压沿石:0.3*8.4=2.52㎡, 2.侧墙石:0.17*8.4=1.43㎡

3.磉石:(0.25*0.5)*6个

4.鼓石:6个 , 5.石台阶:0.3*1.6*2=0.96㎡.

四.地面:1。原土夯实:1.4*1.4*2.5981=1.96*2.5981=5.09㎡

2.150厚碎石垫层:0.15*5.09=0.76m3

3.80厚C15砼垫层:0.08*5.09=0.41m3

4.30厚砂垫层:0.03*

5.09=0.15m3

5.350*350方砖地面:5.09㎡

6.坐凳墙:0.24*0.46*(1.4+0.2)*4=0.71

7.300*4方砖坐凳板:0.3*6.4=1.92㎡

8.砖细踢脚线:0.2*1.6*4=1.28㎡

9.方砖加工:5.09+1.92+1.28=8.29㎡

10.墙面抹灰:0.46*6.4*2=5.89㎡

五.木构件:1.柱:0.162/4*3.14*2.59*6=0.0064*3.14*2.59*6=0.31m3

2.宅墩:0.162/4*

3.14*0.3*6=0.0064*3.14*1.8=0.036≈0.04m3

3.檩条(檐檩):0.162/4*3.14*{(1.4+0.2*2)*6+[(2.424-0.32*2)+

(1.4+0.32*2)]*2=1.12*4}=0.0064*3.14*[1.8*6+(1.784+2.04)*2+4.48

=0.0064*3.14*(10.8+7.65+4.48)=0.0064*3.14*22.93=0.46m3

4.木枋子:0.08*0.2*1.8*6=0.17m3

5.椽子(1).本椽:0.05*0.07*1.612*1.1662*(0.7/2+1)*6=0.0035*1.612*

1.1662*5*6=0.197≈0.2m3

(2).摔网椽:0.0035*0.955*1.414*10*6=0.0035*1.35*60=0.28m3

(3).飞椽:0.04*0.06*0.7*30=0.05m3

(4).立脚飞椽:0.024*0.07*60=0.1m3

6.老戗木:0.14*0.16*2.093*1.1662*6=0.33m3

7.嫩戗:0.14*0.12*1.1*6=0.11m3

8.凌角木:(0.231+0.692)*1.1662*0.6*0.819*1/2*0.08*6=1.08*0.6*

0.819*1/2*0.08*6=0.128≈0.13m3

9.枕头木:0.4*0.5*1/2*0.1*12=0.12m3

10.千斤销:6个

11.灯芯木:0.162/4*3.14*2.5=0.0064*3.14*2.5=0.05m3

12.木天棚:1.42*2.5981=5.09m2

13天棚面层:5.09㎡

长风亭

14.屋面板:[1.4+(0.4+0.7)*2]2*2.5981*1.1662=3.6*3.6*2.5981*

1.1662=39.27m2

15.太平梁:0.182/4*3.14*(1.4-0.32)*2=0.0081*3.14*2.16=0.055 m3

16.挂落:(1.4-0.16)*6=7.44m

17.吴王靠:1.4*4=5.6m

18.大连檐:(1.4+0.7*2)*6=2.8*6=16.8m

10.里口木:16.8m

20封沿板:16.8 m

六.屋面:1.盖蝴蝶瓦:(1.4+0.6*2)2*2.5981*1.1662=2.6*2.6*2.5981*1.1662=20.48m2

2.花边(滴水):2.6*6=16.8m

3.戗脊:(2.96m)6条

4.戗根吞头:6条

5.屋面防水层:(1)1.5厚JSQ高弹性复合防水材料:20.48m2

(2)25厚1:2水泥砂浆钢丝网粉刷层:20.48m2

(3)JS-C高分子防水卷材:20.48m2

(4).钢筋加固:0.222*(16.8+1.88*3*6)=0.222*50.64/1000=0.011T

(5).望砖钉木条:(0.02*0.02):1.88*18=33.84 m3

七.油漆:1.柱:0.16*3.14*2.59*6=7.81m2

2.童柱:0.16*

3.14*1.8=0.9m2

3.檩:0.16*3.14*(1.8*6+3.82*2+1.12*4)=0.16*3.14*22.92=11.52m2

4.枋子:(0.08+0.2)*2*1.8*6=6.05m2

5.椽子:0.17*(1.88*30+1.35*60)=0.17*(5

6.4+81)=0.17*13

7.4=23.36m2

飞椽:0.14*0.2*90=2.52m2

6.老戗:(0.14*2+0.16)*2.44*6=0.44*2.44*6=6.44m2

7.嫩戗:(0.14+0.12*2)*1.1*6=2.51m2

8.凌角木:1.08*0.4*0.819*1/2*2*6=2.12m2

9.枕头木:0.4*0.5*1/2*2*6=2.4m2

10.灯芯木:0.16*3.14*2.5=1.256≈1.26m2

11.太平梁:0.18*3.14*2.16=1.22m3

12.天棚:5.09

13.沿口板:(1.4+0.6*2)2*(-1.4*1.4)2*2.5981*1.1662=2.6*2.6*-1.4*1.4 *2.5981*1.1662=(6.76-1.96)*1.1662*2.5981*0.83=12.07m2

14.挂落:7.44*0.45=3.35m2

15.吴王靠:5.6*1.46=8.18m2

16.大连檐与里口木已成舟:(16.8+16.8)*0.45=33.6*0.45=15.12m

17.封沿板:16.8*2.2=36.96 m

1-9计:65.63 m2

12-13计:17.16 m2

14-15计:11.53 m2

16-17计:52.08 m

18.乳胶漆:5.89㎡

八脚手架: 亭脚手架一座

建筑面积:(3.6+0.24*2)*(1.5+0.24+0.1)=4.08*1.84=7.51㎡

长1-1剖:2.494+3.479+4.00*2+2.474=16.45m

2-2剖:1.4*2+3.6=6.4m

3-3剖:2.9*2=5.8m, 4-4剖:3.6m

一.土方:1。基槽:[(1.1+0.3*2)*28.65+(0.9+0.3*2)*3.6]*1.1=(1.7*28.647+1.5

*3.6)*1.1=(48.7+5.4)*1.1=54.1*1.1=59.51m3

2.基槽夯实:1.7*28.407+1.5*

3.6=5

4.1m2

3.基槽回填土:59.51-(3.45+7.08+2.5+2.26+2.01+0.48)=59.51-17.72

=41.79m3

4.余土外运:17.72m3

二.基础:1.C15砼垫层:0.1*(1.1*28.65+0.9*3.6)=0.1*(31.51+3.24)=0.1*34.75=

3.48m3

2.C25砼带形基础:0.25*(0.9*28.65+0.7*

3.6)=0.25*(25.78+2.52)=0.25

*28.3=7.08m3

3.砖基础(1-2剖):0.24*0.51*(22.85-0.24*9)=0.24*0.51*20.687=2.53m3

(3-4剖):0.37*0.51*(2.9*2+3.6)+0.9*0.3*(0.3+0.6)*2=0.37*

0.51*9.4+0.9*0.3*1.8=1.77+0.49=2.26m3

4.基础圈梁:0.24*(0.24*20.45+0.37*9.4)=0.24*(4.91+3.48)=0.24*8.39

=2.01m3

5.构造柱(基础部分):0.24*0.24*0.75*9+0.24*0.03*0.75*16=0.39+0.09=

0.48m3

三.石作部分:1.磉石:(500*500)*2个 (250*250)*2个

2.鼓石:4个

3.压沿石(300*170):[(2.3+0.15)*2+3.6+0.3+0.25*2]*0.3=(

4.9+3.9 +0.5)*0.3=9.3*0.3=2.79m2

四.楼地面:1.原土夯实:2.3*3.6-0.25(0.25+0.5)*2=2.3*3.6-0.25*1.5=7.68-0.375

=7.305≈7.31m2

2.80厚C15砼垫层:0.08*7.31=0.58m3

3.30厚砂垫层:0.03*7.31=0.22m3

4.350*350方砖地面:7.31m2

5.坐凳墙:0.24*0.46*2.3*2=0.51m3

6.砖细坐凳板:0.3*4.6=1.38m2

7.砖细踢脚线:0,2*2.3*.2=0.92㎡

8.方砖加工:7.31+1.38+0.92+3.14=12.75㎡

五.木构件:1.柱:0.22/4*3.14*(3.00+0.18+0.08-0.14)*4=0.01*3.14*3.13*4

=0.39m3

2.童柱:0.142/4*

3.14*(0.2+0.3+1.00)*2=0.142/4*3.14*3.00=0.05m3

(0.182/4+0.22/4)*1/2*3.14*0.22*4=0.03m3计:0.08 m3

3.梁:0.142/4*3.14*(0.5+0.2)*2+0.182/4*3.14*(0.8+1.5+2.3+0.2*3)

