包装新线安全防护要求

Safety Commissioning

Tool

工厂GF:

机器/设备Machinery/Equipment

日期Date:

审核员Auditor:

是Yes否No

1.1.

叉车装卸点

FLT Loading/Un-

loading point

采取适当的保护措施,防止叉车对输送带造成损坏

(使用金属材质的垂直挡板或在地面上设置叉车轮

阻) Proper

protection preventing damages at conveyor from FLT

(metal vertical plate or floor plate with FLT wheel

stops)

启动前完成

In place before start up

1.2.

设置超声波传感器,当叉车或行人靠近时,停止输送

带运行(光电对射也可)。

Ultrasonic sensor to stop the conveyor when FLT

approaches or pedestrians approach (opposite-type

light barrier might be applied)

启动前完成

In place before start up

符合Yes/No不适用

N/A

备注

Remarks 百威英博标准Description

2.2

2.3 2.4

2.5

2.6

2.7

2.8 2.9 2.10

4.2

4.3 4,4

4.5

4.6

4.7

10.3

10.4 10.5 10.6 10.7 10.8 10.9

10.10

10.11 10.12 10.13 10.14

10.15

10.16 10.17 10.18 10.19

10.2

10.21

10.22 10.23 10.24 10.25

10.26

10.27 10.28 10.29

10.30 10.31

10.32

10.33 10.34