*2=0.142/4*3.14*1.4+0.182/4*3.14*10.4=0.286≈0.29m2

4.枋:0.06*0.08*(2.3+3.6+0.2*3)*2+0.07*0.12*(2.3+3.6+0.2)*2=

0.06*0.08*13+0.07*0.12*12.2=0.0624+0.102=0.16m3

5.木门:2.00*2.1=4.2m2

6.壁板:(0.015*0.12)长:(2.3+3.6)*2=11.8m

7.檩条:0.142/4*3.14*[(2.00+0.2*2)*4+1.5*2]+0.182/4*3.14*[(3.6+ 0.4)*3+(2.3+0.2)*2]=0.142/4*3.14*12.6+0.182/4*3.14*17= 0.63m3

8.老戗:0.16*0.14*1.84*2=0.08m2

9.嫩戗:0.14*0.12*1.1*2=0.03196≈0.04m3

10.戗山木:0.9*0.4*sin125o*1/2*0.06*2=0.9*0.4*0.819*1/2*0.06*2

=0.01769≈0.02m3

11.枕头木:0.8*0.4*1/2*0.1*4=0.064≈0.06m3

12.椽子:(1).弯椽:0.05*0.07*2.8*1.1662*(2.00/0.2+1)=0.0035*

35.97=0.13m3

(2).本椽:0.0035*[1.5*1.1662*11+1.3*1.118*(1.5/0.2+1)* 2]=0.0035*(19.24+26.16)=0.0035*45.4=0.1589

≈0.16m3

(3).摔网椽:0.0035*1.3*1.414*20=0.0035*36.76=0.12867≈0.13m3

13.垂莲柱:0.12*0.12*0.72*2=0.020736≈0.02m3

14.雀脊:(0.6*0.26)*2块, 15.水浪机:4只.

16.闸椽板(小连檐):2.8*2+3.6+0.5*2=10.2+(10.2) =20.4m

17.花撑子:2只(1.1*0.065)

18.屋面板:(2.00*1.1662+1.3*1.118*2)*2.8=14.67m2

19.山花板:0.6*0.75*1/2*4=0.9m2

20.封沿板:10.2

21.木斤销:2个.

六.屋面部分:1.蝴蝶瓦:2.8*(2.00*1.1662+1.3*1.118*2)=2.8*(2.3324+2.9068)=

2.8*5.2392=14.67m2

2.望砖:1.5*2.00*1.1662=

3.4986≈3.5m2

3.防水卷材:1

4.67m2, (钢丝网砂浆防水层) 14.67m2

4.花边(滴水):10.2m

5.排山沟滴:1.5*1.1662*2=3.5m

6.环包脊:2m

7.垂脊:3.5m, 8.搏脊:1.5*2=3m

9.戗脊:2条, 10.戗根吞头:2只

11.泛水2m

13.钢筋加固:0.222*4.6+2.8*2+2.3*1.1413*3=0.222*18.07/1000=0.004T

14.望砖加工:3.5㎡

15钢丝网博风板:3.5 m

七.油漆:1.柱:0.2*3.14*3.12*4=7.84m2

2.梁:0.18*

3.14*10.4=5.88m2

3.童柱:(0.18+0.2)*1/2*3.14*0.22*4=0.53m2

4.枋:(0.06+0.008)*2*13+(0.07+0.12)*2*12.2=3.64+4.64=8.28m2

5.檩条:0.18*3.14*17+0.14*3.14*(2.4*4+3.00)=9.61+5.54=15.15m2

6.老嫩戗:[(0.16*2+0.14)*1.84*2+(0.14*2+0.12)*1.1*2=0.46*1.84*2+

0.4*1.1*2=1.69+0.88=2.57m2

7.戗山木:0.9*0.4*0.819*1/2*4=0.59

8.枕头木:0.8*0.4*1/2*8=1.28m2

门亭

9.椽子:0.17*(35.97+45.4+36.76)=0.17*118.13=20.08m2

\ 10垂莲柱:0.12*4*0.72*2=0.69m2

11.花撑子:[1.1*(0.4+0.065)*2]*2=1.1*0.93*2=2.05m2

12.山花板:0.9*2.4=2.16

13.雀替(花牙子):0.6*0.26*2*0.45=0.14m2

14.闸椽板(小连檐):10.2*2*0.45=9.18+10.2*2.2封沿板=9.18+22.44=

31.62m

15.屋面板:1.3*1.118*2*2.8*0.83=6.76m2

16.木门:4.2m2

油漆合计:古式构件:7.84+5.88+0.53+8.28+15.15+2.57+0.59+1.28+20.08+0.69 =62.89m2

其他木材面:2.16+6.76=8.92m2

八.围墙:1.墙面:0.24*[(2.69+0.28)*(16.45-0.24*5)-1.00*1.00*6]+(0.19*0.2*

1/2*2)*16.45=0.24*(2.97*15.25-6)+0.19*0.2*16.45=0.24*

39.29+0.19*0.2*16.45=9.43+0.63=10.06m3

2-2剖:0.24*[(4.54+0.28)*(6.4-0.24*4)-22/4*3.14+0.038*6.4=0.24*

(4.82*5.44-3.14)+0.038*6.4=0.24*26.22+0.24=6.29+0.24=6.53m3

合计:10.05+6.53=16.58m3

2.圈梁:{0.24*0.26+[0.19*0.06+0.03*(0.03+0.06)]*2}*22.849-2.16=

[0.0624+(0.0114+0.0027)*2]*20.687=0.0906*20.687=1.87m3

3.构造柱GZ:0.24*0.24*(3.7*5+5.55*4)+0.24*0.03*(3.7*10+5.55*6)=

0.0576*(18.5+22.2)+0.0072*(37+33.3)=0.0576*40.7+0.0072

*70.3=2.34+0.51=2.85m3

4.双落水:22.847m

5.花边(滴水):22.847*2=45.214m

6.围墙脊:22.847m

7.墙面抹灰:[(2.95+0.19)*16.45+(4.54+0.19)*6.4-(1.00*1.00*6+2*3.14)]

*2=(3.14*16.45+4.73*6.4-12.28)*2=(51.65+30.27-12.28)*2=

69.64*2=139.28m2

8. 粉座凳墙:0.46*2.3*2=2.12㎡

9粉博风板:3.5 *0.35=1.23㎡

10.乳胶漆:139.28+2.12+3.5*0.35=142.63㎡

12.砖细门边:(0.3+0.1*2)*2.00*3.14=3.14㎡

13.漏窗:1.00*1.00*6=6m2

14.粉窗套:(0.24+0.1*2)*1.00*4*6=10.56㎡

10.脚手架:(1)工具脚手架:16.45*3.3=54.29 m2

(2)双排脚手架: 6.4*4.5=28.8m2

(3)亭脚手架一座.

11斜道一座

12.竹笆栏板:(9.4+16.45+6.4)*0.8=32.25*0.8=25.8㎡

土方承包合同通用版

编号:_______________ 本资料为word版本,可以直接编辑和打印,感谢您的下载 土方承包合同通用版 甲方:___________________ 乙方:___________________ 日期:___________________

篇,希望对你有所帮助。 ________年土方承包合同范本一 发包方以下简称甲方 承包方以下简称乙方 根据国家和____市建设工程项目的有关法律、法规规定,为明确甲乙双方的权利和义务,确保工程项目的质量和安全,保障双方的合法权益经双方协商,特签订本协议。 一、工程项目名称____市保障性住房三林基地3号地块项目二标 二、工程地点____区三林镇2-1地块 三、工程承发包范围和内容 ①、此单价包括所有机械设备的进出场费,挖土地点的挖机、运输车辆、走道板的配备,卸土地点的挖机和推机、走道板的配备,暗浜的挖运等。 回土期间装点的机械和运输车辆、走道板的配备、回土地点的挖机配备,负责土方外运的申报并承担所申报的费用及卸土地点土方堆置费用,工地门外的保洁由乙方负责并承担由于门外保洁不力所产生的罚款。 ②、工程量确定 、基础土方开挖在挖土前双方测定场地原始标高作书面确认,挖土完成后根据现场实际深和大小测量计算方量。 、基础土方回填回填前确定回土完成面标高,并在回土前根据现场实际深和大小测量计算方量作书面确认。 ③、基础回土含基础周边所有开挖范围内的场地平整、压实。 ④、不在土方外运承包范围内的临时挖机台班以甲方有效签证为准计取,承包范围内的工作不得另行签证,所有签证必须经甲方三人以上签字有效,签证程序按甲方要求执行,每月发生的临时用机械费必须每月结算,在下月10前上报确认,隔月作废。 四、双方的职责范围

土石方开挖合同

土石方开挖合同 甲方:四川锦龙建筑工程有限公司(以下简称甲方) 乙方:四川勇业建设工程有限责任公司(以下简称乙方) 甲方委托乙方承担成都市南部副中心科技创业中心9#楼土方开挖、修边及检底等全部施工任务。 根据《中华人民共和国的合同法》及国家有关法规规定,结合本工程具体情况,为明确责任,协作配合,确保工程施工质量,经甲、乙双方协商一致,签订本合同,共同遵守。 第一条工程概况: 1、工程名称:成都市南部副中心科技创业中心9#楼 2、工程建设地点:成都市南延线天府大道西侧 第二条工程施工内容: 1、乙方按甲方指定的灰线范围及坡度进行开挖,并负责修边检底和将所挖土方运出场外(土方弃土场由乙方自行解决) 2、乙方负责修边检底应达到甲方或设计要求的深度和宽度,并达到能浇筑混凝土为准。 3、场内平整土地、场内运土临时道路由乙方免费施工。 4、乙方应负责土方机械的冲洗和厂外道路的卫生清扫工作。 第三条:甲、乙双方责任: 甲方责任: 1、甲方应及时为乙方提供现场的工作条件。 2、甲方应及时为乙方解决现场出现的问题。

3、甲方根据情况尽可能提供现场办公室及临舍。 乙方责任: 1、乙方应在甲方指定的时间和工作范围内完成所承担的工作,若未按规定时间完成,每超过一天自愿罚款10000元。 2、若乙方挖土未按甲方指定的深度和宽度开挖,其超挖宽度不计算工程量;其超挖深度按设计要求的处理方法处理,其所发生的全部费用由乙方承担。 3、乙方车辆外出和向场外运输土方,如污染城市道路导致罚款或受到有关执法部门不良行为公示,其所有罚款由乙方承担。若公示或罚款一次,自愿接受甲方罚款两万元。 4、乙方进场开挖前,编制详细施工方案,包括管理人员名单、机械配置、开挖顺序、行车路线等,并充分考虑与护壁施工单位的配合和交叉作业,经甲方、监理审批后方可开始施工。 5、乙方自行办理土方开挖、渣土清运等相关手续并承担其费用。 6、在现场工作的施工人员,应遵守甲方的安全保卫及其它有关规章制度,并指定专人负责现场安全和协调工作。施工中时刻做到安全第一,确保无安全事故。非甲方原因发生人员伤、亡安全事故,应由乙方负责全部善后工作及所有费用。《“质量、安全”处罚条例》作合同附件附后。 第四条违约责任: 1、甲方未给施工方提供必要的工作条件而造成停、窝工,甲方应付给乙方停、窝工费,工期按实际工日顺延。

上海中心大厦土方施工方案

上海中心大厦土方施工方案 上海中心大厦位于上海浦东陆家嘴金融贸易区核心地段,为陆家嘴金融区最重要的标志性功能性建筑区,与金茂大厦、环球金融中心成“品”字型分布。 上海中心大厦地下室5层,由1 幢121层主楼和1栋5 层商业裙房组成,总建筑面积约为573000m2,主楼建筑高度为632m。 主楼地下工程施工方案 主楼区顺作先行施工、裙房区逆做延后施工,先施工的主楼区以平面圆形的地下连续墙结合六道环撑共同组成支撑“围堰”,土方开挖后,围堰内将形成内部空阔无遮蔽的“井筒”,便于地下室结构施工,且平面空间利用率很高。 主楼地下室为五层混凝土结构,层高4.0~6.0m不等,与裙房区开敞相容,之间无分区、分界的结构墙体。基础底板设计为厚达6.0m的筏板,八根劲性“超级柱”、四根劲性“角柱”及核心筒剪力墙共同构成主楼主体的抗测力体系,为进一步增强核心筒剪力墙的延性,全五层暗柱通体内埋H 型钢、墙体采用“钢板剪力墙”设计。 1.1.1主楼地下工程施工流程

垫层施工及桩头处理 土方开挖与环撑施工 1)概况 主楼基坑土方开挖面积约 1.15万m2,开挖深度约31.1m,总土方量约357600m3;基坑四周均匀设置四个二级挖土平台;环形支撑支撑共设置了六道。 2)主楼基坑土方开挖总平面图

3)

主楼基坑土方开挖总平面图 a.1#、3#、4#大门为施工人员及车辆进出大门;2#大门为贵宾通道,为行人专用;临时大门1、2为临时使用大门,不考虑为土方外运出口; b.图中标高均为相对标高,±0.000相当于绝对标高4.600,标高单位一致; c.施工道路延用地下连续墙施工时的道路; d.土方开挖区域主要分成中央盆式土方F、中间岛式土方E和靠近连续墙的土方A-1,A-2,B-1,B-2,C-1; e.场地西北角预留弃土堆场,土方开挖至一定深度时,为保证出土量,可堆置2000m3以上土方于弃土堆场,弃土堆场距基坑坡顶边

土方测量报告

土方测量报告 LG GROUP system office room 【LGA16H-LGYY-LGUA8Q8-LGA162】

***区 ***地块土方测量报告 一、项目名称: ***区***地块土方工程 二、坐落地点: ***经济园区 三、工程概况: 受天津***投资发展有限公司的委托,我公司承担***区***地块工程地块区域界内土地进行挖填垫土方量的计算,地块位于***经济园区内。测量地区主要部分为沟渠,原地貌均有沟渠和坑,测量时现场原装杂草灌木均已清理完毕,测量完毕后整个区域按设计要求进行场地整理,并对地块内土方量进行计算。 四、作业依据 1、《城市测量规范》CJJ8—99; 2、《工程测量规范》GB50026-2007; 3、《国家三、四等水准测量规范》 GB/T 12898—2009; 4、《全球定位系统(GPS)测量规范》 GB/T 18314—2009。 五、工程期限及时间 1、原地貌地形测量:2013年12月12日 六、坐标系统: 现场布设:在现场进行选点砸钉,采用VRS系统,分别对两个控制点进行60s 平滑采集得取控制点成果。平面控制为市任意直角坐标系;高程控制为***高 1、使用仪器: 南方动态RTKGPS(VRS系统)1+2台套 2、施测方法: 1)控制点检核 采用南方GPS S82RTK测量系统,对控制点KZ10、KZ16,实地直接进行RTK 测量,测量时KZ10作为RTKGPS平面、高程校正点,进行参数校正,KZ16控 制点作为平面及高程检核点,检核结果如下:

2 首先在场地内采用南方GPS架设基准站(RTK系统)在已知控制点KZ10点上进行参数校正,然后到KZ16点上进行精度检验,合格后按委托方指定边界,采集土方工程范围边线;并直接用RTK测量方式测量原始地形、陡坎、地貌和各高程特征点,经过内业处理后作为测量成果;三维坐标数据点采集密度按照5-15米间隔采集,地形变化明显处,加密三维坐标点数据采集; 3)内业成图及土方量计算 (1)外业结束后,检查数据采集成果,并由GPS手薄直接传输到计算机,导出三维坐标数据文件,建立原始数据文件,采用南方地形地籍成图软件()进行测量范围边线、地形图绘制; (2)进行图面清查,按照国家1:1000地形图规范进行地形、地物属性核查,并进行图面修剪、整饰; (3)成果绘制出图; (4)采用南方地形地籍成图软件()软件计算,利用软件中的方格网法土方计算,进行土方量计算; 八、计算说明: 1.本测量工作按甲方要求,采用南方地形地籍成图软件()进行地形图绘制, 并展绘所以高程点,绘制原地貌地形图,并生成高程数据文件; 2.在地形图上勾绘土方计算的区域:主要为半慌地块,面积为平方米; 3.利用软件中“方格网法土方计算→方格网土方计算”的功能,选择土方施工 前的地形高程测量数据文件,然后输入平场高程米,最后选择方格网宽度为 15米,通过计算模型中的每个方格网的四个角点的高程、高差,从而计算出 本网格的土方量变化,最终获得土方施工整个土方量的变化,形成土方量变 化表。

南方CASS9.0 土方量的计算操作流程

南方CASS9.0 土方量的计算操作流程 DTM法土方计算 由DTM模型来计算土方量是根据实地测定的地面点坐标(X,Y,Z)和设计高程,通过生成三角网来计算每一个三棱锥的填挖方量,最后累计得到指定范围内填方和挖方的土方量,并绘出填挖方分界线。 DTM法土方计算共有三种方法,一种是由坐标数据文件计算,一种是依照图上高程点进行计算,第三种是依照图上的三角网进行计算。前两种算法包含重新建立三角网的过程,第三种方法直接采用图上已有的三角形,不再重建三角网。下面分述三种方法的操作过程: 1. 根据坐标计算 ●用复合线画出所要计算土方的区域,一定要闭合,但是尽量不 要拟合。因为拟合过的曲线在进行土方计算时会用折线迭代,影响计算结 果的精度。 ●用鼠标点取“工程应用\DTM法土方计算\根据坐标文件”。 ●提示:选择边界线用鼠标点取所画的闭合复合线弹出如图7-3 土方计算参数设置对话框。 图7-3土方计算参数设置 区域面积:该值为复合线围成的多边形的水平投影面积。 平场标高:指设计要达到的目标高程。 边界采样间隔:边界插值间隔的设定,默认值为20米。 边坡设置:选中处理边坡复选框后,则坡度设置功能变为可选,选中放坡的方式(向上或向下:指平场高程相对于实际地面高程的高低,平场高程 高于地面高程则设置为向下放坡不能计算向内放坡。不能计算向范围线内部 放坡的工程)。然后输入坡度值。 ●设置好计算参数后屏幕上显示填挖方的提示框,命令行显示: 挖方量= XXXX立方米,填方量=XXXX立方米 同时图上绘出所分析的三角网、填挖方的分界线(白色线条)。 如图7-4所示。计算三角网构成详见cass\system\dtmtf.log文件。

土方开挖合作合同(标准版)范本

The obligee in the contract can accomplish the goal in a certain period by discussing the agreed rights and responsibilities. 甲方:___________________ 乙方:___________________ 时间:___________________ 土方开挖合作合同(标准版)

编号:FS-DY-24991 土方开挖合作合同(标准版) 发包方:(以下简称甲方) 承包方:(以下简称乙方) 经甲、乙双方协商一致,就甲方委托乙方建造兰埔花园园林工程,签订以下协议: 一、工程内容: 包括我公司设计的兰埔花园园建、绿化、及其他部分工程(详见图纸)。 以上项目均按双方会审图纸之要求及附后预算总表所列项目、规格、备注、数量、要求施工。 二、工期: 1、开工日期:本项目工程工期从20xx年月日起至20xx 年月日止,共个日历天。 2、施工期内,若因停水、停电、大雨、暴雨天等因情况或甲方书面确认工期可顺延。

3、因甲方原因不能及时移交施工场地则工期顺延。 三、工程合同价款: 经协商本合同总承包价款为人民币:壹佰零捌万元整。若施工过程中甲方有变更需要增加工程,则按实结算。 四、承建方式 乙方对水电及园建工程包工、包料;包质量、包验收合格、包安全、包工期、包文明施工。 1、乙方负责提供所承建工程的饰面样板,必须经双方确认方可进料施工。 2、施工期间甲方负责乙方施工发生的水电费用。 五、工程付款办法 1、本合同自甲、乙双方签订后3天内由甲方向乙方支付订金为合同价款的30%,即人民币:叁拾贰万肆仟元整。乙方收款后第二天安排人员进场施工。 2、待完成总工程80%后,甲方于3天内向乙方支付工程合同价款的30%,即人民币:叁拾贰万肆仟元整。 3、工程竣工后,甲方于一周内向乙方支付工程合同价款的20%,即人民币:贰拾壹万陆仟元整。

土方开挖施工方案.doc香山房地产

目录 一、工程概况 (1) 二、编制依据 (2) 三、施工部署 (3) 四、施工准备 (5) 五、土方开挖 (8) 六、基坑开挖注意事项 (12) 七、基坑开挖过程中可能出现的问题及相应处理措施 (13) 八、安全文明施工技术措施 (14) 附:1、土方开挖平面图 2、土方开挖剖面流程图 第一章工程概况

工程名称:东阳市香山房地产陶然轩住宅楼 建设单位:东阳市香山房地产 设计单位:浙江省建工建筑设计院有限公司 监理单位:浙江联达建设监理咨询有限责任公司 质监单位:东阳市建设工程质量安全监督站 施工单位:浙江中鸿建设集团有限公司 建设地点:山口大道与蒋甘溪路交叉口 建筑层数:地上12层,地下1层 基础类型:地梁、承台、筏板式基础 上部结构:框架结构 耐火等级:地下车库为一级,其余为二级 安全等级:二级,设计使用年限50年 防水等级:地下室二级 人防等级:六级 抗震设防等级:<6度 总建筑面积:18073.4平方米,其中地下4344.20平方米。 建筑高度:40.70米 土方开挖深度:5.02米左右 本工程的±0.00标高相当于黄海标高69.300,场地自然地面标高为-1.28,基坑底标高(包括地下室混凝土垫层和碎石垫层)为-6.300。 第二章编制依据

1、香山房地产陶然轩住宅楼招标文件; 2、现场实地踏勘及招标答疑文件; 3、香山房地产陶然轩住宅楼施工图纸; 4、浙江省东阳市勘察院提供的岩土工程勘察报告; 5、《建筑地基处理技术规范》(JGJ79-2002); 6、《工程测量规范》(GB50026-93); 7、《建筑与市政降水工程技术规程》(JGJ/T111-98); 8、《施工现场临时用电安全技术规范》(JGJ46-88); 9、《建筑施工安全检查评分标准》(JGJ59-99); 10、《建筑机械使用安全技术规程》(JGJ33-86); 11、国家、浙江省、东阳市建设工程的有关文件; 12、中国建筑工业出版社出版的《建筑施工手册》等参考文献; 13、与业主的施工合同。 第三章施工部署 一、人员部署

土方承包合同篇

土方承包合同 2 篇 土方承包合同范本(一) 甲方: 乙方: 为明确甲、乙双方权利、责任关系,依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、法规,并结合本工程的实际情况,遵循平等、自愿、公平和诚实信用的原则,双方就本工程施工事项协商一致,订立本合同。 一、工程名称: 二、工程地点: 三、工作内容:平基放线,劳动力及技术装备的组织,土石方的爆破及开挖,地表清障,清淤,土石方的场内调配及外运、弃渣,以及周边建筑物、居民的安全防护设施,工程资料的编制,压实抽样试验,现场的安全文明施工措施,同周边政府单位包括环卫、城建、公安、交通、建委、街道办事处、居委会及周边企(事)业单位为保证工程质量、进度而作的协调等工作。 四、工程范围: 按甲方提供的施工图纸和甲方批准的施工组织设计在现场指定区域内进行施工,余土外运至渣场,渣场由乙方自行落实,甲方概不负责。 五、合同工期: 开工日期:XX年月日;竣工日期:XX年月曰。合同工期总日历天数天。 六、合同价款: 本合同采用单价包干合同,即乙方完成合同约定承包范围内全部工程内容和工作内容所需要的人工费、材料费、机械费(含机械设备等的进、出场费)、管理费、保险费、利润、税金、环卫出渣费以及倒土费、工程周边社会关系协调等全部费用组成,其单价为: 1、场内回填部分 (1)页岩(松次坚石)做回填方,按元/m3 包干价执行。 2、余土外运部分

(1)外运工程量不论运距远近,按元/m3 包干价执行。 3、其他若甲方需要向乙方临时租用机械设备,按租用期市场价计算租金,机械设备台班以 甲方指定人员签证为准。 七、工程结算:工程完工验收合格后依据甲、乙双方现场实测方格网及实际收方工程量办理结算,结算完毕,移交竣工资料后,一次性付至结算金额的85%,剩余尾款两个月内付清。八、工程质量及技术要求: 本工程严格按照国家现行《土石方爆破工程施工质量验收规范》、《建筑工程质量检验及评定标准》、《建筑地基与基础工程施工质量验收规范》等进行施工和验收。同时,本合同约定: 1、土石方工程施工完成后的验收标高与设计标高的误差不大于土10cm,垂直面无偏坡。 2、进场施工前,必须提前7 天向甲方分别提交:土石方调配及外运施工方案、安全文明施工方案及质量进度保证措施。 3、场内填筑部分必须分层碾压密实,并优先选择页岩以内土石方回填,且在页岩以内土石方有剩的情况下,不得选用砂岩回填。 4、建筑物及其基础外边线6m以外范围内,回填土石方必须分层碾压,密实度不得小于90%。 5、竣工资料为壹式陆套。 九、安全施工:乙方应严格按照国家有关安全施工规范进行施工,采取严格有效的安全防护措施,在施工作业中,所遇任何与工程相关事故,均由乙方自行负责。 十、违约责任:

土方开挖合同

专业工程分包施工合同 合同编号:承合字 2012 第 工程名称: 发包方(简称甲方): 承包方(简称乙方): 合同签定日期:年月日 合同签定地点:

专业工程分包施工合同条款 发包方(简称甲方): 承包方(简称乙方): 按照《中华人民共和国合同法》、《中华人民共和国建筑法》及本工程施工现场具体情况,甲方将本工程工程分包给乙方施工,经双方协商一致,达成以下合同条款: 一、工程概况 建设单位名称:昆明大润房地产开发有限公司 工程名称: 建设地点: 工程内容:机械开挖场地土方(含人工清底、修边坡、开挖道 路及运输土方道路的铺设,开挖出来的土方,有序组织运出土 场)。 二、质量要求:基底的平面尺寸、边坡坡度、标高等应符合设计图纸要求,偏差控制在施工规范允许范围内,按现行验收规范和要求一次性验收合格。若达不到一次验收合格,甲方按结算总价的8%处罚乙方,并且返工的一切损失费及责任由乙方承担。 三、工期要求:天完成,从项目部安排的进场时间起计,直至承包范围内所有工作内容全部完工,最终按项目部安排的施工进度计划完成。逾期一天支付违约金10000.00元,提前一天奖励10000.00元,累计计算,并承担给甲方造成的一切经济损失和法律

责任。 四、承包范围及工作内容:场地土方、基础土方机械开挖(含人工清底、转运、平整、修边坡、承台、地梁土方、长螺旋机引孔土方、开挖道路及运输土方道路的铺设等,土方清底后需确保混凝土垫层能正常浇筑)。 五、承包方式:包工、包机械、包质量、包工期、包安全、包文明施工。 六、合同价款及其他要求: 1、合同量:暂估 2、机械及人工费综合单价:按元/M3(每挖土、清底、运费、管理费及税金等) 3、乙方必须服从甲方的指挥,严格按照(基础土方施工方案)组织施工,若不服从甲方指挥出现超挖、多挖并由此增加其它工作量,甲方不给予结算多余部份工作量。同时若在施工中不服指挥引起的管桩桩身损坏等相关责任由乙方全权承担。 4、以上单价均包括完成该合同承包范围及内容的人工费、材料费、机械费、燃油费、生产工具使用费、生产工人劳动保护费、保险费、工伤人员工资及医疗治疗费用、病假人员工资、节假日加班工资、乙方的管理费及税金、风险费、措施费、政策性人工调差和市场人工及材料价格波动等所有费用。包括工期要求、质量要求、地理位置、现场情况、现场材料运输、材料堆放地点、工人食宿、现场机械配备

土方工程施工组织方案

上海市万达商业广场基坑土方挖运工程

施工组织设计(B版) 中国建筑第二工程局(沪)万达项目经理部 2005年2月3日 目录 第一章、工程概况 (2)

1工程概况 (3) 1.1工程简介 (3) 1.2结构概况 (3) 1.3、工程基地周边管线状况 (4) 1.4、工程地质条件 (4) 1.5、土方工程概况 (5) 1.6、施工项目 (6) 第二章、编制说明 (7) 1、编制依据 (7) 2、编制原则 (7) 第三章、土方开挖施工方案 (7) 1、施工前准备工作 (8) 2.挖土工况与施工顺序 (14) 3.卸土点及土方车辆数量选择 (21) 第四章、施工组织机构及进度保证措施 (21) 第五章、成品保护 (22) 第六章、保洁措施 (22) 第七章、质量保证措施 (23) 第八章、安全文明保证措施 (24) 第九章、进度计划 (27) 第十章、土方工程工况图 (27) 第一章、工程概况

1工程概况 1.1工程简介 工程名称:上海万达商业广场 工程地点:上海市杨浦区五角场,邯郸路、淞沪路口 建设单位:上海万达商业广场置业有限公司 设计单位:上海市房屋建筑设计院 总承包单位:中国建筑第二工程局(沪) 1.2结构概况 1.2.1、万达商业广场基坑平面东西长约285.6m,南北宽约160.2m,基坑开挖面积约46194m2。 本工程±0.000=绝对标高4.200m,现场自然地面相对平均标高为-0.400m,相当于绝对标高3.800m。本工程地下为2层深地下室,局部为三层夹层,基坑开挖深度至相对标高-10.900m,局部深坑标高为-11.500m、-12.900m不等。 1.2.2、本工程基础形式为钢筋砼灌注桩及现浇钢筋砼厚底板基础,底板厚度0.8m,坑底均有150厚素砼垫层,围护采用地下连续墙,厚度为800mm,有效长度28m,地下连续墙顶标高为-0.800m,上有800*800砼压顶梁。

施工日志

七里河体育公园 施 工 日 志

2014.1 对去年完成的工程量进行统计,以及来年工作安排,工作协调 会议对开春后工作分配。机械人员和材料准备备案。 已完成绿化需做好养护,主要保温放置冻害。已完成灰土土垫层进行防冻处理,表面覆土。 2014.2 2.14—2.20陆续大型机械进场,清理去年灰土垫层覆土,并对灰土垫层及基槽进行整改。放线工作围绕西广场进行,从西入口向 东推进,机械开槽外运垃圾土方开始。 已完成绿化浇春季水,3遍透浇,开始进行清表工作,地形平整,对达不到种植条件区域进行垫土方。 给排水工:初步完成工程量统计,开始人员机械及材料的准备,制定工作计划,开始测量放线工做,从南侧厕所处开始开挖基槽。 20号材料进场。 电力工程:根据总工程工期制定的工作计划,将电力施工分为 2部分,一部分开始对已完成过路管线部分的检查看是否具备穿线 条件,准备机械和线缆开始线路铺设工作。第二部分:对没有开挖 的部分进行测量放线工作,对相应工程量统计计划机械人员的配备,机械开挖电缆沟槽,开挖后地基处理垫层铺设,管线铺设。第一部主要集中ABD区,和沿主路部分。第二部分从EF区开始。 一.给排水:基槽开挖基本完成开始对基层处理,管材及施工 人员组织完成,准备在3月10日完成管道的铺设及回填工作,3月底完成井的砌筑和井具安装。 2.20- 3.10对给水管道和排水管道进行开槽及管道铺设

3.10-3.25进行检查井和阀门井的砌筑,井具安装。 3.22-3.28对压力管道进行试压,合格后进行回填工作,非压力 管道进行闭水试验,实验合格后进行回填工作。 截止至3.30完成给排水管道的所有工作任务,4.15与市政自来水接通。 二.电力: 已完成第一部分的线路穿线工作60%,工作计划调整为人员主攻一部分线路,机械设备多调整至2部分电力施工开挖沟槽,计划3月底完成总电力工程量的60%。 3.20已将2013年铺设的预埋管线的线缆铺设工作完成 3.20-3.30进行其他开槽路段的过路管道铺设,主要集中于原商业区相关区域。 4.1-4.20完成加密路和商业区线路的铺设 4.20- 5.15对厕所及管理房设施和灌溉水泵的线路铺设和调试 5.15- 6.10进行灯,音响基础的浇筑, 6.10-6.20完成灯具及其他用电设施的安装 6.20-6.27对用电设施的调试,截止27日全部用电设施已能正常使用

标准土方工程承包合同

标准土方工程承包合同 土方工程承包合同阅读 甲方:XXXX 以下简称甲方 乙方:XXXX 以下简称乙方 因2021年5月10日下暴雨,造成XXXX段发生了塌方,非机动车道无法行人、行车。经请示领导同意,将此塌方地段的土方挖运及清理工作承包给乙方施工,为明确双方权利 义务,特订立如下协议: 1、承包内容:清理及挖运非机动车道、人行道内的土方,修整该段边坡,避免再次发 生塌方。施工时,发生的工程量以我委委派的人员计量为准,工程造价按市场价进行结算。 2、工程结算办法:挖机费按270元/小时计算,土方挖运按100元/车计算,以上单价 含一切税费。 3、质量要求:乙方在施工过程中必须严格把握质量,施工过程中必须按照文明施工要求,并负责竣工后道路的清洁。 4、工期要求:乙方在签订本协议后必须立即组织人力、物力精心安排,周密部署,保 证在今日内顺利完工。 5、安全施工要求:乙方在施工过程中必须树立安全意识,采取安全措施,加强安全管理,如在施工过程中因乙方原因导致的安全事故,其一切经济、法律责任概由乙方负责。 6、付款办法:要求乙方全额垫资建设,在工程验收合格付清。 7、本协议一式捌份,甲方执陆份,乙方执贰份,自签合同起生效。 甲方公章:_________ 乙方公章:_________ 法定代表人签字:_________ 法定代表人签字:_________ _________年____月____日 _________年____月____日 有关简单土方工程承包合同 甲方:发包方______________________________________ 乙方:承包方______________________________________

土石方开挖外运合同(标准版)

土石方开挖外运承包合同 发包单位:____________________________________(以下简称甲方) 承包人:____________________________________(以下简称乙方) 经甲、乙双方协商,在平等自愿的基础上,甲方把平场土石方开挖外运工程承包给乙方施工,并达成以下条款: 一、工程名称:标段 二、承包形式:单价包干(不含税票,只提供总工程款10—20 万元的油发票)。 三、承包单价: 1、综合单价 24 元/m3,含开挖、运输、炸材、人工工资、倒土费及其它合同相关费用,由乙方负责。(如需破碎单价另议)。 四、承包工程内容: 1、甲方提供此项土石方工程的设计图纸标高,交乙方组织施工。 2、乙方负责所有土石方开挖所需的一切机具设备和施工人员、安全防护器具。 五、工程安全及安全责任: 乙方应按照安全施工的标准组织施工,服从甲方现场管理技术人员的监督与指导,不得违章作业,乙方的施工作业人员在施工作业中,没有按作业规范和没有按安全防范配戴安全防护工具的,在施工现场发现后工人罚款50.00元/每次,班组长罚款100.00元/每次(在工程款中扣除);若发生了人员伤亡安全事故,乙方承担所有的责任和所有费用,甲方不负任何责任和不承担任何费用。 六、工程质量: 乙方必须按甲方提供的标高进行土石方开挖,如出现超挖工程量,超挖部分甲方不以认可,未按甲方要求开挖造成损失从乙方工程款中扣除。 七、工程进度: 从合同签定后甲方通知进场之日起计算,有效工期为壹个月,如遇甲方原因或人力不可抗拒的因素,除乙方报上报告后经甲方认可的工期可顺延外,其余均不得以任何理由拖延工期,超期按500元/天进行罚款。 八、付款方式:

工程上海中心大厦施工技术解读

超级工程---上海中心大厦施工技术解读一,工程简介: 上海中心大厦位于陆家嘴金融中心,是一座集商业、办公、酒店观光为一体的综合性摩天大楼。建筑总占地面积约为30370㎡,总建筑面积574058㎡,其中地上部分建筑面积,410139㎡,建筑高度:632米。地下5层,基坑深度,。 主楼为钢筋混凝土与钢结构组合而成的混合结构体系。竖向结构包括核心筒和巨型柱,水平结构包括楼层钢梁、楼面桁架、环状桁架、伸臂桁架及组合楼板。 二,施工技术中的重点及措施: 1,主楼基坑工程: 主楼区基坑采用明挖顺作法先行施工。塔楼围护结构采用121m直径的环 形地下连续墙(厚)加6道环形圈梁支撑体系。土方开挖后形成内部无 遮蔽的“井筒”,便于结构顺作。 随后逆作法施工裙房区结构。 ,降水方案: 、基坑内每25m设置25m深真空管井井点疏干降水井42口,25m深的观察井4口; 、主楼坑内设置55m深的减压降水井12口,45m深的观察井3口; 、基坑外设置65m深的减压降水井28口; 、裙房两墙合一的地下连续墙内侧设置45m深的观察井4口、外侧设置45m深的观察井3口。 ,土方工程: 总土方量约38万m3。采用先开挖中部土方,再挖环边土方的顺序, 分6层开挖。流程如下: 第一、二层土方()→第三层土方、第二道围檩()→第四层土方、 第三道围檩()→第五层土方、第四道围檩()→第六层土方、第五 道围檩()→第七层土方、第六道围檩() 2,桩基工程: ,基桩采用后注浆钻孔灌注桩,桩身混凝土强度C50,单桩承载力特征值10000KN。桩径1m分A、B两种;A桩长86m有效长度56m,247根桩位于核心筒区; B桩长82m有效长度52m,708根桩位于扩展区; ,桩端后注浆施工,每根桩预设3个灌浆管,桩端水泥用量每根4000kg,桩端注浆终止标准采用注浆量和注浆压力双控制,以注浆量为主; ,后注浆钻孔灌注桩施工工艺: 、成孔方式:正循环钻进,反循环清孔; 、泥浆制备:采用专用膨润土和外加剂人工拌制; 泥浆除砂:ZX-250型泥浆净化装置(除砂机)除砂; 、钻头形式:三翼双腰钻加钻具配重;

二断面线间土方计算总结

三角网两期土方操作方法: 第一步: 工程应用--DTA法土方计算---根据坐标文件---选择边界---打开原地貌文件 ---参数设置(是否考虑放坡,已知条件中未给出,按不处理进行,采样间距 20米,平场标高默认)---确认---回车---等高线---三角网存盘写入文件选择好路径保存“原地貌.sjw ” 第二步: 工程应用--DTA法土方计算---根据坐标文件---选择边界---打开设计地貌文件 ---参数设置(采样间距20 米,平场标高默认)---确认---回车---等高线--- 三角网存盘 -------- 写入文件选择好路径保存“设计地貌.sjw ”第三步: 工程应用--DTA法土方计算---计算两期间土方---三角网文件(输2回车)--- 打开 “原地貌.sjw -”--输 2 回车---打开“设计地貌.sjw 这”时一般电脑需要运行较长时间进行计算 断面法操作: 第一步:生成里程文件。一般选择由纵断面生成,在生成前需要用复合线划出你这 两个断面之间的纵断面线(也就是用复合线把这两个断面的中桩连起来)。用鼠标点取“工程应用生成里程文件由纵断面生成新建”。 屏幕提示: 请选取纵断面线: 用鼠标点取所绘的那条纵断面线 屏幕提示:

输入横断面间距: (米)<20.0>输入每两个横断面的间距。断面间距默认值为20 米。可根据不同的地形条件选择,如果精度要求高可按( 1 至5)米任选。屏幕提示: 输入横断面左边xx: (米) 20输入大于0的任意值。根据你的设计要求选择横断面左边长度输入横断面右边长度: (米) 20输入大于0的任意值。根据你的设计要求选择横断面左边长度选择中桩点获取方式: (1)结点 (2)等分 (3)等分且处理结点<2> 1 表示结点上要有断面通过;2 表示从起点开始用相同的间距; 3 表示用相同的间距且要考虑不在整数间距上的结点。 选择其中的一种方式后则自动沿纵断面线生成横断面线。你可根据你那里的实际情况选择,如果生成的横断面在里程的分配上不合理你可在以后修改。对横断面的修改有以下编辑功能添加、 变长、剪切、设计、生成。 添加: 在现有基础上添加横断面线。执行“添加”功能,命令行提示: 选择纵断面线用鼠标选择纵断面线; 输入横断面左边xx: (米) 输入横断面右边xx:

基坑土方开挖合同

基坑土方开挖合同 合同编号: 发包人:(以下简称甲方) 承包人:(以下简称乙方) 依照《中华人民共和国合同法》、《中华人民共和国建筑法》、《建设工程质量管理条例》及其他有关法律、行政法规,为明确双方在施工过程中的权利、义务和责任,遵循平等、自愿、公平和诚实信用的原则,经双方友好协商,签订本合同。 第一条合同内容与承包方式 一、工程名称:基坑土方开挖 二、工程地点: 三、工程范围:万方综合体范围内的土石方工程。具体施工范围以甲方提供的施工图(总平面图、桩基施工图、基础图纸)、设计文件、设计说明及施工过程中下发的设计变更、图纸会审记录等文件资料为准。工程施工过程中,根据工程建设需要,甲方有权视乙方的工程质量、进度、安全等情况对乙方承包范围内的工程量进行调整。 四、工作内容: 1、工程范围内的清理,包括林木砍伐、树桩基挖除及灌木、杂草、农作物、垃圾清理等内容,所有清表垃圾均需外运弃置。 2、场内土石方平衡:挖方区土石方的挖、装、运、平整、修边坡及基底(平台按设计要求标高或缓坡要求完成),含土石方中障碍物清除。边坡及缓坡造型按设计要求及相关规范要求完成。 3、基坑/地下室土石方开挖、装运。 4、原有建筑物基础破碎、清理、外运。 5、淤泥、流沙的开挖、清运。 6、多余土石方外运。 7、零星土石方工程(如甲方要求乙方配合完成的道路、场地平整等)。 8、为可能需要配合的零星工程提供机械设备台班。 五、承包方式:

1、本工程采用单价包干的形式,在承包范围内以包工包料、包机械、包工期、包质量、包安全文明施工、包协调各类外部关系、包验收合格、包市场风险、包税金、包利润、管理费、检测费用的形式由乙方承包。 2、如本工程需办理外运弃置土方等手续的,则由乙方办理相关的手续并承担相关费用。 第二条工期要求 一、开工日期:暂定年月日进场施工,具体开工日期以甲方下发的开工令为准。 二、合同总工期:日历天。乙方需在总工期期限内完成合同约定的所有工作,并完成所有设备离场工作。本工程的所有工期均指日历天数,包括所有法定假期、休息日在内。 三、甲方可以根据现场的施工条件,合理安排本合同工程项目进行分段施工,乙方需无条件的按甲方现场管理代表下发的分段施工指令组织施工。 四、因甲方原因或不可抗力原因导致工期延误的,经甲方确认后,相应工期予以顺延。 第三条施工技术要求 一、按国家、地方颁布的现行最新的施工验收规范和有关法律、法规要求和设计要求组织施工。 二、施工技术要求详见本合同附件。 第四条验收标准 一、本工程的施工及验收应严格按国家和省、市相关设计及施工验收标准、规范及规程执行,要求工程质量合格; 二、施工质量验收按国家《土石方工程施工技术要求》执行。 第五条合同价 一、合同暂定总价:。(含税) 二、计价方式:单价元/方(大写:壹拾叁圆伍角每立方米),按乙方实际挖掘土方测量后计算的工程量,乘以土方单价,据实结算。 三、以上包干单价所包含工作内容: 包括但不限于材料费、人工费、机械费、各种材料损耗、机械进退场费、定位测量放线、管线处理费、垃圾及植被等的开挖及清运、土石方中障碍物清除、场地平整、土石方清运、渣土排放增加费、淤泥流沙开挖清运处理费、施工场地抽地表水费用(含技术处理费,基坑土石方开挖的降水排水费除外)、

_建筑工程计量与计价(上)

第二篇建筑工程计量与计价 第一章土石方工程 总说明 一、适用范围 适用于建筑、安装、市政、园林绿化工程中的土石方工程。 二、本定额人工均按普工计算,每工日42元。其定额含量及单价不得变更。 三、本定额机械按正常合理配置综合取定,实际采用机械不同时,不允许换算。 四、本定额为满足环保要求,配置了洒水车现场降尘作业。若实际未发生时,应扣除洒水车和水的费用。 五、关于沟槽、基坑、土方的划分 建筑、安装、园林(市政)工程工程特征区分表 项目名称底长∶底宽底宽底面积(长×宽) 人工挖沟槽>3 ≤3m(7m) 人工挖基坑≤3 ≤20m2(150m2) 人工挖土方(一)>3 >3m 人工挖土方(二)≤3 >20m2 注:以上挖土深度均大于0.3m,括号内数字为市政工程 六、土石分类表 1、土壤按名称与挖掘难度划分为4类 一、二类土(普通土):砂质粘土、腐质土、种植土、泥炭土、杂堆土、潮湿粘土或黄土、盐碱土 三类土(坚土):中等密实粘土或黄土、含碎石类粘土或黄土 四类土(砂砾坚土):坚硬粘土或黄土、含大量大块碎石砾石粘土或黄土 2、岩石按定性、风化特征、强度划分为5类 极软岩、软岩、较软岩、较坚硬岩、坚硬岩 (原普氏分类法划分为松石、次坚石、普坚石、特坚石) 第一节土方工程 一、土方工程基本知识 (一)土的性质 1.天然含水量ω 土的天然含水量表示土的干湿程度,是指天然状态下,土中水的重量与土颗粒重量之比。土的含水量越大,土越潮湿,对施工越不利。 2.可松性与土方体积折算 ⑴可松性:土体经开挖后,组织被破坏,体积增加,即使夯实也无法恢复其原来体积的性质,称为土的可松性,用可松性系数表示。 ⑵可松性系数:开挖后松散状态下的体积称为虚方体积,回填后未经夯实的体积,称为松填体积。各种状态土方体积与天然状态体积之比,叫做土的可松性系数。 根据可松性系数,各种状态土的体积可按定额规定进行折算。

CASS计算土方量的方法(断面法、三角网法、方格网法、两期计算法)

CASS计算土方量的方法(断面法、三角网法、方格网法、两期计算法) 我们在日常的测量工作中,经常都需要计算一些土方量,而计算两期土方是CASS 的特色之一,特别是区域土方平衡施工过程中,或测量了两次结果之后,它能一次性为我们计算出同一区域的填挖方土方量,很是方便。为了使大家深入了解CASS6.1计算两期土方的方法,提出此问题与大家一起讨论学习。 一般来说,下面三种方法均可以计算两期土方: 1、两断面线间土方计算 2、DTM法两期土方计算 3、方格网土方计算(测量推荐) 三角网法、方格网法是常用的方法,断面法是提供给甲方的方量依据,一般三种方法的计算差距不会超过2%---5% 。 三角网法计算方量:点击等高线,选建立DTM或图面DTM完善 点击建立DTM后会显示:

选由图面高程点生成,确定。 此时要注意左下角显示的文字,点击回车键即可。把区域的边界线选中后,就会自动形成三角网,如图所示:

三角网形成后,再点击工程运用中的DTM法计算土方量,选中根据图上三角网,如图所示: 选中后就会显示下图:

注意左下角的提示:输入平场高度(就是设计深度,一般情况要加上超深0.5m)后回车,方量就会在左下角有显示。方量计算完成。 方格网法计算方量:方格网法计算方量首先要采点,点击工程运用鼠标向下,选指定点生成数据文件,如图所示:

然后就会自动跳出一个窗口,如图所示: 先把文件放在自己能够找的道的文件里,如桌面,起好名字,保存即可。 窗口自动关闭后,左下角就会显示指定点:,此时,只要把鼠标放在高程点上左击后,会显示地物代码,代码就是点的行政代码,如边界线就写B,房子就写F,现在采点直接回车即可。回车后,又会显示高程(0.00),这是后,就需要输入你所用鼠标点击的高程点。水深要有负号,当然,正的水深就不需要加号了,直接输入就好。 最后会显示的是输入点号(1),这一步,只要直接回车就可以了。就这样把工作区域的点全部踩完。 重新打开CASS成图软件,点击绘图处理的站高程点如下图: 就会弹出一个窗口,如下图:

标准版土方工程承包合同

标准版土方工程承包合同 标准版土方工程承包合同1 发包方: ___________________________________________(以下简称甲方) 承包方: ___________________________________________(以下简称乙方) 根据《中华人民共和国合同法》、《建筑法》和相关法律法规等规定,为明确双方在工程承包中的权利、义务和责任,确保工程任务的全面完成,在自愿、平等、互利的原则下,经甲乙双方协商同意签订本合同。 第一条工程概况 (一) 工程名称:_华能蒋公岭风电场(48MW)新建工程__ (二) 工程地点:_九江市都昌县多宝乡________ _ _ (三) 工程范围:就华能蒋公岭风电场风机基础及升压站土石方开挖、钢筋的加工、混凝土浇筑、基础环吊装等。 第二条工程价款 (一)合同价款:本合同采用单价包干决算,即乙方完成合同约定承包范围内全部工程内容所需要的人工费、材料费、机械费

(含机械设备等的进、出场费)、管理费、保险费、利润、税金、环卫出渣费以及倒土费、工程周边社会关系协调等全部费用组成,此单价为固定价格,不随施工时间、施工次数、施工分层分段、所遇到土石方的类别、施工深度、施工天气、道路状况等任何因素而改变。其单价为:本合同混凝土浇筑为60元/M3;土石方开挖为18元/M3 ;钢筋加工750元/吨3;基础环安装为11500 元/台。其它若甲方需要向乙方临时租用机械设备,按市场价计算租金,机械设备台班以甲方指定人员签证为准。 第三条工程质量及技术要求 本工程严格按照国家现行《建筑工程质量检验及评定标准》、《建筑地基与基础工程施工质量验收规范》、《建设工程安全生产管理条例》、等进行施工和验收。同时,本合同约定: 1、乙方根据甲方提供的图纸资料及技术文件进行施工,工程验收时,严格按照图纸和验收标准、规范执行。 2、进场施工前,必须提前5天向甲方分别提交:土石方调配及外运施工方案、护坡方案、安全文明施工方案及质量保证措施和适当安排抢工、缓工、暂停工等施工工期保证措施。 3、按照施工要求施工,废渣及时清运,禁止填埋建筑碎块和垃圾。 第四条工程价款结算

工程土方开挖合同范本【精编版】

工程土方开挖合同范本 发包方: (以下简称甲方) 承包方: (以下简称乙方) 遵循平等、自愿、诚实守信的原则,经甲、乙双方充分协商,就呼家圪台住宅小区建设项目基础土方开挖工程由乙方包工完成,为了双方的合法权益,特订立本合同,由双方共同遵守执行。 一、工程内容及承包范围: 呼家圪台住宅小区1#、2#、3#、5#、6#、8#住宅楼及地下车库基础土方开挖工程,甲方提供大型挖掘机、乙方提供运输车辆等机械,按甲方要求包工按时完成基坑土方开挖及外运,包括挖土、装土、运土、卸土、平整及修理边坡等。所开挖的土方量自行安排场外空地储存堆放。施工中负责施工场地内外道路清理、打扫、洒水等工作。如有违章罚款,一切均由乙方承担。在土方开挖期间,所有土方外运车辆驾驶员严禁喝酒、疲劳驾驶等。若因此发生交通事故均与项目部无关,因事故造成停工或延误工期对项目部造成的经济损失,将在工程款中扣除。

二、工程技术质量要求及工期: 乙方进场后,要服从甲方管理人员的现场指挥,遵守“安全生产、文明施工”条例。作业时,严格按照本工程基坑开挖方案施工。 必须指派专人指挥,采取“分层分段、对称开挖”,并严格遵循“分层开挖、严禁超挖”及大基坑小开挖的原则。当挖至标高接近基础底板标高时,严格按甲方施工人员的抄平位置,由甲方派挖机派人进行人工清槽,乙方给予配合,防止超挖,并按围护结构要求及时修整边坡及放坡,开挖时间:自20xx年月日开挖日起,内完工。 三、安全生产、文明施工: 1、甲方对乙方承包土方开挖工程项目做到安全交底,提出明确的安全要求,乙方必须贯彻执行甲方的要求及有关安全施工的规章制度,严格遵守安全操作规程,作业时挖掘机前方及旋转半径内严禁站人,同时应注意基坑土方坍塌,确保施工安全。 2、乙方人员、机械进场首先要服从项目部管理人员指